CN201645649U - Box house production line - Google Patents

Box house production line Download PDF

Info

Publication number
CN201645649U
CN201645649U CN2010201191643U CN201020119164U CN201645649U CN 201645649 U CN201645649 U CN 201645649U CN 2010201191643 U CN2010201191643 U CN 2010201191643U CN 201020119164 U CN201020119164 U CN 201020119164U CN 201645649 U CN201645649 U CN 201645649U
Authority
CN
China
Prior art keywords
production line
house
box house
workshop
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201191643U
Other languages
Chinese (zh)
Inventor
杨德志
陆沈磊
虞秉言
刘琼
蔡巧根
夏有月
董杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI DEBIN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI DEBIN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI DEBIN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd filed Critical SHANGHAI DEBIN ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority to CN2010201191643U priority Critical patent/CN201645649U/en
Application granted granted Critical
Publication of CN201645649U publication Critical patent/CN201645649U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a box house production line, which comprises a prefabrication workshop, a first spray device, an assembly workshop, a second spray device and a maintenance workshop. Tools for three-dimensional formation of prefabricated components of steel mesh frame sandwich panels are arranged in the prefabrication workshop for splicing the steel mesh frame sandwich panels to form prefabricated components of wall panels, roof panels and floor panels; the first spray device is used for spraying cement mortar on the prefabricated components; assembly platforms are arranged in the assembly workshop and are used for assembling the prefabricated components into a box house; the second spray device is used for spraying cement mortar on the box house; and the maintenance workshop is used for sealing, heating and maintaining the box house. The utility model has high production efficiency, and can ensure the quality. The box house produced with the box house production line has good thermal insulation property and waterproofing performance.

