CN201900249U - Busbar cast welding device for lead-acid storage battery - Google Patents

Busbar cast welding device for lead-acid storage battery Download PDF

Info

Publication number
CN201900249U
CN201900249U CN2010206609487U CN201020660948U CN201900249U CN 201900249 U CN201900249 U CN 201900249U CN 2010206609487 U CN2010206609487 U CN 2010206609487U CN 201020660948 U CN201020660948 U CN 201020660948U CN 201900249 U CN201900249 U CN 201900249U
Authority
CN
China
Prior art keywords
station
welding device
frame
demoulding
lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206609487U
Other languages
Chinese (zh)
Inventor
魏明乐
魏宜强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010206609487U priority Critical patent/CN201900249U/en
Application granted granted Critical
Publication of CN201900249U publication Critical patent/CN201900249U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

一种铅酸蓄电池的汇流板铸焊装置,它包括铅熔炉、脱模入盒机及工件传送机,所述工件传送机是一旋转传送机,其转盘上均布有四个安装有带冷却夹套的汇流板铸焊模具的升降架,围绕转盘设有四个工位,所述铅熔炉位于第一工位上,脱模入盒机则位于第四工位上。本实用新型装置整体结构紧凑、合理,工件传送采用3600旋转机四工位操作,其中第二、三工位为空位,作为汇流排铸焊后的冷却区间;同时巧妙地设计了旋转机升降架上模具夹套的冷却水给水装置,从而使铸焊后的汇流排在模具中实现高效的冷却水冷却,改变了传统的高能耗、庞杂设备的风冷模式,大大缩短了冷却时间,减少了周转模具,提高了生产效率,降低了生产成本。

A manifold casting and welding device for a lead-acid battery, which includes a lead melting furnace, a demoulding machine and a workpiece conveyor. The elevating frame of the manifold casting and welding mold of the jacket is provided with four stations around the turntable, the lead melting furnace is located at the first station, and the demoulding machine is located at the fourth station. The overall structure of the device of the utility model is compact and reasonable, and the workpiece transmission adopts the four-station operation of the 3600 rotary machine, in which the second and third stations are vacant positions, which are used as the cooling section after the bus bar is cast and welded; at the same time, the rotary machine is cleverly designed to lift The cooling water supply device of the mold jacket on the frame enables the bus bar after casting and welding to realize efficient cooling water cooling in the mold, which changes the traditional air cooling mode of high energy consumption and complicated equipment, greatly shortens the cooling time and reduces the The turnover mold is improved, the production efficiency is improved, and the production cost is reduced.

Description

铅酸蓄电池的汇流板铸焊装置Manifold casting and welding device for lead-acid battery

技术领域technical field

本实用新型涉及连接电池金属极板的汇流板的铸焊装置。 The utility model relates to a casting and welding device for a confluence plate connected with a metal pole plate of a battery.

背景技术Background technique

铅酸蓄电池中通常具有由若干正极板和若干负极板组成的极群,极群中的正极板极耳和负极板极耳分别通过汇流板相连接,然后导接正负接线柱。在铅酸蓄电池制造中,对极板与汇流板进行连接的传统方法是手工烧焊,此法费工费时,工效低,质量不可靠,且操作环境污染大,严重损害人体健康。为此,有的企业研制了极板与汇流板的专用铸焊装置。例如:专利号为CN200720149023.4的“小密铸焊机”,它包括通过皮带依次连接的整形机、削耳机、熔铅炉、冷却机和脱模入盒机。又如专利号为CN200720147929.2的“中密铸焊机”,它包含有整形装置、削耳装置、铸焊装置、脱模装置和铸焊盒,重点在于设有一四方位铸焊托架,该铸焊托架下端通过一转轴连接于驱动旋转装置上,上端设置有若干铸焊盒,该整形装置、削耳装置、铸焊装置、脱模装置依次位于铸焊托架延伸的四个方位上,该铸焊旋转托架连接铸焊盒逐一经过上述整形装置、削耳装置、铸焊装置、脱模装置的整形、削耳、铸焊、脱模等工序,完成整个过程。上述专利都实现了极板与汇流板铸焊机械化或半机械化,有效地解决了原手工烧焊劳动强度大、工作效率低和环境污染大的问题。但是,两者都还存在有待进一步提高工作效率、降低能耗和生产成本的问题,例如:前者存在风冷速度慢、能耗高,需要周转模具多,生产成本高等问题;后者则存在铸焊到脱模仅走一个工位即只转动90 0 ,因而冷却时间不足,需在脱模工位上等待冷却而影响工作效率和产量。                              A lead-acid battery usually has an electrode group consisting of several positive plates and several negative plates. The positive plate lugs and the negative plate lugs in the electrode group are respectively connected through a manifold, and then connected to the positive and negative terminals. In the manufacture of lead-acid batteries, the traditional method of connecting the pole plate and the manifold is manual welding. This method is labor-intensive, low in efficiency, unreliable in quality, and pollutes the operating environment and seriously damages human health. For this reason, some enterprises have developed a special casting and welding device for the pole plate and the manifold. For example: the patent No. is CN200720149023.4's "small dense casting and welding machine", which includes a shaping machine, earphone cutting, lead melting furnace, cooling machine and demoulding and boxing machine connected in sequence by a belt. Another example is the "medium-density casting and welding machine" whose patent number is CN200720147929.2. It includes a shaping device, an ear cutting device, a casting and welding device, a demoulding device and a casting and welding box. The focus is to have a four-position casting and welding bracket The lower end of the cast-welding bracket is connected to the driving rotation device through a rotating shaft, and several casting-welding boxes are arranged at the upper end. Azimuthally, the cast-welding rotary bracket is connected to the cast-weld box through the above-mentioned shaping device, ear-cutting device, casting-welding device, demoulding device, etc., to complete the whole process. The above-mentioned patents all realize the mechanization or semi-mechanization of casting and welding of the pole plate and the manifold, effectively solving the problems of high labor intensity, low work efficiency and large environmental pollution of the original manual welding. However, there are still problems in both of which need to further improve work efficiency, reduce energy consumption and production costs. For example, the former has problems such as slow air cooling speed, high energy consumption, many turnover molds, and high production costs; the latter has problems such as casting Welding to stripping only takes one station, that is, only rotates 90 ° , so the cooling time is insufficient, and it is necessary to wait for cooling at the stripping station, which affects work efficiency and output.

