CN201895984U - Hydraulic pay-off stand - Google Patents
Hydraulic pay-off stand Download PDFInfo
- Publication number
- CN201895984U CN201895984U CN2010205600663U CN201020560066U CN201895984U CN 201895984 U CN201895984 U CN 201895984U CN 2010205600663 U CN2010205600663 U CN 2010205600663U CN 201020560066 U CN201020560066 U CN 201020560066U CN 201895984 U CN201895984 U CN 201895984U
- Authority
- CN
- China
- Prior art keywords
- pay
- bearing
- fixing plate
- base
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
液压放线架,属输电线路架设维修用放线架的设计与制造技术领域。在底座的加强筋上有一主支架。在轴承固定板中心部带有轴承。在垫块的上面有一千斤顶。在主支架的两侧上带有后支撑架。在行走轮固定板上带有行走轮。本实用新型的使用是以两台放线架为一组。使用时将导线盘推入两台放线架之间,由千斤顶调整轴承固定板的高度。然后将线盘轴穿入轴承芯孔,即可放线操作。由于本实用新型带有轴承,使得线盘轴转动变得轻快,减轻了拉线人员的劳动强度。另外由于带有行走轮,在遇有复杂地形时可以推动行走,无须多人将其抬起搬运。还有就是因为两台放线架相对为直立面,无须加长线盘轴的长度。又减小了相应部件的重量。从多方面做到省时省力,从而提高了工作效率。解决了现有产品存在的问题。
The utility model relates to a hydraulic pay-off rack, which belongs to the technical field of design and manufacture of a pay-off rack for erection and maintenance of power transmission lines. There is a main support on the reinforcing rib of the base. A bearing is provided at the center of the bearing fixing plate. There is a jack on top of the block. There are rear support frames on both sides of the main support. There are traveling wheels on the traveling wheel fixing plate. The use of the utility model is to take two pay-off racks as a group. When in use, push the wire reel between two pay-off frames, and adjust the height of the bearing fixing plate by a jack. Then thread the spool shaft into the bearing core hole, and then the wire can be released. Because the utility model is equipped with bearings, the rotation of the wire reel shaft becomes brisk, and the labor intensity of the wire pulling personnel is reduced. In addition, due to the walking wheels, it can be pushed and walked when encountering complex terrain, without the need for many people to lift and carry it. In addition, because the two pay-off frames are relatively upright, there is no need to lengthen the length of the wire reel shaft. In turn, the weight of the corresponding components is reduced. It saves time and labor in many ways, thus improving work efficiency. The existing problems of existing products are solved.
Description
技术领域technical field
本实用新型属输电线路架设维修用放线架的设计与制造技术领域。The utility model belongs to the technical field of design and manufacture of a pay-off frame for erection and maintenance of transmission lines.
背景技术Background technique
目前在输电线路架设或维修中使用的放线架为锥形架式,是在方形底座的四周上带有四条斜拉筋,锥形架的顶端有一线盘轴托。线盘轴托由丝杠调节升降。使用时两台放线架为一组,将线盘轴搭在线盘轴托上。放线时,操作人员拉动导线,线盘轴在线盘轴托上干磨擦转动,由于导线盘特别沉重,因此,拉线人员要费出很大的气力。另外,放线架体积大,重量大,特别在遇有复杂地形时搬运特别费力。调节线盘托升降由扳手拧丝杠亦是非常吃力。还有就是由于是锥形支架,因此要求线盘轴的长度要大,否则斜拉筋就会阻挡线盘转动。The pay-off rack used in transmission line erection or maintenance is a tapered frame type at present, is to have four oblique tendons on the four sides of the square base, and the top of the tapered frame has a coil shaft support. The bobbin support is adjusted by the lead screw. When in use, two pay-off racks form a group, and the wire reel shaft is placed on the wire reel shaft support. When setting out, the operator pulls the lead, and the reel shaft is dry-frictioned and rotated on the reel shaft holder. Because the lead reel is particularly heavy, the puller will spend a lot of energy. In addition, the pay-off frame has a large volume and a large weight, and it is particularly laborious to carry when encountering complex terrain. It is also very difficult to adjust the lifting of the reel support by turning the screw with a wrench. In addition, because it is a tapered support, the length of the wire reel shaft is required to be large, otherwise the oblique tendons will block the rotation of the wire reel.
发明内容Contents of the invention
针对上述情况,本实用新型的目的是提供一种体积小,操作搬运省时省力的放线架,以解决现有设备存在的实际问题。In view of the above situation, the purpose of this utility model is to provide a pay-off stand which is small in size and saves time and effort in operation and handling, so as to solve the practical problems existing in the existing equipment.
