The utility model content
The utility model aims to provide a kind of footpath wire clamp erector of striding, and can solve prior art the problem of striding the footpath wire clamp can not be installed quickly and easily.
A kind of footpath wire clamp erector of striding is provided in embodiment of the present utility model, and comprising: support which is provided with guide groove; First keeper is connected with support; First keeper has and strides the structure that footpath wire clamp top board matches; Second keeper is arranged on the support, and can move along guide groove; First keeper and second keeper are positioned at the same side of support, and second keeper has to be fit to tighten be positioned at strides the directly position of the drainage thread of wire clamp; Insulating bar, the one end has screw thread, is spirally connected with support, is used for supporting bracket; The end of thread of insulating bar has the position that compresses second keeper; The insulation force-applying piece is used to tighten the nut of striding the footpath wire clamp.
Preferably, first keeper is hook-shaped, and first keeper is provided with groove.
Preferably, first keeper also comprises: the 3rd keeper is removable installed on the support.
Preferably, the support and first keeper are integral structure.
Preferably, the 3rd keeper is the sheet metal that has bending.
Preferably, stride footpath wire clamp erector and be F shape.
Preferably, stride footpath wire clamp erector, also comprise: elastic clamping pieces is arranged on the side opposite with first keeper of support; Elastic clamping pieces comprises: crossbeam, and vertical fixing is on support; First clamping part that is connected with crossbeam and second clamping part; First clamping part and second clamping part match to form and are fit to the mechanism that footpath wire clamp top board is striden in clamping.
Preferably, stride footpath wire clamp erector, also comprise: elastic fastening hook, be arranged on the support, be used to control the openings of sizes of striding footpath wire clamp mounting strap electric lead.
Preferably, elastic fastening hook is a spring.
Preferably, the insulation force-applying piece comprises: insulation force application rod and the sleeve of being located on the insulation force application rod.
Because adopt first keeper, and stride the structure that footpath wire clamp top board matches; Second keeper, have and be fit to the position that chucking is positioned at the drainage thread of striding the footpath wire clamp, at this moment drainage thread is pressed on the top board, and top board is pressed on again on first keeper, makes drainage thread and stride radial line stably to be held between first keeper and second keeper; Again because adopted insulating bar and insulation force-applying piece, by mobile insulating bar, the radial line mounting board of striding that has drainage thread is connected on the alive circuit, tighten the nut of striding the footpath wire clamp by the insulation force-applying piece, thereby make alive circuit and drainage thread realize being connected fast, easily, so overcome prior art the problem of striding the footpath wire clamp can not be installed quickly and easily, and then reach the effect of increasing work efficiency, reduce labour intensity.
Embodiment
Describe the utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Fig. 1, Fig. 2, Fig. 3, Fig. 5, Fig. 6 have schematically shown provides a kind of structure of striding footpath wire clamp erector, be used for drainage thread 5 and alive circuit 6 are overlapped by striding footpath wire clamp 60, stride footpath wire clamp 60 and have the first passage 603 of installation drainage thread 5 and the second channel 604 of mounting strap electric line 6.This is striden footpath wire clamp erector and comprises: support 20 which is provided with guide groove 201; First keeper 10 is connected with support 20.First keeper 10 has with the location strides the structure that footpath wire clamp 60 top boards 601 match.Second keeper 30 is arranged on the support 20, and can move along guide groove 201, and first keeper 10 and second keeper 30 are positioned at the same side of support 20, and for example second keeper is positioned at the below of first keeper.Second keeper 30 has to be fit to tighten be positioned at strides the directly position of the drainage thread of wire clamp 60, apply power by 30 pairs of drainage threads of second keeper this moment, the top board of striding the footpath wire clamp is pressed on first keeper 10, like this drainage thread 5 and stride footpath wire clamp 60 and just stably be held between first keeper 10 and second keeper 30.Second keeper 30 can slide along guide groove 201, is convenient to installation and removal like this and strides footpath wire clamp 60.Preferably, first keeper and second keeper are respectively substantially perpendicular to support 20.Certainly, first keeper and second keeper also can be not orthogonal to support 20.In addition, can be provided with arc-shaped groove on second keeper, make that second connector 30 is tightr with being connected of drainage thread 5, so that chucking drainage thread 5.
Stride the difference of footpath wire clamp according to model, shape is also different slightly to some extent, for 50~240 models stride footpath wire clamp (Fig. 3 has schematically shown the structure of striding the footpath wire clamp of 50~240 models), this serial model No. to stride footpath wire clamp size bigger, its top board 601 has projection 605; Concerning 16~120 models stride footpath wire clamp 60 (Fig. 4 has schematically shown the structure of striding the footpath wire clamp of 16~120 models), this serial model No. to stride footpath wire clamp size less, its top board 601 is horizontal substantially.
Preferably, as shown in Figure 1, promptly according to first embodiment of the present utility model, for example first keeper 10 is positioned at the upper end of support 20, and first keeper 10 is an integral structure with support 20, is an ancient unit of weight shape substantially.First keeper is provided with groove 101, and first keeper that has a groove 101 substantially matches with the shape of the top board 601 that has projection 605, to locate the top board 601 of striding the footpath wire clamp of 50~240 models.
For making first keeper can satisfy the use that different model is striden the footpath wire clamp, first keeper 10 also comprises: the 3rd keeper 102, promptly according to second embodiment of the present utility model, the 3rd keeper 102 is removable installed in the suitable position on the support 20, and the shape of the 3rd keeper 102 matches with the top board shape of striding footpath wire clamp 60 of 16~120 models.For example the 3rd keeper 102 is for having the sheet metal of bending, as shown in phantom in Figure 3, the 3rd keeper 102 is screwed onto on the support 20 by screw, and be provided with and concordant substantially position, the lower edge of first keeper 10, the top board 601 of striding the footpath wire clamp of bending part clamping 16~120 models by the 3rd keeper 102 plays positioning action with the top board 601 of striding the footpath wire clamp to 16~120 models.Like this when need to install 50~240 models stride the footpath wire clamp time, the 3rd keeper 102 can be removed, only utilize first keeper 10.Make different model stride the footpath wire clamp can both be clamped between first keeper 10 and second keeper 30.