发明内容Contents of the invention

本实用新型的目的,是提供一种结构更合理、能耗低而工作效率更高、操作更稳定可靠的铅酸蓄电池汇流板铸焊装置。 The purpose of the utility model is to provide a lead-acid battery manifold casting and welding device with more reasonable structure, low energy consumption, higher working efficiency and more stable and reliable operation.

本实用新型的技术方案是:包括铅熔炉、脱模入盒机及位于铅熔炉与脱模入盒机之间的工件传送机,所述工件传送机是一旋转传送机,具有机架,机架上安装有由减速传动机构带动作间歇运动的转盘,转盘上均布有四个安装有带冷却夹套的汇流板铸焊模具的升降架,围绕转盘设有四个工位,所述铅熔炉位于第一工位上,随转盘运转至第一工位的升降架正好位于铅熔炉的铅液池上方,在铅熔炉上部与穿出转盘的工件传送机的机架中心轴上端之间连接有支臂,支臂上安装有针对其下方升降架的传动气缸,脱模入盒机则位于第四工位上,随转盘运转至第四工位的升降架正好位于脱模入盒机的上方。 The technical solution of the utility model is: comprising a lead melting furnace, a demoulding machine and a workpiece conveyor located between the lead melting furnace and the demoulding and boxing machine, the workpiece conveying machine is a rotary conveyor with a frame, a The frame is equipped with a turntable that is driven by a reduction transmission mechanism to move intermittently. There are four elevating frames equipped with manifold casting and welding molds with cooling jackets evenly distributed on the turntable. There are four stations around the turntable. The lead The melting furnace is located on the first station, and the lifting frame that moves to the first station with the turntable is just above the lead liquid pool of the lead melting furnace, and is connected between the upper part of the lead melting furnace and the upper end of the central axis of the frame of the workpiece conveyor passing through the turntable. There is a support arm, on which is installed a transmission cylinder for the lifting frame below it, and the demoulding and boxing machine is located on the fourth station, and the lifting frame that moves to the fourth station with the turntable is just located at the bottom of the demoulding and boxing machine. above.

作为优选,所述带动转盘作间歇运动的减速传动机构是由包括连接于转盘底面中心部且围绕机架中心轴的带轴承连接座,带轴承连接座下端连接的带轴承中心轴套,带轴承中心轴套通过槽轮机构、槽轮机构缺口轮中心轴、传动链和减速电机依次相连接而组成。 As a preference, the deceleration transmission mechanism that drives the turntable for intermittent motion is composed of a connecting seat with bearings connected to the center of the bottom surface of the turntable and surrounding the central axis of the frame, a central bushing with bearings connected to the lower end of the connecting seat with bearings, and a bearing with bearings. The central shaft sleeve is formed by being connected successively through a sheave mechanism, a center shaft of a notch wheel of the sheave mechanism, a transmission chain and a reduction motor.

作为优选,所述升降架具有连接底板,在所述连接底板上设有一对套装有弹簧的导柱,一Z形直角折板其上平板套接于导柱的弹簧上方,导柱上端以垫片、螺栓锁定,Z形直角折板的下平板上安装有设有冷却水夹套的汇流板铸焊模具,Z形直角折板上设有夹套冷却水进出通道接管。 As a preference, the lifting frame has a connecting bottom plate, on which a pair of guide posts with springs are set, a Z-shaped right-angled folding plate, the upper flat plate is sleeved on the spring of the guide post, and the upper end of the guide post is covered with a pad The lower plate of the Z-shaped right-angle folded plate is equipped with a manifold casting and welding mold with a cooling water jacket, and the Z-shaped right-angled folded plate is provided with a jacket cooling water inlet and outlet channel connection.

作为优选,所述升降架Z形直角折板的上平板上安装有与升降架传动气缸活塞杆端部的定位块相配接的配位块。 As a preference, the upper plate of the Z-shaped right-angle folding plate of the lift frame is equipped with a coordination block matched with the positioning block at the end of the piston rod of the drive cylinder of the lift frame.

作为优选,所述升降架中冷却装置的给水装置是包括安装于机架中心轴下部固定套上的凹槽形固定盘,凹槽形固定盘内设有中间隔圈将凹槽形固定盘内腔分隔成进水腔和出水腔,进水腔底部连接有进水接管、出水腔底部连接有出水接管,凹槽形固定盘上覆盖有与其相配合的双凸圈活动旋转盘,并在配合面上设有若干密封圈,双凸圈活动旋转盘与带轴承中心轴套相连接而与转盘同步转动,连接各升降架冷却装置的进水管、回水管分别穿过转盘与双凸圈活动旋转盘,接插于凹槽形固定盘的进水腔和出水腔中。 As a preference, the water supply device of the cooling device in the lifting frame includes a groove-shaped fixed plate installed on the fixed sleeve at the lower part of the central axis of the frame. The chamber is divided into a water inlet chamber and a water outlet chamber. The bottom of the water inlet chamber is connected with a water inlet pipe, and the bottom of the water outlet chamber is connected with a water outlet pipe. There are a number of sealing rings on the surface, and the movable rotating disk with double convex rings is connected with the central shaft sleeve with bearings to rotate synchronously with the rotating disk. The plate is inserted into the water inlet cavity and the water outlet cavity of the groove-shaped fixed plate.