本实用新型解决技术问题所采取的技术方案是:由底座和主支架构成。在底座的中间部有一加强筋,在加强筋上有一主支架。主支架内带有滑槽。在滑槽内有一轴承固定板。在轴承固定板中心部带有轴承。在底座加强筋上面有一垫块底座。在垫块底座的上面有一垫块。在垫块的上面有一千斤顶。千斤顶上端抵在轴承固定板的底部。在主支架的两侧上带有后支撑架。在后支撑架上带有千斤顶压杆。在底座后部两侧带有行走轮固定板。在行走轮固定板上带有行走轮。本实用新型的使用是以两台放线架为一组。使用时将导线盘推入两台放线架之间,由千斤顶调整轴承固定板的高度。然后将线盘轴穿入轴承芯孔,即可放线操作。由于本实用新型带有轴承,使得线盘轴转动变得轻快,减轻了拉线人员的劳动强度。另外由于带有行走轮,在遇有复杂地形时可以推动行走,无须多人将其抬起搬运。还有就是因为两台放线架相对为直立面,无须加长线盘轴的长度。又减小了相应部件的重量。从多方面做到省时省力,从而提高了工作效率。解决了现有产品存在的问题。The technical solution adopted by the utility model to solve the technical problem is: it is composed of a base and a main support. There is a reinforcing rib in the middle part of the base, and a main support is arranged on the reinforcing rib. There are sliding slots inside the main bracket. There is a bearing fixing plate in the chute. A bearing is provided at the center of the bearing fixing plate. There is a spacer base above the base stiffener. There is a spacer on the top of the spacer base. There is a jack on top of the block. The upper end of the jack is against the bottom of the bearing fixing plate. There are rear support frames on both sides of the main support. There is a jack pressure bar on the rear support frame. There are traveling wheel fixing plates on both sides of the rear part of the base. There are traveling wheels on the traveling wheel fixing plate. The use of the utility model is to take two pay-off racks as a group. When in use, push the wire reel between two pay-off frames, and adjust the height of the bearing fixing plate by a jack. Then thread the spool shaft into the bearing core hole, and then the wire can be released. Because the utility model is equipped with bearings, the rotation of the wire reel shaft becomes brisk, and the labor intensity of the wire pulling personnel is reduced. In addition, due to the walking wheels, it can be pushed and walked when encountering complex terrains, without the need for many people to lift and carry it. In addition, because the two pay-off frames are relatively upright, there is no need to lengthen the length of the wire reel shaft. In turn, the weight of the corresponding components is reduced. It saves time and effort in many ways, thus improving work efficiency. The existing problems of existing products are solved.
附图说明Description of drawings
附图为本实用新型结构示意图。Accompanying drawing is the structural representation of the utility model.
1-主支架,2-轴承固定板,3-千斤顶压杆,4-垫块,5-底座,6-垫块底座,7-行走轮固定板,8-行走轮,9-千斤顶,10-后支撑架。1-main bracket, 2-bearing fixing plate, 3-jack pressure rod, 4-pad, 5-base, 6-pad base, 7-traveling wheel fixing plate, 8-traveling wheel, 9-jack, 10- Rear support frame.
具体实施方式Detailed ways
本实用新型的结构如附图所示:由底座和主支架构成。在底座5的中间部有一加强筋,在加强筋上有一主支架1。主支架内带有滑槽。在滑槽内有一轴承固定板2。在轴承固定板中心部带有轴承。在底座加强筋上面有一垫块底座6。在垫块底座的上面有一垫块4。在垫块的上面有一千斤顶9。千斤顶上端抵在轴承固定板的底部。在主支架的两侧上带有后支撑架10。在后支撑架上带有千斤顶压杆3。在底座后部两侧带有行走轮固定板7。在行走轮固定板上带有行走轮8。The structure of the utility model is as shown in the accompanying drawings: it is made of a base and a main support. There is a reinforcing rib in the middle part of the
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205600663U CN201895984U (en) | 2010-10-10 | 2010-10-10 | Hydraulic pay-off stand |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205600663U CN201895984U (en) | 2010-10-10 | 2010-10-10 | Hydraulic pay-off stand |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201895984U true CN201895984U (en) | 2011-07-13 |
Family
ID=44253898
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010205600663U Expired - Lifetime CN201895984U (en) | 2010-10-10 | 2010-10-10 | Hydraulic pay-off stand |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201895984U (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102377151A (en) * | 2011-11-24 | 2012-03-14 | 襄城县供电局 | Automatic lifting hydraulic payout stand |
| CN104767157A (en) * | 2015-03-23 | 2015-07-08 | 成都振中电气有限公司 | Device for erecting cable |
| CN104767156A (en) * | 2015-03-23 | 2015-07-08 | 成都振中电气有限公司 | Frame body for laying cable |
