CN201825633U - Balanced hanger for roll group of vertical straightening machine - Google Patents
Balanced hanger for roll group of vertical straightening machine Download PDFInfo
- Publication number
- CN201825633U CN201825633U CN2010205351641U CN201020535164U CN201825633U CN 201825633 U CN201825633 U CN 201825633U CN 2010205351641 U CN2010205351641 U CN 2010205351641U CN 201020535164 U CN201020535164 U CN 201020535164U CN 201825633 U CN201825633 U CN 201825633U
- Authority
- CN
- China
- Prior art keywords
- balance bar
- balance
- vertical
- straightening machine
- balanced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Straightening Metal Sheet-Like Bodies (AREA)
Abstract
本实用新型公开了一种用于立式矫直机辊组的平衡式吊具,其包括:一平衡杆;一平衡杆支柱,设于所述平衡杆的中部;一铲头平板,固定设于所述平衡杆的一端端部;一配重箱,固定设于所述平衡杆的另一端端部。上述吊具使用时,根据需要吊装的立式矫直机辊组的重量选择适当的配重,将配重放置在配重箱内,然后将铲头平板插入待吊装的矫直机辊组的辊座与矫直辊之间的缝隙中,将吊装用钢丝绳与平衡杆支柱固定连接好,开动行车便可将立式矫直机辊组平行吊运至指定的位置。
The utility model discloses a balanced hanger for a vertical straightening machine roller group, which comprises: a balance bar; a balance bar pillar, which is arranged at the middle part of the balance bar; at one end of the balance bar; and a counterweight box fixed at the other end of the balance bar. When using the above spreader, select an appropriate counterweight according to the weight of the vertical leveler roll set to be hoisted, place the counterweight in the counterweight box, and then insert the shovel head plate into the roll of the leveler roll set to be hoisted In the gap between the seat and the straightening roller, the steel wire rope for hoisting is fixedly connected with the balance bar pillar, and the vertical straightening machine roller group can be hoisted in parallel to the designated position when the driving is started.
Description
技术领域technical field
本实用新型涉及一种吊装拆卸装置,尤其涉及一种用于矫直机辊组的吊装拆卸装置。The utility model relates to a hoisting and dismounting device, in particular to a hoisting and dismounting device for a straightening machine roller group.
背景技术Background technique
无缝钢管是常见的冶金金属制品。目前,用于无缝钢管精整矫直加工的是矫直机。而立式矫直机因其受力均匀、耐冲击载荷、强度高、易于调整等优点,成为目前广泛采用的无缝钢管精整矫直设备。Seamless steel pipes are common metallurgical metal products. At present, the straightening machine is used for the finishing and straightening of seamless steel pipes. The vertical straightening machine has become the widely used seamless steel pipe finishing and straightening equipment because of its advantages of uniform force, impact load resistance, high strength, and easy adjustment.
日常工作中,立式矫直机辊组经常需要整体拆卸与安装。由于矫直辊组直接与弯曲的管子接触,并通过辊面挤压弯曲的管子,通过弹性与塑性变形实现矫直的目的,因此辊面磨损快,导致双曲线变化,就不能满足矫直的需要,必须更换修复,同时由于矫直辊组直接承受由挤压变形所带来的载荷,其传动构件易磨损、劣化,一旦辊面磨损量大于规定量就必须进行整体更换,同时辊组其他相关零件发生故障,也必须整体拆卸进行整修,故矫直辊组的日常拆卸、安装维护作业都必须将矫直辊组整体拆卸与安装。In daily work, the roller set of the vertical leveler often needs to be disassembled and installed as a whole. Since the straightening rollers are in direct contact with the curved pipe, and squeeze the curved pipe through the roller surface, the purpose of straightening is achieved through elastic and plastic deformation, so the roller surface wears quickly, resulting in hyperbolic changes, which cannot meet the straightening requirements. If necessary, it must be replaced and repaired. At the same time, because the straightening roller group directly bears the load caused by extrusion deformation, its transmission components are easy to wear and deteriorate. Once the wear of the roller surface exceeds the specified amount, it must be replaced as a whole. Related parts break down, also must be dismantled as a whole and repaired, so the daily disassembly, installation and maintenance work of the straightening roller group must be the whole disassembly and installation of the straightening roller group.
