CN201895984U - Hydraulic pay-off stand - Google Patents

Hydraulic pay-off stand Download PDF

Info

Publication number
CN201895984U
CN201895984U CN2010205600663U CN201020560066U CN201895984U CN 201895984 U CN201895984 U CN 201895984U CN 2010205600663 U CN2010205600663 U CN 2010205600663U CN 201020560066 U CN201020560066 U CN 201020560066U CN 201895984 U CN201895984 U CN 201895984U
Authority
CN
China
Prior art keywords
pay
bearing
stands
stand
guide plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205600663U
Other languages
Chinese (zh)
Inventor
刘子况
伞志军
刘勇
杨德明
李利群
冯晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd filed Critical YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd
Priority to CN2010205600663U priority Critical patent/CN201895984U/en
Application granted granted Critical
Publication of CN201895984U publication Critical patent/CN201895984U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

A hydraulic pay-off stand belongs to the technical field of design and manufacture of pay-off stands for erection and maintenance of power transmission lines. A main support is arranged on a reinforcing bar of a base. A bearing is arranged in the center of a bearing fixing plate. A jack is arranged on a cushion plate. Rear struts are arranged on two sides of the main support. Traveling wheels are arranged on travelling wheel fixing plates. Two pay-off stands in a group are used, a wire guide plate is pushed between the two pay-off stands, and height of the bearing fixing plate is adjusted by the aid of the jack. Paying-off can be started after a guide plate shaft penetrates into a bearing central hole. The hydraulic pay-off stand is provided with the bearing, so that the guide plate shaft can rotate fast and labor intensity of wire pullers can be relieved. Additionally, by the aid of the travelling wheels, the hydraulic pay-off stand can be pushed forward in complex terrains without many people to lift and handle. Further, the two pay-off stands are vertically opposite to each other, no lengthening of the guide plate shaft is needed. Weight of corresponding parts is reduced further. Therefore, the hydraulic pay-off stand is timesaving and laborsaving in many ways, operating efficiency is improved thereby and the problems of existing stands are solved.

Description

The hydraulic pressure pay off rack
Technical field
The utility model belongs to transmission line of electricity and sets up design and the manufacturing technology field of maintenance with pay off rack.
Background technology
The pay off rack that uses in transmission line of electricity sets up or keeps in repair at present is the taper posture, is to have four braces on around the plinth, and there is a wire coil shaft holder on the top of conical mount.The wire coil shaft holder is regulated lifting by leading screw.Two pay off racks are one group during use, and wire coil shaft is ridden in the wire coil shaft holder.During unwrapping wire, operating personal pulling lead, wire coil shaft dry friction in the wire coil shaft holder is rotated, because the lead dish is heavy especially, therefore, the backguy personnel will take very big strength.In addition, the pay off rack volume is big, and weight is big, especially the special effort of carrying when meeting complex-terrain.Regulating drum holder lifting also is very painstaking by the stubborn leading screw of spanner.Also having is exactly owing to be conical support, therefore requires the length of wire coil shaft to want big, rotates otherwise brace will stop drum.
Summary of the invention
At above-mentioned situation, it is little that the purpose of this utility model provides a kind of volume, and the pay off rack that the operation carrying is time saving and energy saving is to solve the practical problems that existing installation exists.
The technical scheme that the utility model technical solution problem is taked is: be made of base and main support.Pars intermedia at base has a reinforced rib, and a main support is arranged on reinforced rib.Have chute in the main support.One bearing (setting) plate is arranged in chute.Have bearing at the bearing (setting) plate central part.One cushion block base is arranged on the base reinforced rib.One cushion block is arranged on the cushion block base.One jack is arranged on cushion block.The jack upper end is against the bottom of bearing (setting) plate.On the both sides of main support, have bracket of rear mounting.On bracket of rear mounting, have the jack depression bar.Have the road wheel adapter plate in both sides, base rear portion.On the road wheel adapter plate, have road wheel.Use of the present utility model is to be one group with two pay off racks.During use the lead dish is pushed between two pay off racks, by the height of jack adjust a bearing adapter plate.Then wire coil shaft is penetrated the bearing core hole, can the unwrapping wire operation.Because the utility model has bearing, make wire coil shaft rotate and become brisk, alleviated backguy personnel's labour intensity.Owing to have road wheel, when meeting complex-terrain, can promote walking in addition, need not many people it be lifted carrying.Be exactly because two pay off racks are vertical surface, the length of the wire coil shaft that need not extend relatively in addition.Reduced the weight of corresponding component again.It is time saving and energy saving to accomplish from many aspects, thereby has improved work efficiency.Solved the problem that existing product exists.
Description of drawings
Accompanying drawing is the utility model structural representation.
The 1-main support, 2-bearing (setting) plate, 3-jack depression bar, 4-cushion block, 5-base, 6-cushion block base, 7-road wheel adapter plate, 8-road wheel, 9-jack, 10-bracket of rear mounting.
The specific embodiment
Structure of the present utility model is as shown in drawings: be made of base and main support.Pars intermedia at base 5 has a reinforced rib, and a main support 1 is arranged on reinforced rib.Have chute in the main support.One bearing (setting) plate 2 is arranged in chute.Have bearing at the bearing (setting) plate central part.One cushion block base 6 is arranged on the base reinforced rib.One cushion block 4 is arranged on the cushion block base.One jack 9 is arranged on cushion block.The jack upper end is against the bottom of bearing (setting) plate.On the both sides of main support, have bracket of rear mounting 10.On bracket of rear mounting, have jack depression bar 3.Have road wheel adapter plate 7 in both sides, base rear portion.On the road wheel adapter plate, have road wheel 8.

