CN201809771U - 铁塔基础浇灌定位工具 - Google Patents

铁塔基础浇灌定位工具 Download PDF

Info

Publication number
CN201809771U
CN201809771U CN2010205681073U CN201020568107U CN201809771U CN 201809771 U CN201809771 U CN 201809771U CN 2010205681073 U CN2010205681073 U CN 2010205681073U CN 201020568107 U CN201020568107 U CN 201020568107U CN 201809771 U CN201809771 U CN 201809771U
Authority
CN
China
Prior art keywords
foundation
positioning plate
iron tower
location
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205681073U
Other languages
English (en)
Inventor
潘红玲
严传飞
杨正新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Electric Power Co Xiangyang Xiang Zhou Power Supply Co
State Grid Corp of China SGCC
Original Assignee
XIANGFAN XIANGYANG POWER SUPPLY CO Ltd HUBEI ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIANGFAN XIANGYANG POWER SUPPLY CO Ltd HUBEI ELECTRIC POWER Co filed Critical XIANGFAN XIANGYANG POWER SUPPLY CO Ltd HUBEI ELECTRIC POWER Co
Priority to CN2010205681073U priority Critical patent/CN201809771U/zh
Application granted granted Critical
Publication of CN201809771U publication Critical patent/CN201809771U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种铁塔基础浇灌定位工具,用于铁塔基础浇灌施工。定位板的斜对角线方向设有腰形通孔,定位板的上下两面装有相互垂直且带有紧固孔的钢管一、钢管二,紧固螺钉一、紧固螺钉二分别装在紧固孔内,定位板的斜对角线方向装有螺母座,旋转螺杆旋在螺母座内。浇灌施工前,将控制铁塔根开的四个辅助钢管分别插入定位板上下两面的钢管内,用紧固螺钉固定并定位在地基中后,转动定位板上的旋转螺杆,使每块定位板上的基础螺栓的平面中心点与定位板的中心点重合,即可实施浇灌。本实用新型可以高效、快捷定位铁塔基础浇灌施工的四个地笼的相对位置,缩短基础浇灌时间,提高基础浇灌的效益与施工工艺水平。

