CN201704878U - 组合式钢筋连接套筒 - Google Patents
组合式钢筋连接套筒 Download PDFInfo
- Publication number
- CN201704878U CN201704878U CN201020101141XU CN201020101141U CN201704878U CN 201704878 U CN201704878 U CN 201704878U CN 201020101141X U CN201020101141X U CN 201020101141XU CN 201020101141 U CN201020101141 U CN 201020101141U CN 201704878 U CN201704878 U CN 201704878U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- reinforcing bar
- slip casting
- mechanical
- combined type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Revetment (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020101141XU CN201704878U (zh) | 2010-01-26 | 2010-01-26 | 组合式钢筋连接套筒 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020101141XU CN201704878U (zh) | 2010-01-26 | 2010-01-26 | 组合式钢筋连接套筒 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201704878U true CN201704878U (zh) | 2011-01-12 |
Family
ID=43442031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201020101141XU Expired - Lifetime CN201704878U (zh) | 2010-01-26 | 2010-01-26 | 组合式钢筋连接套筒 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201704878U (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587586A (zh) * | 2011-01-14 | 2012-07-18 | 中冶建筑研究总院有限公司 | 水泥灌浆螺纹复合钢筋连接接头 |
CN103556786A (zh) * | 2013-10-18 | 2014-02-05 | 沈阳建筑大学 | 装配式预制构件钢筋的连接灌浆套筒及其施工方法 |
CN104533021A (zh) * | 2014-12-19 | 2015-04-22 | 中冶建筑研究总院有限公司 | 一种钢筋连接用全灌浆套筒 |
CN104831869A (zh) * | 2015-04-13 | 2015-08-12 | 吴方华 | 一种半灌浆套筒 |
CN104929318A (zh) * | 2014-03-18 | 2015-09-23 | 宁波市镇海路石建筑科技有限公司 | 一种螺纹钢连接用灌浆套筒 |
CN105064619A (zh) * | 2015-08-02 | 2015-11-18 | 长安大学 | 预制装配式混凝土构件用钢筋套筒灌浆连接件及连接方法 |
CN105064617A (zh) * | 2015-08-06 | 2015-11-18 | 江阴法尔胜住电新材料有限公司 | 一种钢绞线拉索的锚具密封结构 |
CN105113701A (zh) * | 2015-08-19 | 2015-12-02 | 周兆弟 | 装配式建筑物的预制墙体 |
CN105113665A (zh) * | 2015-08-19 | 2015-12-02 | 周兆弟 | 装配式建筑物的预制吊装墙体 |
CN111101714A (zh) * | 2019-12-31 | 2020-05-05 | 山东泰安建筑工程集团有限公司 | 一种装配式建筑预制构件灌浆连接施工方法 |
CN111851865A (zh) * | 2019-04-25 | 2020-10-30 | 润弘精密工程事业股份有限公司 | 钢筋续接器及具有所述钢筋续接器的预铸式建筑结构 |
CN113136982A (zh) * | 2021-03-10 | 2021-07-20 | 河南大学 | 一种新型装配式轻质隔墙连接装置 |
-
2010
- 2010-01-26 CN CN201020101141XU patent/CN201704878U/zh not_active Expired - Lifetime
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587586A (zh) * | 2011-01-14 | 2012-07-18 | 中冶建筑研究总院有限公司 | 水泥灌浆螺纹复合钢筋连接接头 |
CN103556786A (zh) * | 2013-10-18 | 2014-02-05 | 沈阳建筑大学 | 装配式预制构件钢筋的连接灌浆套筒及其施工方法 |
CN104929318A (zh) * | 2014-03-18 | 2015-09-23 | 宁波市镇海路石建筑科技有限公司 | 一种螺纹钢连接用灌浆套筒 |
CN104533021B (zh) * | 2014-12-19 | 2017-04-12 | 中冶建筑研究总院有限公司 | 一种钢筋连接用全灌浆套筒 |
CN104533021A (zh) * | 2014-12-19 | 2015-04-22 | 中冶建筑研究总院有限公司 | 一种钢筋连接用全灌浆套筒 |
