CN201901832U - Simulated ice floor for ice skating rink - Google Patents

Simulated ice floor for ice skating rink Download PDF

Info

Publication number
CN201901832U
CN201901832U CN2010201421768U CN201020142176U CN201901832U CN 201901832 U CN201901832 U CN 201901832U CN 2010201421768 U CN2010201421768 U CN 2010201421768U CN 201020142176 U CN201020142176 U CN 201020142176U CN 201901832 U CN201901832 U CN 201901832U
Authority
CN
China
Prior art keywords
ice
layer
skating rink
emulation
emulation ice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201421768U
Other languages
Chinese (zh)
Inventor
袁桂平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN CHUSHENG INDUSTRIAL CONSTRUCTION DECORATION Co Ltd
Original Assignee
TIANJIN CHUSHENG INDUSTRIAL CONSTRUCTION DECORATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN CHUSHENG INDUSTRIAL CONSTRUCTION DECORATION Co Ltd filed Critical TIANJIN CHUSHENG INDUSTRIAL CONSTRUCTION DECORATION Co Ltd
Priority to CN2010201421768U priority Critical patent/CN201901832U/en
Application granted granted Critical
Publication of CN201901832U publication Critical patent/CN201901832U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a simulated ice floor for an ice skating rink, which is arranged above the ground of a foundation layer in an enclosure of the ice skating rink. The simulated ice floor for the ice skating rink has three layers which are a bottom layer, a simulated ice layer and a self-lubricating simulated ice surface layer from top to bottom, wherein the dimensions of the bottom layer, the simulated ice layer and the self-lubricating simulated ice surface layer are adapted to the area of the ice skating rink. The simulated ice floor needs low production cost, is convenient to construct and maintain, has strong adaptability, and is attractive and durable.

