CN201717674U - Intelligent monitoring system for customer substation - Google Patents

Intelligent monitoring system for customer substation Download PDF

Info

Publication number
CN201717674U
CN201717674U CN2010202374393U CN201020237439U CN201717674U CN 201717674 U CN201717674 U CN 201717674U CN 2010202374393 U CN2010202374393 U CN 2010202374393U CN 201020237439 U CN201020237439 U CN 201020237439U CN 201717674 U CN201717674 U CN 201717674U
Authority
CN
China
Prior art keywords
module
electric energy
transformer station
intelligent monitor
data processor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202374393U
Other languages
Chinese (zh)
Inventor
秦建荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU BEST AREA POWER Co Ltd
Original Assignee
SUZHOU BEST AREA POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU BEST AREA POWER Co Ltd filed Critical SUZHOU BEST AREA POWER Co Ltd
Priority to CN2010202374393U priority Critical patent/CN201717674U/en
Application granted granted Critical
Publication of CN201717674U publication Critical patent/CN201717674U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

The utility model relates to an intelligent monitoring system for a customer substation. The intelligent monitoring system comprises a monitoring device and an electrical monitoring end central data processor, which are mutually communicated through network; the monitoring device is used for acquiring and transferring electrical index parameter data of the substation to the electrical monitoring end central data processor; and the electrical monitoring end central data processor compares the received electrical index parameter data with the safety index, and transfers the electric index parameter data which does not conform to the safety index to an expert database to carry out intelligent interpretation; and the expert database decides whether to start a warning module and transfer the warning information. Through the intelligent interpretation of the expert database, the intelligent monitoring system for the customer substation gives out the warning information accurately, reduces the possibility of false warning and improves the management efficiency of the substation.

