CN201711488U - Workpiece forging device - Google Patents

Workpiece forging device Download PDF

Info

Publication number
CN201711488U
CN201711488U CN2010201560972U CN201020156097U CN201711488U CN 201711488 U CN201711488 U CN 201711488U CN 2010201560972 U CN2010201560972 U CN 2010201560972U CN 201020156097 U CN201020156097 U CN 201020156097U CN 201711488 U CN201711488 U CN 201711488U
Authority
CN
China
Prior art keywords
forging
workpiece
heating furnace
forging device
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201560972U
Other languages
Chinese (zh)
Inventor
吴群
承一枝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU KANING FORGING Co Ltd
Original Assignee
CHANGZHOU KANING FORGING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU KANING FORGING Co Ltd filed Critical CHANGZHOU KANING FORGING Co Ltd
Priority to CN2010201560972U priority Critical patent/CN201711488U/en
Application granted granted Critical
Publication of CN201711488U publication Critical patent/CN201711488U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The utility model relates to a workpiece forging device belonging to the technical field of the forging device. The workpiece forging device comprises a forging hammer and a heating furnace; a running rail is arranged between the forging hammer and the heating furnace; a running cart is arranged on the rail to move on the trial. The workpiece blank is transported through the cart, therefore, the labor intensity of workers is reduced, and the time for transporting workpieces is greatly shortened.

Description

The workpiece forging equipment
Technical field
The utility model relates to the forging equipment technical field.
Background technology
In forging industry, the forging that has is wanted forging and molding in forging hammer, may need through heating for multiple times, in the prior art, to heat the blank of finishing in heating furnace is transported to forging hammer and forges, be one and consume one's strength and the tiring work of manpower that limited the raising of production efficiency, working strength of workers is big.
The utility model content
Technical problem to be solved in the utility model is: the difficulty that overcomes transhipment blank in the prior art.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of workpiece forging equipment, comprise forging hammer and heating furnace, and the transhipment track is set between forging hammer and heating furnace, transport carriage is set in orbit, this dolly moves around in orbit.
The beneficial effects of the utility model are: transport workpiece blank back and forth by dolly, working strength of workers is reduced, the time of transhipment workpiece shortens greatly.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified;
Fig. 1 structural representation of the present utility model;
Among the figure: 1. forging hammer, 2. heating furnace, 3. dolly.
The specific embodiment
As shown in Figure 1, a kind of workpiece forging equipment comprises forging hammer 1 and heating furnace 2, between forging hammer 1 and heating furnace 2 the transhipment track is set, and transport carriage 3 is set in orbit.As improvement, this dolly 3 can be pulled on the track by haulage gear to move around, and haulage gear can be arranged on the dolly 3, perhaps is provided with on the ground.After workpiece blank is sent into heating furnace 2 and is heated to set point of temperature, the workman grabs out heating furnace 2 by grapple with it, dolly 3 is parked in by the work stage of heating furnace 2, the workman is dragged to dolly 3 with the workpiece on the workbench, the dolly 3 of carrying workpiece is subjected to haulage gear to draw mobile in orbit resting on the work stage of forging hammer 1, and the workman can drag workpiece the anvil face of forging hammer easily.

Claims (1)

1. a workpiece forging equipment comprises forging hammer (1) and heating furnace (2), it is characterized in that: between described forging hammer (1) and heating furnace (2) the transhipment track is set, transport carriage (3) is set in orbit.
CN2010201560972U 2010-03-30 2010-03-30 Workpiece forging device Expired - Fee Related CN201711488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201560972U CN201711488U (en) 2010-03-30 2010-03-30 Workpiece forging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201560972U CN201711488U (en) 2010-03-30 2010-03-30 Workpiece forging device

Publications (1)

Publication Number Publication Date
CN201711488U true CN201711488U (en) 2011-01-19

Family

ID=43457487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201560972U Expired - Fee Related CN201711488U (en) 2010-03-30 2010-03-30 Workpiece forging device

Country Status (1)

Country Link
CN (1) CN201711488U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106734825A (en) * 2016-12-16 2017-05-31 蒙阴金华机械有限公司 A kind of forging shifting frock is put
CN107175308A (en) * 2017-07-11 2017-09-19 芜湖泰庆电子科技有限公司 A kind of efficient forging machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106734825A (en) * 2016-12-16 2017-05-31 蒙阴金华机械有限公司 A kind of forging shifting frock is put
CN107175308A (en) * 2017-07-11 2017-09-19 芜湖泰庆电子科技有限公司 A kind of efficient forging machine
CN107175308B (en) * 2017-07-11 2018-12-21 芜湖泰庆电子科技有限公司 A kind of efficient forging machine

Similar Documents

Publication Publication Date Title
CN104117855A (en) Fully automatic continuous production line for ring forgings
CN106348181A (en) Three-dimensional direction carrying hanging tool
CN203956508U (en) Full-automatic continuous production line for annular forgings
CN202317829U (en) Automatic loading device of circular steel tube
CN202270929U (en) A forge piece conveying device
CN201711488U (en) Workpiece forging device
CN203566399U (en) Workpiece turning device
CN203508867U (en) Reinforcing steel bar bending machine
CN104044661A (en) Disassembly line and disassembly technology of large scrapped automobile
CN202764980U (en) Simple rail transport cart
CN204021049U (en) Scrap full-sized car disassembling flow line
CN203737720U (en) Roll replacing device of cold rolling mill work rolls
CN202829467U (en) Lifting charging wagon
CN203079538U (en) Graphite block clamping device
CN202599120U (en) Conveying device used for calcining kiln
CN204569139U (en) Facilitate the lifting appliance that object is laid
CN204624573U (en) Incorgruous workpiece movement system
CN204137871U (en) A kind of full automatic gas pressure elevator
CN202643210U (en) Aluminum ingot putting equipment
CN202169954U (en) Multifunctional tool cart
CN201545475U (en) Point-to-point material transporting device
CN205632728U (en) Header board assembly line
CN203498426U (en) Portal frame type compound self-propelled thermal treatment robot
CN205045747U (en) A hoist that is used for blast furnace stemming mixture production
CN204508566U (en) The dedicated lifting hook of base accident is fallen in a kind of fast processing heating

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110119

Termination date: 20150330

EXPY Termination of patent right or utility model