CN201742067U - Vehicle applicable to constructions in pipeline - Google Patents
Vehicle applicable to constructions in pipeline Download PDFInfo
- Publication number
- CN201742067U CN201742067U CN2010202514064U CN201020251406U CN201742067U CN 201742067 U CN201742067 U CN 201742067U CN 2010202514064 U CN2010202514064 U CN 2010202514064U CN 201020251406 U CN201020251406 U CN 201020251406U CN 201742067 U CN201742067 U CN 201742067U
- Authority
- CN
- China
- Prior art keywords
- underframe
- pipeline
- wheel
- construction
- driving wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 230000005540 biological transmission Effects 0.000 claims abstract description 22
- 230000000007 visual effect Effects 0.000 claims description 3
- 239000000523 sample Substances 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000004035 construction material Substances 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60B—VEHICLE WHEELS; CASTORS; AXLES FOR WHEELS OR CASTORS; INCREASING WHEEL ADHESION
- B60B19/00—Wheels not otherwise provided for or having characteristics specified in one of the subgroups of this group
- B60B19/14—Ball-type wheels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B9/00—Cleaning hollow articles by methods or apparatus specially adapted thereto
- B08B9/02—Cleaning pipes or tubes or systems of pipes or tubes
- B08B9/027—Cleaning the internal surfaces; Removal of blockages
- B08B9/04—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
- B08B9/049—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes having self-contained propelling means for moving the cleaning devices along the pipes, i.e. self-propelled
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model belongs to the technical field of pipeline construction and particularly relates to a vehicle applicable to constructions in a pipeline. The vehicle comprises a power device and a transmission device, which are fixed on a underframe and connected with each other; wheels are arranged on the underframe; the power devices can drive the wheels to rotate through the transmission device; and each wheel is hemisphere-shaped, and raised face of the hemisphere faces towards the internal face of the pipeline. The utility model has the benefits that: when an electric cable or a cable is laid in an underground pipeline, a constructer can wind the electric cable or the cable on the vehicle and then start the power device of the vehicle to drive the wheels to rotate through the transmission device; and the hemisphere-shaped wheels of the vehicle can conveniently rotate to move ahead on the circular arc-shaped internal face of the pipeline, and then pull and lay the electric cable or the cable in the pipeline, so that the constructer can conveniently and rapidly complete the laying of the electric cable, the cable or other lines in the pipeline, and the labor intensity of the constructer is greatly reduced accordingly.
Description
Technical field
The utility model belongs to the pipeline construction technology field, is specifically related to a kind of construction car that is applicable in the pipeline.
Background technology
In the prior art, in urban Underground pipeline when cable laying and cable, usually at first use line or rope to pass pipeline, and tail end online or rope cable, the cable connect to need laid, cable and cable are drawn in the pipeline lay again, yet because pipeline is laid on underground usually, therefore it is bigger to make line or rope pass the difficulty of construction of pipeline, especially when pipeline was longer, the workmen need pay more work, and speed of application is slow and efficient is low.
The utility model content
The purpose of this utility model is to provide a kind of construction car that is applicable in the pipeline, and it is convenient to cable laying or cable in underground piping, and the efficiency of construction height.
Be used for finishing the laying of pipe interior circuits such as cable, cable and the inside detection of pipeline.
For realizing above purpose, the utility model provides following technical scheme: a kind of construction car that is applicable in the pipeline, this construction comprises with car and is fixed on the underframe and interconnected power set and transmission device, described underframe is provided with wheel, power set drive wheel by transmission device, described wheel is the hemisphere shape, and hemispheroidal convex surface is towards the internal face setting of pipeline.
The beneficial effects of the utility model are: when cable laying in underground piping or cable, cable or cable winding can be constructed with on the car, start the power set of this construction then with car, power set drive wheel by transmission device, because described wheel is the hemisphere shape, therefore this construction can be very easily rotated on the internal face of the circular arc of pipeline with the wheel of car and is moved ahead, and then pulling cable or cable laying are in pipeline, make the workmen can finish cable quickly and easily, the laying of pipe interior circuits such as cable greatly reduces workmen's labour intensity.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is a underframe part vertical view of the present utility model;
Fig. 3 is that the utility model is in ducted view.
Embodiment
Shown in Fig. 1~3, a kind of construction car that is applicable in the pipeline, this construction comprises with car and is fixed on the underframe 11 and interconnected power set 13 and transmission device 14, described underframe 11 is provided with wheel 12, power set 13 drive wheel 12 by transmission device 14 and rotate, described wheel 12 is the hemisphere shape, and hemispheroidal convex surface is towards the internal face setting of pipeline 20.