Description

Skating rink emulation ice terrace
Technical field
The present invention relates to the skating rink field, particularly relate to a kind of skating rink emulation ice terrace.
Background technology
As everyone knows, the high-level team of ice-sports mainly concentrates on high altitude localities such as the U.S., Canada, Switzerland, Russia, and reason is that they have advantageous natural conditions, the training and the match of convenient various ice-sports.And most of country has also had a strong impact on popular enthusiasm to this type games simultaneously because the high chiller plant and the operating cost of great number have limited popularizing of ice-sports.The appearance of emulation ice product has thoroughly changed present market situation, makes that not having the refrigeration ice-sports becomes possibility.
Existing in the market emulation ice product has: the U.S. super ice international corporation (SuperIceInternational Corp.) produces (U.S. Patent number US6139438, US5837343); Artificial lawn of Mitsubishi resin A Siteluo (Astro) company and Spain and (the Artificial Grass of beautification of landscape company; Landscaping inc.) development and production (international patent application no PCT/ES/2005/000685), and " skating rink novel floor " (patent No. ZL200620091325.6) of the development of DaLian, China Xiao Zhong deep pool etc.
Utilize synthetic materials to carry out heating cure, the processing of roasting mould earlier but above-mentioned existing products all belongs to, make the sheet material or the bulk of certain specification, adopt special bonding or splicing then, using on-site consolidation to form.It is lubricated to need to beat lubricant agent special before the use, so that reach the effect that the ice face slides.But there is following defective in these type of existing procucts:
1, because emulation ice ice face is to be spliced by bulk, vestige will inevitably occur splicing, and assembling system will inevitably produce assembling deviation, the variation of ambient temperature also can make piece produce either large or small distortion; The planeness deviation is bigger, and the deviation that construction can be accomplished is generally ± and 5%, along with the increase of service life, the deviation that is produced can strengthen year by year simultaneously;
2, construction environment is had relatively high expectations, the face that lays needs very smooth, and erection procedure is comparatively complicated, needs the professional and technical personnel to install simultaneously and the adjustment of special equipment;
3, use preceding the need with the professional equipment polishing, and with lubricator carry out surface lubrication and handle, the promptness of use is relatively poor;
4, need regularly to use specialized apparatus to safeguard, maintain, certain difficulty of construction is arranged, and maintenance period is short, generally weekly 1-2 time; Effectively useful life is shorter, and thickness was generally two-sided 10 years at the sheet material of 30mm;
5, initial investment and later maintenance expense are all higher.
Summary of the invention
The object of the invention provide a kind of cost low, be convenient to construct and maintenance, strong, the attractive and durable skating rink emulation ice terrace of compliance.
The purpose of this utility model is achieved through the following technical solutions:
A kind of skating rink emulation ice terrace, it is arranged on the basal layer ground, in the skating rink enclosing, described skating rink emulation ice terrace is a three layer construction, be followed successively by bottom, emulation ice sheet and self-lubricating emulation ice surface layer from bottom to up, described bottom, emulation ice sheet and the size of self-lubricating emulation ice surface layer and the area of skating rink adapt.
Described bottom is a synthetic resin layer, and described emulation ice sheet is water white modified aqueous epoxy resin layer, and described emulation ice surface layer is the synthetic water-based self-lubricating material layer of nanometer.
Preferably, the thickness of described bottom is 0.3mm-3mm, and the thickness of described emulation ice sheet is 15mm-35mm, and the thickness of described self-lubricating emulation ice surface layer is 0.5mm-1.0mm.
More preferably, the thickness of described bottom is 1.0mm, and the thickness of described emulation ice sheet is 20mm, and the thickness of described self-lubricating emulation ice surface layer is 0.6mm.
In addition, between described skating rink emulation ice terrace and skating rink enclosing, be provided with elastic adhesive tape.The top of described elastic adhesive tape is concordant with self-lubricating emulation ice surface layer, and the bottom is preferably lower than bottom.Preferably, the width of described elastic adhesive tape is 5mm, and its underpart is lower than bottom 15mm.
Emulation ice terrace of the present utility model has solved the defective of like product in the past, and like product is compared with it, has following advantage:
1, emulation ice terrace basal layer ground is provided with three layers, every layer is all adopted liquid castable from the levelling technology, realized seamless-molding, even several thousand square meter places are also without any the splicing vestige, thoroughly solved the big problem of existing procucts planeness deviation, make planeness remain on ± 0.05%;
(1) 2, construction is simple.The constructor does not need professional training just can easily finish.Whole construction course does not need special equipment, and quick solidifying, duration weak point have stronger compliance simultaneously, no matter be under indoor and outdoor, upstairs house, can both finish construction under the situation that does not change agent structure, construction area to several thousand square meters, can both reach same quality specifications from several square meters; The construction finished product thickness can be grasped flexibly according to actual conditions, arbitrarily adjusts;
3, cast-type self-lubricating emulation ice surface layer adopts the synthetic water-based self-lubricating material of nanometer, realized that unlubricated dose is lubricated, guarantee in the operating period, not make with lubricator, also can keep uniform low-friction coefficient, the coefficient of sliding friction<0.03 of emulation ice surface layer and skates (true ice is 0.03 with the coefficient of sliding friction of skates) has reached the slide effect the same with true ice during slip.
4, be easy to safeguard.The maintenance phase of the present utility model be per 3 months once, do not need special service equipment; Spendable effective age was greater than 20 years;
5, initial investment and maintenance cost are lower, with 1000m 2The ice stadium be that example compares:
Unit: ten thousand yuan
Project Water system is really iced Similar emulation ice product * Novel simulated ice terrace
The initial investment expense 2500 ?410 250
The later maintenance expense 65 ?50 30
* annotate: the data source U.S. The product introduction of agency.
Description of drawings
Fig. 1 is the perspective view of skating rink emulation ice terrace of the present utility model.
The specific embodiment
Describe below in conjunction with the concrete structure of accompanying drawing skating rink emulation ice terrace of the present utility model.
As shown in Figure 1, skating rink emulation of the present utility model ice terrace be arranged on the basal layer ground, in the skating rink enclosing 3.Described skating rink emulation ice terrace comprises: upwards pour into a mould the bottom 4, emulation ice sheet 2 and the self-lubricating emulation ice surface layer 1 that form successively from basal layer ground 6.The size of bottom 4, emulation ice sheet 2 and self-lubricating emulation ice surface layer 1 adapts with the area of skating rink, bottom 4 be used to bond basal layer ground 6 and emulation ice sheet 2.
The thickness of bottom 4 is preferably 1.0mm for being generally 0.3mm-3mm; The thickness of emulation ice sheet 2 is generally 15mm-35mm, is preferably 20mm; The thickness of self-lubricating emulation ice surface layer 1 is generally 0.5mm-1.0mm, is preferably 0.6mm.
In addition, also be provided with elastic adhesive tape between skating rink emulation ice terrace and skating rink enclosing, its objective is under the situation of temperature acute variation, compensation is because of the flexible crack that causes, ground.The top of elastic adhesive tape 5 is concordant with self-lubricating emulation ice surface layer 1, and the bottom is preferably lower than bottom 4.Preferably, the width of elastic adhesive tape is 5mm, and its underpart is lower than bottom 15mm.
The material of bottom is a synthetic resin, solidifies back pouring simulation ice sheet at bottom, and the effect of bottom is infiltration bonding basal layer ground and emulation ice sheet.Emulation ice sheet material is water white modified aqueous epoxy resin, pouring simulation ice surface layer again after it solidifies.Emulation ice surface layer adopts the synthetic water-based self-lubricating material of nanometer, can realize that unlubricated dose is lubricated, and guarantees not make with lubricator in the operating period, also can keep uniform low-friction coefficient, reaches the slide effect the same with true ice during slip.After treating that emulation ice surface layer solidifies, border around the cutting, depth of cut is loaded adhesive tape then for being lower than emulation ice terrace 15mm in the cut place.The attached space enclosing structure of constructing again after above step is finished.

