CN201620853U - Multi-layer mining single pump constant pressure gas-proof pipe column - Google Patents
Multi-layer mining single pump constant pressure gas-proof pipe column Download PDFInfo
- Publication number
- CN201620853U CN201620853U CN201020138280XU CN201020138280U CN201620853U CN 201620853 U CN201620853 U CN 201620853U CN 201020138280X U CN201020138280X U CN 201020138280XU CN 201020138280 U CN201020138280 U CN 201020138280U CN 201620853 U CN201620853 U CN 201620853U
- Authority
- CN
- China
- Prior art keywords
- packer
- gas
- liquid separation
- separation device
- constant pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及油田采油技术领域,特别涉及高气油比井进行多层开采时使用的多层开采防气采油井下管柱,适用于套管完井方式层间有压力干扰的多层系油井合层开采。The utility model relates to the technical field of oil production in oil fields, in particular to a multi-layer production gas-proof oil recovery downhole pipe string used in multi-layer production in wells with a high gas-oil ratio, and is suitable for multi-layer oil wells with pressure interference between layers in the casing completion mode Combined mining.
背景技术Background technique
对于多层系油井分层开采,主要采用分层采油泵、控制工具和普通深井泵的进行开采。对于分层采油泵有分采混出及分采分出两种方式,抽汲的两层依靠泵径的大小控制,存在两层抽汲强度难以控制,无法实现两层均按合理油井工作制度生产的问题。对于控制工具和普通深井泵方式开采,采用的控制工具主要有定压配产器和恒排量控制器,恒排量控制器对于产量较低的井无法实现,定压配产器和普通深井泵开采管柱目前未见采取防气措施的应用,而且定压配产器对泵的抽汲产生一定的影响。For layered production of multi-layer oil wells, layered oil production pumps, control tools and ordinary deep well pumps are mainly used for production. For layered oil production pumps, there are two methods of separate production and mixed production and separate production and separation. The two layers of pumping are controlled by the size of the pump diameter, and the pumping intensity of the two layers is difficult to control, and it is impossible to achieve a reasonable oil well working system for both layers. production problems. For control tools and ordinary deep well pump mining, the control tools used mainly include constant pressure distribution device and constant displacement controller. The constant displacement controller cannot be realized for wells with low production. At present, there is no application of gas prevention measures in the pump production string, and the constant pressure distributor has a certain influence on the pumping of the pump.
实用新型内容Utility model content
本实用新型的目的是:提供一种多层开采单泵定压防气管柱,在现有单泵定压工艺管柱的基础上,通过一种油管进液方式气液分离装置解决高气油比井多层开采时防气困难的问题,同时实现了泵的抽汲不受定压配产器限制、能够获得两层动液面数据的功能,能够使开采的两层均按设定的合理流压生产。The purpose of this utility model is: to provide a multi-layer mining single-pump constant-pressure anti-air pipe string, on the basis of the existing single-pump constant-pressure process pipe string, through a gas-liquid separation device for oil pipe feeding to solve the problem of high gas oil Compared with the problem of difficult gas prevention in the multi-layer production of the well, at the same time, the pumping is not limited by the constant pressure distribution device, and the function of obtaining the dynamic liquid level data of the two layers can be achieved, so that the two layers can be mined according to the set Reasonable flow pressure production.
本实用新型采用的技术方案是:多层开采单泵定压防气管柱,主要由深井泵、气液分离装置、Y111封隔器、定压配产器、Y211封隔器、筛管、丝堵组成。在油管下端连接有深井泵。其特征在于:在深井泵的下端连接有气液分离装置,气液分离装置下端连接Y111封隔器,Y111封隔器的下端连接定压配产器,定压配产器的下端连接Y211封隔器,Y211封隔器的下端连接筛管和丝堵。其中Y111封隔器的位置在上部油层之上,Y211封隔器在上部油层与下部油层之间。下部油层产出的流体经筛管、定压配产器后进入油管并与上部油层产出的流体混合;上部油层产出的流体进入定压配产器后,进入油管内与下部油层产出的流体混合,混合后的流体向上通过气液分离装置进入套管,经气液分离装置分离出的气体向上运动从套管排出,经气液分离装置分离后的液体通过气液分离装置进入深井泵,并通过深井泵举升至地面。The technical scheme adopted by the utility model is: multi-layer mining single-pump constant-pressure anti-air pipe string, mainly composed of deep well pump, gas-liquid separation device, Y111 packer, constant-pressure distribution device, Y211 packer, screen pipe, wire Block composition. A deep well pump is connected to the lower end of the tubing. It is characterized in that: a gas-liquid separation device is connected to the lower end of the deep well pump, the lower end of the gas-liquid separation device is connected to a Y111 packer, the lower end of the Y111 packer is connected to a constant pressure distribution device, and the lower end of the constant pressure distribution device is connected to a Y211 packer. The lower end of the Y211 packer is connected with the screen pipe and the plug. The Y111 packer is above the upper oil layer, and the Y211 packer is between the upper oil layer and the lower oil layer. The fluid produced in the lower oil layer enters the oil pipe after passing through the screen tube and the constant pressure distributor and mixes with the fluid produced in the upper oil layer; the fluid produced in the upper oil layer enters the constant pressure distributor, enters the oil pipe and is produced The mixed fluid enters the casing through the gas-liquid separation device upwards, the gas separated by the gas-liquid separation device moves upwards and is discharged from the casing, and the liquid separated by the gas-liquid separation device enters the deep well through the gas-liquid separation device pump, and is lifted to the surface by a deep well pump.
