CN201627351U - Lifting operation table for construction - Google Patents
Lifting operation table for construction Download PDFInfo
- Publication number
- CN201627351U CN201627351U CN2010200411843U CN201020041184U CN201627351U CN 201627351 U CN201627351 U CN 201627351U CN 2010200411843 U CN2010200411843 U CN 2010200411843U CN 201020041184 U CN201020041184 U CN 201020041184U CN 201627351 U CN201627351 U CN 201627351U
- Authority
- CN
- China
- Prior art keywords
- center pillar
- construction
- connecting rod
- side column
- supporting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- RKTYLMNFRDHKIL-UHFFFAOYSA-N copper;5,10,15,20-tetraphenylporphyrin-22,24-diide Chemical compound [Cu+2].C1=CC(C(=C2C=CC([N-]2)=C(C=2C=CC=CC=2)C=2C=CC(N=2)=C(C=2C=CC=CC=2)C2=CC=C3[N-]2)C=2C=CC=CC=2)=NC1=C3C1=CC=CC=C1 RKTYLMNFRDHKIL-UHFFFAOYSA-N 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000010626 work up procedure Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a tool for construction of workers, in particular to a lifting operation table for construction in higher places; the principle of a connecting rod mechanism is utilized, the connecting rod is contracted to the center of a supporting bracket by pushing four side columns to the center, the side columns, thin columns and the connecting rod are contracted to the center of the supporting bracket, an inclined support is driven to lift a supporting plate, and then the supporting plate is supported and fixed by a fixing column and a supporting column; in the utility model, the principle of the connecting rod mechanism is utilized, the lifting of the construction table is realized, so as to realize the purpose of being convenient for construction by workers without building scaffolds, the labor and time are saved, movement can be realized without disassembly, the disadvantage that the scaffold is immovable is solved; the lifting operation table is supported and fixed by the fixing column and the supporting column, the stability is strong, the danger of construction workers on the supporting plate is reduced, the structure is simple, the usage is convenient, the manufacturing cost is low, damage is not easy, the practical applicability is strong and the service life is long.
Description
Technical field:
The utility model relates to the working instrument of a kind of workman, and is particularly a kind of at higher place construction liftable operation post.
Background technology:
At present, in building, advertising, municipal administration, traffic road and bridge, industries such as mine, for some places that can't directly construct because of the highly higher workman of making, the construction workman often adopts the method that scaffolds erecting, build operation platform, convenient construction personnel work up and down, scaffold comprises fastener type steel pipe scaffold, the gate-type steel pipe scaffold, the bowl fastening type steel pipe scaffold, button disc type scaffold, various ways such as aluminium alloys fast-assembling scaffold, but it is not just removable no matter in a single day the scaffold of which kind of form is built, will mobile scaffold, must dismantle then from newly building, very bother, and, scaffold must be with its component assembling overlap joint piecemeal, it is time-consuming to build a scaffold, effort, take a lot of work and to overlap workman's work high above the ground also very dangerous, and scaffold erecting just a large amount of time of needs waste, influence construction speed, build finish a scaffold after, its height is with regard to relative fixed, as constructing to higher place, then must on the basis of original scaffold, continue to build, until reaching desired height.
The utility model content:
In sum, in order to overcome the deficiency of prior art problem, the utility model provides a kind of construction liftable operation post, and it is a principle of utilizing linkage, realize the lifting of operation platform, do not need to scaffold erecting, what do not need that dismounting just can be random moves, the saving of labor, laborsaving, save time, it is simple in structure, easy to use, practical, long service life.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of construction liftable operation post, wherein: it comprises bracing frame, supporting plate 1, upper cardan 2, diagonal brace 4 and lower cardan 5, bracing frame is the tetragonal body structure, be provided with lower cardan 5 on four side columns 8 of bracing frame, the bottom surface of supporting plate 1 is provided with four upper cardans 2, four lower cardans 5 are connected by four diagonal braces 4 respectively with four upper cardans 2, be provided with center pillar 12 on four sides of bracing frame, be provided with buttress shaft 11 between side column 8 and the center pillar 12, be provided with contiguous block 6 on side column 8 and the center pillar 12, one end of connecting rod 7 is hinged on the contiguous block 6, the other end of connecting rod 7 is hinged on the buttress shaft 11, side column 8, the lower end of center pillar 12 and buttress shaft 11 is provided with universal wheel 10.