Description

The customer substation intelligent monitor system
Technical field
The utility model relates to a kind of power consumption equipment real-time monitoring system, relates in particular to a kind of customer substation intelligent monitor system.
Background technology
Along with progress, the development and national economy of society, electric energy is played the part of more and more important role in economic life.Electric energy is the essential consumer goods of current society as main energy sources.Because the particularity of electric energy product, its quality and process of consumption always can't be paid attention to by consumers in general.Especially along with high speed development of national economy, large-capacity power user's (transformer station) quantity is also in rapid increase.The operation and the maintenance of transformer station's power distribution system equipment that present these large-capacity users are provided with in enterprise are very weak.Adopt artificial mode on duty to manage mostly, and the operation maintenance personnel lack practical experience and professional knowledge, slightly or all many-sided factors such as lack a sense of responsibility in addition, easily cause the substation equipment fault, therefore take place in the time of accident, be difficult to satisfy enterprise security, reliable, economic need for electricity.With transformer station's power distribution system equipment as the electric energy management object, can not be from truly realizing starting point, mid point to electric energy and the supervision of terminal power consumption overall process, and only realized management to electric power, effectively do not manage for electric weight, the quality of power supply, production process etc.
In addition, the expense of manual maintenance enterprise transformer substation system operation is higher, and for reducing cost, enterprise tends to employ some to hold the transformer station of the electrician management enterprise of many duties.The actual like this consequence that causes often, the problem that transformer station of the tame enterprise of each that this electrician managed all can't really run well has been brought very big potential safety hazard and loss to the enterprises and individuals.In addition, the fault of enterprise's controller switching equipment and personnel's misoperation fault has also brought threat to the safe operation of electrical network.
Except be applied in transformer station in the enterprise need improve manually on duty, only carry out the various potential problems of the incomplete supervision of transformer station at controller switching equipment, another application scenarios is an outdoor power equipment, transformer etc. for example, One's name is legion, often to reach thousands of points, and the wide very dispersion again that distributes.Equipment is in outdoor, and unfavorable factors such as high temperature, low temperature, humidity, dust can influence equipment normally to be moved, and a lot of residing environmental conditions of equipment are also very abominable, to the monitoring of these outdoor power equipments, safeguard and brought a lot of difficulties.But these outdoor power equipments again must Monitoring and Controlling.In addition, also can there be the possibility of artificial destruction in these outdoor power equipments.For the ease of the operational factor of understanding these outdoor power equipments, stolen situation, rely on manually on duty, monitoring to be impossible to realize.Therefore need carry out remote monitoring to these outdoor power equipments, help in time finding abnormal situation, in time it be carried out maintenance, repair, guarantee normal power supply.
The utility model content
The technical problem that the utility model solved is to provide a kind of customer substation intelligent monitor system, operation, abnormal conditions that it can the remote automation monitoring substation, and can intellectual analysis interpretation warning message.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: a kind of customer substation intelligent monitor system, and it comprises monitoring equipment, communication manager and the electric energy supervision end central data processor that intercoms mutually by network; Wherein monitoring equipment is used to gather the power index supplemental characteristic of transformer station and by network the power index supplemental characteristic is sent to electric energy supervision end central data processor; Described communication manager is provided with the communication module that connects described monitoring equipment and electric energy supervision end central processing unit, described electric energy supervision end central data processor comprises that database module, the experts database module that described power index supplemental characteristic is analyzed reach the alarm module that is connected with described experts database module, are provided with safety index and transmit warning message by network in the described alarm module.
As further improvement of the utility model, described monitoring equipment is connected with the controller switching equipment of transformer station to gather the power index supplemental characteristic of controller switching equipment.
As further improvement of the utility model, described experts database module comprises at least one following submodule: electric energy visualization processing system module, distribution diagnostic system module, energy consumption audit and evaluation expert system module, power quality analysis expert system module, energy saving space assessment experts system module, electric energy optimizing expert system module, distribution safety analysis evaluation module, distribution fail-safe analysis evaluation module, energy-conservation and distribution modification scheme expert system module.
As further improvement of the utility model, described customer substation intelligent monitor system also comprises the attendant of the transformer station working computer that is connected with electric energy supervision end central data processor by network.
As further improvement of the utility model, the warning information of described alarm module is sent to the attendant's of transformer station mobile phone by the form of note or Email, and described electric energy supervision end central data processor is connected by network with described mobile phone.
As further improvement of the utility model, described monitoring equipment has the CPU module, be connected with the data acquisition module of gathering transformer station's power index supplemental characteristic with the CPU module, and described power index supplemental characteristic is sent to the communication module of communication manager by network.
As further improvement of the utility model, described monitoring equipment also has the GPS locating module that is connected with the CPU module, is used for showing in electric energy supervision end central data processor the position of fault or warning transformer station.
As further improvement of the utility model, described monitoring equipment also has anti-thefting monitoring module and the alarm module that is connected with the CPU module.
The beneficial effects of the utility model are: the customer substation intelligent monitor system is by the intelligent interpretation of experts database module, accurately provide warning message, reduce the wrong report probability, improve substation management efficient, thereby and provide the foundation of energy-saving and emission-reduction measure to reach the effect of energy savings.
Description of drawings
Fig. 1 is the hardware composition frame chart of the utility model customer substation intelligent monitor system.
Fig. 2 is the software architecture diagram of the utility model customer substation intelligent monitor system.
Fig. 3 is the monitoring equipment image data tabulation of the utility model customer substation intelligent monitor system.
Embodiment
The hardware composition of the utility model customer substation intelligent monitor system 100 sees also Fig. 1, and customer substation intelligent monitor system 100 is by the monitoring equipment 1 that is connected with each power consumption equipment of transformer station, be connected by network with monitoring equipment 1 and the user side communication manager 3 of reception and edit monitoring equipment 1 Monitoring Data, and the compositions such as the attendant of transformer station working computer 7 that receive the Monitoring Data of monitoring equipment 1 or the data of user side communication manager 3 and the electric energy supervision end central data processor of handling 5 and hold central data processor 5 to communicate by letter by network by network 6 and electric energy supervision.
The parameter that user side central data processor 5 is monitored at monitoring equipment 1 is provided with safety index, has database, java standard library, experts database, alarm module and correcting module in addition.