CN104831869A (zh) * | 2015-04-13 | 2015-08-12 | 吴方华 | 一种半灌浆套筒 |
CN105064619A (zh) * | 2015-08-02 | 2015-11-18 | 长安大学 | 预制装配式混凝土构件用钢筋套筒灌浆连接件及连接方法 |
CN105064617A (zh) * | 2015-08-06 | 2015-11-18 | 江阴法尔胜住电新材料有限公司 | 一种钢绞线拉索的锚具密封结构 |
CN105113665A (zh) * | 2015-08-19 | 2015-12-02 | 周兆弟 | 装配式建筑物的预制吊装墙体 |
WO2017028474A1 (zh) * | 2015-08-19 | 2017-02-23 | 周兆弟 | 装配式建筑物的预制墙体 |
CN105113701A (zh) * | 2015-08-19 | 2015-12-02 | 周兆弟 | 装配式建筑物的预制墙体 |
CN111851865A (zh) * | 2019-04-25 | 2020-10-30 | 润弘精密工程事业股份有限公司 | 钢筋续接器及具有所述钢筋续接器的预铸式建筑结构 |
CN111101714A (zh) * | 2019-12-31 | 2020-05-05 | 山东泰安建筑工程集团有限公司 | 一种装配式建筑预制构件灌浆连接施工方法 |
CN113136982A (zh) * | 2021-03-10 | 2021-07-20 | 河南大学 | 一种新型装配式轻质隔墙连接装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201704878U (zh) | 组合式钢筋连接套筒 | |
CN201704879U (zh) | 瓶状注浆钢筋连接套筒 | |
CN204919998U (zh) | 钢筋连接用球墨铸铁半灌浆套筒组件 | |
CN107023121B (zh) | 一种用于装配式混凝土结构延性连接的钢筋灌浆套筒 | |
CN201217847Y (zh) | 插入式预留孔灌浆钢筋搭接连接构件 | |
CN201217890Y (zh) | 套入式灌浆钢筋连接套筒 | |
CN102071776A (zh) | 预制套灌浆钢筋连接套筒及其施工方法 | |
CN210263647U (zh) | 一种用于钢筋连接的灌浆套筒 | |
CN105064619A (zh) | 预制装配式混凝土构件用钢筋套筒灌浆连接件及连接方法 | |
CN100593065C (zh) | 一种双层套筒钢筋连接器及其钢筋连接施工方法 | |
CN204370701U (zh) | 用于装配式混凝土建筑结构中的钢筋机械连接装置 | |
CN103147440A (zh) | 预应力锚索施工方法 | |
CN104963461A (zh) | 一种采用钢纤维砂浆灌浆套筒的预制构件间钢筋连接方式 | |
CN205935417U (zh) | 一种带螺纹连接件的半灌浆套筒 | |
CN103835441A (zh) | 预制钢筋混凝土构件用钢筋机械连接件及其安装方法 | |
CN103590541A (zh) | 装配式预制构件钢筋的连接灌浆套筒及其施工方法 | |
CN203729498U (zh) | 装配式墙体竖向钢筋钢套管对接连接结构 | |
CN105019606A (zh) | 一种预制混凝土构件钢筋灌浆连接件及连接方法 | |
CN204826423U (zh) | 一种预制装配式混凝土构件用钢筋套筒灌浆连接件 | |
CN204826429U (zh) | 一种预制混凝土构件钢筋灌浆连接件 | |
CN203701436U (zh) | 装配式墙体竖向钢筋钢套管搭接连接结构 | |
CN102071775A (zh) | 插入式预留孔排气钢筋搭接结构装配式施工方法 | |
CN106149874B (zh) | 预制装配式混凝土结构钢筋连接方法 | |
CN204691081U (zh) | 含带肋约束波纹管钢筋搭接连接构件 | |
CN103556786A (zh) | 装配式预制构件钢筋的连接灌浆套筒及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100039 Fuxing Road, Beijing, Haidian District, No. 34 Patentee after: Beijing Building Construction Research Institute Co., Ltd. Address before: 100039 Fuxing Road, Beijing, Haidian District, No. 34 Patentee before: Beijing Research Inst of Building Engineering |
|
TR01 | Transfer of patent right |
Effective date of registration: 20170802 Address after: 100039, Beijing, Haidian District Fuxing Road, No. 34 office building 1 Patentee after: Construction Project Quality First Testing Institute Of Beijin Address before: 100039 Fuxing Road, Beijing, Haidian District, No. 34 Patentee before: Beijing Building Construction Research Institute Co., Ltd. |
|
TR01 | Transfer of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20110112 |
|
CX01 | Expiry of patent term |