CN201695586U - Insulated roof exhaust pipe - Google Patents
Insulated roof exhaust pipe Download PDFInfo
- Publication number
- CN201695586U CN201695586U CN2010202557746U CN201020255774U CN201695586U CN 201695586 U CN201695586 U CN 201695586U CN 2010202557746 U CN2010202557746 U CN 2010202557746U CN 201020255774 U CN201020255774 U CN 201020255774U CN 201695586 U CN201695586 U CN 201695586U
- Authority
- CN
- China
- Prior art keywords
- exhaust pipe
- exhaust
- roof
- way joint
- thermal insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
本实用新型涉及一种建筑用型材,具体的说是一种保温屋面排气管。它包括置于混凝土屋面板和保温层之间的排气管本体,所述排气管本体上设有排气孔。采用上述技术方案的本实用新型与现有技术相比,排气管置于混凝土屋面板预先留设的分隔缝预埋,施工方便,排气系统简单美观,排气效果好。
The utility model relates to a section material for building, in particular to a thermal insulation roof exhaust pipe. It includes an exhaust pipe body placed between the concrete roof panel and the insulation layer, and the exhaust pipe body is provided with exhaust holes. Compared with the prior art, the utility model adopting the above-mentioned technical scheme has the exhaust pipe placed in the pre-buried separation joint of the concrete roof panel, which is convenient for construction, the exhaust system is simple and beautiful, and the exhaust effect is good.
Description
技术领域:Technical field:
本实用新型涉及一种建筑用型材,具体的说是一种保温屋面排气管。The utility model relates to a section material for building, in particular to a thermal insulation roof exhaust pipe.
背景技术:Background technique:
建筑物屋面多采用保温设计。屋面保温层采用水泥膨胀珍珠岩。这种保温材料是现场搅拌浇筑的。浇筑时含有大量的水分。正常的施工工艺是晾晒几天达到一定的含水率后再行施工上部的找平层和防水层。然而,目前的建筑工程施工工期要求极不合理,多数建筑物为了避免混凝土结构冬季施工产生大量的技术措施费,而把混凝土结构封顶安排在冬季到来之前。这样安排,屋面工程则落到了冬季进行施工。而冬季施工水泥膨胀珍珠岩保温层,由于气温较低,其干燥时间比夏季大大延长。又考虑到冬季雨雪的影响,需要及时施工上部找平层和防水层。同样,遇到工期特别紧张,需要尽量缩短工序间隔时间的时候,也客观上要求及时进行下道工序即防水层的施工。此种情况下,如不采取排气措施,日后气温升高,水泥膨胀珍珠岩保温层内水分蒸发聚集形成较大压力,极易造成上部找平层和防水层空鼓开裂而漏水。建筑图集推荐做法是施工保温层时双向间隔一定距离设置排气槽,槽内填充陶粒等轻质松散材料。按照一定屋面面积范围,在双向排气槽的接口处设置突出屋面的倒u形PP-R出气管。这种做法的缺点有三:一,这种填充材料往往用量较少,尤其屋面面积小的建筑物,整个工程用不了多少,还必须进行采购、验收等一系列经济、质量控制程序,给项目管理增加工作量;二,由于填充料为松散材料,是排气槽形成以后进行填充的,故施工水泥膨胀珍珠岩保温层留设排气槽时需专门支设模板,增加了施工工序;三,突出屋面的T型PP-R出气管直接插在排气松散材料中,不易固定牢靠,排气效果不好,屋面成型后排气管排列不整齐,不美观。Building roofs are mostly designed for thermal insulation. The roof insulation layer uses cement expanded perlite. This insulation material is poured on site. Contains a lot of water when pouring. The normal construction process is to dry for a few days to reach a certain moisture content before constructing the upper leveling layer and waterproof layer. However, the current construction period requirements for construction projects are extremely unreasonable. In order to avoid a large amount of technical measures for the construction of concrete structures in winter, most buildings arrange the topping of concrete structures before the arrival of winter. With this arrangement, the roofing project will be carried out in winter. In winter, when the cement expanded perlite insulation layer is constructed, the drying time is much longer than that in summer due to the lower temperature. Considering the impact of rain and snow in winter, it is necessary to construct the upper screed and waterproof layer in time. Similarly, when the construction period is particularly tight and the interval between processes needs to be shortened as much as possible, it is also objectively required to carry out the next process, that is, the construction of the waterproof layer in a