Monitoring equipment 1 of the present utility model is sent to user side communication manager 3 or electric energy supervision end central data processor 5 in the time of can having data acquisition module with every power index supplemental characteristic of real-time collection each transformer of transformer station and power consumption equipment and by network implementation.See also Fig. 3, these parameters comprise indexs such as ambient temperature, imbalance of three-phase voltage degree, three-phase current unbalance degree, harmonic current aberration rate, harmonic voltage aberration rate, frequency, gross power factor, phase power factor (PF), total load (comprising transformer and power consumption equipment), single-phase load, phase voltage, line voltage, phase current (comprising transformer and power consumption equipment), zero-sequence current, phase voltage deviation, line voltage deviation, frequency departure.Each parameter can hold safety index default in the central data processor 5 to compare with the electric energy supervision, in case this monitored parameter exceeds safety index, system at first calls experts database the parameter that this exceeds safety index is carried out intellectual analysis, and whether confirm really needs to report to the police, prevent to report by mistake warning information.If belong to the situation that needs are reported to the police really, then system sends warning message by network to the phone number of the attendant of transformer station working computer 7 or setting, removes maintenance and repair before sending someone.So, can save manpower, making reports to the police becomes intelligent more.
In addition, this monitoring equipment 1 can also have following functional module:
CPU module, and the data acquisition module, communication module, power module, GPS locating module, anti-thefting monitoring module and the alarm module that are connected with the CPU module.
Data acquisition module, it is used for gathering above-mentioned every power index supplemental characteristic of transformer station's power consumption equipment.
Communication module, it is used for communicating by letter with user side communication manager 3 or electric energy supervision end central data processor 5, and it can adopt modes such as Ethernet, local area network (LAN), the Internet, GPRS wireless telecommunications for example to carry out the real-time Transmission of data target.
The GPS locating module, it can be corresponding one by one with its residing physical location with the data of the power consumption equipment of transformer station, guarantees that the maintenance, repair personnel are faster, arrives at the destination more accurately.Electric energy supervision end data central processing unit 5 has corresponding map with it, can show the power consumption equipment position of each transformer station.
Power module, it is by mains supply, in conjunction with solar cell or storage battery power supply.The permanently effective monitoring to transformer station is guaranteed in the not only electrical energy saving but also guarantee that monitoring equipment does not cut off the power supply of the supply power mode of triplicity.
Anti-thefting monitoring module and alarm module, it can be according to the specific requirement and the environmental condition of safety precaution management, means such as employing active infrared are deployed troops on garrison duty to monitored transformer, situations such as illegal invasion, theft, destruction and robbery to the zone of setting up defences, carry out in real time, effectively visit and report to the police, by communication module the warning message that obtains is sent to electric energy supervision end central data processor 5 again, the alarm module of monitoring equipment 1 can be activated to carry out onsite alarming simultaneously, stops the continuation of destruction.
The utility model customer substation intelligent monitor system 100 is sent to the supplemental characteristic of monitoring equipment 1 monitoring electric energy user side central data processor 3 aggregation process or directly holds central data processor 5 by Network Transmission to the electric energy supervision through network, then the data of gathering are carried out analyzing and processing, with the overall process of the input of diagrammatic form Real time dynamic display transformer station power consumption equipment electric energy, transmission, consumption and realize that data exceed the function of intelligent interpretation warning message behind the safety index.
In the customer substation intelligent monitor system 100 of the present utility model, the communication mode between monitoring equipment 1 and communication manager 3, the central data processor 5 adopts recurrence main station system notion, communicates in conjunction with multi-communication protocol.This network can pass through Ethernet, GPRS wireless transmission, the Internet or local area network (LAN) to be realized.
The utility model customer substation intelligent monitor system 100 software sections also comprise the data acquisition main station system, resolve by stipulations after the reception Monitoring Data, deposit data in raw data base then.System extracts initial data then, initial data is carried out analysis-by-synthesis, generate transformer station's electric energy and use the integrated information analysis diagram, comprising information such as the electric energy Audit Report of power consumption equipment, distribution diagnosis, the quality of power supply, energy consumption grade, power consumption equipment economize on electricity spaces, and send into User Information Database.Further, system extracts each converting station electric power and uses integrated information data from User Information Database, calls in the experts database module respective standard in the corresponding expert system module and java standard library module, and transformer station's distribution network electric energy consumption situation is analyzed.Further, system extracts initial data and can compare with the safety index of setting, in case these data exceed safety index, then calls the experts database module data message that exceeds standard is carried out interpretation, to determine whether to need to start alarm module.If need the on-site maintenance maintenance really, then send warning message to the attendant of transformer station computer or special handset number by network.Warning message can also be realized by modes such as fax, phones.
Above-mentioned java standard library module has seven submodules such as electric energy optimizing scheme base module, electricity consumption level evaluation criterion library module, the flat evaluation criterion library module of electric pollution, quality of power supply java standard library module, power saving scheme library module, enterprise electrical energy consumption java standard library module, product electric energy consumption java standard library module.The experts database module has electric energy visualization processing system module, distribution diagnostic system module, energy consumption audit and estimates nine submodules such as expert system module, power quality analysis expert system module, energy saving space assessment experts system module, electric energy optimizing expert system module, distribution safety analysis evaluation module, distribution fail-safe analysis evaluation module, energy-conservation and distribution modification scheme expert system module.In addition, electric energy supervision end central data processor 5 also is provided with the correcting module that improves the java standard library module, and it can revise the analysis result that the java standard library module provides, and can totally learn and import in the java standard library module, constantly improves the java standard library module with this.
Customer substation intelligent monitor system 100 of the present utility model possesses the energy consumption module of auditing automatically.Construction and operation by customer substation intelligent monitor system 100, realize the collection of electric energy consumption online data, and audit accurately each power consumption equipment of transformer station and to the power consumption of whole transformer station of science, calculate and announce energy consumption index and data automatically with different measurement periods such as day, week, the moon, season, years.
Customer substation intelligent monitor system 100 of the present utility model possesses the distribution diagnostic module.The practical operation situation of transformer station's distribution and the problem of existence can have in time been fullyed understand by electric energy management system 100, as voltage fluctuation, frequency fluctuation, load unbalanced, electric net overload, harmonic distortion, voltage sag, failure warning.Can carry out the optimization of electrical network and the electricity consumption facility is carried out preventive maintenance according to measured data, with grid equipment or power consumption equipment damage dropping to bottom line.Simultaneously, by the efficiency analytical model that system provides, analyze the electricity consumption level of transformer station, and evaluate its electricity consumption level.