| CN105947774A (en) * | 2016-06-26 | 2016-09-21 | 桐乡守敬应用技术研究院有限公司 | Wire coil lifting paying-off mechanism |
| CN106241485A (en) * | 2016-09-22 | 2016-12-21 | 国网山东省电力公司莱芜供电公司 | Assembled moving cable pay off rack |
| CN106558854A (en) * | 2015-09-25 | 2017-04-05 | 国家电网公司 | A kind of cable terminal manufacturing device |
| CN107235377A (en) * | 2017-08-04 | 2017-10-10 | 广西启智电力科技有限公司 | A kind of take-up stand |
| CN108609432A (en) * | 2018-03-20 | 2018-10-02 | 饶榕琦 | A kind of cable unwinding device for power construction |
-
2010
- 2010-10-10 CN CN2010205600663U patent/CN201895984U/en not_active Expired - Lifetime
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102377151A (en) * | 2011-11-24 | 2012-03-14 | 襄城县供电局 | Automatic lifting hydraulic payout stand |
| CN104767157A (en) * | 2015-03-23 | 2015-07-08 | 成都振中电气有限公司 | Device for erecting cable |
| CN104767156A (en) * | 2015-03-23 | 2015-07-08 | 成都振中电气有限公司 | Frame body for laying cable |
| CN106558854A (en) * | 2015-09-25 | 2017-04-05 | 国家电网公司 | A kind of cable terminal manufacturing device |
| CN105947774A (en) * | 2016-06-26 | 2016-09-21 | 桐乡守敬应用技术研究院有限公司 | Wire coil lifting paying-off mechanism |
| CN106241485A (en) * | 2016-09-22 | 2016-12-21 | 国网山东省电力公司莱芜供电公司 | Assembled moving cable pay off rack |
| CN107235377A (en) * | 2017-08-04 | 2017-10-10 | 广西启智电力科技有限公司 | A kind of take-up stand |
| CN108609432A (en) * | 2018-03-20 | 2018-10-02 | 饶榕琦 | A kind of cable unwinding device for power construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201895984U (en) | Hydraulic pay-off stand | |
| CN201962016U (en) | Hoisting and conveying device | |
| CN205159901U (en) | Special dolly is installed and removed to high -order earth connection | |
| CN203247031U (en) | Hoisting device for curtain board transporting | |
| CN106241485A (en) | Assembled moving cable pay off rack | |
| CN206532646U (en) | Simple pay off rack is used in a kind of cable production | |
| CN202016492U (en) | Cabinet body transporting vehicle | |
| CN203818129U (en) | Front axle maintenance tray for loader | |
| CN202415091U (en) | Balancing lift truck | |
| CN204586929U (en) | Small members handling go-cart | |
| CN203312666U (en) | Lift truck for replacing or overhauling disconnecting switch | |
| CN202978125U (en) | Cable pay-off rack | |
| CN202333531U (en) | Hydraulic elevating type tool car | |
| CN206784896U (en) | A kind of high-lift operation hanging cradle with aluminium sheet soldering | |
| CN204452491U (en) | A kind of multi-functional substation special cart | |
| CN203818080U (en) | Maintenance device adapted to front axles of loading machines in different models | |
| CN206673433U (en) | High-voltage board integrated installation device | |
| CN104444879A (en) | Simple and easy equipment hoister used for maintaining electric equipment | |
| CN206051476U (en) | A kind of transformer coil dump car | |
| CN104701784A (en) | Pay-off bracket with adjustable height | |
| CN105270448B (en) | A kind of multi-functional telegraph pole transport vehicle | |
| CN203545559U (en) | Electric meter box hoisting tool | |
| CN204847574U (en) | Drum support | |
| CN204224152U (en) | A kind of simple machine hoisting device safeguarded for electrical equipment | |
| CN204566377U (en) | A kind of precast beam steel strand pulling machine hoisting frame device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121112 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20121112 Address after: Zhanqian District 115000 in Liaoning province Yingkou city Bohai street, No. 40 East Patentee after: Yingkou Power Supply Company, Liaoning Electric Power Co., Ltd. Patentee after: State Grid Corporation of China Address before: 115000, No. 40, Bohai Avenue, Yingkou, Liaoning Patentee before: Yingkou Power Supply Company, Liaoning Electric Power Co., Ltd. |
|
| CX01 | Expiry of patent term |
Granted publication date: 20110713 |
|
| CX01 | Expiry of patent term |