Description

A kind of box house production line
Technical field
The utility model relates to building field, particularly a kind of box house production line.
Background technology
Traditional armored concrete box house production line has two kinds, a kind of is integrated poured flask ovary room production line, design according to the box house, build the house integral mold plate, cast concrete, maintenance is to certain length of time after the form removal, and its production stage is that formwork erection, assembling reinforcement are built box house, casting concrete, form removal, whitewashed, maintenance; A kind of is the packaging box of assembled large panel house production line, at first produces assembled large panel, assembling at the scene after the moulding, and its production stage is that formwork erection, assembling reinforcement, cast concrete, form removal, maintenance obtain assembled large panel, assembled cartridge house, whitewash.Traditional integrated poured type and the packaging armored concrete box of assembled large panel house production line all need a large amount of steel forms, and operations such as assembly jig and dismounting mould are arranged, the operation trouble, and production efficiency is not high.
The utility model content
The purpose of this utility model is to provide a kind of box house production line.
Box of the present utility model house production line comprises in proper order by production:
Prefabricated workshop, inside is equipped with: several steel wire net rack battenboard prefabricated components stereo shaping frocks are used for the steel wire net rack battenboard is assembled into shingle nail, roof boarding, ground plate prefabricated member; Equipment is smeared in spray, is used for cement mortar is smeared in described prefabricated components spray;
Composing room, internal configurations has: several assembly platforms are used for prefabricated components are assembled into the box house; Equipment is smeared in spray, is used for cement mortar is smeared in box house spray;
Between caring the car, heated sealed maintenance box house.
Box of the present utility model house production line, described composing room and described prefabricated workshop yi word pattern layout or and Column Layout.
Box house production line of the present utility model is arranged in the described composing room between described caring the car.
Box house production line of the present utility model, described steel wire net rack battenboard prefabricated components stereo shaping frock is cross or the L type.Described L type frock comprises two orthogonal single face supports, be weldingly connected by a square steel, described single face support comprises several support channel-section steels that are parallel to each other, be weldingly connected by several connection channel-section steels that are parallel to each other between adjacent two stands channel-section steel, described channel-section steel fluting one faces L type frock outside, described L type frock also comprises several universal wheels, equidistantly is welded on the lower end of the two stands of L type frock.
Box house production line of the present utility model, described production line also disposes means of transport, and the means of transport of prefabricated workshop configuration is used to deliver prefabricated components, and the means of transport of composing room's configuration is used for carrier box ovary room.The means of transport of described prefabricated workshop configuration is 5 tons of drivings, and the means of transport of described composing room configuration is 5 tons of drivings and 20 tons of drivings.
Box house production line of the present utility model, described assembly platform comprises a platform panel; One bracing frame is welded on described platform panel below; One i-shape steel beam is welded on the support frame as described above bottom; Several road wheels are installed in the i-shape steel beam bottom.Support frame as described above comprises outer supporting mechanism and interior load-bearing supporting mechanism, described outer supporting mechanism is the frame type steel construction, be welded on four limits of described platform panel, described interior load-bearing supporting mechanism is a groined type supporting mechanism, is welded on described platform panel bottom between two parties.
Box house production line of the present utility model also is provided with track in the described composing room, described assembly platform setting in orbit.
Box of the present utility model house production line, the production efficiency height can be ensured the quality of products, and the box house thermal and insulating performance of production, water resistance are superior.
Description of drawings
Fig. 1 is the schematic diagram of box house production line.
Fig. 2 is composing room's configuration schematic diagram.
Fig. 3 is for composing room in the utility model one preferred implementation and the schematic diagram between caring the car.
Fig. 4 is the cross stereo shaping frock of a steel wire net rack battenboard prefabricated components schematic diagram.
Fig. 5 is a steel wire net rack battenboard prefabricated components L type stereo shaping frock schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further details.Should be understood that following examples only are used to the utility model is described but not are used to limit scope of the present utility model.
As shown in Figure 1, box of the present utility model house production line comprises in proper order by production:
Prefabricated workshop 1, inside is equipped with: several steel wire net rack battenboard prefabricated components stereo shaping frocks 11 are used for the steel wire net rack battenboard is assembled into shingle nail, roof boarding, ground plate prefabricated member; Equipment 12 is smeared in spray, is used for cement mortar is smeared in described prefabricated components spray;
Composing room 2, internal configurations has: several assembly platforms 21 are used for prefabricated components are assembled into the box house; Equipment 12 is smeared in spray, is used for cement mortar is smeared in box house spray;
Between caring the car 3, heated sealed maintenance box house.
Box of the present utility model house production line, described composing room 2 and described prefabricated workshop 1 yi word pattern layout or and Column Layout.
As shown in Figure 2, two tracks 22,23 are set also in the composing room 2, assembly platform 21 is arranged on the track 22,23.
As shown in Figure 3, in the utility model one preferred implementation, 3 are arranged in the composing room 2 between caring the car.
In addition, production line of the present utility model also disposes means of transport, is used to deliver prefabricated components, box house.
In the preferred implementation of the present utility model, in prefabricated workshop, use cross frock 10, as shown in Figure 4, select the section bar of the 10# square steel of 100 * 100mm as cross frock 10, intercept four the support shaped steel of 20 8 meters long 10# square steel as cross frock 10, intercept 48 0.8 meter long 10# square steel as connecting shaped steel, intercept 4 3.6 meters long 10# square steel as the fixing shaped steel of the end points of cross frock 10; On platform, spacing is 0.8 meter between every with 4 support shaped steel laid parallel successively, connects the shaped steel welding with three between every, connects 2 meters of shaped steel spacings, proofreaies and correct then and obtains the single face support.To put according to cross between four single faces, angle is the right angle between support, and support flatness, angle are proofreaied and correct in the welding of support node.Obtaining highly is 3.6 meters, the cross frock 10 that every stent length is 8 meters.The steel plate welding that the end points shaped steel of cross frock 10 and support end points and shaped platform are pre-buried.