作为优选,所述凹槽形固定盘外套有接漏盘,接漏盘下部通过导管与出水接管相连接。 Preferably, the groove-shaped fixed plate is covered with a leak plate, and the lower part of the leak plate is connected to the water outlet pipe through a conduit.

作为优选,所述脱模入盒机具有门形机架,门形机架底板的前部安装有上顶脱模气缸,上顶脱模气缸的活塞杆顶部安装有U形托板,U形托板两竖板上部内侧安装有一对水平搁条,而门形机架的两内侧则设有与极板夹具的底板相配合的夹具滑槽板,夹具滑槽板一端的机架上安装有限位挡块,门形机架的底板上安装有由气缸带动的升降台,升降台上安装有与夹具内的极群相对应的顶杆,门形机架的顶部安装有下压气缸。 As a preference, the demoulding and boxing machine has a door-shaped frame, an upper demoulding cylinder is installed on the front part of the door-shaped frame bottom plate, and a U-shaped supporting plate is installed on the top of the piston rod of the upper-top demoulding cylinder. A pair of horizontal shelves are installed on the upper inner side of the two vertical plates of the supporting plate, and a clamp chute plate matched with the bottom plate of the pole plate clamp is provided on the two inner sides of the door frame, and the frame at one end of the clamp chute plate is limited Position block, the base plate of the door-shaped frame is equipped with a lifting platform driven by a cylinder, the lifting platform is equipped with a corresponding ejector rod with the pole group in the fixture, and the top of the door-shaped frame is equipped with a downward pressure cylinder.

作为优选,所述第一工位与第四工位之间还配接有工件传送带,工件传送带侧旁依次设有极群装入夹具工作台、整形工作台、切耳刷耳工作台。 Preferably, a workpiece conveyor belt is connected between the first station and the fourth station, and beside the workpiece conveyor belt, there are successively provided an electrode group loading fixture workbench, a shaping workbench, and an ear-cutting brush ear workbench.

作为优选,工件传送带是双层工件传送带。 Preferably, the workpiece conveyor belt is a double-layer workpiece conveyor belt.

作为优选,所述第四工位上还另配接有双层工件传送带。 Preferably, a double-layer workpiece conveyor belt is additionally connected to the fourth station.

本实用新型的有益效果是:装置整体结构紧凑、合理,工件传送采用360 0 旋转机四工位操作,其中第二、三工位为空位,作为汇流排铸焊后的冷却区间;同时巧妙地设计了旋转机升降架上模具夹套的冷却水给水装置,从而使铸焊后的汇流排在模具中实现高效的冷却水冷却,改变了传统的高能耗、庞杂设备的风冷模式,大大缩短了冷却时间,提高了生产效率,降低了生产成本;另外,四工位仅需用四只固定模具,操作应用简便,且由于模具冷却效果好,不易变形而使用寿命长。 The beneficial effects of the utility model are: the overall structure of the device is compact and reasonable, and the workpiece transmission adopts the four-station operation of the 360 ° rotary machine, wherein the second and third stations are vacant, as the cooling section after the busbar is cast and welded; at the same time, it is cleverly The cooling water supply device for the mold jacket on the lifting frame of the rotating machine is designed, so that the busbar after casting and welding can be cooled efficiently by cooling water in the mold, which changes the traditional air cooling mode of high energy consumption and complicated equipment, and greatly shortens the The cooling time is shortened, the production efficiency is improved, and the production cost is reduced; in addition, only four fixed molds are needed for the four stations, which is easy to operate and apply, and because the mold has a good cooling effect, it is not easy to deform and has a long service life.

附图说明Description of drawings

图1为本装置总体流程结构示意图。 Figure 1 is a schematic diagram of the overall process flow of the device.

图2为由铅熔炉、脱模入盒机及工件传送机构成的本装置主机部分立体结构示意图。 Fig. 2 is a three-dimensional structural schematic diagram of the main part of the device composed of a lead melting furnace, a demoulding machine and a workpiece conveyor.

图3为本装置的工件传送机局部剖视立体结构示意图。 FIG. 3 is a schematic diagram of a partially cut-away three-dimensional structure of the workpiece conveyor of the device.

图4为工件传送机中带动转盘作间歇运动的减速传动机构原理图。 Fig. 4 is a schematic diagram of the deceleration transmission mechanism that drives the turntable for intermittent motion in the workpiece conveyor.

图5为减速传动机构中的槽轮机构结构示意图。 Fig. 5 is a schematic structural diagram of the sheave mechanism in the reduction transmission mechanism.

图6为工件传送机中冷却水给水装置结构示意图。 Fig. 6 is a schematic diagram of the structure of the cooling water supply device in the workpiece conveyor.

图7为工件传送机中转盘上的升降架结构示意图。 Fig. 7 is a structural schematic diagram of the lifting frame on the turntable in the workpiece conveyor.