Description

铁塔基础浇灌定位工具
技术领域
本实用新型涉及电力施工技术领域,特别是用于铁塔基础浇灌时能定位铁塔四个方位基础螺栓位置的定位装置。
背景技术
铁塔基础施工一般分为三个阶段:一是基础开挖阶段,二是基础浇灌阶段,三是基础养护阶段。在日常的施工过程中,现场的基础开挖与基础内浇注的钢骨架制作是同步进行的,基础浇灌时先将制好的带有基础螺栓的钢骨架俗称“地笼”(由基础螺栓与钢骨架组成)放置在开挖好的基础内,将铁塔四个脚的地笼放正后浇灌混凝土,浇灌好的混凝土基础经过养护,即可在浇灌后的地笼上组装杆塔了。
目前,基础浇灌时铁塔四个方位基础螺栓的定位,尚无成型的专用工具,普遍采用塑料、棉质、尼龙等材质的线、绳拉成网格进行定位,因线绳类定位工具刚性差,基础浇灌施工过程中产生的碰触会使定位拉线发生移位、断裂,定位不准确,影响施工效率。
发明内容
为解决现有定位拉线在基础浇灌时使基础螺栓的定位存在的效率不高、定位不准的问题,本实用新型的发明目的在于提供一种铁塔基础浇灌定位工具,以实现铁塔基础浇灌时使基础螺栓定位准确、提高施工效率的目的。
为实现上述目的,本实用新型的技术方案是:定位板的斜对角线方向设有腰形通孔,定位板的上下两面装有相互垂直且带有紧固孔的钢管一、钢管二,紧固螺钉一、紧固螺钉二分别装在紧固孔内,定位板的斜对角线方向装有螺母座,旋转螺杆旋在螺母座内。
浇灌施工前,将控制铁塔根开的四个辅助钢管分别插入定位板上下两面的钢管内,用紧固螺钉固定并定位在地基中后,转动定位板上的旋转螺杆,使每块定位板上的基础螺栓的平面中心点与定位板的中心点重合,即可实施浇灌。
本实用新型与现有技术相比,可以高效、快捷定位铁塔基础浇灌施工的四个地笼的相对位置,缩短基础浇灌时间,提高基础浇灌的效益与施工工艺水平。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型的结构简图;
图2是本实用新型的应用简图。
具体实施方式
如图1所示,定位板1用500mm*500mm*5mm的钢板制作,定位板1的斜对角线方向设有四个腰形通孔,通常35kV-110kV输电线路基础螺栓直径在20mm-46mm之间,螺栓间距在200mm-300mm之间,所以每个腰形通孔直径为48mm,槽的最近点离定位板1中心点110mm,最远点离定位板1中心点250mm,以便适用于日常施工维护中出现的各种规格的螺栓直径与螺栓间距;定位板1的上下两面焊接相互垂直直径为50mm的钢管一2、钢管二3,在钢管一2、钢管二3两端约10mm处设置紧固孔,两个紧固螺钉一4、紧固螺钉二5分别装在紧固孔内,定位板1的斜对角线方向焊装有四个螺母座6,四个旋转螺杆7分别旋在螺母座6内,旋转螺杆7长度为210mm,以便在旋转螺杆7伸缩时,控制四个基础螺栓(图中未示出)的平面中心点与定位板1的中心点重合。
如图2所示,控制铁塔基础根开的四个辅助钢管8分别穿过定位板1上下相互垂直的两面钢管一2、钢管二3,即先通过两根辅助钢管从定位板1的下层钢管二3内穿过,确定基础根开a,然后通过另两根钢管从定位板1的上层钢管一2穿过,确定基础根开b,用紧固螺钉一4、紧固螺钉二5固定辅助钢管8,以确定四个定位板的相对位置即基础根开,再用另外14根钢管组成的支撑架(图中未示出)将基础地笼相对位置固定,并在一个平面,同时四个地笼所组成的平面中心点与铁塔中心点位置重合,最后调整每块定位板1的四个旋转螺杆7,使每块定位板1上的基础螺栓的平面中心点与定位板的中心点重合,即可实施浇灌。

Claims (2)

1.一种铁塔基础浇灌定位工具,其特征在于:定位板(1)的斜对角线方向设有腰形通孔,定位板(1)的上下两面装有相互垂直且带有紧固孔的钢管一(2)、钢管二(3),紧固螺钉一(4)、紧固螺钉二(5)分别装在紧固孔内。
2.根据权利要求1所述的铁塔基础浇灌定位工具,其特征在于:定位板(1)的斜对角线方向装有螺母座(6),旋转螺杆(7)旋在螺母座(6)内。
CN2010205681073U 2010-10-06 2010-10-06 铁塔基础浇灌定位工具 Expired - Fee Related CN201809771U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205681073U CN201809771U (zh) 2010-10-06 2010-10-06 铁塔基础浇灌定位工具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205681073U CN201809771U (zh) 2010-10-06 2010-10-06 铁塔基础浇灌定位工具

Publications (1)

Publication Number Publication Date
CN201809771U true CN201809771U (zh) 2011-04-27

Family

ID=43892712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205681073U Expired - Fee Related CN201809771U (zh) 2010-10-06 2010-10-06 铁塔基础浇灌定位工具

Country Status (1)