Further, described hemispheroidal convex surface is set to smooth surface; Perhaps hemispheroidal convex surface be provided with inner-walls of duct on the spiral slot deep-slotted chip breaker that matches and rotate.
When the internal face of pipeline 20 is the light face, also be that the internal face of pipeline 20 is comparatively smooth smooth, the convex surface of the hemisphere shape of wheel 12 then is set to smooth surface at this moment, is beneficial to wheel 12 rotations and advances; When the internal face of pipeline 20 is provided with spiral groove, this moment wheel 12 the convex surface of hemisphere shape then be provided with inner-walls of duct on the spiral slot deep-slotted chip breaker that matches and rotate, make wheel 12 to advance smoothly equally.
Described power set 13, transmission device 14 all are positioned at the upside of underframe 11, and wheel 12 is positioned at the both sides of underframe 11, are beneficial to this construction and advance in pipeline with car.
As preferred version of the present utility model, described power set 13 are battery 131 and motor 132; Described transmission device 14 is a gear drive.Certainly the also visual field condition of power set 13 and adopt fuel engines, transmission device then also can be selected the kinds of drive such as chain transmission or band transmission.
For convenience cable laying or cable, the utility model is provided with the draw-gear 15 that can connect drag rope or cable on described underframe 11, and draw-gear 15 is arranged at tailstock portion, as shown in Figure 2.
This construction not only is used for cable laying certainly with car, such as placing construction equipment or construction material on the underframe 11 of car to further facilitate pipeline construction in this construction, also lighting and/or visual probe can be set at the upside of underframe 11, to realize detection to pipe interior.
As shown in Figure 1, 2, described wheel 12 comprises first driving wheel 121 that directly links to each other with transmission device 14 and the driven pulley 123 that is used for support underframe 11, first driving wheel 121 and driven pulley 123 all are set to two, and first driving wheel 121 and driven pulley 123 are distributed on the both sides of underframe 11, so that construction is advanced stably with car.
As preferred version of the present utility model, between described first driving wheel 121 and be provided with axle 16 between the driven pulley 123, the length of described axle 16 is axially adjustable along it.
Because axle 16 length is axially adjustable along it, so this construction just can be applicable to the pipeline of various different-diameters on through the simple basis of adjusting with car, and applicability by force and be convenient to operate.The adjustable length of axle has multiple implementation, such as axle being divided into a plurality of segments that can be connected to each other together, when caliber is big a plurality of segments is all coupled together, and caliber hour then only couples together the part segment; Certainly also can to adopt each segment to constitute each other to be slidingly matched and can the fit clamping be that the mode of one couples together to axle.
As shown in Figure 3, described underframe 11 upsides also are provided with second driving wheel 122 that directly links to each other with transmission device 14, second driving wheel 122 is the wheel shape, the direction of rotation of described second driving wheel 122 and first driving wheel 121, the top of second driving wheel 122 are positioned at the top of construction with car.
Second driving wheel 122 the further applicability of the present utility model that improved is set, during more the or cable mat laid of the cable of laying when pipe interior, underframe 11 might be elevated when advancing and make first driving wheel 121 of underframe 11 both sides and driven pulley 123 dally, thereby this construction can not be moved on car, this moment is owing to the top of constructing with car also is provided with second driving wheel 122 that directly links to each other with transmission device 14, therefore second driving wheel 122 can be rotated further and promote this construction and continues to move ahead with car along the top of inner-walls of duct, thus carrying out smoothly of having guaranteed to construct.
Claims (10)
1. one kind is applicable to the construction car in the pipeline, this construction comprises that with car being fixed on underframe (11) goes up and interconnected power set (13) and transmission device (14), described underframe (11) is provided with wheel (12), power set (13) drive wheel (12) by transmission device (14) and rotate, it is characterized in that: described wheel (12) is the hemisphere shape, and hemispheroidal convex surface is towards the internal face setting of pipeline (20).
2. construction car according to claim 1 is characterized in that: described power set (13), transmission device (14) all are positioned at the upside of underframe (11), and wheel (12) is positioned at the both sides of underframe (11).
3. construction car according to claim 1 is characterized in that: described power set (13) are battery (131) and motor (132).
4. construction car according to claim 1 is characterized in that: described transmission device (14) is a gear drive.
5. according to each described construction car of claim 1~4, it is characterized in that: described underframe (11) upside is provided with lighting and/or visual probe.
6. according to each described construction car of claim 1~4, it is characterized in that: described underframe (11) is provided with the draw-gear (15) that can connect drag rope or cable, and draw-gear (15) is arranged at tailstock portion.