Possesses the power quality analysis module in the customer substation intelligent monitor system 100 of the present utility model.According to image data usefulness, voltage three-phase imbalance, nonlinear load, harmonic wave and a harmonic wave etc. of frequency departure, voltage deviation, voltage fluctuation and the flickering of user and regional power grid, waveform, power factor (PF), zero-sequence current, reactive power compensator are analyzed, thereby the quality of power supply is estimated.At the quality of power supply, also can propose quality of power supply report and offer the attendant of transformer station with different measurement periods.
Customer substation intelligent monitor system 100 of the present utility model possesses the Energy Consumption Evaluation module.The energy consumption level data of the world that provides by system, domestic industry, product are made the evaluation of science to the energy consumption level of transformer station.And the quality of power supply, distribution reliability and the Electrical Safety of transformer station carried out I, II, III level ranking.
Customer substation intelligent monitor system 100 of the present utility model possesses economize on electricity space evaluation module.By the economize on electricity space assessment models that system provides, the science assessment is made in transformer station economize on electricity space, point out that there is the space of how much economizing on electricity in transformer station, from which aspect economizes on electricity, how to economize on electricity, and the energy-saving efficiency analysis is provided.
Customer substation intelligent monitor system 100 of the present utility model possesses automatic generation electric energy optimizing and reducing energy consumption scheme module.Result according to power quality analysis, Energy Consumption Evaluation analysis, economize on electricity spatial analysis generates electric energy optimizing and reducing energy consumption scheme automatically.
Specific implementation process of the present utility model is as follows:
1. after each monitoring equipment 1 is gathered energy information in transformer station's distribution network, send to electric energy user side communication manager 3, be transferred to area under one's jurisdiction electric energy supervision end central data processor 5 by the Internet 4 then by network; Or directly electric energy is transferred to electric energy supervision end central data processor 5 by monitoring equipment 1 by the Internet 4.
2. electric energy supervision end central data processor 5 is carried out the stipulations parsing according to the employed transfer of data stipulations of different model monitoring equipment, accepts the data that monitoring equipment 1 or 3 transmission of electric energy user side communication manager come, and deposits raw data base in.
3. system extracts transformer station's initial data, initial data is carried out analysis-by-synthesis, generate transformer station's electric energy and use the integrated information analysis diagram, comprising information such as the electric energy Audit Report of transformer station, distribution diagnosis, transformer station's quality of power supply, energy consumption grade, transformer station economize on electricity spaces, and send into User Information Database.
4. system extracts transformer electricity usage integrated information data from User Information Database, calls in the experts database respective standard in the corresponding expert system module and java standard library, and transformer station's distribution network electric energy consumption situation is analyzed:
1) visualization processing system module in the system call experts database module and distribution diagnostic system module, all electric energy user power utilization integrated informations in the distribution are analyzed data to be handled, generate decision-making reports such as transformer station's electric energy consumption information chart and distribution diagnosis chart, and send into the solution bank module.
2) audit of the energy consumption in the system call experts database module and evaluation expert system module are audited to transformer station's electric energy consumption according to transformer station's electric energy consumption information data, generate transformer station's electric energy audit statement, and send into solution bank; From the energy consumption standard library module, call the electric energy energy consumption standard then, transformer station's energy consumption level is evaluated, form transformer station's energy consumption level form and regional energy consumption grade chart, and send into the solution bank module.
3) power quality analysis expert system module in the system call experts database module, transformer station's quality of power supply is analyzed, and call quality of power supply standard, electricity consumption level evaluation criterion library module, the horizontal evaluation criterion library module of electric pollution in the java standard library module, transformer station's quality of power supply, electricity consumption level, electric pollution level are assessed, thereby generate transformer station's power quality analysis chart and quality of power supply grade, electricity consumption level grade, electric pollution grade chart, and send into the solution bank module.
4) energy saving space assessment experts system module in the system call experts database module is analyzed transformer station's energy saving space, generates energy saving space assessment report, and transformer station's energy saving space assessment report is sent into the solution bank module.
5) electric energy optimizing expert system module in the system call experts database module, according to transformer station's energy consumption level, the quality of power supply, electricity consumption level, electric pollution level, the energy saving space etc. transformer station's electric energy operational version is optimized, call electric energy optimizing scheme base module then, generate transformer station's electric energy optimizing scheme, and send into the solution bank module.
6) system is according to transformer station's energy consumption level form and transformer station's energy consumption grade chart, electric energy audit statement, power quality analysis chart and quality of power supply grade, electricity consumption level grade, electric pollution grade chart, energy saving space assessment report, transformer station's electric energy optimizing scheme etc., generate transformer station's electricity consumption integrated information analysis diagram, and send into the solution bank module.
7) the energy-conservation and distribution modification scheme expert system module of system call according to transformer station's electricity consumption integrated information, is called energy-saving scheme java standard library module, generates transformer station's power saving scheme and distribution modification scheme, and sends into the solution bank module.
8) when Monitoring Data exceeds safety index, call the experts database module Monitoring Data that exceeds standard is carried out intelligent decision, determine whether to need to continue alert program.If sentence read result is reported to the police for needs, then alarm module is activated, and the concurrent alarming information of delivering newspaper is given the attendant's of transformer station computer or mobile phone, and the more specific location information of fault transformer station is provided simultaneously.
5. the attendant of transformer station can also pass through network login customer substation intelligent monitor system except that receiving warning message, checks user's electric energy consumption information and transformer station's electric energy consumption information.System can also be according to user's request, form with weekly, monthly magazine even quarterly report, user's electricity consumption situation (comprising concrete power consumption index) is sent to the user, and simultaneously various charts that also experts database module, java standard library module can be formed and prioritization scheme send to the user user are provided the use of making a strategic decision.
6. enterprise or relevant departments formulate the energy-saving and emission-reduction measure with reference to relevant decision-making report of transformer station and decision scheme.
Special needs to be pointed out is, in the utility model embodiment only with this customer substation intelligent monitor system as example, the customer substation intelligent monitor system of any kind all is suitable for the principle that the utility model discloses in actual applications.For the person of ordinary skill of the art, that is done under instruction of the present utility model changes at equivalence of the present utility model, must be included in the scope that the utility model claim advocated.