In another preferred implementation of the present utility model, in prefabricated workshop, use L type frock 20, as shown in Figure 5, choose 6 universal wheels, intercept the angle steel of 3 meters long 10# square steel as L type frock 20, intercept 68 meters long 10# channel-section steels as support shaped steel, intercept 12 1.5 meters long 10# channel-section steels as connecting shaped steel.With 38 meters long 10# channel-section steels as vertical wall bracket shaped steel laid parallel successively on platform, spacing between per two is 1.5 meters, connect the shaped steel welding with three between per two, connecting the shaped steel spacing is 2 meters, universal wheel is welded on the lower end of support, concrete, in the channel-section steel bottom surface of nethermost support shaped steel, three universal wheel equidistant welding on 8 meters length, Using such method obtains two single face supports.To put by L shaped between two single faces, channel-section steel fluting one faces the outside of L type frock 20,10# square steel and a support welding; 10# square steel and the welding of another support, the welding position is as the criterion the welding of support node with two support angles, 90 degree of L type frock 20.Obtain 3 meters of the height of L type frock 20,8 meters of the stent length of L type frock 20.
Assembly platform in the composing room of the present utility model comprises the platform panel, below welding one bracing frame, bracing frame is the supporting mechanism that assembly platform outside supporting mechanism and interior load-bearing supporting mechanism combine, the outside supporting mechanism welds the frame type steel construction along assembly platform four limits with channel-section steel, interior load-bearing supporting mechanism is a groined type supporting mechanism, be welded on the assembly platform bottom between two parties, an i-shape steel beam is fixed in the bracing frame bottom, in the bottom of girder steel road wheel is installed.Concrete, can adopt the 10mm steel plate to be made into a length is that 8 meters, width are 4 meters assembly platform panel, have enough rigidity bracing frames with one of welding such as channel-section steel, then the assembly platform panel is welded on the bracing frame, proofread and correct, polish, fix an i-shape steel beam at last in the bracing frame bottom, road wheel is installed in the bottom of girder steel.
In the preferred implementation of the present utility model, production line can be produced 10 box houses daily, is made up of a prefabricated workshop, a composing room, a heating curing workshop.Prefabricated workshop and composing room highly are 12 meters, width is 14 meters, length is 150 meters, and prefabricated shop assembled workshop can the yi word pattern layout, promptly joins end to end, also can and Column Layout, highly be 5 meters between caring the car, width is that 12 meters, length are 50 meters, is positioned at the composing room middle part between caring the car, one one of 5 tons of driving of prefabricated workshop configuration, each one one of 5 tons of drivings of composing room's configuration and 20 tons of driving; Two tracks of composing room's configuration are shelved 10 assembly platforms respectively.
In prefabricated workshop, prefabricated 120 L shaped steel screen frame battenboard prefabricated components moulding frocks adopt wherein 10 L type frocks, produce 10 roof boardings, 10 ground panels daily, and wherein 20 L types are produced 20 L type two sides body shingle nails daily; Adopt other 30 L type frocks in second day, and produced 10 roof boardings, 10 ground panels, 20 two sides body shingle nails daily; Adopted other 30 L type frocks on the 3rd day, adopted other 30 L type frocks, and moved in circles in the 4th day.In prefabricated workshop, two sides body shingle nail and roof boarding prefabricated components only spray smears cement mortar one time; It is identical with the steel wire spacing with battenboard that thickness is smeared in cement mortar spray, and promptly cement mortar and steel wire net rack one are flat, expose the steel wire net rack reinforcing bar, and four limits are all reserved 150mm and do not sprayed and smear cement mortar.The mortar one-time-reach-place is smeared in the spray of panel bottom surface, ground, gross thickness 30mm, full shop, cement mortar is smeared in spray one time above the ground panel, it is identical with the steel wire spacing with battenboard that thickness is smeared in the cement mortar spray, be that cement mortar and steel wire net rack one are flat, expose the steel wire net rack reinforcing bar, four limits reservation 150mm does not spray and smears cement mortar.The cement mortar that spray is smeared surpassed after 72 hours, hung the workshop with driving, put into the warehouse, waited for entering composing room.
In composing room, 20 assembly platforms recycle, day 10 box houses of assembling.At first carry out panel assembling: lifting ground panel, be shelved on the assembly platform, sprayed and smeared bottom surface that cement mortar puts in place down; Lifting L type two sides body shingle nail, as base plate, two L type two sides body shingle nails are formed box house wall frame with the ground panel; The lifting roof boarding is shelved on the wall frame of two L type two sides body shingle nails compositions, withstands with some supports below roof boarding and between above the ground panel.Adopt the welding of overlap joint muscle, reinforcement welding then between plate and the plate.At last above the panel, inside and outside, the inside and outside spray of roof boarding of body of wall smears cement mortar, thickness deducts 5mm according to design thickness.Finish inside and outside spray and smear the first pass cement mortar, enter care the car between.
Between caring the car, at first maintenance 6 hours in curing kilns continues the assembled cartridge house on other the assembly platform between curing period in composing room and the first pass cement mortar is smeared in spray.Spray again behind first group of box house kiln discharge and smear second time fiber cement mortar of 5mm, this moment, second group of box house entered maintenance in the curing kilns, kiln discharge sprays and smears second time fiber cement mortar of 5mm after 6 hours, first group of box house advances the curing kilns heating curing again and withdraws from the workshop after 6 hours, begin to assemble the 3rd group of box house, second group of box enters maintenance in the curing kilns, 6 hours.So the spraying maintenance is assembled in circulation.The box house that maintenance is good hangs with driving, puts into the stacking place and carries out interior and exterior finishes.
Box house production line of the present utility model has following beneficial effect:
(1) production efficiency height
Adopt this production line, finished half prefabricated components production in two hours, comprise that finishing steel mesh frame sandwich splices, welds, sprays and smear cement mortar, wherein mortar makes two bites at a cherry, and a prefabricated components spray is smeared, and the spray of Integratively house is smeared; Box house assembling in two hours puts in place; Finish whole spray in two hours and smear cement mortar; Finish maintenance in 12 hours, finished the production and assembly of box house in namely 1 day.
(2) house superior performance
Cement sandwich board with were mesh box house intension polystyrene foam plastics heat-insulating material, thermal and insulating performance is superior, and does not have heat bridge, cold bridge problem.
(3) quality assurance
Traditional steel mesh frame sandwich all is to spray at the construction field (site) to smear cement mortar, usually affects the cement sandwich board with were mesh construction quality because of mortar quality, workman's technical merit etc. The cement sandwich board with were mesh box house is to produce under industrialized environment, and the quality assurance means are various.
(4) overall performance is good
The box house that adopts this production line to produce, key node welds with reinforcing bar, and spray is smeared cement mortar and is basically belonged to " integral cast-in-situ " technology, and node all is once to spray to smear the cement mortar moulding, and overall performance is good.
(5) water resistance is superior
The box house of this production line production belongs to half prefabricated, half " cast-in-place ", and all plates all are once to spray to smear cement mortar " the wet connection " with plate node, avoid the infiltration of prefabricated components seam.