图8为本装置中的脱模入盒机立体结构示意图。 Fig. 8 is a schematic diagram of the three-dimensional structure of the demoulding and boxing machine in this device.

图9为极群工件立体结构示意图。 Fig. 9 is a schematic diagram of the three-dimensional structure of the pole group workpiece.

图10为极群夹具工件立体结构示意图。 Fig. 10 is a schematic diagram of the three-dimensional structure of the pole group fixture workpiece.

图11为夹具中装配有极群的立体结构示意图。 Fig. 11 is a three-dimensional structural schematic view of the pole group assembled in the jig.

具体实施方式Detailed ways

下面结合附图以实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing, the utility model is further described with embodiment.

本装置的主要部分由铅熔炉1、脱模入盒机3及位于铅熔炉与脱模入盒机之间的工件传送机2组成。工件传送机2是一旋转传送机,具有机架21,机架21上安装有由减速传动机构28带动作间歇运动的转盘22,转盘22上均布有四个安装有带冷却夹套的汇流板铸焊模具230的升降架23,围绕转盘22设有四个工位,所述铅熔炉位于第一工位上,转盘22运转至第一工位的升降架23正好位于铅熔炉1的铅液池上方,在铅熔炉1上部与穿出转盘22的工件传送机2的机架中心轴24上端之间连接有支臂25,支臂25上安装有针对其下方升降架23的传动气缸26,脱模入盒机3则位于第四工位上,随转盘22运转至第四工位的升降架23正好位于脱模入盒机3的上方。 The main part of the device is made up of a lead melting furnace 1, a demoulding and boxing machine 3 and a workpiece conveyor 2 between the lead melting furnace and the demoulding and boxing machine. The workpiece conveyor 2 is a rotary conveyor with a frame 21 on which a turntable 22 driven by a reduction transmission mechanism 28 for intermittent motion is installed. The lifting frame 23 of the plate casting and welding mold 230 is provided with four stations around the turntable 22. The lead melting furnace is located on the first station, and the lifting frame 23 that the turntable 22 moves to the first station is just positioned at the lead melting furnace 1. Above the liquid pool, a support arm 25 is connected between the upper part of the lead melting furnace 1 and the upper end of the frame central axis 24 of the workpiece conveyor 2 passing through the turntable 22, and the drive cylinder 26 for the lifting frame 23 below it is installed on the support arm 25 , The demoulding box machine 3 is located on the fourth station, and the lifting frame 23 that moves to the fourth station with the turntable 22 is just above the demoulding box machine 3 .

工件传送机2中带动转盘22作间歇运动的减速传动机构28是由包括连接于转盘22底面中心部且围绕机架中心轴24的带轴承2851的连接座285,带轴承连接座285下端连接的带轴承2861的中心轴套286,带轴承中心轴套286通过槽轮机构284、槽轮机构缺口轮中心轴283、传动链282和减速电机281依次相连接而组成。其中减速电机,本实施例采用变频电机,无级变速,这样更有利于调节转盘运转速度,调控工件在每一工位上的仃留时间。上述轴承2861采用圆锥滚柱轴承。所述槽轮机构284由十字槽板2841、与十字槽板弧边相配合的缺口轮2842,缺口轮缺口部径向延伸臂端部安装的与十字槽板十字槽相配合的滚轮2843组成,十字槽板2841固定于中心轴套286上,缺口轮固定于缺口轮中心轴283上;十字槽板2841上还开设有若干冷却水导管的穿孔28411。转盘22上的升降架23具有连接底板231,在所述连接底板231上设有一对套装有弹簧232的导柱233,一Z形直角折板235其上平板套接于导柱的弹簧上方,导柱233上端以垫片、螺栓236锁定,Z形直角折板235的下平板上安装有设有冷却水夹套的汇流板铸焊模具230,Z形直角折板236上设有夹套冷却水进出通道接管234。为了使各升降架23能在传动气缸26带动下作升降活动,所述升降架Z形直角折板235的上平板上安装有与升降架传动气缸26活塞杆端部的定位块261相配接的配位块237。本升降架23中冷却装置的给水装置29,包括安装于机架中心轴下部固定套241上的凹槽形固定盘292,凹槽形固定盘292内设有中间隔圈2921将凹槽形固定盘内腔分隔成进水腔2922和出水腔2923,进水腔2922底部连接有进水接管271、出水腔2923底部连接有出水接管272,凹槽形固定盘292上覆盖有与其相配合的双凸圈活动旋转盘291,并在配合面上设有若干密封圈293,双凸圈活动旋转盘291与带轴承中心轴套286相连接而与转盘22同步转动,连接各升降架冷却装置的进水管273、回水管274分别穿过转盘22、十字槽板2841与双凸圈活动旋转盘291,接插于凹槽形固定盘的进水腔2922和出水腔2923中。为了消除可能因密封圈泄漏造成的漏水,在所述凹槽形固定盘292外套有接漏盘294,接漏盘294下部通过导管2941与出水接管272相连接。 The reduction transmission mechanism 28 that drives the turntable 22 in the workpiece conveyor 2 for intermittent motion is composed of a connecting seat 285 that is connected to the center of the bottom surface of the turntable 22 and surrounds the central axis 24 of the frame 2851, and the lower end of the belt bearing connecting seat 285 is connected. The central shaft sleeve 286 of the band bearing 2861, the central shaft sleeve 286 of the band bearing is connected successively by the sheave mechanism 284, the notch wheel center shaft 283 of the sheave mechanism, the transmission chain 282 and the reduction motor 281 and forms. Wherein the deceleration motor, the present embodiment adopts the frequency conversion motor, stepless speed change, is more conducive to adjusting the running speed of the turntable like this, regulates and regulates the stay time of the workpiece on each station. Above-mentioned bearing 2861 adopts tapered roller bearing. The sheave mechanism 284 is composed of a cross groove plate 2841, a notch wheel 2842 matched with the arc edge of the cross groove plate, and a roller 2843 installed at the end of the radially extending arm of the notch portion of the notch wheel and matched with the cross groove of the cross groove plate. The cross groove plate 2841 is fixed on the central shaft sleeve 286, and the notch wheel is fixed on the center shaft 283 of the notch wheel; the cross groove plate 2841 is also provided with a plurality of perforations 28411 for cooling water conduits. The lifting frame 23 on the turntable 22 has a connection base plate 231, on which a pair of guide posts 233 with springs 232 are set, and a Z-shaped right-angle folding plate 235 on which the flat plate is socketed above the springs of the guide posts. The upper end of the guide post 233 is locked with gaskets and bolts 236, and the manifold casting and welding mold 230 with a cooling water jacket is installed on the lower plate of the Z-shaped right-angle folding plate 235, and the Z-shaped right-angle folding plate 236 is provided with a jacket cooling The water in and out of the channel connects 234 . In order to make each lifting frame 23 move up and down under the drive of the transmission cylinder 26, the upper plate of the Z-shaped right-angle folding plate 235 of the lifting frame is equipped with a positioning block 261 matched with the end of the piston rod of the lifting frame transmission cylinder 26. Coordination block 237 . The water supply device 29 of the cooling device in this lifting frame 23 includes a groove-shaped fixed disk 292 installed on the lower fixing sleeve 241 of the central axis of the frame. The groove-shaped fixed disk 292 is provided with an intermediate spacer ring 2921 to fix the groove-shaped The disc inner chamber is divided into a water inlet chamber 2922 and a water outlet chamber 2923. The bottom of the water inlet chamber 2922 is connected with a water inlet pipe 271, and the bottom of the water outlet chamber 2923 is connected with a water outlet pipe 272. The groove-shaped fixed disk 292 is covered with double The convex ring movable rotating disk 291 is provided with several sealing rings 293 on the mating surface. The double convex ring movable rotating disk 291 is connected with the central shaft sleeve 286 with bearings and rotates synchronously with the rotating disk 22, and is connected to the cooling devices of each lifting frame. The water pipe 273 and the water return pipe 274 respectively pass through the rotating disk 22, the cross recessed plate 2841 and the movable rotating disk 291 with double convex rings, and are inserted into the water inlet chamber 2922 and the water outlet chamber 2923 of the groove-shaped fixed disk. In order to eliminate the water leakage that may be caused by the leakage of the sealing ring, the groove-shaped fixed plate 292 is covered with a leak plate 294 , and the lower part of the leak plate 294 is connected to the water outlet pipe 272 through a conduit 2941 .