Claims (8)

1. customer substation intelligent monitor system, it comprises monitoring equipment, communication manager and the electric energy supervision end central data processor that intercoms mutually by network; Wherein monitoring equipment is used to gather the power index supplemental characteristic of transformer station and by network the power index supplemental characteristic is sent to electric energy supervision end central data processor; It is characterized in that: described communication manager is provided with the communication module that connects described monitoring equipment and electric energy supervision end central processing unit, described electric energy supervision end central data processor comprises that database module, the experts database module that described power index supplemental characteristic is analyzed reach the alarm module that is connected with described experts database module, are provided with safety index and transmit warning message by network in the described alarm module.
2. customer substation intelligent monitor system as claimed in claim 1 is characterized in that, described monitoring equipment is connected with the controller switching equipment of transformer station to gather the power index supplemental characteristic of controller switching equipment.
3. customer substation intelligent monitor system as claimed in claim 2, it is characterized in that described experts database module comprises at least one following submodule: electric energy visualization processing system module, distribution diagnostic system module, energy consumption audit and evaluation expert system module, power quality analysis expert system module, energy saving space assessment experts system module, electric energy optimizing expert system module, distribution safety analysis evaluation module, distribution fail-safe analysis evaluation module, energy-conservation and distribution modification scheme expert system module.
4. customer substation intelligent monitor system as claimed in claim 1 is characterized in that, described customer substation intelligent monitor system also comprises the attendant of the transformer station working computer that is connected with electric energy supervision end central data processor by network.
5. customer substation intelligent monitor system as claimed in claim 1, it is characterized in that, the warning information of described alarm module is sent to the attendant's of transformer station mobile phone by the form of note or Email, and described electric energy supervision end central data processor is connected by network with described mobile phone.
6. customer substation intelligent monitor system as claimed in claim 1, it is characterized in that described monitoring equipment has the CPU module, be connected with the data acquisition module of gathering transformer station's power index supplemental characteristic with the CPU module, and described power index supplemental characteristic is sent to the communication module of communication manager by network.
7. customer substation intelligent monitor system as claimed in claim 6 is characterized in that, described monitoring equipment also has the GPS locating module that is connected with the CPU module, is used for showing in electric energy supervision end central data processor the position of fault or warning transformer station.
8. customer substation intelligent monitor system as claimed in claim 7 is characterized in that, described monitoring equipment also has anti-thefting monitoring module and the alarm module that is connected with the CPU module.
CN2010202374393U 2010-06-25 2010-06-25 Intelligent monitoring system for customer substation Expired - Fee Related CN201717674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202374393U CN201717674U (en) 2010-06-25 2010-06-25 Intelligent monitoring system for customer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202374393U CN201717674U (en) 2010-06-25 2010-06-25 Intelligent monitoring system for customer substation

