CN201885572U - MLCC (multilayer ceramic capacitor) atmosphere tunnel firing furnace completing rubber removal and firing once - Google Patents

MLCC (multilayer ceramic capacitor) atmosphere tunnel firing furnace completing rubber removal and firing once Download PDF

Info

Publication number
CN201885572U
CN201885572U CN2010206244774U CN201020624477U CN201885572U CN 201885572 U CN201885572 U CN 201885572U CN 2010206244774 U CN2010206244774 U CN 2010206244774U CN 201020624477 U CN201020624477 U CN 201020624477U CN 201885572 U CN201885572 U CN 201885572U
Authority
CN
China
Prior art keywords
binder removal
firing furnace
furnace
mlcc
firing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206244774U
Other languages
Chinese (zh)
Inventor
卢艺森
许耿睿
周剑恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Fenghua Advanced Technology Holding Co Ltd
Original Assignee
Guangdong Fenghua Advanced Technology Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Fenghua Advanced Technology Holding Co Ltd filed Critical Guangdong Fenghua Advanced Technology Holding Co Ltd
Priority to CN2010206244774U priority Critical patent/CN201885572U/en
Application granted granted Critical
Publication of CN201885572U publication Critical patent/CN201885572U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tunnel Furnaces (AREA)

Abstract

本实用新型公开了一种一次性完成排胶和烧成的MLCC气氛隧道烧成炉,包括隧道式烧成炉、电气控制设备、推进系统、回转轨道,还包括隧道式排胶炉,所述回转轨道贯穿过排胶炉炉膛及烧成炉炉膛形成一回转回路。本实用新型不但使工艺更合理化,同时既减少了产品的搬送时间,亦提高了烧成效率,更主要的是大大节约了排胶用电的消耗,显著地提高了经济效益。本实用新型提高劳动生产率、减低劳动成本、减少大量的加工工具的投入(如:排胶板等);减少产品在途因人为造成的损耗。

Figure 201020624477

The utility model discloses an MLCC atmosphere tunnel firing furnace capable of completing debinding and firing at one time, comprising a tunnel type firing furnace, electrical control equipment, a propulsion system, a rotary track, and a tunnel type debinding furnace. The rotary track runs through the hearth of the debinding furnace and the hearth of the firing furnace to form a rotary circuit. The utility model not only makes the process more rational, but also reduces the conveying time of the product and improves the firing efficiency. More importantly, it greatly saves the electricity consumption for degluing and significantly improves the economic benefit. The utility model improves labor productivity, reduces labor costs, and reduces the investment of a large number of processing tools (such as: rubber-removing boards, etc.); and reduces the loss of products in transit due to human beings.