Claims (10)

1. box house production line is characterized in that described production line comprises in proper order by production:
Prefabricated workshop, inside is equipped with: several steel wire net rack battenboard prefabricated components stereo shaping frocks are used for the steel wire net rack battenboard is assembled into shingle nail, roof boarding, ground plate prefabricated member; Equipment is smeared in spray, is used for cement mortar is smeared in described prefabricated components spray;
Composing room, internal configurations has: several assembly platforms are used for prefabricated components are assembled into the box house; Equipment is smeared in spray, is used for cement mortar is smeared in box house spray;
Between caring the car, heated sealed maintenance box house.
2. box according to claim 1 house production line is characterized in that, described composing room and described prefabricated workshop yi word pattern layout or and Column Layout.
3. box according to claim 1 house production line is characterized in that, is arranged in the described composing room between described caring the car.
4. box according to claim 1 house production line is characterized in that, described steel wire net rack battenboard prefabricated components stereo shaping frock is cross or the L type.
5. box according to claim 4 house production line, it is characterized in that, described L type frock comprises two orthogonal single face supports, be weldingly connected by a square steel, described single face support comprises several support channel-section steels that are parallel to each other, and is weldingly connected by several connection channel-section steels that are parallel to each other between adjacent two stands channel-section steel, and described channel-section steel fluting one faces L type frock outside, described L type frock also comprises several universal wheels, equidistantly is welded on the lower end of the two stands of L type frock.
6. box according to claim 1 house production line is characterized in that described production line also disposes means of transport, and the means of transport of prefabricated workshop configuration is used to deliver prefabricated components, and the means of transport of composing room's configuration is used for carrier box ovary room.
7. box according to claim 6 house production line is characterized in that, the means of transport of described prefabricated workshop configuration is 5 tons of drivings, and the means of transport of described composing room configuration is 5 tons of drivings and 20 tons of drivings.
8. box according to claim 1 house production line is characterized in that described assembly platform comprises a platform panel; One bracing frame is welded on described platform panel below; One i-shape steel beam is welded on the support frame as described above bottom; Several road wheels are installed in the i-shape steel beam bottom.
9. box according to claim 8 house production line, it is characterized in that, support frame as described above comprises outer supporting mechanism and interior load-bearing supporting mechanism, described outer supporting mechanism is the frame type steel construction, be welded on four limits of described platform panel, the load-bearing supporting mechanism is a groined type supporting mechanism in described, is welded on described platform panel bottom between two parties.
10. box according to claim 1 house production line is characterized in that, track also is set in the described composing room, and described assembly platform setting in orbit.
CN2010201191643U 2010-02-25 2010-02-25 Box house production line Expired - Fee Related CN201645649U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201191643U CN201645649U (en) 2010-02-25 2010-02-25 Box house production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201191643U CN201645649U (en) 2010-02-25 2010-02-25 Box house production line