而目前,由于立式矫直机辊组空间有限,且机座为半封闭的“C”框架结构,无法按照常规垂直作业方法进行吊装,因此立式矫直机辊组的整体拆卸与安装只能采用滑道与手动葫芦牵引相结合的作业方式进行吊装。而现有的这种吊装方式存在一定不足:At present, due to the limited space of the roller group of the vertical straightening machine and the semi-closed "C" frame structure of the machine base, it is impossible to hoist according to the conventional vertical operation method. Therefore, the overall disassembly and installation of the vertical straightening machine roller group is only It can be hoisted by the combination of slideway and manual hoist traction. And existing this hoisting mode has certain deficiency:
(1)作业效率低:采用多套手动葫芦,需要多次将手动葫芦拆卸、安装在矫直辊组上,作业繁琐流程长,重复性作业多,影响作业效率,拆卸或安装一套辊组需要12小时左右;(1) Low operating efficiency: With multiple sets of manual hoists, it is necessary to disassemble and install the manual hoist on the straightening roller group many times. The operation is cumbersome and the process is long, and there are many repetitive operations, which affects the operating efficiency. It is necessary to remove or install a set of roller groups. It takes about 12 hours;
(2)劳动强度大:采用人工手动方式作业,凭借人力牵引矫直辊组提升或下降,劳动强度高、体力消耗大,需要多人轮换牵引作业,拆卸或安装一套辊组需要起重工、行车工、钳工等多工种多人作业;(2) High labor intensity: manual operation is adopted, and the straightening roller group is lifted or lowered by human traction. The labor intensity is high and the physical exertion is high, and multiple people are required to rotate the traction operation. Removing or installing a set of roller groups requires lifting workers, Multi-person operations such as truckers and fitters;
(3)存在安全隐患:拆卸、安装手动葫芦需要登高作业,矫直辊组下滑时,因重力作业前倾,操作手动葫芦困难,需要多人协调配合,同时手动葫芦稳定性相对不足、易晃动,存在安全隐患。(3) There are potential safety hazards: dismantling and installing the manual hoist requires climbing operations. When the straightening roller group slides down, it is difficult to operate the manual hoist due to the gravity operation, which requires the coordination and cooperation of multiple people. At the same time, the manual hoist is relatively unstable and easy to shake ,There are security risks.
发明内容Contents of the invention
本实用新型的目的是提供一种用于立式矫直机辊组的平衡式吊具,其用于大孔径无缝钢管精整矫直机矫直辊组的现场拆卸与安装作业,通过利用杠杆平衡原理,在消除现有吊装装置安全隐患的基础上,减轻作业强度,减少作业时间与人力消耗,有效提高作业效率,满足的现场生产作业的需要。The purpose of this utility model is to provide a balanced suspension for vertical straightening machine rollers, which is used for on-site disassembly and installation of large-diameter seamless steel pipe finishing and straightening machine straightening rollers. The principle of lever balance, on the basis of eliminating the safety hazards of the existing hoisting devices, reduces the work intensity, reduces the work time and manpower consumption, effectively improves the work efficiency, and meets the needs of on-site production operations.
为了实现上述发明目的,本实用新型提供了一种用于立式矫直机辊组的平衡式吊具,其包括:In order to achieve the purpose of the above invention, the utility model provides a balanced hanger for a vertical straightening machine roller group, which includes:
一平衡杆;a balance bar;
一平衡杆支柱,设于所述平衡杆的中部;a balance pole strut, located in the middle of the balance pole;
一铲头平板,固定设于所述平衡杆的一端端部;A shovel head plate fixed at one end of the balance bar;
一配重箱,固定设于所述平衡杆的另一端端部。A counterweight box is fixed on the other end of the balance pole.
上述吊具使用时,根据需要吊装的立式矫直机辊组的重量选择适当的配重,将配重放置在配重箱内,然后将铲头平板插入待吊装的矫直机辊组的辊座与矫直辊之间的缝隙中,将吊装用钢丝绳与平衡杆支柱固定连接好,开动行车便可将立式矫直机辊组平行吊运至指定的位置。When using the above spreader, select an appropriate counterweight according to the weight of the vertical leveler roll set to be hoisted, place the counterweight in the counterweight box, and then insert the shovel head plate into the roll of the leveler roll set to be hoisted In the gap between the seat and the straightening roller, the steel wire rope for hoisting is fixedly connected with the balance bar pillar, and the vertical straightening machine roller group can be hoisted in parallel to the designated position when the driving is started.
优选地,所述平衡杆的中部与所述平衡杆支柱铰接。Preferably, the middle part of the balance pole is hinged to the support of the balance pole.
