CN201679030U - A rotary road construction equipment - Google Patents

A rotary road construction equipment Download PDF

Info

Publication number
CN201679030U
CN201679030U CN2010201415150U CN201020141515U CN201679030U CN 201679030 U CN201679030 U CN 201679030U CN 2010201415150 U CN2010201415150 U CN 2010201415150U CN 201020141515 U CN201020141515 U CN 201020141515U CN 201679030 U CN201679030 U CN 201679030U
Authority
CN
China
Prior art keywords
bulldozer
soil
road building
rotary road
wheel device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201415150U
Other languages
Chinese (zh)
Inventor
张为春
谭艳艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Technology
Original Assignee
Shandong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Technology filed Critical Shandong University of Technology
Priority to CN2010201415150U priority Critical patent/CN201679030U/en
Application granted granted Critical
Publication of CN201679030U publication Critical patent/CN201679030U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses rotary road building equipment which belongs to the technical field of engineering machinery and is mainly characterized by including a chain wheel device and a belt wheel device; the chain wheel device consists of a chain wheel, a soil holding device and a soil shoveling device; wherein the chain wheel device is obliquely fixed on the bulldozer of the engineering machinery; one end of the belt wheel device is fixed on the bulldozer and the other end of the belt wheel device is arranged on a movable auxiliary support wheel. The rotary road building equipment has the advantages of simple operation, human resource and material saving, high road building efficiency and good pavement building quality, etc.

Description

一种旋转式筑路设备 A rotary road construction equipment

技术领域technical field

本实用新型提供一种旋转式筑路设备,属于工程机械技术领域。The utility model provides a rotary road construction equipment, which belongs to the technical field of engineering machinery.

背景技术Background technique

为了更好的利用一些滩涂地面的资源,就需要在这些滩涂地面修筑路面,现在的修路方式是用液压挖掘机将路面保护区以外的土挖掘到需要修筑的路面上,该筑路方式是间歇式作业,修筑的路面质量差且效率太低,又因为滩涂地面筑路的重复性大,这样就需对现有的筑路方法进行改进,使得所修路面质量提高并且提高工作效率。In order to make better use of resources on some tidal flats, it is necessary to build roads on these tidal flats. The current road construction method is to use hydraulic excavators to excavate the soil outside the road surface protection area to the road surface that needs to be built. The road construction method is Intermittent operation, the quality of the road surface built is poor and the efficiency is too low, and because of the high repeatability of road construction on tidal flats, it is necessary to improve the existing road construction methods to improve the quality of the road surface and improve work efficiency.

发明内容Contents of the invention

本实用新型的目的是提供一种能克服上述缺陷、易操作、工作性能优良的旋转式筑路设备。是通过以下技术方案来实现的:The purpose of this utility model is to provide a rotary road construction equipment that can overcome the above-mentioned defects, is easy to operate, and has excellent working performance. It is achieved through the following technical solutions:

一种旋转式筑路设备,包括链轮装置和带轮装置,两者成空间垂直状态,其中链轮装置倾斜安置于推土机上,链轮装置采用曳引链,在一端链轮轴上安装铲上装置,在曳引链的销轴上安装盛土装置,在另一链轮轴上安置从推土机上引出的液压泵,由液压泵提供动力完成取土及初步抬高运输的工作,带轮装置也倾斜安置于推土机上,一端带轮轴处安装液压泵,并引出固定支撑,固定在推土机上,另一端带轮安装可以移动的辅助支撑,带轮装置完成土的长距离运输。A rotary road construction equipment, including a sprocket device and a pulley device, both of which are in a vertical state, wherein the sprocket device is placed obliquely on the bulldozer, and the sprocket device adopts a traction chain, and a shovel is installed on the sprocket shaft at one end Install the soil holding device on the pin shaft of the traction chain, and install the hydraulic pump drawn from the bulldozer on the other sprocket shaft. The hydraulic pump provides power to complete the work of soil extraction and preliminary lifting and transportation, and the pulley device is also tilted. Installed on the bulldozer, a hydraulic pump is installed on the pulley shaft at one end, and a fixed support is drawn out to fix it on the bulldozer, and a movable auxiliary support is installed on the other end of the pulley. The pulley device completes the long-distance transportation of soil.