Claims (7)

1. terrace is iced in a skating rink emulation, it is arranged on the basal layer ground, in the skating rink enclosing, it is characterized in that: described skating rink emulation ice terrace is a three layer construction, be followed successively by bottom, emulation ice sheet and self-lubricating emulation ice surface layer from bottom to up, described bottom, emulation ice sheet and the size of self-lubricating emulation ice surface layer and the area of skating rink adapt.
2. skating rink emulation ice terrace according to claim 1, it is characterized in that: described bottom is a synthetic resin layer, described emulation ice sheet is water white modified aqueous epoxy resin layer, and described emulation ice surface layer is the synthetic water-based self-lubricating material layer of nanometer.
3. skating rink emulation ice terrace according to claim 1 and 2, it is characterized in that: the thickness of described bottom is 0.3mm-3mm, and the thickness of described emulation ice sheet is 15mm-35mm, and the thickness of described self-lubricating emulation ice surface layer is 0.5mm-1.0mm.
4. skating rink emulation ice terrace according to claim 3, it is characterized in that: the thickness of described bottom is 1.0mm, and the thickness of described emulation ice sheet is 20mm, and the thickness of described self-lubricating emulation ice surface layer is 0.6mm.
5. skating rink emulation ice terrace according to claim 1 is characterized in that: be provided with elastic adhesive tape between described skating rink emulation ice terrace and skating rink enclosing.
6. skating rink emulation ice terrace according to claim 5 is characterized in that: the top of described elastic adhesive tape is concordant with described self-lubricating emulation ice surface layer, and the bottom is lower than described bottom.
7. skating rink emulation ice terrace according to claim 6, it is characterized in that: the width of described elastic adhesive tape is 5mm, its underpart is lower than described bottom 15mm.
CN2010201421768U 2010-03-26 2010-03-26 Simulated ice floor for ice skating rink Expired - Fee Related CN201901832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201421768U CN201901832U (en) 2010-03-26 2010-03-26 Simulated ice floor for ice skating rink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201421768U CN201901832U (en) 2010-03-26 2010-03-26 Simulated ice floor for ice skating rink

Publications (1)

Publication Number Publication Date
CN201901832U true CN201901832U (en) 2011-07-20

Family

ID=44272434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201421768U Expired - Fee Related CN201901832U (en) 2010-03-26 2010-03-26 Simulated ice floor for ice skating rink

Country Status (1)

Country Link
CN (1) CN201901832U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328726A (en) * 2014-11-05 2015-02-04 南通四建集团有限公司 Construction method of structural layer of skating rink of speed skating museum
CN105525547A (en) * 2016-01-29 2016-04-27 中国人民解放军军事交通学院 Simulation ice surface road used for vehicle driver training
CN109865278A (en) * 2019-01-31 2019-06-11 泰山体育产业集团有限公司 A kind of anti-sideslip hydrodynamic lubrication emulation slab
CN111454563A (en) * 2020-04-29 2020-07-28 一起划冰雪体育发展(福建)有限公司 Normal-temperature ice and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328726A (en) * 2014-11-05 2015-02-04 南通四建集团有限公司 Construction method of structural layer of skating rink of speed skating museum
CN105525547A (en) * 2016-01-29 2016-04-27 中国人民解放军军事交通学院 Simulation ice surface road used for vehicle driver training
CN109865278A (en) * 2019-01-31 2019-06-11 泰山体育产业集团有限公司 A kind of anti-sideslip hydrodynamic lubrication emulation slab
CN111454563A (en) * 2020-04-29 2020-07-28 一起划冰雪体育发展(福建)有限公司 Normal-temperature ice and preparation method thereof

Similar Documents

Publication Publication Date Title
CN201901832U (en) Simulated ice floor for ice skating rink
CN205134138U (en) Four seasons skiing shakedown
CN206163072U (en) Height -adjustable's information service activity show screen
CN205182148U (en) Simulation skiing machine
CN206380361U (en) A kind of pullable wall green device
CN203923852U (en) A kind of green special man lawn
CN203088395U (en) Mirror suitable for being used in makeup
CN205755836U (en) A kind of flower pot with automatic watering function frame
CN205598567U (en) Badminton teaching rack
CN103592814A (en) Water curtain displaying and playing system
CN207295379U (en) A kind of automation filling device of the polypropylene dedicated chinampa of indoor decoration
CN207054177U (en) A kind of municipal administration is repaired facility with afforestation vegetation
CN202844525U (en) Magnetic suspension skating shoes and skating rink
CN204428757U (en) A kind of ice hockey training airplane
CN201880292U (en) Device for picking ping-pong balls
CN206274850U (en) Environmentally friendly vertical greening decorative wall
CN204970200U (en) Multipurpose shoe rack
CN206276012U (en) A kind of skiing part for dry skiing
CN205604010U (en) Durable type artificial turf
CN204616635U (en) Moisturizing nursery pond
CN213369081U (en) Supporting device for hypsizigus marmoreus planting
CN107185197A (en) A kind of curling stone used on level land
Green et al. Summer deficit irrigation of bermudagrass
CN201470045U (en) Novel plastic skating grass
CN105970768A (en) Compound skiing units for mock skiing and installation method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110720