本装置的脱模入盒机3具有门形机架38,门形机架底板的前部安装有上顶脱模气缸39,上顶脱模气缸39的活塞杆顶部安装有U形托板33,U形托板两竖板上部内侧安装有一对水平搁条331,而门形机架的两内侧则设有与极板夹具9的底板相配合的夹具滑槽板34,夹具滑槽板一端的机架上安装有限位挡块37,门形机架的底板上安装有由气缸带动的升降台31,升降台31上安装有与夹具内的极群相对应的顶杆32,同时门形机架的顶部安装有下压气缸35。 The demoulding machine 3 of this device has door-shaped frame 38, and the front portion of door-shaped frame bottom plate is equipped with upper top demoulding cylinder 39, and the piston rod top of upper top demoulding cylinder 39 is equipped with U-shaped supporting plate 33 A pair of horizontal shelves 331 are installed on the upper inner side of the two vertical plates of the U-shaped supporting plate, and a clamp chute plate 34 that matches the bottom plate of the pole plate clamp 9 is provided on the two inner sides of the door frame, and one end of the clamp chute plate is The limit stopper 37 is installed on the frame of the door frame, and the lifting table 31 driven by the cylinder is installed on the bottom plate of the door frame. The top of the frame is equipped with a downward pressure cylinder 35.

本装置的铅熔炉1采用常规的铅熔炉,它具有炉架11,炉架中前部设有电热铅液池13,铅液池上方设有带排气接管的排气罩14,炉架侧面还设有助焊剂槽12。 The lead melting furnace 1 of this device adopts conventional lead melting furnace, and it has a furnace frame 11, and the front part of the furnace frame is provided with an electric heating liquid lead pool 13, and an exhaust hood 14 with an exhaust connecting pipe is arranged above the furnace frame. A flux tank 12 is also provided.

