CN201785405U - Steel slag hot-integrating pool - Google Patents

Steel slag hot-integrating pool Download PDF

Info

Publication number
CN201785405U
CN201785405U CN2010205177999U CN201020517799U CN201785405U CN 201785405 U CN201785405 U CN 201785405U CN 2010205177999 U CN2010205177999 U CN 2010205177999U CN 201020517799 U CN201020517799 U CN 201020517799U CN 201785405 U CN201785405 U CN 201785405U
Authority
CN
China
Prior art keywords
billet
shaped
slag
steel
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205177999U
Other languages
Chinese (zh)
Inventor
谷金生
王远志
岳文龙
周维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ansteel Engineering Technology Corp Ltd
Original Assignee
Ansteel Engineering Technology Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ansteel Engineering Technology Corp Ltd filed Critical Ansteel Engineering Technology Corp Ltd
Priority to CN2010205177999U priority Critical patent/CN201785405U/en
Application granted granted Critical
Publication of CN201785405U publication Critical patent/CN201785405U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

本实用新型公开了一种钢渣热闷渣池,主要包括渣池四壁钢筋混凝土墙(1),其特征在于,钢筋混凝土墙(1)的侧壁上设有若干个T字形槽(2),每个T字形槽(2)内插入一个或分段插入多个H型钢(3),相邻两个T字形槽(2)内的H型钢(3)之间插入两块以上的钢坯(4)。本实用新型可将原来从上至下的一整块钢坯分割成多块安装,且不需增加固定装置,从而即可以减小每块钢坯的体积、增加钢坯的自由端数量进而减小每块钢坯的变形量,增加热闷渣护及其固定装置的使用寿命,降低生产成本,提高作业率。

The utility model discloses a hot stuffy slag pool for steel slag, which mainly includes reinforced concrete walls (1) on the four walls of the slag pool, and is characterized in that several T-shaped grooves (2) are arranged on the side walls of the reinforced concrete wall (1) One or more H-shaped steels (3) are inserted in each T-shaped groove (2), and more than two steel billets are inserted between the H-shaped steels (3) in two adjacent T-shaped grooves (2) ( 4). The utility model can divide the original whole billet from top to bottom into multiple pieces for installation without adding fixing devices, thereby reducing the volume of each billet, increasing the number of free ends of the billet and reducing the number of each billet. The deformation of the billet increases the service life of the hot stuffy slag protection and its fixing devices, reduces the production cost and improves the operation rate.

Description

一种钢渣热闷渣池 A hot stuffy slag pool for steel slag

技术领域technical field

本实用新型属于金属冶炼领域,特别涉及一种钢渣热闷渣池。The utility model belongs to the field of metal smelting, in particular to a hot stuffy slag pool for steel slag.

背景技术Background technique

目前,在炼钢炉渣热闷渣池内四壁需要用钢坯做护板,以保护热闷渣池的池壁,由于闷渣的工艺要求,需要将热态的钢渣1100℃倒入闷渣池中,然后打水冷却。现应用的热闷渣池的护板是采用将多块长与热闷渣池深相同的钢坯安装在热闷渣池四周并用长螺栓将其与热闷渣池壁固定在一起,但是由于热渣池内温度变化大(由1100℃降至80℃左右)从而导致钢坯护板变形大、护板固定螺栓变形,最后导致固定装置失效、护板向内倾倒、生产终断。由于钢坯体积、厚度大,恢复原状比较困难,维护及更换时间长。由于护板固定螺栓是穿透热闷渣池侧壁的,更换时相当困难,有时需要破坏地面,另外由于热闷渣池在生产时是处于高温的碱性蒸汽环境中,导致设备维护及更换次数频繁。现有热闷渣池护板及其固定装置寿命比较短,且生产成本大,对生产影响大。At present, the four walls in the hot slag pool of steelmaking slag need to use steel billets as guard plates to protect the pool wall of the hot slag pool. Due to the technical requirements of the hot slag pool, it is necessary to pour hot steel slag at 1100°C into the stuffy slag pool , and then pour water to cool. The protective plate of the hot stuffy slag pool currently used is to install multiple steel billets with the same length and depth as the hot stuffy slag pool around the hot stuffy slag pool and fix them with the wall of the hot stuffy slag pool with long bolts. Large temperature changes in the slag pool (from 1100°C to about 80°C) lead to large deformation of the billet guard plate and deformation of the guard plate fixing bolts, which eventually lead to failure of the fixing device, inward dumping of the guard plate, and production interruption. Due to the large volume and thickness of the billet, it is difficult to restore the original shape, and the maintenance and replacement time is long. Since the fixing bolts of the guard plate penetrate the side wall of the hot stuffy slag pool, it is quite difficult to replace it, and sometimes the ground needs to be destroyed. In addition, because the hot stuffy slag pool is in a high-temperature alkaline steam environment during production, it leads to equipment maintenance and replacement. Frequently. The existing hot stuffy slag pool guard plate and its fixing device have relatively short service life, high production cost, and great impact on production.

