CN201765150U CN2010201010544U CN201020101054U CN201765150U CN 201765150 U CN201765150 U CN 201765150U CN 2010201010544 U CN2010201010544 U CN 2010201010544U CN 201020101054 U CN201020101054 U CN 201020101054U CN 201765150 U CN201765150 U CN 201765150U
Authority
CN
China
Prior art keywords
buttress
crossbeam
pier
web member
cross beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201010544U
Other languages
English (en)
Inventor
吴忠新
徐汉东
徐进
刘世坤
王叶平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Institute of building science group Limited by Share Ltd
Original Assignee
CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd filed Critical CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority to CN2010201010544U priority Critical patent/CN201765150U/zh
Application granted granted Critical
Publication of CN201765150U publication Critical patent/CN201765150U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本实用新型涉及一种建筑静载试验用支墩悬吊装置,包括支墩,横梁以及压块,所述支墩上架设有数个横梁,所述横梁上堆积数个压块,所述支墩与所述横梁之间设置有连接件,通过连接件将横梁与支墩固定。本实用新型能够有效减少横梁上压块的堆积数量,充分利用支墩的自重,有效降低运输成本以及吊装成本,并且结构简单,便于推广,经济效益可观,一般单个项目可以减少相应运输费以及吊装费的10-30%。

Description

建筑静载试验用支墩悬吊装置
技术领域
本实用新型涉及工民建、桥梁、道路以及港口的静载试验装置,尤其涉及一种静载试验用支墩悬吊装置。
背景技术
现有技术中,静载试验装置,包括支墩、横梁以及压块,横梁设置在支墩上,然后将压块堆积在横梁上,其中,支墩只是用于支撑横梁,而没有其它用途,由于运输支墩以及压块比较笨重,需要通过起重机进行吊装以及汽车运输,吊装以及运输的成本压力较大。
实用新型内容
本实用新型要解决的技术问题是:提供一种有效降低成本的静载试验用支墩悬吊装置。
为了克服背景技术中存在的缺陷,本实用新型解决其技术问题所采用的技术方案是:一种建筑静载试验用支墩悬吊装置,包括支墩,横梁以及压块,所述支墩上架设有数个横梁,所述横梁上堆积数个压块,所述支墩与所述横梁之间设置有连接件,通过连接件将横梁与支墩固定。
根据本实用新型的另一个实施例,建筑静载试验用支墩悬吊装置进一步包括所述连接件一端与横梁扣接,一端与支墩固定连接。
根据本实用新型的另一个实施例,建筑静载试验用支墩悬吊装置进一步包括所述连接件至少包括绞花篮扣,钢丝绳以及调节螺杆,所述绞花篮扣与钢丝绳活动连接,所述绞花篮扣与横梁铰接,所述调节螺杆位于钢丝绳的中间。
根据本实用新型的另一个实施例,建筑静载试验用支墩悬吊装置进一步包括所述横梁为工字钢。
所述支墩包括上支墩与下支墩,所述下支墩通过连接与横梁固定连接,所述上支墩位于横梁与下支墩之间。
本实用新型解决了背景技术中存在的缺陷,本实用新型能够有效减少横梁上压块的堆积数量,充分利用支墩的自重,有效降低运输成本以及吊装成本,并且结构简单,便于推广,经济效益可观,一般单个项目可以减少相应运输费以及吊装费的10-30%。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型的优选实施例的结构示意图;
图2是连接件的结构示意图;
其中:1、横梁,2、压块,3、连接件,4、上支墩,5、下支墩,31、绞花篮扣,32、钢丝绳,33、螺杆。
具体实施方式
现在结合附图和优选实施例对本实用新型作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,因此其仅显示与本实用新型有关的构成。
如图1所示,本实用新型涉及一种建筑静载试验用支墩悬吊装置,包括支墩,横梁1以及压块2,所述支墩上架设有数个横梁1,所述横梁1上堆积数个压块2,所述支墩与所述横梁1之间设置有连接件3,通过连接件3将横梁1与支墩固定。其中,所述连接件3一端与横梁1扣接,一端与支墩固定连接。其中,所述支墩包括上支墩4与下支墩5,所述下支墩5通过连接件3与横梁1固定连接,所述上支墩4位于横梁1与下支墩5之间。
为了能够有效将支墩与横梁1固定,如图2所示,本实用新型中所述连接件3至少包括绞花篮扣31,钢丝绳32以及调节螺杆33,所述绞花篮扣31与钢丝绳32活动连接,所述绞花篮扣31与横梁1铰接,所述调节螺杆33位于钢丝绳32的中间。而横梁1优选为工字钢。
本实用新型的安装过程如下:
首先将上支墩4置于下支墩5上,接着将横梁1架设在上支墩4上,然后将压块2堆积在横梁1上,接着,通过连接件3将横梁1与下支墩5连接,连接件3的绞花篮扣31先与横梁1扣接,而钢丝绳32与下支墩5固定,最后通过螺杆33调节横梁1与下支墩5之间距离,直至固定。
以上述依据本实用新型的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改。本项实用新型的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (4)