为了使汇流板铸焊各项工序配合更加有序,以进一步提高生产效率,本装置在所述第一工位与第四工位之间还配接有工件传送带5,工件传送带5侧旁依次设有极群装入夹具工作台8、整形工作台7、切耳刷耳工作台6,各工作台上分别装置有夹具极群装配机、整形机、切耳刷耳机。该工件传送带5是双层工件传送带,下层将极群10装配到夹具9中经整形、切耳刷耳后的工件输送到第一工位,而第四工位上回收的空夹具9则通过工件传送带5上层输送到极群装入夹具工作台8。第四工位上还另配接有双层工件传送带4,以将装好极群的蓄电池盒通过工件传送带4上层输送到下一工序,并从下层接收空蓄电池盒。 In order to make the various processes of manifold casting and welding more orderly and to further improve production efficiency, this device is also equipped with a workpiece conveyor belt 5 between the first station and the fourth station, and the sides of the workpiece conveyor belt 5 are sequentially There are a pole group loading fixture workbench 8, a shaping workbench 7, and an ear-cutting and brushing workbench 6, each of which is equipped with a jig and pole-group assembly machine, a shaping machine, and an ear-cutting and brushing earphone. The workpiece conveyor belt 5 is a double-layer workpiece conveyor belt. The lower layer assembles the pole group 10 into the fixture 9 and transports the workpiece after being shaped, ear-cut and brushed to the first station, and the empty fixture 9 recovered on the fourth station is passed through. The upper layer of the workpiece conveyor belt 5 is delivered to the pole group and loaded into the fixture workbench 8. The fourth station is also equipped with a double-layer workpiece conveyor belt 4, so that the battery box with the pole group is transported to the next process through the upper layer of the workpiece conveyor belt 4, and the empty battery box is received from the lower floor.

本装置的工作过程是:全套设备由电脑PLC控制,当铅熔炉温度显示设定温度时,启动各设备,开始工作流程,首先第8工作台的工人将预先整理好的由设有负极凸耳1011的负极板101、包套有绝缘套1022并设有正极凸耳1021的正极板102依次叠合而成的极群10装配到夹具9中,并放到工件传送带5下层输送到整形工作台7,对夹具中的极群进行整形,随后传送到切耳刷耳工作台6,对整形后的极群极耳进行削平打磨,然后随传送带5传送到第一工位;与此同时第一工位上,工件传送机支臂上的传动气缸26下压,推动其下方升降架上的模具230浸入铅熔炉的铅液池13中,尔后传动气缸26带动升降架上升复位,此时模具230槽腔中已灌满铅液,操作人员用刮板刮去模具表面上的铅液,再从传送带5上取下夹具,对夹具中的极群极耳涂刷助焊剂,然后使夹具的定位销91对准模具定位销孔2301插入,即执行汇流排铸焊;然后随着工件传送机转盘22的间歇转动,经汇流排铸焊后的工件通过第二、三工位空位区间的冷却,到达第四工位脱模入盒机3的托板33上方,在设定的程控PLC控制下,托板33上升,使夹具底板两侧搁置于托板的一对水平搁条331上,此时托板继续上升,从而使夹具与升降架上的模具脱离,当托板33继续上升至其水平搁条331与机架两内侧的夹具滑槽板34相平齐时,操作人员将夹具底板拉入夹具滑槽板34的滑槽中,随后将蓄电池盒体倒置在夹具底板的极群槽孔上方,此时机架顶部下压气缸35下压支住蓄电池壳体,同时升降台31上升,升降台上安装的顶杆32即将夹具中的极群顶入蓄电池盒体中,尔后下压气缸35和升降台31复位,操作人员将装配好极群的蓄电池盒体取送到工件传送带4上层输送去下一工序,另将空夹具从夹具滑槽板34退出,放置到工件传送带5的上层带上输送到工作台8重复使用。 The working process of this device is: the whole set of equipment is controlled by computer PLC. When the temperature of the lead melting furnace shows the set temperature, start all the equipment and start the working process. Negative electrode plate 101 of 1011, positive electrode plate 102 covered with insulating sleeve 1022 and provided with positive electrode lug 1021 are sequentially stacked, and the electrode group 10 formed by sequentially stacking is assembled in the fixture 9, and placed on the lower layer of the workpiece conveyor belt 5 to be transported to the shaping workbench 7. Reshape the pole group in the jig, and then transfer it to the ear cutting and brushing workbench 6, flatten and polish the shaped pole group ear, and then transfer it to the first station along with the conveyor belt 5; at the same time, the first On the station, the transmission cylinder 26 on the support arm of the workpiece conveyor presses down, pushing the mold 230 on the lifting frame below it to immerse in the lead liquid pool 13 of the lead melting furnace, and then the transmission cylinder 26 drives the lifting frame to rise and reset. At this time, the mold 230 The cavity has been filled with liquid lead, and the operator scrapes off the liquid lead on the surface of the mold with a scraper, and then removes the jig from the conveyor belt 5, brushes flux on the pole group lugs in the jig, and then makes the positioning of the jig The pin 91 is aligned with the positioning pin hole 2301 of the mold and inserted, that is, the bus bar is cast and welded; then with the intermittent rotation of the workpiece conveyor turntable 22, the workpiece cast and welded by the bus bar passes through the cooling of the second and third station vacancies, Arriving at the top of the supporting plate 33 of the demoulding and boxing machine 3 at the fourth station, under the control of the set program-controlled PLC, the supporting plate 33 rises, so that both sides of the jig bottom plate rest on a pair of horizontal shelves 331 of the supporting plate. When the supporting plate continues to rise, the clamp and the mold on the lifting frame are separated. When the supporting plate 33 continues to rise until its horizontal shelf bar 331 is flush with the clamp chute plates 34 on both inner sides of the frame, the operator will place the clamp bottom plate Pull it into the chute of the fixture chute plate 34, and then put the battery box upside down above the pole group slots on the bottom plate of the fixture. At this time, the pressing cylinder 35 on the top of the rack presses down to support the battery case, and the lifting platform 31 rises at the same time. , the ejector rod 32 installed on the lifting platform is about to push the pole group in the fixture into the battery box, and then press down the cylinder 35 and the lifting platform 31 to reset, and the operator will pick up the assembled battery box body of the pole group and send it to the workpiece conveyor belt 4 The upper layer is transported to the next process, and the empty fixture is withdrawn from the fixture chute plate 34 in addition, placed on the upper belt of the workpiece conveyor belt 5 and transported to the workbench 8 for reuse.