根据需要分采的两层前期测得的压力数据设定定压配产器的开启压力。下入工艺管柱时,定压配产器设置在压力较高或需要限制的一层(一般为上层),筛管与丝堵之间连接有油管,Y211封隔器设置在两个油层之间,Y111封隔器设置在上油层上部,保证开采的两个油层分别卡在套管内形成封闭空间。气液分离装置连接在深井泵下端。管柱下到位后,上提下放管柱坐封封隔器,依靠Y211封隔器自带的卡瓦形成支点坐封Y111封隔器,封隔器坐封吨位应控制在6-8t,封隔器坐封后,下入抽油杆完井生产。The opening pressure of the constant pressure distribution device is set according to the pressure data measured in the early stage of the two layers that need to be mined separately. When running into the process string, the constant pressure distribution device is set in the layer where the pressure is relatively high or needs to be restricted (generally the upper layer), the oil pipe is connected between the screen and the plug, and the Y211 packer is set between the two oil layers During the period, the Y111 packer was set on the upper part of the upper oil layer to ensure that the two oil layers exploited were stuck in the casing respectively to form a closed space. The gas-liquid separation device is connected to the lower end of the deep well pump. After the tubing string is put in place, lift up and lower the tubing string to set the packer, and rely on the slips of the Y211 packer to form a fulcrum to set the Y111 packer. The setting tonnage of the packer should be controlled at 6-8t. After the spacer is set, the sucker rod is lowered into the well to complete production.
所述的气液分离装置是由上接头、分流机构、接箍、内管、外管和下接头组成。在上接头下端内螺纹连接有分流机构;分流机构下端内螺纹连接一个内管,分流机构下端外螺纹连接一个外管,外管的下部有筛孔。在内管的下端连接一个下接头,下接头的上端另一个外螺纹连接外管的下端。其中分流机构下端有不通的中心孔,在不通的中心孔周围有轴向通孔,下端不通的中心孔与轴向通孔联通。The gas-liquid separation device is composed of an upper joint, a flow diversion mechanism, a collar, an inner pipe, an outer pipe and a lower joint. The inner thread at the lower end of the upper joint is connected with a diversion mechanism; the inner thread at the lower end of the diversion mechanism is connected with an inner pipe, and the outer thread at the lower end of the diversion mechanism is connected with an outer pipe, and the lower part of the outer pipe has a sieve hole. A lower joint is connected to the lower end of the inner pipe, and another external thread on the upper end of the lower joint is connected to the lower end of the outer pipe. Wherein, the lower end of the flow diversion mechanism has a blocked central hole, and an axial through hole is formed around the blocked central hole, and the blocked central hole at the lower end communicates with the axial through hole.
油层产出的气、液混合流体经下接头流入内管内,流经内管上端的分流机构。从分流机构的中心孔流入轴向通孔内。在轴向通孔内气、液混合流体中的气体向上运动,液体向下运动,实现游离气体的有效分离。液体从分流机构流出至外管内,在深井泵的抽汲下,外管内液体向下运动通过外管下端筛孔流出外管。The gas-liquid mixed fluid produced in the oil layer flows into the inner pipe through the lower joint, and flows through the flow distribution mechanism at the upper end of the inner pipe. It flows into the axial through hole from the center hole of the splitter mechanism. In the axial through hole, the gas in the gas-liquid mixed fluid moves upward, and the liquid moves downward, so as to realize the effective separation of free gas. The liquid flows out from the diverting mechanism into the outer pipe, and under the pumping of the deep well pump, the liquid in the outer pipe moves downwards and flows out of the outer pipe through the mesh hole at the lower end of the outer pipe.
本实用新型的有益效果:本实用新型多层开采单泵定压防气管柱,Beneficial effects of the utility model: the utility model multi-layer mining single-pump constant pressure anti-trachea column,
1、深井泵与定压配产器之间采用气液分离装置使得油管与套管连通,为开放空间,消除了定压配产器对深井泵抽汲的影响。1. A gas-liquid separation device is used between the deep well pump and the constant pressure distribution device to connect the oil pipe and the casing, which is an open space and eliminates the influence of the constant pressure distribution device on the deep well pump pumping.