实用新型内容Utility model content

本实用新型的目的在于提供一种可快速安装或更换、以及减小钢坯变形增加使用寿命的钢渣热闷渣池。The purpose of the utility model is to provide a steel slag hot stuffy slag pool that can be quickly installed or replaced, and can reduce the deformation of the billet and increase the service life.

本实用新型的目的,一种钢渣热闷渣池,主要包括渣池四壁钢筋混凝土墙,其特征在于,钢筋混凝土墙的侧壁上设有若干个T字形槽,每个T字形槽内插入一个或分段插入多个H型钢,相邻两个T字形槽内的H型钢之间插入两块以上的钢坯。T字形槽、H型钢及钢坯之间留有1~10mm的间隙。The purpose of this utility model is a hot stuffy slag pool for steel slag, which mainly includes reinforced concrete walls on the four walls of the slag pool. Insert multiple H-shaped steels one by one or in sections, and insert more than two billets between the H-shaped steels in two adjacent T-shaped slots. A gap of 1 to 10mm is left between the T-shaped groove, the H-shaped steel and the billet.

本实用新型H型钢、钢坯的更换及安装可用厂房内的吊车进行安装,既方便又快捷,可节省大量的安装时间,为生产的顺利进行提供了保障。本实用新型可以将原来从上至下的一整块钢坯分割成多块安装,且不需增加固定装置,可以减小每块钢坯的体积、增加钢坯的自由端数量,进而减小每块钢坯的变形量,增加热闷渣护板及其固定装置的使用寿命,降低生产成本,提高作业率。The replacement and installation of the H-shaped steel and steel billet of the utility model can be installed by a crane in the factory building, which is convenient and fast, can save a lot of installation time, and provides a guarantee for the smooth progress of production. The utility model can divide a whole steel billet from top to bottom into multiple pieces for installation, and does not need to add fixing devices, can reduce the volume of each steel billet, increase the number of free ends of the steel billet, and further reduce the number of each steel billet The amount of deformation increases, the service life of the hot stuffy slag guard and its fixing devices is increased, the production cost is reduced, and the operation rate is improved.

附图说明Description of drawings

图1为本实用新型钢渣热闷渣池的平面布置图;Fig. 1 is the plane layout drawing of hot stuffy slag pond of steel slag of the present invention;

图2为本实用新型钢渣热闷渣池的断面图;Fig. 2 is the sectional view of hot stuffy slag pond of steel slag of the present utility model;

图3为本实用新型钢渣热闷渣池的局部放大图。Fig. 3 is a partially enlarged view of the steel slag hot stuffy slag pool of the utility model.