Claims (1)

1. hydraulic pressure pay off rack, it is characterized in that: the pars intermedia at base (5) has a reinforced rib, one main support (1) is arranged on reinforced rib, have chute in the main support, one bearing (setting) plate (2) is arranged in chute, have bearing at the bearing (setting) plate central part, one cushion block base (6) is arranged on the base reinforced rib, one cushion block (4) is arranged on the cushion block base, one jack (9) is arranged on cushion block, on the both sides of main support, have bracket of rear mounting (10), have road wheel adapter plate (7), on the road wheel adapter plate, have road wheel (8) in both sides, base rear portion.
CN2010205600663U 2010-10-10 2010-10-10 Hydraulic pay-off stand Expired - Lifetime CN201895984U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205600663U CN201895984U (en) 2010-10-10 2010-10-10 Hydraulic pay-off stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205600663U CN201895984U (en) 2010-10-10 2010-10-10 Hydraulic pay-off stand

Publications (1)

Publication Number Publication Date
CN201895984U true CN201895984U (en) 2011-07-13

Family

ID=44253898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205600663U Expired - Lifetime CN201895984U (en) 2010-10-10 2010-10-10 Hydraulic pay-off stand

Country Status (1)

Country Link
CN (1) CN201895984U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102377151A (en) * 2011-11-24 2012-03-14 襄城县供电局 Automatic lifting hydraulic payout stand
CN104767157A (en) * 2015-03-23 2015-07-08 成都振中电气有限公司 Device for erecting cable
CN104767156A (en) * 2015-03-23 2015-07-08 成都振中电气有限公司 Frame body for laying cable
CN105947774A (en) * 2016-06-26 2016-09-21 桐乡守敬应用技术研究院有限公司 Wire coil lifting paying-off mechanism
CN106241485A (en) * 2016-09-22 2016-12-21 国网山东省电力公司莱芜供电公司 Assembled moving cable pay off rack
CN106558854A (en) * 2015-09-25 2017-04-05 国家电网公司 A kind of cable terminal manufacturing device
CN107235377A (en) * 2017-08-04 2017-10-10 广西启智电力科技有限公司 A kind of take-up stand
CN108609432A (en) * 2018-03-20 2018-10-02 饶榕琦 A kind of cable unwinding device for power construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102377151A (en) * 2011-11-24 2012-03-14 襄城县供电局 Automatic lifting hydraulic payout stand
CN104767157A (en) * 2015-03-23 2015-07-08 成都振中电气有限公司 Device for erecting cable
CN104767156A (en) * 2015-03-23 2015-07-08 成都振中电气有限公司 Frame body for laying cable
CN106558854A (en) * 2015-09-25 2017-04-05 国家电网公司 A kind of cable terminal manufacturing device
CN105947774A (en) * 2016-06-26 2016-09-21 桐乡守敬应用技术研究院有限公司 Wire coil lifting paying-off mechanism
CN106241485A (en) * 2016-09-22 2016-12-21 国网山东省电力公司莱芜供电公司 Assembled moving cable pay off rack
CN107235377A (en) * 2017-08-04 2017-10-10 广西启智电力科技有限公司 A kind of take-up stand
CN108609432A (en) * 2018-03-20 2018-10-02 饶榕琦 A kind of cable unwinding device for power construction

Similar Documents

Publication Publication Date Title
CN201895984U (en) Hydraulic pay-off stand
CN202721425U (en) Portable fast lifting cable paying off rack
CN201186838Y (en) Vertical type coil holder
CN107013080A (en) A kind of power network electric pole erection construction method
CN202945014U (en) Lifting device for manual hole digging pile of building operation
CN204552055U (en) A kind of scalable nacelle device
CN206784896U (en) A kind of high-lift operation hanging cradle with aluminium sheet soldering
CN203818129U (en) Front axle maintenance tray for loader
CN211549703U (en) Split type tunnel construction trolley
CN102943615A (en) Horizontal-buckling support insulating ladder
CN201577351U (en) Greenhouse truss crawler-type lifting erecting equipment
CN203818080U (en) Maintenance device adapted to front axles of loading machines in different models
CN102910539B (en) Hoisting structure for replacing main transmission shaft or driving device of escalator
CN202175527U (en) Portable manual multifunctional lifting jack
CN205687497U (en) A kind of simple and easy hoisting device installing transhipment for power equipment
CN211466201U (en) Traction support mounting tool
CN204617630U (en) Novel electric power insulation bench
CN207346915U (en) Liftable cable pay-off rack
CN206416798U (en) A kind of lifting moving system
CN202899721U (en) Steel pole provided with platform and used for high-tension transmission line iron tower
CN207552941U (en) Tooth block tensioning equipment mobile formwork on roof box in a kind of cast-in-situ continuous beam
CN206588659U (en) A kind of boring mirror holder load carrier of solar energy mirror holder
CN204802893U (en) Electronic hoisting frame
CN205687455U (en) A kind of lifting device
CN104806009A (en) System for single-supporting rod variable-section silo slip forms and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121112

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121112

Address after: Zhanqian District 115000 in Liaoning province Yingkou city Bohai street, No. 40 East

Patentee after: Yingkou Power Supply Company, Liaoning Electric Power Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 115000, No. 40, Bohai Avenue, Yingkou, Liaoning

Patentee before: Yingkou Power Supply Company, Liaoning Electric Power Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110713