7. construction car according to claim 1, it is characterized in that: described wheel (12) comprises first driving wheel (121) that directly links to each other with transmission device (14) and the driven pulley (123) that is used for support underframe (11), first driving wheel (121) and driven pulley (123) all are set to two, and first driving wheel (121) and driven pulley (123) are distributed on the both sides of underframe (11).
8. construction car according to claim 1, it is characterized in that: described underframe (11) upside also is provided with second driving wheel (122) that directly links to each other with transmission device (14), second driving wheel (122) is the wheel shape, the direction of rotation of described second driving wheel (122) and first driving wheel (121), the top of second driving wheel (122) are positioned at the top of construction with car.
9. construction car according to claim 1 is characterized in that: described hemispheroidal convex surface is set to smooth surface; Perhaps hemispheroidal convex surface be provided with inner-walls of duct on the spiral slot deep-slotted chip breaker that matches and rotate.
10. construction car according to claim 7 is characterized in that: be provided with axle (16) between described first driving wheel (121) and between the driven pulley (123), the length of described axle (16) is axially adjustable along it.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202514064U CN201742067U (en) | 2010-07-07 | 2010-07-07 | Vehicle applicable to constructions in pipeline |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202514064U CN201742067U (en) | 2010-07-07 | 2010-07-07 | Vehicle applicable to constructions in pipeline |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201742067U true CN201742067U (en) | 2011-02-09 |
Family
ID=43557345
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010202514064U Expired - Fee Related CN201742067U (en) | 2010-07-07 | 2010-07-07 | Vehicle applicable to constructions in pipeline |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201742067U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103643801A (en) * | 2013-12-09 | 2014-03-19 | 中国水利水电第六工程局有限公司 | Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope |
| CN110282486A (en) * | 2019-06-14 | 2019-09-27 | 国网山东省电力公司临沂供电公司 | Pay-off device for electric power construction |
| CN110445083A (en) * | 2019-08-22 | 2019-11-12 | 任双霞 | A kind of PP pipeline construction installation integration apparatus |
| CN111463720A (en) * | 2020-05-29 | 2020-07-28 | 唐山兴邦管道工程设备有限公司 | Paying-off walking device for laying cable on outer wall of pipeline |
-
2010
- 2010-07-07 CN CN2010202514064U patent/CN201742067U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103643801A (en) * | 2013-12-09 | 2014-03-19 | 中国水利水电第六工程局有限公司 | Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope |
| CN110282486A (en) * | 2019-06-14 | 2019-09-27 | 国网山东省电力公司临沂供电公司 | Pay-off device for electric power construction |
| CN110445083A (en) * | 2019-08-22 | 2019-11-12 | 任双霞 | A kind of PP pipeline construction installation integration apparatus |
| CN111463720A (en) * | 2020-05-29 | 2020-07-28 | 唐山兴邦管道工程设备有限公司 | Paying-off walking device for laying cable on outer wall of pipeline |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201742067U (en) | Vehicle applicable to constructions in pipeline | |
| CN205039464U (en) | Wall body threading machine | |
| CN204144812U (en) | Flatwise cable laying engineering truck | |
| CN203212111U (en) | Novel cable reel base | |
| CN104118764A (en) | Wire recovery device | |
| CN205429593U (en) | Automatic laying device of cable conductor | |
| CN202187347U (en) | Vehicle-mounted ground anchor machine | |
| CN106229894A (en) | Crane span structure threading traction apparatus | |
| CN203306018U (en) | Special vehicle for automatically laying subway cable | |
| CN203582190U (en) | Cable take-up and pay-off device | |
| CN203445577U (en) | Cable drum rapid wire releaser | |
| CN211077965U (en) | Cable pay-off that municipal construction used | |
| CN105293216A (en) | Wire take-up and tensioning method for electric power construction | |
| CN221009661U (en) | Tunnel power cable laying construction device | |
| CN204947477U (en) | Electric power cable erection conveying coaster | |
| CN205901187U (en) | Crane span structure threading draw gear | |
| CN201160203Y (en) | Double-roll traction machine | |
| CN210669476U (en) | Power pipeline buries device underground | |
| CN211151353U (en) | Cable laying equipment | |
| CN203545355U (en) | Glass-fiber-reinforced-plastic pipe penetrating device for communication construction | |
| CN204001902U (en) | Coaxial asynchronous full-automatic Traverse Displacement Unit | |
| CN203845603U (en) | Towage and cable setting and tensioning integrated cable tow truck | |
| CN209217586U (en) | A kind of power line construction cable safety hitch | |
| CN202228852U (en) | Automatic threading device for underground pipeline | |
| CN205029252U (en) | Cable laying device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110209 Termination date: 20130707 |