timely manner. In this case, if exhaust measures are not taken, the temperature will rise in the future, and the water in the cement expanded perlite insulation layer will evaporate and accumulate to form a large pressure, which will easily cause the upper leveling layer and waterproof layer to crack and leak. The recommended method in the Building Atlas is to set up exhaust grooves at a certain distance in both directions when constructing the insulation layer, and fill the grooves with light loose materials such as ceramsite. According to a certain range of roof area, an inverted U-shaped PP-R air outlet pipe protruding from the roof is provided at the interface of the two-way exhaust groove. There are three disadvantages of this approach: First, this kind of filling material is often used in a small amount, especially for buildings with small roof areas. The entire project will not use much, and a series of economic and quality control procedures such as procurement and acceptance must be carried out. Increase the workload; two, since the filling material is loose material, it is filled after the vent groove is formed, so when constructing the cement expanded perlite insulation layer to leave the vent groove, it is necessary to set up a special formwork, which increases the construction process; three, The T-shaped PP-R outlet pipe protruding from the roof is directly inserted into the loose exhaust material, which is not easy to fix firmly, and the exhaust effect is not good. After the roof is formed, the exhaust pipes are not arranged neatly and are not beautiful.
实用新型内容:Utility model content:
本实用新型的发明目的是克服现有技术中存在的缺陷和不足而提供一种利于施工,排气效果好的保温屋面排气管。The purpose of the invention of the utility model is to overcome the defects and deficiencies in the prior art and provide a thermal insulation roof exhaust pipe which is convenient for construction and has a good exhaust effect.
本实用新型采用如下技术方案:The utility model adopts the following technical solutions:
一种保温屋面排气管,包括置于混凝土屋面板和保温层之间的排气管本体,所述排气管本体上设有排气孔。A thermal insulation roof exhaust pipe includes an exhaust pipe body placed between a concrete roof panel and an insulation layer, and an exhaust hole is arranged on the exhaust pipe body.
采用上述技术方案的本实用新型与现有技术相比,排气管置于混凝土屋面板预先留设的分隔缝预埋,施工方便,排气系统简单美观,排气效果好。Compared with the prior art, the utility model adopting the above-mentioned technical scheme, the exhaust pipe is placed in the pre-buried separation joint of the concrete roof slab, the construction is convenient, the exhaust system is simple and beautiful, and the exhaust effect is good.
作为本实用新型的一种优选方案,所述相邻铺设的两排气管本体之间通过三通接头连接,该三通接头的另一端口与伸出屋面的出气管连接。As a preferred solution of the present invention, the bodies of the two adjacent exhaust pipes are connected by a three-way joint, and the other port of the three-way joint is connected with the air outlet pipe protruding from the roof.
作为本实用新型的一种优选方案,所述排气孔均布设置。As a preferred solution of the present invention, the exhaust holes are evenly distributed.
作为本实用新型的一种优选方案,所述三通接头用四通接头代替。As a preferred solution of the present invention, the three-way joint is replaced by a four-way joint.
附图说明:Description of drawings:
图1是本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图2是本实用新型应用剖面示意图。Fig. 2 is a schematic cross-sectional view of the application of the utility model.
图3是本实用新型应用平面示意图。Fig. 3 is a schematic diagram of an application plane of the utility model.