具体实施方式Detailed ways

下面结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

如图1、2、3所示,一种钢渣热闷渣池,主要包括渣池四壁钢筋混凝土墙1,钢筋混凝土墙1的侧壁上设有若干个T字形槽2,每个T字形槽2内插入一个或分段插入多个H型钢3(渣池较深的情况可将H型钢分成两段以上),相邻两个T字形槽2内的H型钢3之间插入两块以上的钢坯4。T字形槽2、H型钢3及钢坯4之间留有1~10mm的间隙。As shown in Figures 1, 2, and 3, a hot stuffy slag pool for steel slag mainly includes reinforced concrete walls 1 on the four walls of the slag pool. Several T-shaped grooves 2 are arranged on the side walls of the reinforced concrete wall 1, and each T-shaped Insert one or multiple H-shaped steel 3 into the slot 2 (the H-shaped steel can be divided into two or more sections if the slag pool is deep), and insert more than two pieces of H-shaped steel 3 in two adjacent T-shaped slots 2 The billet 4. A gap of 1 to 10 mm is left between the T-shaped groove 2, the H-shaped steel 3 and the billet 4.

热闷渣池的T字形槽2的数量可根据渣池大小进行布置,并根据钢坯4的厚度确定H型钢3的大小,根据H型钢3的大小确定T字形槽2的大小,根据T字形槽2的大小确定钢筋混凝土墙1的大小。并根据钢坯的变形量确定每块钢坯的大小。The number of T-shaped grooves 2 in the hot stuffy slag pool can be arranged according to the size of the slag pool, and the size of the H-shaped steel 3 is determined according to the thickness of the steel billet 4. The size of the T-shaped groove 2 is determined according to the size of the H-shaped steel 3. According to the size of the T-shaped groove The size of 2 determines the size of the reinforced concrete wall 1. And determine the size of each billet according to the deformation of the billet.

安装或更换时只需用吊车将H型钢3插入侧壁T字形槽内,再将相应尺寸的钢坯4插入相邻两个T字形槽2内的H型钢3之间。由于各部分之间采取插入式,可大减少安装或更换时间,提高生产效率。由于T字形槽2、H型钢3及钢坯4之间留有一定的间隙,可使钢坯膨胀产生的变形及产生的破坏力得以减小甚至是消除,提高了热闷渣池护板及其固定装置的使用寿命,大大降低了生产及维护成本。When installing or replacing, only need to insert the H-shaped steel 3 in the T-shaped groove of the side wall with a crane, and then insert the steel billet 4 of the corresponding size between the H-shaped steel 3 in two adjacent T-shaped grooves 2 . Due to the plug-in type between each part, the installation or replacement time can be greatly reduced and the production efficiency can be improved. Since there is a certain gap between the T-shaped groove 2, the H-shaped steel 3 and the steel billet 4, the deformation and destructive force generated by the expansion of the billet can be reduced or even eliminated, and the protection plate and its fixing of the hot stuffy slag pool are improved. The service life of the device greatly reduces production and maintenance costs.

Claims (2)

1.一种钢渣热闷渣池,主要包括渣池四壁钢筋混凝土墙(1),其特征在于,钢筋混凝土墙(1)的侧壁上设有若干个T字形槽(2),每个T字形槽(2)内插入一个或分段插入多个H型钢(3),相邻两个T字形槽(2)内的H型钢(3)之间插入两块以上的钢坯(4)。1. A hot stuffy slag pool for steel slag, mainly comprising reinforced concrete walls (1) on four walls of the slag pool, characterized in that, the side walls of the reinforced concrete wall (1) are provided with several T-shaped grooves (2), each One or multiple H-shaped steels (3) are inserted into the T-shaped slots (2), and more than two steel billets (4) are inserted between the H-shaped steels (3) in two adjacent T-shaped slots (2). 2.根据权利要求1所述的一种钢渣热闷渣池,其特征在于,T字形槽(2)、H型钢(3)及钢坯(4)之间留有1~10mm的间隙。2. A hot stuffy slag pool for steel slag according to claim 1, characterized in that there is a gap of 1-10 mm between the T-shaped groove (2), the H-shaped steel (3) and the billet (4).
CN2010205177999U 2010-09-03 2010-09-03 Steel slag hot-integrating pool Expired - Fee Related CN201785405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205177999U CN201785405U (en) 2010-09-03 2010-09-03 Steel slag hot-integrating pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205177999U CN201785405U (en) 2010-09-03 2010-09-03 Steel slag hot-integrating pool

