CN201797066U - 一种能二次验电的接地线 - Google Patents

一种能二次验电的接地线 Download PDF

Info

Publication number
CN201797066U
CN201797066U CN2010202071831U CN201020207183U CN201797066U CN 201797066 U CN201797066 U CN 201797066U CN 2010202071831 U CN2010202071831 U CN 2010202071831U CN 201020207183 U CN201020207183 U CN 201020207183U CN 201797066 U CN201797066 U CN 201797066U
Authority
CN
China
Prior art keywords
ground
wire
hook
electroscope
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202071831U
Other languages
English (en)
Inventor
王启新
王宇
李细楚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUIZHOU POWER SUPPLY Co OF HUBEI ELECTRIC POWER Co
State Grid Corp of China SGCC
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010202071831U priority Critical patent/CN201797066U/zh
Application granted granted Critical
Publication of CN201797066U publication Critical patent/CN201797066U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

一种能二次验电的接地线。验电器、活动绝缘连杆、接地挂钩、绝缘操作杆顺序相连;再从接地挂钩处与接地软铜线、接地桩相连。停电线路进行正常操作停电验电后,在挂接地线时,固定在接地挂钩上的验电器必然先靠近导线,如有电压随即报警,即刻停止再向上挂接地挂钩,从而避免事故的发生;当验电器验明线路确无电压后,继续往上举起绝缘操作杆,挂上接地挂钩,即完成操作。

Description

一种能二次验电的接地线 
技术领域
本实用新型涉及电力线路施工安全领域,特别是涉及一种能二次验电的接地线。 
背景技术
目前,根据《电力安全规程(线路部分)》的要求,保证供电线路施工安全的技术措施是:停电、验电和挂接地线。当停电验电后,却不能做到立即挂上接地线,这是因为接地线需要施工人员在杆塔上用绳索从地面吊上来,才能挂上,这一过程约需2-5分钟时间,这期间停电线路随时有来电的可能,出现带电挂接地线重大事故。 
实用新型内容
为了克服传统接地线的不足,尽量缩短验电和挂接地线这之间的时间,保证施工人员和设备安全,本实用新型开发一种能二次验电的接地线。 
本实用新型所要解决的技术目的:按正常停电施工程序,进行停电、验电、挂接地线,在挂接地线时利用固定在接地线上的验电器再次验电,即二次验电。在再次验电确无电压后,几秒钟内能挂上接地线,从而防止触电事故和设备损坏事故的发生,更加安全地保证施工顺利进行。 
为了实现上述目的,本实用新型采用以下技术方案实现的。 
本实用新型提出一种能二次验电的接地线,验电器、活动绝缘连杆、接地挂钩、绝缘操作杆顺序相连;再从接地挂钩处与接地软铜线、接地桩相连,活 动绝缘连杆的一端与验电器连接,活动绝缘连杆的另一端与接地挂钩连接。验电器与接地挂钩之间有一定长度的活动绝缘连杆。 
活动绝缘连杆与接地挂钩可以拆卸分离。 
为了确保施工安全,本实用新型能二次验电接地线必须在按《电力线路安全规程》正常停电、验电后方能挂上使用,其它如铜软线与接地挂钩、接地桩、挂接地线方法符合技术标准和操作要求。 
附图说明
图1为该实用新型一种能二次验电的接地线示意图。 
具体实施方式
参阅图1,本实用新型是由相应电压等级验电器1,活动绝缘连杆2,接地挂钩3,接地软铜线4,绝缘操作杆5,接地桩6组成;验电器1、活动绝缘连杆2、接地挂钩3、绝缘操作杆5顺序相连;再从接地挂钩处3与接地软铜线4、接地桩6相连,活动绝缘连杆2的一端与验电器1连接,活动绝缘连杆2的另一端与接地挂钩3连接。 
参阅图1,停电线路进行正常操作停电验电后,在活动绝缘连杆2的上端用螺丝固定验电器1,活动绝缘连杆2的下端用螺丝固定在接地挂钩3上。然后把接地软铜线4、绝缘操作杆5,接地桩6按按常规方式分别组装完毕后,按《电力安全规程》操作程序进行,当挂接地线时,验电器1必然先靠近导线,如有电压随即报警,即刻停止再向上挂接地挂钩3,从而避免事故的发生。 
当验电器1验明线路确无电压后,才能继续往上举起绝缘操作杆5,挂上导线接地挂钩3,即完成操作。 
活动绝缘连杆2与接地挂钩3可以拆卸分离,当施工完毕后取下相应部分分别妥善保管。 

Claims (3)