具体实施方式:Detailed ways:
下面结合附图及实施例详述本实用新型:Describe the utility model in detail below in conjunction with accompanying drawing and embodiment:
一种保温屋面排气管,参见附图1至附图3,图中:排气管本体1,排气孔2,三通接头3,出气管4,混凝土屋面板5,水泥膨胀珍珠岩保温层6,水泥沙浆保温层7,屋面柔性防水屋8。A thermal insulation roof exhaust pipe, see accompanying drawings 1 to 3, in the figure: exhaust pipe body 1,
本实施例中,排气管本体1上设有排气孔2,相邻铺设的两排气管本体1之间通过三通接头3连接,三通接头3的另一端口与伸出屋面的出气管4连接。出气管4依次穿过水泥膨胀珍珠岩保温层6、水泥沙浆保温层7和屋面柔性防水屋8后伸出,排气孔2均布设置于排气管本体1上,排气孔2的间距可根据实际需要设为3~5cm。In this embodiment, the exhaust pipe body 1 is provided with an
在施工水泥膨胀珍珠岩保温层6时,按照一定间距双向铺设PP-R排气管本体1。在相邻排气管本体1之间通过三通接头3与伸出屋面的PP-R出气管4连接。当气温升高,水泥膨胀珍珠岩保温层6内水分蒸发聚集于PP-R排气管本体1内,通过突出屋面的T型PP-R出气管4排出,从而达到减小柔性防水层下部的压力,避免水泥砂浆找平层以及柔性防水层被水蒸气拱裂而漏水的事故。When constructing the cement expanded perlite insulation layer 6, the PP-R exhaust pipe body 1 is laid bidirectionally according to a certain interval. The adjacent exhaust pipe bodies 1 are connected to the PP-
本实施例中的三通接头3可以用四通接头代替。The three-
本实施例中的排气管本体1可以就地取材,施工方便,排气效果好,可以解决现有技术中排气措施工序麻烦、程序繁琐、排气效果不好、成型后屋面不美观的技术问题。The exhaust pipe body 1 in this embodiment can be made from local materials, which is convenient for construction and has a good exhaust effect, which can solve the problems of troublesome exhaust measures in the prior art, cumbersome procedures, poor exhaust effect, and unsightly roof after forming. technical problem.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202557746U CN201695586U (en) | 2010-07-09 | 2010-07-09 | Insulated roof exhaust pipe |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202557746U CN201695586U (en) | 2010-07-09 | 2010-07-09 | Insulated roof exhaust pipe |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201695586U true CN201695586U (en) | 2011-01-05 |
Family
ID=43396826
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010202557746U Expired - Fee Related CN201695586U (en) | 2010-07-09 | 2010-07-09 | Insulated roof exhaust pipe |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201695586U (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102691385A (en) * | 2011-03-22 | 2012-09-26 | 江苏华江建设集团有限公司 | A roof exhaust system |
| WO2012159251A1 (en) * | 2011-05-20 | 2012-11-29 | Dow Global Technologies Llc | Venting apparatus for exterior insluation and finish systems |
| CN102979258A (en) * | 2012-11-28 | 2013-03-20 | 江苏江中集团有限公司 | Roof exhaust system |
| CN103362253A (en) * | 2012-03-29 | 2013-10-23 | 夏翠萍 | Construction method for insulating layer of roof |
| CN104032931A (en) * | 2014-06-11 | 2014-09-10 | 中国建筑第八工程局有限公司 | Points warehouse seam exhaust passage structure and construction method of points warehouse seam exhaust passage structure |
| CN106320616A (en) * | 2015-12-10 | 2017-01-11 | 湖北晶標建筑工程有限公司 | Heat insulation roof exhaust pipeline system and construction method |
| CN107816175A (en) * | 2017-11-02 | 2018-03-20 | 上海延吉物业管理有限公司 | A kind of exhaust apparatus for heat insulation house surface and a kind of heat insulation house surface method for maintaining |
| CN108149864A (en) * | 2016-12-02 | 2018-06-12 | 荣盛建设工程有限公司 | Exempt from exhaust hole roofing construction technique |
-
2010
- 2010-07-09 CN CN2010202557746U patent/CN201695586U/en not_active Expired - Fee Related
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102691385A (en) * | 2011-03-22 | 2012-09-26 | 江苏华江建设集团有限公司 | A roof exhaust system |