Publications (1)

Publication Number Publication Date
CN201785405U true CN201785405U (en) 2011-04-06

Family

ID=43817379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205177999U Expired - Fee Related CN201785405U (en) 2010-09-03 2010-09-03 Steel slag hot-integrating pool

Country Status (1)

Country Link
CN (1) CN201785405U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103820589A (en) * 2014-03-13 2014-05-28 济钢集团国际工程技术有限公司 Slot self-locking type slag disintegrating tank
CN110714105A (en) * 2019-10-29 2020-01-21 宣化钢铁集团有限责任公司 Long-life converter liquid steel slag retaining wall
CN113234873A (en) * 2021-06-08 2021-08-10 中国二十二冶集团有限公司 Multilayer assembled slag disintegrating pool
CN113969327A (en) * 2021-10-25 2022-01-25 中冶东方工程技术有限公司 Steel billet fixing device of steel slag hot stewing pit and steel slag hot stewing pit applying steel slag hot stewing pit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103820589A (en) * 2014-03-13 2014-05-28 济钢集团国际工程技术有限公司 Slot self-locking type slag disintegrating tank
CN103820589B (en) * 2014-03-13 2015-05-13 济钢集团国际工程技术有限公司 Slot self-locking type slag disintegrating tank
CN110714105A (en) * 2019-10-29 2020-01-21 宣化钢铁集团有限责任公司 Long-life converter liquid steel slag retaining wall
CN110714105B (en) * 2019-10-29 2024-03-01 宣化钢铁集团有限责任公司 Liquid steel slag retaining wall of converter with long service life
CN113234873A (en) * 2021-06-08 2021-08-10 中国二十二冶集团有限公司 Multilayer assembled slag disintegrating pool
CN113969327A (en) * 2021-10-25 2022-01-25 中冶东方工程技术有限公司 Steel billet fixing device of steel slag hot stewing pit and steel slag hot stewing pit applying steel slag hot stewing pit

Similar Documents

Publication Publication Date Title
CN201785405U (en) Steel slag hot-integrating pool
CN204126263U (en) A kind of beam, the pre-buried horizontal case fastening devices of wall
CN207016810U (en) One kind cooling wall type blast furnace iron/slag runner
CN202063937U (en) Blast furnace front slag iron runner
CN204187994U (en) Tertiary air valve is special protects brick
CN203097422U (en) Fixed spring clip structure used for sound absorbing barrier of transformer station
CN204768973U (en) Welt and coal pulverizer in coal pulverizer
CN203487843U (en) Heat insulation type round stock ground
CN202109764U (en) Arch crown refractory brick for hot blast furnace
CN205681082U (en) Conduit line and cover plate
CN202602228U (en) Closed type cable pit
CN205077081U (en) Novel "bosh of blast furnace hearth cooling wall links up structure
CN202164311U (en) Water-cooling structure iron storing type iron runner
CN201751785U (en) Arc furnace water-cooling slag-adhering furnace wall structure
CN204692907U (en) Coal injection pipe wear-resistant ceramic external member
CN202667631U (en) Composite safety mark for air brick
CN211260814U (en) A kind of domestic waste incineration grate grate block structure
CN202166320U (en) Refractory block
CN202869669U (en) Thermocouple protection device
CN201377566Y (en) Pulley with easy disassembly and assembly and without damaging armored rope
CN204081465U (en) A kind of New Type Architecture Mode splicing structure
CN203572223U (en) Boiler wall
CN203373378U (en) Bulk material blanking water-cooled sliding chute device of converter
CN206094896U (en) Leak protection heat preservation smelting furnace
CN206109436U (en) Thin furnace lining structure combined with plate wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20170903