Publications (1)

Publication Number Publication Date
CN201717674U true CN201717674U (en) 2011-01-19

Family

ID=43463680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202374393U Expired - Fee Related CN201717674U (en) 2010-06-25 2010-06-25 Intelligent monitoring system for customer substation

Country Status (1)

Country Link
CN (1) CN201717674U (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102096987A (en) * 2011-01-25 2011-06-15 北京煜邦电力技术有限公司 Wireless alarm method and device for power plant or transformer substation
CN102122844A (en) * 2011-03-01 2011-07-13 江苏省电力设计院 Intelligent substation based on sensor, communication network and expert system
CN102176631A (en) * 2011-03-09 2011-09-07 重庆市电力公司教育培训中心 Electrical safety type early warning system
CN102937680A (en) * 2012-11-08 2013-02-20 辽宁省电力有限公司阜新供电公司 Intelligent distribution network fault monitoring terminal
CN103439613A (en) * 2013-09-03 2013-12-11 苏州太谷电力股份有限公司 Electric power security integrated monitoring device and analyzing method thereof
CN103729977A (en) * 2013-11-14 2014-04-16 大唐陈村水力发电厂 Hydrological monitoring automatic warning device
CN104280752A (en) * 2014-10-13 2015-01-14 国家电网公司 Geographical coordinate correction method of power distribution equipment management system
CN104810928A (en) * 2015-05-16 2015-07-29 云南电网有限责任公司楚雄供电局 Visual electric network monitoring early warning and emergency commanding system
CN105116788A (en) * 2015-07-10 2015-12-02 成都振中电气有限公司 Power distribution monitoring terminal based on ZigBee and Beidou communication
CN107181320A (en) * 2017-06-20 2017-09-19 安徽燕青科技集团有限公司 A kind of intelligent distribution transformer terminals
CN107357237A (en) * 2017-08-31 2017-11-17 北京蓝海华业科技股份有限公司 A kind of system of intelligent monitoring transformer station
CN110634083A (en) * 2019-10-28 2019-12-31 三峡电能能源管理(湖北)有限公司 High-efficient safe distribution network electric energy operation system
CN110649707A (en) * 2019-09-23 2020-01-03 南京工业职业技术学院 Power distribution monitoring system of box-type intelligent substation
CN110989454A (en) * 2019-12-20 2020-04-10 明日能源(苏州)有限公司 Energy consumption management system and method based on cloud platform