Claims (10)

1. the cylinder manifold cast welding device of a lead-acid accumulator, comprise plumbous smelting furnace (1), the demoulding is gone into box machine (3) and is gone into workpiece conveyer (2) between the box machine in plumbous smelting furnace and the demoulding, it is characterized in that workpiece conveyer (2) is a rotation conveyer, has frame (21), be equipped with on the frame (21) by reduction gearing mechanism (28) and drive the rotating disk (22) of doing intermittent movement, be evenly equipped with four cranes (23) that the cylinder manifold cast welded mold (230) of band cooling jacket is installed on the rotating disk (22), be provided with four stations around rotating disk (22), described plumbous smelting furnace (1) is positioned on first station, just in time be positioned at the lead pool top of plumbous smelting furnace (1) to the crane (23) of first station with rotating disk (22) running, on plumbous smelting furnace (1) top and pass between frame central axle (24) upper end of workpiece conveyer (2) of rotating disk (22) and be connected with support arm (25), transmission cylinder (26) at its below crane (23) is installed on the support arm (25), the demoulding is gone into box machine (3) and then is positioned on the 4th station, just in time is positioned at the top that box machine (3) are gone in the demoulding with rotating disk (22) running to the crane (23) of the 4th station.
2. press the cylinder manifold cast welding device of the described lead-acid accumulator of claim 1, it is characterized in that it is by comprising that the tape spool that is connected in rotating disk (22) portion of bottom center and centers on frame central axle (24) holds Connection Block (285) that described drive rotating disk (22) is made the reduction gearing mechanism (28) of intermittent movement, the tape spool that tape spool holds the connection of Connection Block (285) lower end holds central axle sleeve (286), and tape spool holds central axle sleeve (286) by Geneva mechanism (284), Geneva mechanism breach wheel central shaft (283), driving-chain (282) is connected successively with reducing motor (281) and forms.
3. press the cylinder manifold cast welding device of the described lead-acid accumulator of claim 1, it is characterized in that described crane (23) has connection base plate (231), on described connection base plate, be provided with a pair of guide pillar (233) that is set with spring (232), one its upper flat plate of Z-shaped right angle flap (235) is socketed on the spring top of guide pillar, guide pillar (233) upper end is with pad, bolt (236) locking, the cylinder manifold cast welded mold (230) that is provided with cooling water jecket is installed on the following flat board of Z-shaped right angle flap (235), and Z-shaped right angle flap (235) is provided with chuck cooling water access way and takes over (234).
4. by the cylinder manifold cast welding device of claim 1 or 3 described lead-acid accumulators, it is characterized in that on the upper flat plate of the Z-shaped right angle of described crane flap (235) the coordination piece (237) matched with the locating piece (261) of crane transmission cylinder (26) piston rod end being installed.
5. press the cylinder manifold cast welding device of the described lead-acid accumulator of claim 1, the waterworks (29) that it is characterized in that cooling device in the described crane (23) are to comprise the groove shape fixed disk (292) that is installed on the frame central axle bottom fixed cover (241), be provided with middle space collar (2921) in the groove shape fixed disk (292) groove shape fixed disk inner chamber is separated into intake antrum (2922) and water chamber (2923), intake antrum (2922) bottom is connected with into water adapter (271), water chamber (2923) bottom is connected with water outlet and takes over (272), be coated with the movable rotating disc (291) of the biconvex circle that matches with it on the groove shape fixed disk (292), and on mating surface, be provided with some sealing rings (293), the movable rotating disc of biconvex circle (291) and tape spool hold that central axle sleeve (286) is connected and with rotating disk (22) rotation synchronously, the water inlet pipe (273) that connects each crane cooling device, return pipe (274) passes rotating disk (22) and the movable rotating disc (291) of biconvex circle respectively, patches in the intake antrum (2922) and water chamber (2923) of groove shape fixed disk.
6. by the cylinder manifold cast welding device of the described lead-acid accumulator of claim 5, it is characterized in that outer being with of described groove shape fixed disk (292) connects drain cap (294), connects drain cap (294) bottom and is connected by conduit (2941) and water outlet adapter (272).
7. press the cylinder manifold cast welding device of the described lead-acid accumulator of claim 1, it is characterized in that the described demoulding goes into box machine (3) and have portal frame (38), the front portion of portal frame base plate is equipped with top demoulding cylinder (39), the piston rod part of last top demoulding cylinder (39) is equipped with U-shaped supporting plate (33), U-shaped supporting plate (33) two riser upper inner are equipped with a pair of level and put bar (331), two inboards of portal frame then are provided with the anchor clamps coulisse (34) that matches with the base plate of pole plate anchor clamps (9), positive stop (37) is installed on the frame of anchor clamps coulisse one end, the lifting platform (31) that is driven by cylinder is installed on the base plate of portal frame, be equipped with on the lifting platform (31) and the corresponding push rod (32) of utmost point faciation in the anchor clamps, the top of portal frame is equipped with down air cylinder (35) simultaneously.
8. press the cylinder manifold cast welding device of the described lead-acid accumulator of claim 1, it is characterized in that also having connected between described first station and the 4th station workpiece conveyor (5), workpiece conveyor (5) side is other be provided with successively utmost point group pack into anchor clamps workbench (8), shaping workbench (7), cut ear brush ear workbench (6).
9. by the cylinder manifold cast welding device of the described lead-acid accumulator of claim 1, it is characterized in that described the 4th station has also connected workpiece conveyor (4).
10. by the cylinder manifold cast welding device of claim 8 or 9 described lead-acid accumulators, it is characterized in that workpiece conveyor (4,5) is double-deck workpiece conveyor.
CN2010206609487U 2010-12-15 2010-12-15 Busbar cast welding device for lead-acid storage battery Expired - Lifetime CN201900249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206609487U CN201900249U (en) 2010-12-15 2010-12-15 Busbar cast welding device for lead-acid storage battery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206609487U CN201900249U (en) 2010-12-15 2010-12-15 Busbar cast welding device for lead-acid storage battery

