CN201739764U - Optimized air-storage tank inspection-hole structure - Google Patents

Optimized air-storage tank inspection-hole structure Download PDF

Info

Publication number
CN201739764U
CN201739764U CN2010202500606U CN201020250060U CN201739764U CN 201739764 U CN201739764 U CN 201739764U CN 2010202500606 U CN2010202500606 U CN 2010202500606U CN 201020250060 U CN201020250060 U CN 201020250060U CN 201739764 U CN201739764 U CN 201739764U
Authority
CN
China
Prior art keywords
cover plate
manhole
ring
manhole circle
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202500606U
Other languages
Chinese (zh)
Inventor
王吉时
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SHENJIANG PRESSURE VESSEL CO Ltd
Original Assignee
SHANGHAI SHENJIANG PRESSURE VESSEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SHENJIANG PRESSURE VESSEL CO Ltd filed Critical SHANGHAI SHENJIANG PRESSURE VESSEL CO Ltd
Priority to CN2010202500606U priority Critical patent/CN201739764U/en
Application granted granted Critical
Publication of CN201739764U publication Critical patent/CN201739764U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to an optimized air-storage tank inspection-hole structure, which comprises a manhole ring, a nut, a gasket, a pressure plate, a cover plate, a bolt and a sealing ring, wherein the cover plate is elliptic, the radial section of the manhole ring is elliptic, the cover plate is covered on the inner end surface of the manhole ring, the sealing ring is arranged between the cover plate and the inner end surface of the manhole ring, the bolt is fixedly arranged on the cover plate, the nut and the gasket are both arranged on the bolt, the pressure plate is positioned between the gasket and the outer end surface of the manhole ring, the manhole ring is formed from a seamless steel pipe with an elliptic radial section, more than three positioning parts are fixedly arranged in the inner-end inner wall of the manhole ring along the circumferential direction, and the sealing ring is positioned between the positioning parts and the cover plate. The utility model solves the quality problem caused by welds by forming the manhole ring through the seamless steel pipe, eliminates the quality hidden danger invisible to naked eyes, saves the man hour and the material consumed by manual electric-arc welding, prevents the sealing ring from sliding out when in installation by arranging the positioning parts in the manhole ring, lowers the installation difficulty and ensures the installation quality.

Description

A kind of gas holder peep hole structure of optimization
Technical field:
The utility model relates to container, relates in particular to gas holder, the particularly peep hole of gas holder, and concrete is a kind of gas holder peep hole structure of optimization.
Background technique:
Peep hole on the gas holder is also referred to as manhole, under the normal working of container, it is by covering palte seal, when needs annual test or third pary certification or discovery have other situation, need open cover plate, the work maintainer enters container intracavity by peep hole and is engaged in the inspection operation.In the prior art, peep hole is made of manhole circle, nut, packing ring, pressing plate, cover plate, bolt and seal ring, and it is oval that cover plate is, and the manhole circle is radial cross section and is oval tubular, by two radial cross sections is that semielliptical workpiece welding constitutes, because its weld seam can't be done the RT non-destructive inspection, therefore can not guarantee the weld seam inherent quality, often produce the phenomenon of infiltration in use, simultaneously, welding two semiellipse workpiece needs manual finishing, and efficient is low, the cost height.In addition, when cover plate was packed in the manhole circle, seal ring often can not put in place, caused sealing surface to reveal.
Summary of the invention:
The purpose of this utility model is to provide a kind of gas holder peep hole structure of optimization, and the gas holder peep hole structure of described this a kind of optimization will solve the technical problem that manhole circle weldquality can not guarantee, manhole circle welding efficiency is low, cost is high and seal ring can not put in place in the gas holder peep hole device in the prior art.
The gas holder peep hole structure of this optimization of the present utility model is by the manhole circle, nut, packing ring, pressing plate, cover plate, bolt and seal ring constitute, it is oval that described cover plate is, it is oval that the radial cross section of described manhole circle is, cover plate covers and is arranged on the interior edge face of manhole circle, described seal ring is arranged between the interior edge face of cover plate and manhole circle, described bolt setting on the cover board, described nuts and washers all is arranged on the bolt, described pressing plate is between packing ring and manhole circle exterior edge face, wherein, described manhole circle is oval seamless steel pipe by a radial cross section and constitutes, along the locating piece that circumferentially is set with three above numbers, described seal ring is between locating piece and cover plate in the inner inwall of manhole circle.
Further, the edge circumferentially is set with four locating pieces in the inner inwall of manhole circle.
Working principle of the present utility model is: the manhole circle is oval seamless steel pipe by radial cross section and constitutes, and has solved because the quality problems that weld seam causes have been eliminated the hidden danger of quality that is invisible to the naked eye, and saved man-hour that manual electric arc welding consumed and material.Locating piece prevents that seal ring from skidding off when mounted, has reduced installation difficulty, has guaranteed installation quality.
The utility model compared with the prior art, its effect is actively and significantly.The utility model utilizes seamless steel pipe to constitute the manhole circle, solved because the quality problems that weld seam causes, eliminated the hidden danger of quality that is invisible to the naked eye, and man-hour that manual electric arc welding consumed and material have been saved, in the manhole circle, locating piece is set, prevented that seal ring from skidding off when mounted, reduced installation difficulty, guaranteed installation quality.
Description of drawings:
Fig. 1 is the structural representation of the gas holder peep hole structure of a kind of optimization of the present utility model.
Embodiment:
As shown in Figure 1, the gas holder peep hole structure of a kind of optimization of the present utility model, by manhole circle 4, nut 8, packing ring 7, pressing plate 6, cover plate 1, bolt 5 and seal ring 2 constitute, it is oval that described cover plate 1 is, it is oval that the radial cross section of described manhole circle 4 is, cover plate 1 covers and is arranged on the interior edge face of manhole circle 4, described seal ring 2 is arranged between the interior edge face of cover plate 1 and manhole circle 4, described bolt 5 is fixedly installed on the cover plate 1, described nut 8 and packing ring 7 all are arranged on the bolt 5, described pressing plate 6 is between packing ring 7 and manhole circle 4 exterior edge faces, wherein, described manhole circle 4 is oval seamless steel pipe by a radial cross section and constitutes, and along the locating piece 3 that circumferentially is set with three above numbers, described seal ring 2 is between locating piece 3 and cover plate 1 in the inner inwall of manhole circle 4.
Further, the edge circumferentially is set with four locating pieces 3 in the inner inwall of manhole circle 4.
The working procedure of present embodiment is: manhole circle 4 is oval seamless steel pipe by radial cross section and constitutes, and has solved because the quality problems that weld seam causes have been eliminated the hidden danger of quality that is invisible to the naked eye, and saved man-hour that manual electric arc welding consumed and material.Locating piece 3 prevents that seal ring 2 from skidding off when mounted, has reduced installation difficulty, has guaranteed installation quality.