Insulating bar 40 is used for supporting bracket 20.For example stride footpath wire clamp erector and be F shape.Preferably, insulating bar 40 has the end of thread 401, and support 20 has screw, and insulating bar 40 is spirally connected with support 20.The end of thread 401 of insulating bar has the position that compresses second keeper 30, can play the slip that prevents second keeper like this, makes second keeper can tighten the effect of drainage thread.Insulation force-applying piece 90 is used to tighten the nut of striding the footpath wire clamp.The force-applying piece that for example insulate comprises insulation force application rod 902 and the sleeve of being located on the insulation force application rod 901, and the nut of striding the footpath wire clamp can be entrapped in the sleeve 901, by rotating insulated force-applying piece, realizes tightening the function of striding footpath wire clamp nut.
As described below according to a kind of use of striding footpath wire clamp erector of the present utility model:
(1) install the 50-240 model stride footpath wire clamp (as shown in Figure 4 stride footpath wire clamp) time, earlier the top board 601 of striding footpath wire clamp 60 is placed on first keeper 10, the projection 605 of top board is positioned at groove 101, then drainage thread 5 is placed on and strides the footpath wire clamp near in the wing passage 603 of support 20, promote second keeper 30, second keeper 30 is pressed on the drainage thread 5, rotating insulated then action bars 40, the end of thread 401 of insulating bar is pressed on second keeper 30, second keeper is played the effect of limit slippage.The footpath wire clamp 60 of striding that so just will have drainage thread 5 is fixed on to be placed on and strides on the wire clamp erector of footpath, operate insulating bar then, another passage 604 of striding the footpath wire clamp is overlapped on the alive circuit 6, to stride nut screwing clamping on ply-yarn drill with insulating sleeve 90 then, overlap drainage thread on the alive circuit 6 quickly and easily thereby be implemented in.After installation is striden the footpath wire clamp finished, rotate insulating bar 40, its end of thread 401 no longer is pressed on second keeper 30, second keeper can take off striding footpath wire clamp erector, so that next installation of striding the footpath wire clamp like this along guide groove 201 landings.
(2) the 16-120 model is being installed when striding footpath wire clamp (as shown in Figure 5 stride footpath wire clamp), be with the difference of striding the footpath wire clamp that the 50-240 model is installed, one the 3rd keeper 102 is installed at support 20 places, the 3rd keeper 102 is positioned at the place, lower edge of first keeper 10, and the top board 601 that the 16-120 model is striden footpath wire clamp 60 is pressed on the 3rd keeper 102.
Preferably, promptly according to the 3rd embodiment of the present utility model, a kind of footpath wire clamp erector of striding also comprises: elastic clamping pieces 70 is arranged on the side opposite with first keeper 10 of support 20, described elastic clamping pieces 70 comprises: crossbeam 702, and vertical fixing is on described support 20; First clamping part 701 that is connected with described crossbeam 70 and second clamping part 703; First clamping part 701 and second clamping part 703 match to form and are fit to the mechanism that footpath wire clamp top board 601 is striden in clamping, can install two so simultaneously and stride the footpath wire clamp on this device, save time more when overlapping many drainage threads.For example elastic clamping pieces 70 is a spring clip, first clamping part 701 and second clamping part 703 are the circular arc clamping part, and it is hinged with crossbeam 702 respectively, form not closed circle as shown in Figure 6 under the nature, the diameter of first clamping part 701 and second clamping part, 703 formed circles is less than the length of the top board 601 of striding the footpath wire clamp, fold up when placing in the elastic clamping pieces 70 when striding radial line like this, first clamping part 701 and second clamping part 703 of elastic clamping pieces are in open configuration.Under the effect of the natural restoring force of first clamping part 701 and second clamping part 703, first clamping part and second clamping part can stably clamp strides the footpath wire clamp.
Preferably, according to the 4th embodiment of the present utility model, a kind of footpath wire clamp erector of striding also comprises: elastic fastening hook 80 is a spring for example, is arranged on the support 20, is used to control the openings of sizes of striding footpath wire clamp 60 mounting strap electric leads.For fear of need to be mounted to the top board 601 of alive circuit 6 ends too little with the opening of lower platen 602 because of striding footpath wire clamp 60, one end hook of spring can be connected on the support 20, the other end can hook lower platen 602 opening edges of striding the footpath wire clamp of need clamping live wire along last, can increase the size of opening like this, be convenient to live wire and enter top board and the formed second channel 604 that is used for the mounting strap electric lead of lower platen, after in alive circuit 6 enters second channel 604 and by the insulation force-applying piece, will striding the nut screwing clamping of footpath wire clamp, can utilize the insulation force-applying piece that spring is struck from striding the footpath wire clamp.
As can be seen from the above description, the utility model the above embodiments have realized following technique effect:
When having guaranteed the line security operation, can on live wire, overlap drainage thread according to a kind of footpath wire clamp erector of striding of the present utility model easily, Billy shortens about about 30 minutes of man-hour with insulation bobbin winoler overlap joint drainage thread, thereby improved operating efficiency greatly, reduced labour intensity, and, improved fail safe owing to stride the footpath wire clamp than firmly.
The above is a preferred embodiment of the present utility model only, is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within spirit of the present utility model and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within the protection range of the present utility model.