2、气液分离装置实现了多层开采过程中游离气体的分离出来。2. The gas-liquid separation device realizes the separation of free gas in the multi-layer mining process.
3、两层液体均可进入油套环空,能够测得两层动液面数据。3. Both layers of liquid can enter the annular space of the oil jacket, and the data of the dynamic liquid level of the two layers can be measured.
4、定压配产器对于两层均实现单流作用,进一步防止层间干扰。4. The constant pressure distribution device realizes single-flow effect on both layers, further preventing inter-layer interference.
附图说明Description of drawings
图1是本实用新型多层开采单泵定压防气管柱结构示意图。Fig. 1 is a schematic diagram of the structure of the multi-layer mining single-pump constant-pressure gas-proof pipe string of the utility model.
图2是气液分离装置2结构示意图。FIG. 2 is a schematic structural diagram of the gas-
图3是气液分离装置的分流机构9的横截面示意图。Fig. 3 is a schematic cross-sectional view of the flow dividing
图中,1.深井泵,2.气液分离装置,3.Y111封隔器,4.定压配产器,5.Y211封隔器,6.筛管,7.丝堵,8.上接头,9.分流机构,10.接箍,11.内管,12.外管,13.下接头。In the figure, 1. Deep well pump, 2. Gas-liquid separation device, 3. Y111 packer, 4. Constant pressure distribution device, 5. Y211 packer, 6. Screen pipe, 7. Plug, 8. Up Joint, 9. Diverting mechanism, 10. Coupling, 11. Inner pipe, 12. Outer pipe, 13. Lower joint.
具体实施方式Detailed ways
实施例1:以一个多层开采单泵定压防气管柱为例,对本实用新型作进一步详细说明。Embodiment 1: Taking a multi-layer mining single-pump constant-pressure gas-proof pipe string as an example, the utility model is further described in detail.
参阅图1。本实用新型多层开采单泵定压防气管柱,主要由深井泵1、气液分离装置2、Y111封隔器3、定压配产器4、Y211封隔器5、筛管6、丝堵7组成。多层开采单泵定压防气管柱下入油井套管内。See Figure 1. The utility model multi-layer mining single-pump constant-pressure anti-air pipe string mainly consists of a deep well pump 1, a gas-
在油管下端连接有一个深井泵1。在深井泵1的下端连接有一个气液分离装置2,气液分离装置2下端连接Y111封隔器3,Y111封隔器3的下端连接定压配产器4,定压配产器4的下端连接一个Y211封隔器5,Y211封隔器5的下端依次连接筛管6和丝堵7。Y111封隔器3的位置在上部油层之上,Y211封隔器5在上部油层与下部油层之间。A deep well pump 1 is connected to the lower end of the oil pipe. A gas-
参阅图2。气液分离装置2是由上接头8、分流机构9、接箍10、内管11、外管12和下接头13组成。在上接头8下端内螺纹连接有一个分流机构9;分流机构9下端内螺纹连接一个内管11,分流机构9下端外螺纹连接一个外管12,外管12的下部有筛孔;在内管11的下端连接一个下接头13,下接头13的上端另一个外螺纹连接外管12的下端。See Figure 2. The gas-
参阅图3。分流机构9下端有不通的中心孔,在不通的中心孔周围有两个轴向通孔,下端不通的中心孔与轴向通孔联通。See Figure 3. There is an unreasonable central hole at the lower end of the
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201020138280XU CN201620853U (en) | 2010-03-19 | 2010-03-19 | Multi-layer mining single pump constant pressure gas-proof pipe column |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201020138280XU CN201620853U (en) | 2010-03-19 | 2010-03-19 | Multi-layer mining single pump constant pressure gas-proof pipe column |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201620853U true CN201620853U (en) | 2010-11-03 |
Family
ID=43024309
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201020138280XU Expired - Lifetime CN201620853U (en) | 2010-03-19 | 2010-03-19 | Multi-layer mining single pump constant pressure gas-proof pipe column |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201620853U (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102661270A (en) * | 2012-05-21 | 2012-09-12 | 李广青 | Long-plunger-piston gas-locking-prevention respective pumping mixing oil well pump |
| CN102704891A (en) * | 2012-06-26 | 2012-10-03 | 刘庆敏 | Device for collecting oil well natural gas |
| CN103470232A (en) * | 2013-08-30 | 2013-12-25 | 成都科盛石油科技有限公司 | Production allocation machine with baffle plates |
| CN103470231A (en) * | 2013-08-30 | 2013-12-25 | 成都科盛石油科技有限公司 | Bottom-hole regulator with hemispherical structure on plug |
| CN103470230A (en) * | 2013-08-30 | 2013-12-25 | 成都科盛石油科技有限公司 | Dead-angle-free production allocation machine |
| CN106567695A (en) * | 2016-11-02 | 2017-04-19 | 中国石油化工股份有限公司 | Oil well gas prevention system |
| CN106761601A (en) * | 2016-12-01 | 2017-05-31 | 中国石油天然气股份有限公司 | An oil well downhole gas gathering and mixed pumping process string |
