CN201649748U - 储罐及容器底圈壁板垂直度调节支撑装置 - Google Patents
储罐及容器底圈壁板垂直度调节支撑装置 Download PDFInfo
- Publication number
- CN201649748U CN201649748U CN2009202820616U CN200920282061U CN201649748U CN 201649748 U CN201649748 U CN 201649748U CN 2009202820616 U CN2009202820616 U CN 2009202820616U CN 200920282061 U CN200920282061 U CN 200920282061U CN 201649748 U CN201649748 U CN 201649748U
- Authority
- CN
- China
- Prior art keywords
- rod
- storage tank
- supporting
- adjusting
- adjusting screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000001105 regulatory effect Effects 0.000 claims description 14
- 238000010276 construction Methods 0.000 abstract description 7
- 238000000034 method Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
储罐及容器底圈壁板垂直度调节支撑装置,应用于储罐及容器正装法施工领域内的底圈壁板垂直度调节的支撑。包括:调节螺杆(5)、调节螺母(4)、支撑杆(3)、支撑板(1)和连接板(2),调节螺杆(5)两端分别设有反向螺纹,中间设有调节孔(6),支撑杆(3)直径大于调节螺杆(5)直径,调节螺杆(5)两端套装在支撑杆(3)内通过调节螺母(4)与支撑杆(3)连接,支撑杆(3)两外端部垂直连接连接板(2),连接板(2)与支撑板(1)垂直连接。具有大大提高了施工效率,结构稳定、不仅能支撑壁板还可以自由调节壁板垂直度,操作简便等优点。
Description
技术领域
储罐及容器底圈壁板垂直度调节支撑装置,应用于储罐及容器正装法施工领域内的底圈壁板垂直度调节的支撑。
背景技术
现有的正装法储罐及容器安装中底圈壁板支撑为“F”型或者是“I”型斜支撑,是固定底圈壁板的单一支撑件,仅起到固定作用,不具备调节底圈壁板垂直度的功能。
实用新型内容
本实用新型要解决的技术问题是:克服现有的不足,提供一种能够实现安装底圈壁板垂直度自由调节的要求、结构稳定、便于垂直度调节支撑的储罐及容器底圈壁板垂直度调节支撑装置。
本实用新型解决其技术问题所采用的技术方案是:储罐及容器底圈壁板垂直度调节支撑装置,其特征在于:包括:调节螺杆、调节螺母、支撑杆、支撑板和连接板,调节螺杆两端分别设有反向螺纹,中间设有调节孔,支撑杆直径大于调节螺杆直径,调节螺杆两端套装在支撑杆内通过调节螺母与支撑杆连接,支撑杆两外端部垂直连接连接板,连接板与支撑板垂直连接。
与现有技术相比,本实用新型所具有的有益效果是:
1、本实用新型储罐及容器底圈壁板垂直度调节支撑装置结构简单、加工容易,采用无缝钢管、螺杆和钢板加工即可,成本低。
2、实用性强,解决了储罐及容器正装法施工过程中底圈壁板垂直度不易调控的问题,不仅能支撑壁板还可以自由调节壁板垂直度。
3、大大提高了施工效率,具有结构稳定、可调性高、操作简便的特点。
附图说明
图1是本实用新型储罐及容器底圈壁板垂直度调节支撑装置的结构示意图;
图2是图1的储罐及容器底圈壁板垂直度调节支撑装置安装示意图。
图1-2是本实用新型储罐及容器底圈壁板垂直度调节支撑装置的最佳实施例。其中1、支撑板;2、连接板;3、支撑杆;4、调节螺母;5、调节螺杆6、调节孔。
具体实施方式
参照图1:
储罐及容器底圈壁板垂直度调节支撑装置由调节螺杆5、调节螺母4、支撑杆3、支撑板1、连接支撑板1与支撑杆3的连接板2、调节孔6组成。调节螺杆5的长度1000mm,两端各400mm长的M40~M60的螺纹,其中两端螺纹必须为左旋和右旋方向不一致,中心无螺纹部分设置φ20mm的调节孔6,调节孔6为圆孔,调节孔6用于调节螺纹伸出的长短,也可以是方孔、六棱等各种形状,只要能够与圆钢或者撬棍配合即可。调节螺母4为M40~M60和调节螺杆5两端配套,调节螺母4外形为圆形与支撑杆3焊接在一起。支撑杆3为无缝钢管,长度根据壁板高度确定。支撑杆3再与连接板2焊接。连接板2与支撑板1垂直焊接再一起。
本储罐及容器底圈壁板垂直度调节支撑装置使用过程如下:
参照图2:
将储罐及容器底圈壁板垂直度调节支撑装置倾斜一定角度与底圈壁板和下表面形成一定的角度,将两端的支撑板1分别于底圈壁板和下表面焊接或固定。将圆钢或者撬棍插入调节螺杆5的调节孔6内,旋转调节螺杆5使支撑装置的整体长度发生变化,以达到调节底圈壁板的垂直度的目的。垂直度调节完毕后将圆钢或者撬棍从调节螺杆5的调节孔6内拔出对壁板起支撑作用。
Claims (1)
1.储罐及容器底圈壁板垂直度调节支撑装置,其特征在于:包括:调节螺杆(5)、调节螺母(4)、支撑杆(3)、支撑板(1)和连接板(2),调节螺杆(5)两端分别设有反向螺纹,中间设有调节孔(6),支撑杆(3)直径大于调节螺杆(5)直径,调节螺杆(5)两端套装在支撑杆(3)内通过调节螺母(4)与支撑杆(3)连接,支撑杆(3)两外端部垂直连接连接板(2),连接板(2)与支撑板(1)垂直连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202820616U CN201649748U (zh) | 2009-11-24 | 2009-11-24 | 储罐及容器底圈壁板垂直度调节支撑装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202820616U CN201649748U (zh) | 2009-11-24 | 2009-11-24 | 储罐及容器底圈壁板垂直度调节支撑装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201649748U true CN201649748U (zh) | 2010-11-24 |