Publications (1)

Publication Number Publication Date
CN201900249U true CN201900249U (en) 2011-07-20

Family

ID=44270852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206609487U Expired - Lifetime CN201900249U (en) 2010-12-15 2010-12-15 Busbar cast welding device for lead-acid storage battery

Country Status (1)

Country Link
CN (1) CN201900249U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102039396A (en) * 2010-12-15 2011-05-04 魏明乐 Busbar cast welding device for lead-acid storage battery
CN103071781A (en) * 2013-01-11 2013-05-01 浙江欧德申自动化设备有限公司 In-mold and demolding mechanism for casting and welding storage battery
CN103752801A (en) * 2013-12-31 2014-04-30 张家港市智周工业技术有限公司 Lead supplying mechanism of storage battery casting and welding machine
CN104057069A (en) * 2014-05-26 2014-09-24 超威电源有限公司 Automatic handling device and handling method thereof for lead-acid battery cast-weld jig
CN105382475A (en) * 2015-11-10 2016-03-09 浙江海悦自动化机械股份有限公司 Lead-acid storage battery multi-station welding unit
CN106077588A (en) * 2016-08-30 2016-11-09 福建亚亨机械股份有限公司 A kind of accumulator cell lead bus-bar casting device
CN114309547A (en) * 2021-12-08 2022-04-12 长兴宝鑫机械有限公司 Circulation mechanism in a casting and welding mold

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102039396A (en) * 2010-12-15 2011-05-04 魏明乐 Busbar cast welding device for lead-acid storage battery
CN102039396B (en) * 2010-12-15 2012-08-15 魏明乐 Busbar cast welding device for lead-acid storage battery
CN103071781A (en) * 2013-01-11 2013-05-01 浙江欧德申自动化设备有限公司 In-mold and demolding mechanism for casting and welding storage battery
CN103752801A (en) * 2013-12-31 2014-04-30 张家港市智周工业技术有限公司 Lead supplying mechanism of storage battery casting and welding machine
CN104057069A (en) * 2014-05-26 2014-09-24 超威电源有限公司 Automatic handling device and handling method thereof for lead-acid battery cast-weld jig
CN104057069B (en) * 2014-05-26 2016-04-27 超威电源有限公司 A kind of automatic handling device of cast welding clamp for lead-acid storage battery and handling method thereof
CN105382475A (en) * 2015-11-10 2016-03-09 浙江海悦自动化机械股份有限公司 Lead-acid storage battery multi-station welding unit
CN105382475B (en) * 2015-11-10 2017-04-26 浙江海悦自动化机械股份有限公司 Lead-acid storage battery multi-station welding unit
CN106077588A (en) * 2016-08-30 2016-11-09 福建亚亨机械股份有限公司 A kind of accumulator cell lead bus-bar casting device
CN114309547A (en) * 2021-12-08 2022-04-12 长兴宝鑫机械有限公司 Circulation mechanism in a casting and welding mold

Similar Documents

Publication Publication Date Title
CN102039396B (en) Busbar cast welding device for lead-acid storage battery
CN201900249U (en) Busbar cast welding device for lead-acid storage battery
CN209183677U (en) Automatic battery is at production line
CN106571492B (en) Automatic production equipment and production process flow for cutting, brushing and cast welding of storage battery
CN201889424U (en) Casting and welding device for bus board of lead-acid battery
CN111977300B (en) Capping device for new energy battery processing and working method thereof
CN201020525Y (en) Medium density casting welding machine
CN107331899B (en) A battery shaping mechanism
CN204957773U (en) Battery electricity core top side seal conveyer
CN201960114U (en) Cast welding machine for storage battery pole groups
CN202183445U (en) Multi-station rotating disc type top side packaging machine
CN111266556A (en) Full-automatic cast welding process and production line for lead-acid storage battery
CN102039397B (en) Storage battery pole group cast-weld machine
CN109167101B (en) Automatic auxiliary assembly of electric automobile lithium cell electricity core production and processing
CN206225487U (en) Battery cuts brush and cast welding integral type automated production equipment
CN214382931U (en) Lead-acid storage battery cast-weld equipment
CN207222919U (en) A battery casting welding machine
CN110439894B (en) Full-automatic feeding device for cast welding of lead-acid storage battery
CN205904580U (en) Battery sheet's automation of welding equipment
CN207558946U (en) Formation device
CN214488797U (en) A lead-acid battery casting and welding production line
CN202726029U (en) Totally-closed cast welding machine for connection strip of electrode plate of storage battery
CN113562462A (en) Electricity core automatic feeding equipment
CN205414921U (en) Full -automatic bearing roller production facility
CN105643348B (en) A kind of pole plate docking facilities

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110720

Effective date of abandoning: 20120815

AV01 Patent right actively abandoned

Granted publication date: 20110720

Effective date of abandoning: 20120815