Country Link
CN (1) CN201809771U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561383A (zh) * 2011-06-23 2012-07-11 中冶建工集团有限公司 塔吊底座安装方法
CN104294840A (zh) * 2014-09-16 2015-01-21 中国建筑第二工程局有限公司 塔吊基础固定支脚调节系统及其施工工法
CN104532870A (zh) * 2014-11-28 2015-04-22 国网河南省电力公司洛阳供电公司 一种预埋螺栓定位装置
CN106400829A (zh) * 2016-11-29 2017-02-15 国网河南省电力公司三门峡供电公司 用于塔基的定位装置及基于该定位装置的塔基施工方法
CN106436744A (zh) * 2016-11-29 2017-02-22 国网河南省电力公司三门峡供电公司 一种塔基定位机构及塔基定位施工方法
CN112411601A (zh) * 2020-11-10 2021-02-26 梁昌爱 一种通讯电塔施工基础地基施工方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561383A (zh) * 2011-06-23 2012-07-11 中冶建工集团有限公司 塔吊底座安装方法
CN102561383B (zh) * 2011-06-23 2015-02-18 中冶建工集团有限公司 塔吊底座安装方法
CN104294840A (zh) * 2014-09-16 2015-01-21 中国建筑第二工程局有限公司 塔吊基础固定支脚调节系统及其施工工法
CN104294840B (zh) * 2014-09-16 2015-11-18 中国建筑第二工程局有限公司 塔吊基础固定支脚调节系统及其施工工法
CN104532870A (zh) * 2014-11-28 2015-04-22 国网河南省电力公司洛阳供电公司 一种预埋螺栓定位装置
CN106400829A (zh) * 2016-11-29 2017-02-15 国网河南省电力公司三门峡供电公司 用于塔基的定位装置及基于该定位装置的塔基施工方法
CN106436744A (zh) * 2016-11-29 2017-02-22 国网河南省电力公司三门峡供电公司 一种塔基定位机构及塔基定位施工方法
CN112411601A (zh) * 2020-11-10 2021-02-26 梁昌爱 一种通讯电塔施工基础地基施工方法

Similar Documents

Publication Publication Date Title
CN103103987B (zh) 一种组合钢板桩施工导向架及其组合钢板桩施工方法
CN203022024U (zh) 一种管廊现浇施工整体移动式模架
CN205669338U (zh) 一种分片式折弯钢塔结构
CN203891058U (zh) 一种固定式塔吊基础预埋地脚螺栓定位工具
CN106884541A (zh) 剪力墙内预留插筋的定位组件、定位装置及定位方法
CN203270599U (zh) 一种地脚螺栓预埋模具
CN105350560A (zh) 一种海上测风雷达基础结构及其安装方法
CN203741866U (zh) 一种混凝土基础内预埋螺杆的固定架结构
CN205025089U (zh) 现浇混凝土楼板钢套管预埋一次成型施工结构
CN108223294B (zh) 混凝土塔筒高空用预应力穿筋及锚栓调平装置的使用方法
CN205933000U (zh) 一种超高层外挂动臂塔吊爬升支撑装置
CN204982776U (zh) 多个大型混凝土支墩同步施工滑模系统
CN207160045U (zh) 一种支架基础预埋螺栓定位装置
CN202832238U (zh) 输电铁塔复合基础锚固钻机全方位移动底座
CN202381269U (zh) 风力发电机基础环安装水平度的调整装置
CN202114437U (zh) 基础螺栓定位装置
CN207436091U (zh) 一种设备基础用环状地脚螺栓快速定位装置
CN206110123U (zh) 钢筋笼定位装置
CN205476528U (zh) 预制桩快速就位装置
CN105064681B (zh) 一种钢结构地脚螺栓的安装方法
CN105297711B (zh) 一种可重复利用的桩基钢筋笼桩定位装置及方法
CN103510514A (zh) 一种钢绞线锚具基座
CN202881968U (zh) 厂房螺栓预埋精度控制结构
CN203113362U (zh) 一种钢结构厂房预制基础结构
CN203440827U (zh) 电气化铁路接触网钢管支柱基础螺栓定位模具

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XIANGYANG XIANGZHOU POWER SUPPLY COMPANY OF HUBEI

Free format text: FORMER OWNER: XIANGFAN XIANGYANG POWER SUPPLY COMPANY OF HUBEI ELECTRIC POWER CORP.

Effective date: 20121214

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121214

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121214

Address after: 441100 Xiangfan City, Hubei province Xiangyang District Zhangwan Aviation Road No. 195

Patentee after: Hubei electric power company Xiangyang Xiang Zhou power supply company

Patentee after: State Grid Corporation of China

Address before: 441100 Xiangfan City, Hubei province Xiangyang District Zhangwan Aviation Road No. 195

Patentee before: Xiangfan Xiangyang Power Supply Co., Ltd., Hubei Electric Power Company

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110427

Termination date: 20181006