Family
ID=43114977
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202820616U Expired - Lifetime CN201649748U (zh) | 2009-11-24 | 2009-11-24 | 储罐及容器底圈壁板垂直度调节支撑装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201649748U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104232113A (zh) * | 2013-06-06 | 2014-12-24 | 五冶集团上海有限公司 | 干熄焦高层钢结构立柱垂直度调整支架及其使用方法 |
CN105683575A (zh) * | 2013-10-29 | 2016-06-15 | 兵神装备株式会社 | 单轴偏心螺杆泵 |
-
2009
- 2009-11-24 CN CN2009202820616U patent/CN201649748U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104232113A (zh) * | 2013-06-06 | 2014-12-24 | 五冶集团上海有限公司 | 干熄焦高层钢结构立柱垂直度调整支架及其使用方法 |
CN104232113B (zh) * | 2013-06-06 | 2016-06-01 | 五冶集团上海有限公司 | 干熄焦高层钢结构立柱垂直度调整支架及其使用方法 |
CN105683575A (zh) * | 2013-10-29 | 2016-06-15 | 兵神装备株式会社 | 单轴偏心螺杆泵 |
CN105683575B (zh) * | 2013-10-29 | 2017-12-05 | 兵神装备株式会社 | 单轴偏心螺杆泵 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201739731U (zh) | 一种便携可调式支架 | |
CN203271095U (zh) | 一种高度可调支模架 | |
CN202787668U (zh) | 一种悬挑工字钢梁后置螺栓锚固系统 | |
CN202000651U (zh) | 立柱加固用可调节附壁支撑装置 | |
CN201649748U (zh) | 储罐及容器底圈壁板垂直度调节支撑装置 | |
CN201260050Y (zh) | 220kv更换母线支柱绝缘子用支架 | |
CN202347866U (zh) | 手动螺旋升降器 | |
CN202644965U (zh) | 脚手架预埋可调节式连墙装置 | |
CN201962672U (zh) | 一种螺旋地桩 | |
CN202299410U (zh) | 大吨位倒锥形水塔水箱下锥壳模板支设结构 | |
CN2856263Y (zh) | 可调节模板支撑管件 | |
CN204383529U (zh) | 一种土木工程管件放置架 | |
CN202731291U (zh) | 一种模板支撑可调顶托 | |
CN201915632U (zh) | 一种梁模板可调支托结构 | |
CN201439640U (zh) | 钢管脚手架多功能底座 | |
CN204221254U (zh) | 一种小型钢管传送结构 | |
CN210659383U (zh) | 一种高强度建筑用单支撑 | |
CN214531162U (zh) | 混凝土基础预埋件浇筑固定装置 | |
CN202194073U (zh) | 大体积长悬臂盖梁施工装置 | |
CN209398924U (zh) | 一种高效的给排水预埋管固定工具 | |
CN203475827U (zh) | 一种可调式加固一体梁双顶托 | |
CN208379602U (zh) | 用于圆钢管支撑的位移调节装置 | |
CN206956720U (zh) | 高强度混凝土预制管桩接桩构造 | |
CN201236478Y (zh) | 提升脚手架的防止内、外倾斜装置 | |
CN217079630U (zh) | 一种盘扣架可调托撑高度快速调节装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SINOPEC TENTH CONSTRUCTION COMPANY Free format text: FORMER NAME: NO.10 CONSTRUCTION CORP., SINOPEC |
|
CP01 | Change in the name or title of a patent holder |
Address after: 255438 No. 29, Linzi, Zibo District, Shandong, Jianshe Road Patentee after: SINOPEC Tenth Construction Company Address before: 255438 No. 29, Linzi, Zibo District, Shandong, Jianshe Road Patentee before: No.10 Construction Corp., SINOPEC |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20101124 |