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102096987A (en) * 2011-01-25 2011-06-15 北京煜邦电力技术有限公司 Wireless alarm method and device for power plant or transformer substation
CN102122844A (en) * 2011-03-01 2011-07-13 江苏省电力设计院 Intelligent substation based on sensor, communication network and expert system
CN102176631A (en) * 2011-03-09 2011-09-07 重庆市电力公司教育培训中心 Electrical safety type early warning system
CN102937680A (en) * 2012-11-08 2013-02-20 辽宁省电力有限公司阜新供电公司 Intelligent distribution network fault monitoring terminal
CN103439613A (en) * 2013-09-03 2013-12-11 苏州太谷电力股份有限公司 Electric power security integrated monitoring device and analyzing method thereof
CN103729977B (en) * 2013-11-14 2016-05-04 大唐陈村水力发电厂 Water regime monitoring automatic alarm
CN103729977A (en) * 2013-11-14 2014-04-16 大唐陈村水力发电厂 Hydrological monitoring automatic warning device
CN104280752A (en) * 2014-10-13 2015-01-14 国家电网公司 Geographical coordinate correction method of power distribution equipment management system
CN104810928A (en) * 2015-05-16 2015-07-29 云南电网有限责任公司楚雄供电局 Visual electric network monitoring early warning and emergency commanding system
CN105116788A (en) * 2015-07-10 2015-12-02 成都振中电气有限公司 Power distribution monitoring terminal based on ZigBee and Beidou communication
CN107181320A (en) * 2017-06-20 2017-09-19 安徽燕青科技集团有限公司 A kind of intelligent distribution transformer terminals
CN107357237A (en) * 2017-08-31 2017-11-17 北京蓝海华业科技股份有限公司 A kind of system of intelligent monitoring transformer station
CN110649707A (en) * 2019-09-23 2020-01-03 南京工业职业技术学院 Power distribution monitoring system of box-type intelligent substation
CN110634083A (en) * 2019-10-28 2019-12-31 三峡电能能源管理(湖北)有限公司 High-efficient safe distribution network electric energy operation system
CN110989454A (en) * 2019-12-20 2020-04-10 明日能源(苏州)有限公司 Energy consumption management system and method based on cloud platform

Similar Documents

Publication Publication Date Title
CN102299554B (en) Intelligent monitoring system of user transformer substation
CN201717674U (en) Intelligent monitoring system for customer substation
CN205544597U (en) Multi -functional three -phase power monitoring device
CN103268115B (en) Electric power demand side supervisory system and method for supervising
CN201118280Y (en) Low-voltage electric network automatic monitoring system
CN101789628B (en) Enterprise electrical energy-saving management system
CN104092310B (en) A kind of intelligent power distribution monitoring and energy management system backstage
CN102299555B (en) Electric energy management system in administrative district
CN107863824A (en) Distribute-electricity transformer district intelligence managing and control system based on the optimization of load Intelligent cluster
CN105634138A (en) Multifunctional three-phase electric power monitoring apparatus
CN101826755A (en) Intelligent power distribution network and power-consumption real-time monitoring and managing system
CN102299556A (en) Real-time monitoring system of electric equipment
CN201984120U (en) Electrical energy quality monitoring system
CN202083724U (en) Intelligent meter box
CN201548615U (en) Distribution line network theoretical line loss real-time statistical analysis system
CN208127987U (en) A kind of novel intelligent distribution transformer terminals based on cloud platform
CN201717676U (en) Administrative territory electric energy management system
CN115528817A (en) Intelligent power distribution and utilization system, method, medium, equipment and terminal for user side
CN104269040A (en) Power utilization information acquisition and orderly power utilization management system
CN102299553B (en) Electricity service effect support system
CN110544082A (en) Business prepayment cloud platform system
CN202871052U (en) Comprehensive monitoring alarm system used for 10kV outdoor power distribution network transformer
CN204992782U (en) Collecting and distributing monitoring device of electric power
CN108303924A (en) Based on shared photovoltaic information collection cloud platform monitoring system and monitoring method
CN101207302A (en) System for operation and supervising management of distributing changeable power

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110119

Termination date: 20150625

EXPY Termination of patent right or utility model