Figure 201020624477

Description

The disposable MLCC atmosphere tunnel firing furnace of finishing binder removal and burning till
Technical field
The utility model relates to the technical field of MLCC firing process.
Background technology
It is one important procedure of MLCC manufacture process that MLCC, promptly conventional chip capacitor, its high temperature burn till.Before burning till, must handle through the binder removal of product.The binder removal principle mainly be with product by heating to 300-400 ℃ so that product is separated out at the solvent composition in the manufacture process before, the high temperature that is beneficial to product burns till sclerosis.The high temperature of MLCC product burns till by MLCC atmosphere tunnel firing furnace and finishes.Existing way is to use the binder removal case independently to finish binder removal, transfers to by manually-operateds such as flaps and carries out sintering on the atmosphere firing furnace.Production process fails to realize full automation, and production efficiency is low, and can not burn till the quality that also can influence product behind the binder removal at once.
The utility model content
The purpose of this utility model is to remedy the deficiencies in the prior art, realizes that single stove finishes binder removal and burning till once.
In order to realize the foregoing invention purpose, the utility model has adopted following technical scheme: the disposable MLCC atmosphere tunnel firing furnace of finishing binder removal and burning till, comprise tunnel type firing furnace, electrical control equipment, propulsion system, rotary track, it is characterized in that: also comprise tunnel type binder removal stove, described rotary track penetrates binder removal stove burner hearth and the firing furnace burner hearth forms the single-revolution loop.
Pending product is loaded in the push pedal, and push pedal is positioned on the described rotary track and is pushed in the burner hearth along rotary track by described propulsion system.
Described binder removal furnace body is assembled by plurality of sections, makes installation, maintenance more convenient.
Described binder removal furnace body is made up of intensification heating region, constant temperature binder removal zone and cooling cooled region, 16 meters of length overalls, and being divided into is seven warm areas, each warm area top is respectively arranged with the heating element heater of independent control.Reasonably warm area quantity has been guaranteed the realization of binder removal process curve, because the binder removal time shortens the more compact and reasonable that causes warm area to design.
The sidewall of the furnace body of described binder removal stove is provided with suction opeing, the air inlet that connects exhausting system, and the body of heater roof is provided with the circulating fan inlet.Because can produce binder removal oil in the binder removal process, binder removal oil is a kind of organic deep-etching and inflammable liquid, and body of heater itself is the high temperature mode of heating, thus suction opeing and air quantity be provided with very crucial.
The utility model is to utilize the track of himself to transform increase binder removal heating arrangements on the atmosphere continuous tunnel furnace, make the shared rotary track of binder removal heating furnace and firing furnace, product advances sintering furnace at once continuously behind binder removal, need not carry out the flap operation, realize that single stove finishes binder removal and burning till once, thereby improved product quality greatly, realized that single stove finishes binder removal and burning till once.The utility model not only makes technology more rationalize, and has both reduced the conveyance time of product simultaneously, has also improved and has burnt till efficient, and main is the consumption of having saved the binder removal electricity consumption greatly, has improved economic benefit significantly.The utility model is raised labour productivity, is lowered labour cost, reduces the input (as: binder removal plate etc.) of a large amount of machining tools; Reducing product in transit is the loss that causes because of the people.
Compared with prior art, the advantage that the utlity model has can see the following form 1,
Table 1: the electric consumption of using of transforming the back saving
Figure BDA0000034249210000021
By last table as can be known, behind enforcement the utility model, the electricity consumption that the every batch products of binder removal can be saved 94.4kwh, by working as 300 batches of calculating of every month output of the every stove of predecessor company, every bar oven can be saved the electricity consumption of 28320KWh in every month.By 0.65 yuan of calculating of every degree electricity, every bar oven can be saved 18408 yuan in every month, and can save 216576 yuan every year, and energy-saving effect is remarkable.
Secondly, implement the input that the utility model also can reduce a large amount of machining tools, as the binder removal plate, former each binder removal case need dispose 1200 blocks of binder removal plates, every long stove need mate 6 binder removal casees, therefore, and to the input that can save 7200 blocks of binder removal plates after the sintering furnace transformation of separate unit tunnel; By 20 yuan of calculating of every block of binder removal plate (about 1 year of the life-span of binder removal plate), every continuous tunnel furnace can be saved 7200*20=144000 unit every year after the project implementation.
Once more, can reduce product after the project implementation is the loss that causes because of the people, reduces product and collapses the quality problems that the limit collapses the angle.Originally each binder removal case is finished and is needed to carry out flap behind the binder removal and carry out sintering to the atmosphere firing furnace, collapse the limit and collapse the angle ratio because of flap causes about every batch about 4~5/5000, after the project implementation, advance sintering furnace after the binder removal stove at once continuously, need not carry out the flap operation, thereby improved product quality greatly, by 1,500 ten thousand calculating of every bar oven output every day, transform the waste product that the every bar oven in back can reduce 4~5/5000*1500*30=36~450,000 granule products, pressing 13.5 yuan/K of product average price calculates, every bar oven can be saved 4860~6075 yuan in every month after the project implementation, can save 58320~72900 yuan every year.Simultaneously, because of reducing the generation of product appearance defective, operation is easier after making carries out the outward appearance judgement to product, has reduced the probability of choosing the outward appearance product;
Can reduce labour intensity after the transformation, lower labour cost, originally the workman need once adorn alms bowl and a flap, the firing furnace sintering of being allowed for access, only need once adorn alms bowl after transforming and get final product, the original big and heavy travel position of workman is simplified greatly, reduce means of transport and personnel simultaneously and dropped into, simplify working procedure, thereby improved efficiency.
In sum, transform the every continuous tunnel furnace in back and can save 216576+144000+58320=418896 unit every year, can improve product quality greatly simultaneously, increase work efficiency.
Description of drawings
Fig. 1 is the integral planar schematic diagram of the disposable firing furnace of the utility model.
Fig. 2 is the vertical functional areas distribution of a utility model binder removal stove schematic diagram.
Fig. 3 is the complete assembling schematic diagram of binder removal stove.
Fig. 4 is the graph of a relation of technological temperature curve and product displacement under integrated tunnel type firing furnace fltting speed of the present utility model.
The specific embodiment
As shown in Figure 1, the utility model comprises firing furnace 1 and binder removal stove 3, and the rotary track 2 of firing furnace 1 penetrates the burner hearth of binder removal stove 3, forms a closed-loop path.Processed product is positioned in the push pedal, and push pedal places the rotary track porch, and by the operation of rotary track, processed product is admitted in the binder removal stove, carries out binder removal by default process curve in burner hearth.Product through binder removal is pushed into the burner hearth through the burner direction of rotary track from firing furnace together with its push pedal, in burner hearth, carry out high temperature sintering under the atmosphere state then by default process curve, then carry out air-cooled at the furnace outlet place, push pedal is pushed the tail of coming out of the stove, once charging circulation is finished in operator's blanking.
Shown in Fig. 2~3, the body of heater of binder removal stove 3 vertically divides three parts: the thermal treatment zone, binder removal district, cooling zone.Rise to maximum operation (service) temperature in Heating Zone Temperature from normal temperature, the binder removal district keeps the constant of temperature, and the cooling zone temperature is reduced to normal temperature naturally.Binder removal furnace body length overall 16M, body of heater are divided into six joints to be convenient to make and assembling, is divided into seven warm areas, wherein has six to be the temperature control district, and totally 14 groups of temperature thermocouples 34 use 14 cfentrifugal blower air blast.
Refractory brick, insulating brick, alumina silicate fibre heat-insulating material are formed burner hearth basic structure, and good heat insulation effect is arranged.Irregular alumina firebrick is used to keep chamber structure can fully absorb heat simultaneously, and guide rail is made with alumina refractory, and the high-temperature region guide rail is made bearing with heat-resistance stainless steel, can prevent the thrust plate wearing and tearing.
The heating element heater level is installed in the top of each warm area, and temperature deviation is in allowed band.Each heating element heater is independently controlled.The size that each warm area is regulated air quantity by the hand-operated valve on the in/out air tube is regulated the uniformity of temperature, and blast pipe is used for each warm area capacity to be regulated.Can the product that comes out in the binder removal district further be cooled off in the cooling zone.
The propulsion system tape jam abnormal alarm system of rotary track.Consider shockproof requirement, blower fan should separate with the binder removal guide rail.
The sidewall of the furnace body of binder removal stove is provided with suction opeing 32, the air inlet 31 that connects exhausting system.The body of heater roof is provided with circulating fan inlet 33, inserts the gas output tube of circulating fan 35, adopts air blast mode furnace roof air intake.
Switch board is made vertical interval steel cabinet, panel operation.The design easy operating monitoring of executive component.Temperature table, ammeter, solid-state relay, switch etc. place in the cabinet, connect with standard cable.
Fig. 4 is the graph of a relation of technological temperature curve and product displacement under the fltting speed, from this figure as can be known, in definite body of heater length is under the situation of 16M, the stove fltting speed: 20 minutes/pushing plate, pushing plate size: 340 * 340 * 30MM, according to time of technology dump temperature curve advance distance: 340 * 16H * 60/20=16320MM as can be known.