Claims (2)

1. the gas holder peep hole structure of an optimization, by the manhole circle, nut, packing ring, pressing plate, cover plate, bolt and seal ring constitute, it is oval that described cover plate is, it is oval that the radial cross section of described manhole circle is, cover plate covers and is arranged on the interior edge face of manhole circle, described seal ring is arranged between the interior edge face of cover plate and manhole circle, described bolt setting on the cover board, described nuts and washers all is arranged on the bolt, described pressing plate is between packing ring and manhole circle exterior edge face, it is characterized in that: described manhole circle is oval seamless steel pipe by a radial cross section and constitutes, along the locating piece that circumferentially is set with three above numbers, described seal ring is between locating piece and cover plate in the inner inwall of manhole circle.
2. the gas holder peep hole structure of a kind of optimization as claimed in claim 1 is characterized in that: in the inner inwall of manhole circle along circumferentially being set with four locating pieces.
CN2010202500606U 2010-07-06 2010-07-06 Optimized air-storage tank inspection-hole structure Expired - Lifetime CN201739764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202500606U CN201739764U (en) 2010-07-06 2010-07-06 Optimized air-storage tank inspection-hole structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202500606U CN201739764U (en) 2010-07-06 2010-07-06 Optimized air-storage tank inspection-hole structure

Publications (1)

Publication Number Publication Date
CN201739764U true CN201739764U (en) 2011-02-09

Family

ID=43555039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202500606U Expired - Lifetime CN201739764U (en) 2010-07-06 2010-07-06 Optimized air-storage tank inspection-hole structure

Country Status (1)

Country Link
CN (1) CN201739764U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102313132A (en) * 2010-07-06 2012-01-11 上海申江压力容器有限公司 Improved structure of gas storage tank access hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102313132A (en) * 2010-07-06 2012-01-11 上海申江压力容器有限公司 Improved structure of gas storage tank access hole
CN102313132B (en) * 2010-07-06 2015-02-11 上海申江压力容器有限公司 Improved structure of gas storage tank access hole

Similar Documents

Publication Publication Date Title
CN201739764U (en) Optimized air-storage tank inspection-hole structure
CN103759901B (en) Corrugated metal pipe components tightness test device and test method
CN102313132B (en) Improved structure of gas storage tank access hole
CN204901134U (en) Butt welding flange
CN203131313U (en) Blind plate allowing convenient blocking and drawing in process of gas pipeline repair operation with gas
CN204383176U (en) A kind of aluminum magnesium alloy D shape fuel tank
CN203258202U (en) Sealing structure at outlet position of inner coil of equipment
CN201366934Y (en) Automobile fuel tank oil-filling pipe with built-in threaded tube sleeve
CN202252179U (en) Stop check valve for high-pressure bellows
CN204399820U (en) Inner floating roof structure
CN205470862U (en) Industrial boiler collection case hand hole device
CN202914924U (en) Flange structure of thrust-stop ring
CN102861998B (en) Sealing structure for titanium steel or zirconium titanium steel composite board device lining
CN204901117U (en) Converter is with antitorque oxygen blast metal collapsible tube
CN205037064U (en) High pressure acetylene storage tank
CN204152758U (en) The sealing configuration of piston compressor high pressure valve opening
CN201527881U (en) Transformer tank adopting trapezoidal rising base structure
CN202545998U (en) Detachable combination valve plate
CN203585627U (en) Exhaust pipe sealing gasket
CN203209490U (en) Weld rolling device for large-diameter thin-wall stainless steel pipes
CN101716988A (en) Simple and easy underwater welding chamber of ocean platform
CN112164569B (en) Oil tank pickling process for oil-immersed transformer
CN201902682U (en) Stop valve of corrugated pipe
CN204646448U (en) A kind of exhaust pipe seal gasket sheet
CN202487314U (en) 10 kV transformer casing pipe mounting flange

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110209

Effective date of abandoning: 20150211

RGAV Abandon patent right to avoid regrant