| CN110306937A (en) * | 2019-06-06 | 2019-10-08 | 中国石油天然气股份有限公司西南油气田分公司工程技术研究院 | The measuring body down-hole string of the isolated height of one kind and its production method |
-
2010
- 2010-03-19 CN CN201020138280XU patent/CN201620853U/en not_active Expired - Lifetime
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102661270A (en) * | 2012-05-21 | 2012-09-12 | 李广青 | Long-plunger-piston gas-locking-prevention respective pumping mixing oil well pump |
| CN102661270B (en) * | 2012-05-21 | 2014-10-22 | 李广青 | Long-plunger-piston gas-locking-prevention respective pumping mixing oil well pump |
| CN102704891A (en) * | 2012-06-26 | 2012-10-03 | 刘庆敏 | Device for collecting oil well natural gas |
| CN103470232A (en) * | 2013-08-30 | 2013-12-25 | 成都科盛石油科技有限公司 | Production allocation machine with baffle plates |
| CN103470231A (en) * | 2013-08-30 | 2013-12-25 | 成都科盛石油科技有限公司 | Bottom-hole regulator with hemispherical structure on plug |
| CN103470230A (en) * | 2013-08-30 | 2013-12-25 | 成都科盛石油科技有限公司 | Dead-angle-free production allocation machine |
| CN106567695A (en) * | 2016-11-02 | 2017-04-19 | 中国石油化工股份有限公司 | Oil well gas prevention system |
| CN106761601A (en) * | 2016-12-01 | 2017-05-31 | 中国石油天然气股份有限公司 | An oil well downhole gas gathering and mixed pumping process string |
| CN110306937A (en) * | 2019-06-06 | 2019-10-08 | 中国石油天然气股份有限公司西南油气田分公司工程技术研究院 | The measuring body down-hole string of the isolated height of one kind and its production method |
| CN110306937B (en) * | 2019-06-06 | 2023-10-03 | 中国石油天然气股份有限公司西南油气田分公司工程技术研究院 | Isolated high-compression-resistance underground tubular column and production method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206016778U (en) | A gravel filling sand control device | |
| CN102808584B (en) | Mechanical water plugging pipe string and method for multi-point water outlet in multi-stage fracturing horizontal well with casing completion | |
| CN207568578U (en) | Self-flowing water injection column | |
| CN105178947A (en) | An integrated method for finding and plugging water in horizontal wells | |
| CN104533356B (en) | A method for two-layer self-controlled layered oil recovery and a layered oil recovery method | |
| CN201810286U (en) | Separate mining mixed pumping string suitable for two-layer mining | |
| CN206158696U (en) | An integrated pipe string for layered oil recovery and water blocking | |
| CN102278101B (en) | Subdivided layer watered oil extraction pipe column | |
| CN203239303U (en) | Production device for injection and production in the same well | |
| RU2354810C1 (en) | Method for simultaneous-separate operation of pressure well | |
| CN201723198U (en) | Double opening differential pressure sleeve | |
| CN104632195B (en) | A water-seeking pipe string and method for a gas-lift-aided horizontal well | |
| CN104929560A (en) | Sand-prevention blanking plug | |
| CN210134883U (en) | Injection-production integrated tubing string in the same well | |
| CN108442916A (en) | Horizontal well bore hole screen casing damage testing tubing string | |
| CN203239302U (en) | Layered Water Injection String | |
| CN206309357U (en) | An oil well downhole gas gathering and mixed pumping process string | |
| CN205089297U (en) | Multilayer becomes hole sand screen | |
| CN201581856U (en) | A Multistage Compression External Packer for Staged Completion of Horizontal Wells | |
| CN201460826U (en) | Multi-layered production separate-pumping process pipe column | |
| CN204941490U (en) | A kind of note adopts one pressure cone downcomer rod structure | |
| CN204060654U (en) | Large displacement flowback sand blaster | |
| CN201778767U (en) | All-in-one pipe string for water isolation, water plugging, acidification, and plugging removal | |
| CN204283383U (en) | Layered Water Injection String for Thin Interbeds | |
| CN209586343U (en) | A kind of layering gaslift reduces the flow string of bottom pressure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20101103 |