优选地,所述平衡杆放置于所述平衡杆支柱上,平衡杆的中部与平衡杆支柱接触连接。Preferably, the balance pole is placed on the balance pole support, and the middle part of the balance pole is in contact with the balance pole support.
优选地,所述平衡杆支柱上设有至少一吊装孔。Preferably, at least one hoisting hole is provided on the balance pole pillar.
优选地,所述铲头平板与平衡杆之间还设有至少一定位平板组件,用以实现铲头平板与平衡杆之间的固定连接。Preferably, at least one positioning plate assembly is provided between the shovel head plate and the balance bar to realize the fixed connection between the shovel head plate and the balance bar.
优选地,所述配重箱上还设有至少一个吊钩。Preferably, at least one hook is further provided on the counterweight box.
优选地,所述平衡杆支柱上设有两个对称设置的吊装孔,一销轴贯穿所述两个吊装孔设置于平衡杆支柱上。Preferably, two symmetrically arranged hoisting holes are provided on the balance bar strut, and a pin shaft is arranged on the balance bar strut through the two hoisting holes.
本实用新型所述的用于立式矫直机辊组的平衡式吊具,其结构简单,通过巧妙的运用杠杆原理,能够实现立式矫直机辊组的快速拆卸与安装,在吊运过程中无安全隐患,大大提高了工作效率。The balanced sling used for the roller group of the vertical straightening machine described in the utility model has a simple structure, and can realize the quick disassembly and installation of the roller group of the vertical straightening machine by ingeniously using the lever principle. There is no potential safety hazard in the process, which greatly improves work efficiency.
附图说明Description of drawings
以下结合附图和具体实施例来对本实用新型所述的用于立式矫直机辊组的平衡式吊具做进一步说明。The balanced hanger used for the vertical straightening machine roller group described in the utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.
图1为本实用新型所述的用于立式矫直机辊组的平衡式吊具的一种典型实施方式的结构示意图。Fig. 1 is a structural schematic diagram of a typical embodiment of a balanced hanger for a vertical straightening machine roller set according to the present invention.
图2为图1的侧视图。FIG. 2 is a side view of FIG. 1 .
图3为本实用新型所述的用于立式矫直机辊组的平衡式吊具中平衡杆与平衡杆支柱的连接关系示意图。Fig. 3 is a schematic diagram of the connection relationship between the balance bar and the balance bar pillar in the balanced spreader for the vertical straightening machine roller group according to the present invention.
图4为图3的侧视图。FIG. 4 is a side view of FIG. 3 .
图5为本实用新型所述的用于立式矫直机辊组的平衡式吊具的使用状态图。Fig. 5 is a view of the use state of the balanced hanger used for the vertical straightening machine roller set according to the utility model.
具体实施方式Detailed ways
如图1和图2所示,该用于立式矫直机辊组的平衡式吊具包括:平衡杆1;平衡杆支柱2为框架结构,平衡杆1的中部搁置于平衡杆支柱2上,二者形成杠杆结构;铲头平板3固定设于平衡杆1的一端端部;配重箱4,固定设于平衡杆1的另一端端部,设于配重箱内的配重根据待吊装的矫直机辊组的重量进行选择,为了便于配重箱的安装,配重箱4上设有一对对称设置的吊钩41。As shown in Fig. 1 and Fig. 2, the balanced spreader for the vertical straightening machine roller group includes: a
如图3和图4所示,平衡杆支柱2上对称的位置开有一对销孔,销轴6设于其内,销轴7与销孔之间设有滚动轴承6。平衡杆1的右端端部,其上下两个面上均固定设有两块定位平板5,共同形成了定位平板组件,铲头平板与定位板组件固定连接。As shown in Fig. 3 and Fig. 4, a pair of pin holes are opened at symmetrical positions on the
如图5所示,吊具使用时,根据需要吊装的立式矫直机辊组的重量选择适当的配重,将配重放置在配重箱4内,然后将铲头平板3插入待吊装的矫直机辊组的辊座9与矫直辊8之间的缝隙中,将吊装用钢丝绳10与平衡杆支柱2固定连接好,开动行车便可将立式矫直机辊组平行吊运至指定的位置。As shown in Figure 5, when using the sling, select an appropriate counterweight according to the weight of the vertical leveler roller set to be hoisted, place the counterweight in the
本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本实用新型,而并非用作为对本实用新型的限定,只要在本实用新型的实质精神范围内,对以上所述实施例的变化、变型都将落在本实用新型的权利要求书范围内。Those of ordinary skill in the art should recognize that the above embodiments are only used to illustrate the utility model, rather than as a limitation to the utility model, as long as within the spirit of the utility model, the above-mentioned The changes and modifications of the embodiments will all fall within the scope of the claims of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205351641U CN201825633U (en) | 2010-09-19 | 2010-09-19 | Balanced hanger for roll group of vertical straightening machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205351641U CN201825633U (en) | 2010-09-19 | 2010-09-19 | Balanced hanger for roll group of vertical straightening machine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201825633U true CN201825633U (en) | 2011-05-11 |