Claims (5)

1. the disposable MLCC atmosphere tunnel firing furnace of finishing binder removal and burning till, comprise tunnel type firing furnace, electrical control equipment, propulsion system, rotary track, it is characterized in that: also comprise tunnel type binder removal stove, described rotary track penetrates binder removal stove burner hearth and the firing furnace burner hearth forms the single-revolution loop.
2. the disposable MLCC atmosphere tunnel firing furnace of finishing binder removal and burning till according to claim 1, it is characterized in that: pending product is loaded in the push pedal, and push pedal is positioned on the described rotary track and is pushed in the binder removal stove burner hearth along rotary track by described propulsion system.
3. the disposable MLCC atmosphere tunnel firing furnace of finishing binder removal and burning till according to claim 1, it is characterized in that: described binder removal furnace body is assembled by plurality of sections.
4. the disposable MLCC atmosphere tunnel firing furnace of finishing binder removal and burning till according to claim 1, it is characterized in that: described binder removal furnace body is made up of intensification heating region, constant temperature binder removal zone and cooling cooled region, 16 meters of length overalls, being divided into is seven warm areas, and each warm area top is respectively arranged with the heating element heater of independent control.
5. the disposable MLCC atmosphere tunnel firing furnace of finishing binder removal and burning till according to claim 4, it is characterized in that: the sidewall of the furnace body of described binder removal stove is provided with suction opeing, the air inlet that connects exhausting system, and the body of heater roof is provided with the circulating fan inlet.
CN2010206244774U 2010-11-25 2010-11-25 MLCC (multilayer ceramic capacitor) atmosphere tunnel firing furnace completing rubber removal and firing once Expired - Fee Related CN201885572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206244774U CN201885572U (en) 2010-11-25 2010-11-25 MLCC (multilayer ceramic capacitor) atmosphere tunnel firing furnace completing rubber removal and firing once