其工作原理为:在浅海地带,司机驾驶工程机械推土机缓慢向前行驶,此过程曳引链跟输送带都在转动,铲土装置将土推挤在一起,随着曳引链的转动,安装于曳引链销轴上的盛土装置将土刮起,继续转动,将土初步抬高到链轮顶部,随后土便掉到输送带上,然后由输送带将土输送到目的地,链轮装置和带轮装置同时工作,慢慢的输送工作将循环起来,从而有效率的完成输送工作。Its working principle is: in the shallow sea area, the driver drives the construction machinery bulldozer to move forward slowly. During this process, the traction chain and the conveyor belt are rotating, and the shovel device pushes the soil together. With the rotation of the traction chain, the installation The soil holding device on the pin shaft of the traction chain scrapes up the soil, continues to rotate, and initially raises the soil to the top of the sprocket, then the soil falls onto the conveyor belt, and then the conveyor belt transports the soil to the destination, the sprocket The device and the pulley device work at the same time, and the conveying work will be cycled slowly, so as to complete the conveying work efficiently.

本实用新型优点在于:The utility model has the advantages that:

1、本旋转式筑路设备安置于同一台推土机上,推土机为链轮装置和带轮装置提供相同的动力,使得两者同时工作,输送工作连续,从而提高工作效率。1. The rotary road construction equipment is placed on the same bulldozer, which provides the same power for the sprocket device and the pulley device, so that both work at the same time, and the conveying work is continuous, thereby improving work efficiency.

2、完成输送工作只需要一名驾驶员,避免了人力物力的浪费。2. Only one driver is needed to complete the transportation work, which avoids the waste of manpower and material resources.

3、此输送土的方式可以保证所有路面土分配均匀,因此所修的路面的质量得以提高。3. This method of conveying soil can ensure that all pavement soil is evenly distributed, so the quality of the repaired pavement can be improved.

附图说明:Description of drawings:

图1是本实用新型实施例的结构示意图;Fig. 1 is the structural representation of the utility model embodiment;

图2是本实用新型实施例的结构示意图。Fig. 2 is a schematic structural view of an embodiment of the utility model.

具体实施方式Detailed ways

1、曳引链  2、链轮  3、链轮  4、铲土装置  5、盛土装置  6、输送带7、带轮  8、可移动的辅助支撑  9、带轮  10、固定支撑1. Traction chain 2. Sprocket 3. Sprocket 4. Shovel device 5. Soil filling device 6. Conveyor belt 7. Pulley 8. Movable auxiliary support 9. Pulley 10. Fixed support

一种链轮装置由曳引链1、两个链轮2、3、铲土装置4和盛土装置5组成,铲土装置4安装在链轮3的轴上,随着推土机的前进,将土推挤在一起,盛土装置5安装在曳引链1的各个销轴上,随着曳引链的转动将土刮起,并将土输送到链轮的最高端,随后土便落在输送带上,带轮装置由输送带6、带轮7、9、可移动的辅助支撑8、固定支撑10组成,在带轮9的轴处安装液压泵,并引出固定支撑10安装在推土机上,在带轮7的轴安装可移动的辅助支撑8,输送带接受链轮装置传送来的土,完成最终的输送工作,将土输送到目的地。A sprocket device consists of a traction chain 1, two sprockets 2, 3, a shoveling device 4 and an earth holding device 5. The shoveling device 4 is installed on the shaft of the sprocket 3, and as the bulldozer advances, the soil Pushing together, the soil holding device 5 is installed on each pin shaft of the traction chain 1. With the rotation of the traction chain, the soil is scraped up, and the soil is transported to the highest end of the sprocket, and then the soil falls on the conveyor belt. Above, the pulley device is composed of conveyor belt 6, pulleys 7, 9, movable auxiliary support 8, and fixed support 10. A hydraulic pump is installed on the shaft of pulley 9, and the fixed support 10 is drawn out to be installed on the bulldozer. A movable auxiliary support 8 is installed on the shaft of the pulley 7, and the conveyor belt receives the soil delivered by the sprocket device, completes the final conveying work, and transports the soil to the destination.

