CN201747043U - Tie structure of vertical upright of scaffold and wall body - Google Patents
Tie structure of vertical upright of scaffold and wall body Download PDFInfo
- Publication number
- CN201747043U CN201747043U CN2010205075001U CN201020507500U CN201747043U CN 201747043 U CN201747043 U CN 201747043U CN 2010205075001 U CN2010205075001 U CN 2010205075001U CN 201020507500 U CN201020507500 U CN 201020507500U CN 201747043 U CN201747043 U CN 201747043U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- wall
- scaffold
- wall body
- backing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 41
- 239000010959 steel Substances 0.000 claims abstract description 41
- 238000003466 welding Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a tie structure of a vertical upright of a scaffold and a wall body. The tie structure is characterized by the inclusion of a steel pipe, steel bearing plates, bolts and a fastener. The steel pipe is connected with the vertical upright of the scaffold, and extends out of the wall body by 12 to 20cm after passing the wall body; the round steel bearing plates, with a thickness of 8 to 12mm and a diameter of 15 to 25cm, are arranged on two sides of the wall body, and are welded with the steel pipe; welding seams are formed at the joint of the steel pipe and the steel bearing plates; and the round steel bearing plates on two sides of the wall body are closely connected through the two bolts. The tie structure has a simple structure and strong practicability.
Description
Technical field
The utility model relates to a kind of scaffold upright rod and sockets wall structure, is applicable to building field.
Background technology
In the building process of construction, scaffold will with the effective drawknot of body of wall to satisfy bearing capacity and stability, generally speaking,, be connected with the fastener of steel pipe by scaffold upright rod and can make scaffold and the effective drawknot of body of wall at body of wall inner concrete member embedded steel tube.But do not have under the concrete component situation in the body of wall part, may cause scaffold to be difficult to the effective drawknot of body of wall.
The utility model content
The technical problem that the utility model solves provides a kind of scaffold upright rod and sockets wall structure, solves the problem of the difficult drawknot of scaffold and body of wall.
The structure that the utility model provides comprises steel pipe, billet, bolt, fastener.Steel pipe is connected with scaffold upright rod by fastener, and steel pipe passes through body of wall and stretches out body of wall 12~20cm, in the body of wall both sides circular steel backing plate is set all.The circular steel plate thickness is 8~12mm, and circular steel backing plate diameter is 15~25cm, and circular steel backing plate and steel pipe are welded to connect, and all there is weld seam steel pipe and billet junction.Being positioned at body of wall both sides circular steel backing plate closely connects by two bolts.
The utility model simple structure, practical.
Description of drawings
Fig. 1 scaffold upright rod sockets the wall structure schematic diagram
Accompanying drawing sign: 1, steel pipe, 2, billet, 3, bolt, 4, fastener, 5, weld seam, 6, scaffold upright rod, 7, body of wall
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 sockets the wall structure schematic diagram for scaffold upright rod.Present embodiment comprises steel pipe 1, billet 2, bolt 3, fastener 4.Steel pipe 1 is connected with scaffold upright rod 6 by fastener 4, and steel pipe 1 passes through body of wall 7 and stretches out body of wall 15cm, in body of wall 7 both sides circular steel backing plate 2 is set all.Circular steel backing plate 2 thickness are 10mm, and circular steel backing plate diameter is 20cm, and circular steel backing plate 2 is welded to connect with steel pipe 1, and steel pipe 1 all has weld seam 5 with billet 2 junctions.Being positioned at body of wall 7 both sides circular steel backing plates 2 closely connects by two bolts 3.
Claims (1)
1. a scaffold upright rod sockets wall structure, it is characterized in that comprising steel pipe, billet, bolt, fastener, steel pipe is connected with scaffold upright rod by fastener, steel pipe passes through body of wall and stretches out body of wall 12~20cm, in the body of wall both sides circular steel backing plate is set all, and the circular steel plate thickness is 8~12mm, circular steel backing plate diameter is 15~25cm, circular steel backing plate and steel pipe are welded to connect, and all there is weld seam steel pipe and billet junction, are positioned at body of wall both sides circular steel backing plate and closely connect by two bolts.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205075001U CN201747043U (en) | 2010-08-19 | 2010-08-19 | Tie structure of vertical upright of scaffold and wall body |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205075001U CN201747043U (en) | 2010-08-19 | 2010-08-19 | Tie structure of vertical upright of scaffold and wall body |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201747043U true CN201747043U (en) | 2011-02-16 |
Family
ID=43581724
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010205075001U Expired - Fee Related CN201747043U (en) | 2010-08-19 | 2010-08-19 | Tie structure of vertical upright of scaffold and wall body |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201747043U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107268972A (en) * | 2017-08-08 | 2017-10-20 | 吉林建筑大学 | External hanging type scaffold and its installation method are climbed in one kind |
-
2010
- 2010-08-19 CN CN2010205075001U patent/CN201747043U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107268972A (en) * | 2017-08-08 | 2017-10-20 | 吉林建筑大学 | External hanging type scaffold and its installation method are climbed in one kind |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202755656U (en) | Split bolt fixing structure for double-layer steel plate shearing wall | |
| CN203808251U (en) | Ring plate type round-steel tubular column-H-shaped steel girder joint structure convenient to mount | |
| CN103072906B (en) | Connecting device of inner climbing type tower crane and building structure and construction method utilizing same | |
| CN202138969U (en) | Tower crane wall-attaching device used in cast-in-place concrete structure | |
| CN202954557U (en) | Scaffold wall connection part | |
| CN202611223U (en) | Recyclable bolt type scaffold wall connection piece | |
| CN201747043U (en) | Tie structure of vertical upright of scaffold and wall body | |
| CN202936996U (en) | Wall connecting piece for scaffold | |
| CN201660911U (en) | Hold hoop device for pile top | |
| CN201605868U (en) | Communication tower | |
| CN202124933U (en) | Connecting structure for steel bar truss floor deck and concrete wall column | |
| CN203547021U (en) | Novel steel column | |
| CN203654710U (en) | Instrumental connecting tube for external wall scaffold shearing wall portion | |
| CN203613796U (en) | Recoverable eave tile bolt formwork system of steel-reinforced concrete column | |
| CN202209046U (en) | Wall connecting rod for external scaffold | |
| CN102661035A (en) | Tool type wall connecting piece for exterior wall scaffold | |
| CN203891547U (en) | Concrete filled steel tube iron tower node structure | |
| CN102852249B (en) | A kind of modified Coupled Shear Wall structure | |
| CN203834906U (en) | Triangular operation platform used for capital construction slope face | |
| CN204139334U (en) | Girder steel and steel column weld temporary connecting structure entirely | |
| CN206397109U (en) | The connecting elements of external scaffolding wall connecting rod part and shear wall | |
| CN203361672U (en) | Novel shape-fixed steel plate net protective barrier | |
| CN202925980U (en) | 66kV tubular bus overroad full-connection framework | |
| CN203891449U (en) | Wall connecting piece for wall connection of scaffold | |
| CN204738516U (en) | Modular supporting rack device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110216 Termination date: 20110819 |