Family
ID=43964183
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010205351641U Expired - Fee Related CN201825633U (en) | 2010-09-19 | 2010-09-19 | Balanced hanger for roll group of vertical straightening machine |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201825633U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105417351A (en) * | 2016-01-12 | 2016-03-23 | 中车贵阳车辆有限公司 | Car coupler buffer hoisting device and hoisting method thereof |
| CN111517221A (en) * | 2020-03-27 | 2020-08-11 | 海洋石油工程(青岛)有限公司 | Pipe fitting hoisting and assembling method |
-
2010
- 2010-09-19 CN CN2010205351641U patent/CN201825633U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105417351A (en) * | 2016-01-12 | 2016-03-23 | 中车贵阳车辆有限公司 | Car coupler buffer hoisting device and hoisting method thereof |
| CN105417351B (en) * | 2016-01-12 | 2017-08-01 | 中车贵阳车辆有限公司 | A kind of coupler draft gear handling apparatus and its handling method |
| CN111517221A (en) * | 2020-03-27 | 2020-08-11 | 海洋石油工程(青岛)有限公司 | Pipe fitting hoisting and assembling method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204675602U (en) | A kind of novel squeeze roll changing rig | |
| CN104649122B (en) | A kind of novel squeeze roll changing rig | |
| CN201980858U (en) | Leveling-machine supporting-roller hoisting tool | |
| CN201678360U (en) | An equipment hoisting device | |
| CN202575637U (en) | Lifting device for overhauling annealing furnaces | |
| CN202098959U (en) | Lifting tool for replacing tension roller of cold rolling temper mill | |
| CN204416909U (en) | A kind of suspender for changing vertical miller roll | |
| CN201864455U (en) | Special guide lifting appliance for milling line | |
| CN204873450U (en) | Be applied to hoist of backing roll | |
| CN204938732U (en) | Bulb type hydraulic ram lifting device | |
| CN204702399U (en) | A kind of Steel plate hoisting implement | |
| CN203284167U (en) | Hanging cable pulley overhauling device of large bridge crane | |
| CN209651728U (en) | The hanging apparatus of thin-wall barrel workpiece | |
| CN202717508U (en) | Lifting device for carbon sleeve roller | |
| CN201380286Y (en) | Special lifting tool for entirely hoisting bale rotary table | |
| CN103693577A (en) | Roller-exchanging roller hanging device | |
| CN206108845U (en) | Roller hoist for dismouting is stabilized to annealing stove | |
| CN204508570U (en) | Medium-speed pulverizer mill hoisting mechanism | |
| CN204549893U (en) | A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing | |
| CN205802756U (en) | Rolling mill smoothing roll roller sheet dismounting special hanger | |
| CN205709589U (en) | A mobile crane | |
| CN204148240U (en) | A kind of roller mill working roll lifting device | |
| CN204588465U (en) | The lifting device of the side press module of large lateral pressure milling train | |
| CN204265222U (en) | Sintering pallet Novel hanging tool | |
| CN203715065U (en) | Large-size multilayer load bearing frame pipeline lifting structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: BAOSTEEL SPECIAL STEEL CO., LTD. Free format text: FORMER OWNER: BAOSHAN IRON + STEEL CO., LTD. Effective date: 20140128 |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 201900 BAOSHAN, SHANGHAI TO: 200940 BAOSHAN, SHANGHAI |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20140128 Address after: 200940 Baoshan District aquatic Road, Shanghai, No. 1269 Patentee after: BAOSTEEL SPECIALSTEEL CO., LTD. Address before: 201900 Shanghai City, Baoshan District Mudanjiang Road No. 1813 South Patentee before: Baoshan Iron & Steel Co., Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110511 Termination date: 20190919 |