Further, the quantity of the buttress shaft 11 between described side column 8 and the center pillar 12 is at least two, connects by connecting rod 7 between two adjacent buttress shafts 11, and adjacent two quarter butts of connecting rod 7 are hinged and become " V " type or " V " type of falling.
Further, be set with fixed leg 9 outside the bottom of described side column 8, fixed leg 9 and side column 8 are connected by bolt.
Further, described center pillar 12 is a hollow column, is set with pillar 3 in it, and pillar 3 and center pillar 12 are connected by bolt, and the bottom of center pillar 12 is set with fixed leg 9, and fixed leg 9 and center pillar 12 are connected by bolt.
The beneficial effects of the utility model are:
(1), the utility model is the principle of utilizing linkage, realizes the lifting of operation platform, thereby realize the purpose that makes things convenient for the workman to construct, do not need to scaffold erecting, the saving of labor, laborsaving, save time;
(2), the lower end of all side columns of the utility model, center pillar and buttress shaft all is provided with universal wheel, what do not need that dismounting just can be random moves, and solves the immovable shortcoming of scaffold;
(3), the bottom of side column of the present utility model and center pillar all is provided with fixed leg, pillar is set in the center pillar, after the utility model is moved to construction location, putting down fixed leg props up the utility model, after supporting plate is raised to desired height, utilize shore supports under supporting plate, increase stability of the present utility model, reduce the danger of construction workman on the supporting plate;
(4), the utility model is simple in structure, easy to use, cost is low, and is not fragile, practical, long service life.
Description of drawings:
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the left view of the utility model Fig. 1;
Fig. 3 is the utility model user mode schematic diagram.
The specific embodiment:
The utility model is described in further detail below in conjunction with accompanying drawing.
As Fig. 1, shown in Figure 2, a kind of construction liftable operation post, it comprises bracing frame, supporting plate 1, universal joint 2, diagonal brace 4 and universal joint 5, bracing frame is the tetragonal body structure, be provided with lower cardan 5 on four side columns 8 of bracing frame, four upper cardans 2 are arranged on the centre of the bottom surface of supporting plate 1, four lower cardans 5 are connected by four diagonal braces 4 respectively with four upper cardans 2, the structure of four sides of bracing frame is identical, with side shown in Figure 1 is example, be provided with center pillar 12 on the side, center pillar 12 is arranged on the axis of side, be provided with two buttress shafts 11 between the side column 8 in left side and the center pillar 12 and between the side column 8 on right side and the center pillar 12, be fixed with four contiguous blocks 6 on the right flank of the side column 8 in left side, also be fixed with four contiguous blocks 6 on the left surface of the side column 8 on right side, all be hinged with connecting rod 7 on each contiguous block 6, the other end of connecting rod 7 all is hinged on the buttress shaft 11 adjacent with contiguous block 6, connect by connecting 7 between two adjacent buttress shafts 11, adjacent two quarter butts of connecting rod 7 are hinged to " V " type or " V " type of falling, side column 8, the lower end of center pillar 12 and buttress shaft 11 is provided with universal wheel 10, be set with fixed leg 9 outside the bottom of side column 8, fixed leg 9 and side column 8 are connected by bolt, center pillar 12 is a hollow column, be set with pillar 3 in it, pillar 3 and center pillar 12 are connected by bolt, the upper end of pillar 3 is supported on the bottom surface of supporting plate 1, the bottom of center pillar 12 is set with fixed leg 9, fixed leg 9 and center pillar 12 are connected by bolt, fixed leg 9 is provided with a plurality of bolts hole, by regulating the position of connecting bolt, can be in the position of side column 8 and center pillar 12 adjusted fixed legs 9, in like manner, pillar 3 is provided with a plurality of bolts hole, can be by regulating the position of connecting bolt, in the position of center pillar 12 adjusted pillars 3.
As shown in Figure 3, during use, the utility model is moved to the desired position, then four side columns 8 are promoted to the center, supporting plate 1 is raised under the effect of diagonal brace 4, after supporting plate 1 reaches desired height, regulate the position of the connecting bolt of fixed leg 9 and side column 8 and center pillar 12, utilize fixed leg 9 that the utility model is held up, make universal wheel 10 liftoff, then connecting bolt is fixed, again the position of the connecting bolt of adjustable fixing 3 and center pillar 12, pillar 3 is supported on the bottom surface of supporting plate 1, thereby finishes the rise process of supporting plate 1.Opposite when making course of action that supporting plate 1 descends with rise.