Publications (1)

Publication Number Publication Date
CN201645649U true CN201645649U (en) 2010-11-24

Family

ID=43110867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201191643U Expired - Fee Related CN201645649U (en) 2010-02-25 2010-02-25 Box house production line

Country Status (1)

Country Link
CN (1) CN201645649U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528882A (en) * 2011-12-27 2012-07-04 厦门吉信德宠物用品有限公司 Automatic production line for house body plates of pet house
CN108729572A (en) * 2017-04-13 2018-11-02 北新建材集团有限公司 A kind of production line of wall
CN109968515A (en) * 2019-04-24 2019-07-05 湖北科宇智能装备有限公司 Modularization movable type PC production line

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528882A (en) * 2011-12-27 2012-07-04 厦门吉信德宠物用品有限公司 Automatic production line for house body plates of pet house
CN102528882B (en) * 2011-12-27 2013-12-04 厦门吉信德宠物用品有限公司 Automatic production line for house body plates of pet house
CN108729572A (en) * 2017-04-13 2018-11-02 北新建材集团有限公司 A kind of production line of wall
CN108729572B (en) * 2017-04-13 2020-10-09 北新建材集团有限公司 Production line of wall body
CN109968515A (en) * 2019-04-24 2019-07-05 湖北科宇智能装备有限公司 Modularization movable type PC production line

Similar Documents

Publication Publication Date Title
CN106013454B (en) Building and method of construction based on large spatial structure body and free-standing peripheral structure
JP3218530U (en) Central assembly steel structure
CN102251699B (en) Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method
CN103821276A (en) Novel assembly-type modular building system
CN108005410B (en) Assembled steel-concrete combined structure residential system and construction method thereof
CN103088947B (en) Cold bending thin wall lattice configuration steel-concrete folding heat preservation floor slab and production technology thereof
CN108005265B (en) Multilayer prefabricated steel reinforced concrete shear wall structure and preparation and construction methods thereof
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN114658219B (en) Construction method for single-side assembled formwork support
CN103352537B (en) Overall load bearing heat preserving wallboard and production construction process thereof
CN207739674U (en) A kind of assembled Residential System of Steel-concrete Composite Structure
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN103306463B (en) Metal liner concrete air channel construction method
CN201645649U (en) Box house production line
CN210421424U (en) Assembled steel structure building
CN100451257C (en) Concrete complex building of steel meshwork framework, and construction procedure
CN202865996U (en) Room modular structure for nuclear power plant
CN103362307B (en) Construction method for modularizing insulation wall boards and pouring integrated house building
CN104153576A (en) Construction method for building combined type building
CN113931350A (en) Construction method of composite light sandwich partition wall
CN210395712U (en) Assembled integral window frame wall
CN112746704A (en) Arch type steel-concrete combined ceiling structure of large-span giant underground workshop and construction method
CN213709846U (en) Self-heat-insulation building with assembled steel structure
CN206681145U (en) A kind of light-duty assembling type steel structure house
CN111021544A (en) Large-span variable-space assembly type building and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124

Termination date: 20130225