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206244774U CN201885572U (en) 2010-11-25 2010-11-25 MLCC (multilayer ceramic capacitor) atmosphere tunnel firing furnace completing rubber removal and firing once

Publications (1)

Publication Number Publication Date
CN201885572U true CN201885572U (en) 2011-06-29

Family

ID=44183118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206244774U Expired - Fee Related CN201885572U (en) 2010-11-25 2010-11-25 MLCC (multilayer ceramic capacitor) atmosphere tunnel firing furnace completing rubber removal and firing once

Country Status (1)

Country Link
CN (1) CN201885572U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102956355A (en) * 2012-10-26 2013-03-06 广东风华高新科技股份有限公司 Method for producing multilayer ceramic capacitor and equipment for sintering copper end electrodes
CN105783514A (en) * 2016-04-27 2016-07-20 苏州汇科机电设备有限公司 Glue discharging and sintering combined furnace for sintering electronic elements
CN111637742A (en) * 2020-06-11 2020-09-08 新化县群华陶瓷科技有限公司 Environment-friendly energy-saving tunnel de-waxing kiln

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102956355A (en) * 2012-10-26 2013-03-06 广东风华高新科技股份有限公司 Method for producing multilayer ceramic capacitor and equipment for sintering copper end electrodes
CN102956355B (en) * 2012-10-26 2015-07-29 广东风华高新科技股份有限公司 The manufacture method of multilayer ceramic capacitor and the equipment of sintered copper termination electrode
CN105783514A (en) * 2016-04-27 2016-07-20 苏州汇科机电设备有限公司 Glue discharging and sintering combined furnace for sintering electronic elements
CN111637742A (en) * 2020-06-11 2020-09-08 新化县群华陶瓷科技有限公司 Environment-friendly energy-saving tunnel de-waxing kiln

Similar Documents

Publication Publication Date Title
CN103453764B (en) High sintering roller way kiln
CN101762154B (en) Energy-saving ceramic tunnel kiln
CN107860220A (en) Energy-efficient automation tunnel cave
CN204187975U (en) The compound tunnel cave of a kind of circulation
CN105202912A (en) Gas roller way kiln
CN211476673U (en) Energy-saving and environment-friendly kiln for firing refractory bricks
CN107843113A (en) A kind of energy-efficient automation roller kilns
CN101857383A (en) Beam limekiln
CN103940221A (en) Novel energy-saving kiln
CN201875734U (en) Combustion supporting air heating and energy-saving device and ceramic firing kiln
CN209371763U (en) A tunnel kiln for bauxite roasting
CN201885572U (en) MLCC (multilayer ceramic capacitor) atmosphere tunnel firing furnace completing rubber removal and firing once
CN102925635B (en) Rail locomotive bolster lateral frame continuous pushing-disc type heat treatment production line
CN207635836U (en) Energy-efficient automation tunnel oven
CN208108780U (en) A kind of device solidifying rock wool board using waste heat of cupola furnace second compensation
CN203518564U (en) Novel environment-friendly rotary energy-saving kiln
CN207649334U (en) A kind of energy-efficient automation roller kilns
CN112010346A (en) Arsenic trioxide purification system and purification method
CN107806760B (en) Annular full automatic control de-waxing energy conservation and environmental protection tunnel oven
CN203582903U (en) Malleable cast iron heat accumulating type tunnel annealing furnace production line
CN212902588U (en) Energy-saving roasting furnace
CN109307431B (en) A hybrid heating industrial kiln
CN203479020U (en) Fuel gas type aluminum enamel heating curing oven capable of recycling waste heat of flue
CN205192225U (en) Gas roll table kiln
CN216716969U (en) Sintering ignition furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110629

Termination date: 20171125