1.一种建筑静载试验用支墩悬吊装置,包括支墩,横梁以及压块,所述支墩上架设有数个横梁,所述横梁上堆积数个压块,其特征在于:所述支墩与所述横梁之间设置有连接件,通过连接件将横梁与支墩固定。
2.如权利要求1所述的建筑静载试验用支墩悬吊装置,其特征在于:所述连接件一端与横梁扣接,一端与支墩固定连接。
3.如权利要求1所述的建筑静载试验用支墩悬吊装置,其特征在于:所述连接件至少包括绞花篮扣,钢丝绳以及调节螺杆,所述绞花篮扣与钢丝绳活动连接,所述绞花篮扣与横梁铰接,所述调节螺杆位于钢丝绳的中间。
4.如权利要求1所述的建筑静载试验用支墩悬吊装置,其特征在于:所述横梁为工字钢。 
CN2010201010544U 2010-01-25 2010-01-25 建筑静载试验用支墩悬吊装置 Expired - Fee Related CN201765150U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201010544U CN201765150U (zh) 2010-01-25 2010-01-25 建筑静载试验用支墩悬吊装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201010544U CN201765150U (zh) 2010-01-25 2010-01-25 建筑静载试验用支墩悬吊装置

Publications (1)

Publication Number Publication Date
CN201765150U true CN201765150U (zh) 2011-03-16

Family

ID=43717760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201010544U Expired - Fee Related CN201765150U (zh) 2010-01-25 2010-01-25 建筑静载试验用支墩悬吊装置

Country Status (1)

Country Link
CN (1) CN201765150U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102866055A (zh) * 2012-08-27 2013-01-09 中国科学院武汉岩土力学研究所 一种原位试验装置反力系统
CN102135473B (zh) * 2010-01-25 2016-05-18 常州市建筑科学研究院股份有限公司 建筑静载试验用支墩悬吊装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102135473B (zh) * 2010-01-25 2016-05-18 常州市建筑科学研究院股份有限公司 建筑静载试验用支墩悬吊装置
CN102866055A (zh) * 2012-08-27 2013-01-09 中国科学院武汉岩土力学研究所 一种原位试验装置反力系统

Similar Documents

Publication Publication Date Title
CN102212630B (zh) 利用活动吊盘的方式更换高炉冷却壁的施工方法
CN205296844U (zh) 预制箱梁钢绞线吊点
CN202577150U (zh) 墩顶提升吊架
CN200958001Y (zh) 可调式专用钢轨吊具
CN201765150U (zh) 建筑静载试验用支墩悬吊装置
CN101913534B (zh) 固定双吊点悬臂轨道式桁吊
CN101508067B (zh) 大型液压机机架原位液压顶升翻转安装方法
CN201330112Y (zh) 一种空心板梁的吊装工具
CN102493353A (zh) 桥梁施工中大型设备的起吊方法及墩顶提升吊架
CN103288002A (zh) 简易组合门架高空重物吊装装置
CN105645275A (zh) 缆索吊起重机及其施工方法
CN201786010U (zh) 一种施工用升降平台
CN202194072U (zh) 挂篮悬拼式行走装置
CN205170161U (zh) 一种预制梁板钢筋骨架吊具
CN203284126U (zh) 简易组合门架高空重物吊装装置
CN103754770B (zh) 钢筋笼吊装装置
CN201027135Y (zh) 一种用于吊运55mPHC管桩的吊具机构
CN102061681B (zh) 固定双吊点悬臂轨道式桁吊安装方法
CN102135473A (zh) 建筑静载试验用支墩悬吊装置
CN203461720U (zh) 简易悬臂吊装机械
CN202643086U (zh) 一种羟化反应器的吊装工具
CN214993195U (zh) 一种利用钢绞线吊装挂篮底托的装置
CN201433064Y (zh) 一种多吊点起重机起升机构
CN201433038Y (zh) 风电塔架单节塔筒吊钩
CN204098493U (zh) 一种建筑用模块式可拆装进出料活动平台

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE CO., LT

Free format text: FORMER OWNER: CHANGZHOU CONSTRUCTION SCIENCE INST. CO., LTD.

Effective date: 20110914

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110914

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Changzhou Architectural Research Institute Co., Ltd.

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Changzhou Construction Science Inst. Co., Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Changzhou Institute of building science group Limited by Share Ltd

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Changzhou Architectural Research Institute Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20180125

CF01 Termination of patent right due to non-payment of annual fee