| CN102691385B (en) * | 2011-03-22 | 2014-05-14 | 江苏华江建设集团有限公司 | Roof exhaust system |
| WO2012159251A1 (en) * | 2011-05-20 | 2012-11-29 | Dow Global Technologies Llc | Venting apparatus for exterior insluation and finish systems |
| CN103362253A (en) * | 2012-03-29 | 2013-10-23 | 夏翠萍 | Construction method for insulating layer of roof |
| CN102979258A (en) * | 2012-11-28 | 2013-03-20 | 江苏江中集团有限公司 | Roof exhaust system |
| CN102979258B (en) * | 2012-11-28 | 2015-03-04 | 江林 | Roof exhaust system |
| CN104032931A (en) * | 2014-06-11 | 2014-09-10 | 中国建筑第八工程局有限公司 | Points warehouse seam exhaust passage structure and construction method of points warehouse seam exhaust passage structure |
| CN106320616A (en) * | 2015-12-10 | 2017-01-11 | 湖北晶標建筑工程有限公司 | Heat insulation roof exhaust pipeline system and construction method |
| CN108149864A (en) * | 2016-12-02 | 2018-06-12 | 荣盛建设工程有限公司 | Exempt from exhaust hole roofing construction technique |
| CN107816175A (en) * | 2017-11-02 | 2018-03-20 | 上海延吉物业管理有限公司 | A kind of exhaust apparatus for heat insulation house surface and a kind of heat insulation house surface method for maintaining |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201695586U (en) | Insulated roof exhaust pipe | |
| CN204715638U (en) | A kind of roof covering water-proof structure | |
| CN102912945B (en) | Roof compound seepage-proofing steam exhausting hole detail treatment technology | |
| CN202755547U (en) | Inverted type waterproof roof | |
| CN206873781U (en) | High-low bay deformation joint of roof waterproofing node | |
| CN107190873A (en) | One kind building surface recombination heat-insulation layer and its installation method | |
| CN204326522U (en) | Insulation protection integrated non-dismantling formwork | |
| CN104005503B (en) | A kind of flat roof deck modular construction | |
| CN206616785U (en) | Inverted roof provided with steam passing away | |
| CN203188486U (en) | Waterproof structure for roof | |
| CN205063202U (en) | Be located eave decorative board on outer wall | |
| CN204691088U (en) | A kind of cold bending thin wall steel work steel tiled roof system | |
| CN202483092U (en) | Vapor-proof thermal insulation walkable roof | |
| CN207436295U (en) | A kind of building surface recombination insulating layer | |
| CN202899319U (en) | Waterproof panel point of side wall of existing building and roof of new-built building | |
| CN104196130B (en) | A kind of waterproof construction of water scenery glass lighting ceiling and preparation method thereof | |
| CN208396162U (en) | A kind of thermal isolation by water storage roofing | |
| CN205476117U (en) | Structure that passive form building parapet bears down on one | |
| CN201746992U (en) | Waterproof heat insulation roof with novel design | |
| CN206360219U (en) | Constructing structure for High angle pitched roof | |
| CN209958622U (en) | Waterproof and heat-preservation integrated roof | |
| CN113417410A (en) | Waterproof construction method for roof, basement outer wall and basement roof | |
| CN207525964U (en) | A kind of prefabricated composite wallboard pitched roof system | |
| CN201099948Y (en) | Waterproof and insulated roof | |
| CN221920038U (en) | Waterproof people's roofing of going up keeps warm |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110105 Termination date: 20110709 |