Claims (4)
1. construction liftable operation post, it is characterized in that: it comprises bracing frame, supporting plate (1), upper cardan (2), diagonal brace (4) and lower cardan (5), bracing frame is the tetragonal body structure, be provided with lower cardan (5) on four side columns (8) of bracing frame, the bottom surface of supporting plate (1) is provided with four upper cardans (2), four lower cardans (5) and four upper cardans (2) are by being connected by four diagonal braces (4) respectively, be provided with center pillar (12) on four sides of bracing frame, be provided with buttress shaft (11) between side column (8) and the center pillar (12), be provided with contiguous block (6) on side column (8) and the center pillar (12), one end of connecting rod (7) is hinged on the contiguous block (6), the other end of connecting rod (7) is hinged on the buttress shaft (11), side column (8), the lower end of center pillar (12) and buttress shaft (11) is provided with universal wheel (10).
2. construction liftable operation post according to claim 1, it is characterized in that: the quantity of the buttress shaft (11) between described side column (8) and the center pillar (12) is at least two, connect by connecting rod (7) between adjacent two buttress shafts (11), adjacent two quarter butts of connecting rod (7) are hinged and become " V " type or " V " type of falling.
3. construction liftable operation post according to claim 1 is characterized in that: be set with fixed leg (9) outside the bottom of described side column (8), fixed leg (9) is connected by bolt with side column (8).
4. construction liftable operation post according to claim 1, it is characterized in that: described center pillar (12) is a hollow column, be set with pillar (3) in it, pillar (3) is connected by bolt with center pillar (12), the bottom of center pillar (12) is set with fixed leg (9), and fixed leg (9) is connected by bolt with center pillar (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010200411843U CN201627351U (en) | 2010-01-14 | 2010-01-14 | Lifting operation table for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010200411843U CN201627351U (en) | 2010-01-14 | 2010-01-14 | Lifting operation table for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201627351U true CN201627351U (en) | 2010-11-10 |
Family
ID=43058742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010200411843U Expired - Fee Related CN201627351U (en) | 2010-01-14 | 2010-01-14 | Lifting operation table for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201627351U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760455A (en) * | 2016-12-29 | 2017-05-31 | 沈阳化工大学 | A kind of fixed overall support for interior decoration |
CN112360128A (en) * | 2020-11-24 | 2021-02-12 | 浙江省建工集团有限责任公司 | Operation shelf for construction |
-
2010
- 2010-01-14 CN CN2010200411843U patent/CN201627351U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760455A (en) * | 2016-12-29 | 2017-05-31 | 沈阳化工大学 | A kind of fixed overall support for interior decoration |
CN112360128A (en) * | 2020-11-24 | 2021-02-12 | 浙江省建工集团有限责任公司 | Operation shelf for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201738250U (en) | Arch culvert and arch ring steel die trolley | |
CN203270461U (en) | Bailey beam support without buttress in soft foundation | |
CN202627493U (en) | Combined template for constructing elevator shaft | |
CN203223003U (en) | Detachable triangular jig frame for steel truss assembling | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN207672575U (en) | A kind of assembled adjustable steel support component | |
CN204418198U (en) | A kind of pin-connected panel open caisson foundation of punching block structure | |
CN201627351U (en) | Lifting operation table for construction | |
CN203834370U (en) | Arch ring steel formwork trolley for circular arch culvert | |
CN205314539U (en) | Large -scale cantilever type combination steel form | |
CN112853991A (en) | Anti-toppling scaffold for bridge road and building construction and construction method | |
CN205421023U (en) | Public road bridge roof beam strutting arrangement | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN211571448U (en) | Arch ring supporting formwork | |
CN204019070U (en) | Derrick assembling combination steelframe | |
CN210887994U (en) | Multi-use architecture construction platform of adjustable height | |
CN110952465A (en) | Arch ring supporting template and setting method thereof | |
CN204532374U (en) | The multi-functional chassis of metro station construction | |
CN103821110A (en) | Box culvert inner form steel form trolley | |
CN202001787U (en) | Detachable ground anchor of tower crane | |
CN203008375U (en) | Conversion beam stanchion | |
CN201924600U (en) | Cast-in-place crossbeam construction formwork supporting system with beam type switching layer | |
CN201671060U (en) | Sliding device for prestress tensioning jack | |
CN206800204U (en) | A kind of highway bridge bent cap reinforcement cage mold | |
CN206267039U (en) | A kind of jack support platform of hollow slab girder jack-up construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101110 Termination date: 20180114 |
|
CF01 | Termination of patent right due to non-payment of annual fee |