Claims (3)

1. rotary road building equipment, comprise chain gear apparatus and pulley arrangement, it is characterized in that: close the position of chain gear apparatus and pulley arrangement is the spatial vertical relation, and wherein chain gear apparatus comprises dragging chain (1), scraper device (4), Earth container (5) and sprocket wheel (2,3); Pulley arrangement comprises conveyer belt (6), belt wheel (7,9), fixed support (10) and supplemental support (8).
2. a kind of according to claim 1 rotary road building equipment, it is characterized in that: the chain gear apparatus tiltably-mounted is on the engineering machinery bulldozer, wherein locate to lay the hydraulic pump of drawing from bulldozer at sprocket wheel (2), locate to install scraper device (4) at sprocket wheel (3), Earth container (5) is installed on each bearing pin of dragging chain (1).
3. a kind of according to claim 1 rotary road building equipment, it is characterized in that: the hydraulic pump of drawing from bulldozer is installed at an end belt wheel (9) the axle place of pulley arrangement, and draw fixed support (10) at this place and be installed on the bulldozer, locate to install supplemental support (8) at belt wheel (9).
CN2010201415150U 2010-03-26 2010-03-26 A rotary road construction equipment Expired - Fee Related CN201679030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201415150U CN201679030U (en) 2010-03-26 2010-03-26 A rotary road construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201415150U CN201679030U (en) 2010-03-26 2010-03-26 A rotary road construction equipment

Publications (1)

Publication Number Publication Date
CN201679030U true CN201679030U (en) 2010-12-22

Family

ID=43344081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201415150U Expired - Fee Related CN201679030U (en) 2010-03-26 2010-03-26 A rotary road construction equipment

Country Status (1)

Country Link
CN (1) CN201679030U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526794A (en) * 2013-10-30 2014-01-22 山东理工大学 Rotary road building equipment
CN103590306A (en) * 2013-11-20 2014-02-19 山东理工大学 Hydraulic device for rotary road building equipment
CN109440848A (en) * 2018-11-19 2019-03-08 阿尔法(江苏)重工科技有限公司 A kind of removable conveying device of bull-dozer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526794A (en) * 2013-10-30 2014-01-22 山东理工大学 Rotary road building equipment
CN103590306A (en) * 2013-11-20 2014-02-19 山东理工大学 Hydraulic device for rotary road building equipment
CN103590306B (en) * 2013-11-20 2015-10-14 山东理工大学 A kind of hydraulic means for rotary road building equipment
CN109440848A (en) * 2018-11-19 2019-03-08 阿尔法(江苏)重工科技有限公司 A kind of removable conveying device of bull-dozer

Similar Documents

Publication Publication Date Title
CN104695965B (en) Multifunctional originating station and originating method for departure and reception of shield
CN105297807B (en) A kind of integrated pipe canal open cut development machine with automatic backfill function
CN102587438A (en) Silt removing machine for sewage-discharging channels
CN203818326U (en) Cement stirring device
CN206694038U (en) Hob type push pipe excavator
CN201679030U (en) A rotary road construction equipment
CN101864781B (en) Mining machine for dredging
CN204510322U (en) A kind of inclined shaft excavating equipment
CN103643714B (en) River-crossing tunnel trash rake
CN204849883U (en) Three -dimensional excavation system
CN204343358U (en) The removable earthwork equipment of all-hydraulic control crawler type based on flexible delivery
CN204509885U (en) Track sleeper dismantling equipment for construction of water diversion type hydropower station
CN107326952A (en) A kind of pipeline excavator
CN204060707U (en) The inner dross extractor of tunnel piercing main beam
CN207348865U (en) A kind of municipal administration is holed equipment with high efficiency
CN206829145U (en) Deep Foundation Pit Excavation vertical-lift goes out indigenous equipment
CN205438877U (en) Muddy water agitating unit
CN204383486U (en) A kind of rail-variable track construction engineering truck
CN203022119U (en) Down-hole guide frame for joint sewage suction truck
CN203652804U (en) Novel loading mechanism
CN206957581U (en) A kind of excavation of foundation pit device
CN208121649U (en) A kind of civil engineering ground smoothing machine
CN205873715U (en) River silt hoist device
CN206844194U (en) Multi-functional silt remover
CN215562895U (en) A multifunctional resource mining device and mining vehicle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101222

Termination date: 20120326