1.一种能二次验电的接地线,验电器、活动绝缘连杆、接地挂钩、绝缘操作杆顺序相连;再从接地挂钩处与接地软铜线、接地桩相连,其特征在于活动绝缘连杆的一端与验电器连接,活动绝缘连杆的另一端与接地挂钩连接。
2.根据权利要求书1所述一种能二次验电的接地线,其特征是验电器与接地挂钩之间有一定长度的活动绝缘连杆。
3.根据权利要求书1所述一种能二次验电的接地线,其特征是活动绝缘连杆与接地挂钩可以拆卸分离。 
CN2010202071831U 2010-05-18 2010-05-18 一种能二次验电的接地线 Expired - Fee Related CN201797066U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202071831U CN201797066U (zh) 2010-05-18 2010-05-18 一种能二次验电的接地线

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202071831U CN201797066U (zh) 2010-05-18 2010-05-18 一种能二次验电的接地线

Publications (1)

Publication Number Publication Date
CN201797066U true CN201797066U (zh) 2011-04-13

Family

ID=43851966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202071831U Expired - Fee Related CN201797066U (zh) 2010-05-18 2010-05-18 一种能二次验电的接地线

Country Status (1)

Country Link
CN (1) CN201797066U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105161878A (zh) * 2015-06-18 2015-12-16 国家电网公司 配电快速声光验电接地线
CN106990280A (zh) * 2017-05-11 2017-07-28 广东电网有限责任公司清远供电局 一种高压验电器
CN109142850A (zh) * 2018-10-29 2019-01-04 广东电网有限责任公司 一种验电器头用导向机构
CN109212298A (zh) * 2018-10-29 2019-01-15 广东电网有限责任公司 一种全线通用型验电器头

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105161878A (zh) * 2015-06-18 2015-12-16 国家电网公司 配电快速声光验电接地线
CN106990280A (zh) * 2017-05-11 2017-07-28 广东电网有限责任公司清远供电局 一种高压验电器
CN109142850A (zh) * 2018-10-29 2019-01-04 广东电网有限责任公司 一种验电器头用导向机构
CN109212298A (zh) * 2018-10-29 2019-01-15 广东电网有限责任公司 一种全线通用型验电器头
CN109212298B (zh) * 2018-10-29 2023-08-01 广东电网有限责任公司 一种全线通用型验电器头
CN109142850B (zh) * 2018-10-29 2023-08-01 广东电网有限责任公司 一种验电器头用导向机构

Similar Documents

Publication Publication Date Title
CN203929814U (zh) 避雷器带电测试专用接线钳
CN202026034U (zh) 10kV线路架空导线绝缘抬线器
CN201797066U (zh) 一种能二次验电的接地线
CN108459196A (zh) 一种验电简易装置
CN203932808U (zh) 带电更换绝缘子导线提升装置
CN113009379A (zh) 一种基于无人机斜拉法的特高压线路人工短路试验方法
CN201857793U (zh) 带有驱鸟器的铁塔
CN106299764B (zh) 一种具有双挂线模式的导线接地线夹
CN203166397U (zh) 一种消除感应电压的电路结构
CN103532052A (zh) 一种adss光缆带电架设简易跨越架及实施方法
CN203013967U (zh) 可转变角度导线接地装置
CN202616664U (zh) 绝缘抬线器
CN102684108A (zh) 10kV线路架空导线带电修复方法及绝缘抬线器
CN203398351U (zh) 一种挂接地线验电提醒装置
CN103746198A (zh) 验电接地一体杆
CN208013285U (zh) 一种验电简易装置
CN205335800U (zh) 一种导线绝缘支撑板装置
CN206002592U (zh) 一种架空线路地面验电器
CN204597353U (zh) 一种t形单杆瓷横担提线装置
CN203932626U (zh) 一种接地线
CN203536864U (zh) 一种adss光缆带电架设简易跨越架
CN202905989U (zh) 10kV多用途接地线
CN203242956U (zh) 钩导线绝缘单梯
CN105301295B (zh) 室内电缆进线变压器绕组短接装置
CN204067617U (zh) 接地装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SUIZHOU ELECTRIC POWER SUPPLY COMPANY, HUBEI ELECT

Free format text: FORMER OWNER: WANG YU

Effective date: 20131009

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: WANG QIXIN

Effective date: 20131009

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 441300 SUIZHOU, HUBEI PROVINCE TO: 100031 DONGCHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131009

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Patentee after: State Grid Corporation of China

Patentee after: Suizhou Power Supply Company of Hubei Electric Power Company

Address before: 441300 power supply center of urban power supply center, No. 9 Yanhe Road, Hubei, Suizhou

Patentee before: Wang Qixin

Patentee before: Wang Yu

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20150518

EXPY Termination of patent right or utility model