CN201620037U - Accident emergency facility for alumina plant wet-process production workshop - Google Patents

Accident emergency facility for alumina plant wet-process production workshop Download PDF

Info

Publication number
CN201620037U
CN201620037U CN2009203188182U CN200920318818U CN201620037U CN 201620037 U CN201620037 U CN 201620037U CN 2009203188182 U CN2009203188182 U CN 2009203188182U CN 200920318818 U CN200920318818 U CN 200920318818U CN 201620037 U CN201620037 U CN 201620037U
Authority
CN
China
Prior art keywords
production workshop
wet
accident emergency
emergency facility
workshop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009203188182U
Other languages
Chinese (zh)
Inventor
唐雄俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203188182U priority Critical patent/CN201620037U/en
Application granted granted Critical
Publication of CN201620037U publication Critical patent/CN201620037U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses an accident emergency facility for an alumina plant wet-process production workshop, which comprises a safety trench (2) surrounded a wet-process production workshop (1). The safety trench (2) is communicated with a water collection tank (3), a small pit (4) is arranged at the bottom of the water collection tank (3) and is provided therein with a sinking pump (5), and the drainage port of the sinking pump (5) is connected with a pipeline (6) and the feed system of the production system. The accident emergency facility can control the leaked alkaline liquid within the safety trench surrounded the wet-process production workshop when a certain liquid tank in the wet-process production workshop leaks, and can well guide the effluent alkaline liquid and material slurry for recovery and reuse, so as to reduce raw material waste and prevent the alkaline liquid and material slurry from contaminating the surrounding environment of the wet-process production workshop. The accident emergency facility also has the characteristics of simple structure, convenient construction and short construction period.

Description

The accident emergency facility in alumina producer wet production workshop
Technical field
The utility model relates to a kind of accident emergency facility, the accident emergency facility in particularly a kind of alumina producer wet production workshop
Background technology
In aluminum oxide production process, there are a lot of operations to adopt " wet processing " to produce, some groove jars are arranged in the wet production workshop, various alkali lye or slip are housed.In process of production, accidents such as bakie, excessive groove or the groove that collapses may take place owing to a variety of causes, in case have an accident, alkali lye and slip be sinuous flow everywhere, flow to very big a slice area outside the workshop, the environment around the workshop is caused great pollution, and alkali lye and also loss thereupon of slip, can't recycling, cause the waste of raw materials for production.
The utility model content
The purpose of this utility model is, the accident emergency facility in a kind of alumina producer wet production workshop is provided, and it can well dredge effusive alkali lye and slip when accident takes place, make the alkali lye of loss and slip obtain recycling, reduces the waste of raw material; Can prevent also simultaneously that alkali lye and slip from polluting the environment around the wet production workshop.
The technical solution of the utility model: the accident emergency facility in a kind of alumina producer wet production workshop, this facility comprise the safe ditch that is provided with around factory wet production workshop; Safe ditch is connected with water collecting basin, and the water collecting basin bottom is provided with pitting, is provided with submersible pump in the pitting, and the water port of submersible pump is connected with the feeder system of production system with pipeline.
In the accident emergency facility in above-mentioned alumina producer wet production workshop, the top of described water collecting basin is provided with overflow port, and overflow port is connected with water exhaust system through the waterways.
In the accident emergency facility in aforementioned alumina producer wet production workshop, described water collecting basin bottom is provided with 〉=1% the gradient, and pitting is positioned at position, the end, slope.
In the accident emergency facility in aforementioned alumina producer wet production workshop, described submersible pump is the alkaline-resisting sump pump of 100RV-SPI type.
In the accident emergency facility in aforementioned alumina producer wet production workshop, described safe ditch, water collecting basin, waterways are alkali-resistant concrete and make.
Compared with prior art, prior art is not established the accident emergency facility, in case have an accident, alkali lye and slip be sinuous flow everywhere, flow to very big a slice area outside the workshop, the environment around the workshop is caused great pollution, and alkali lye and also loss thereupon of slip, can't recycling, cause the waste of raw materials for production.Facility of the present utility model can be in the wet production workshop when wherein the leakage accident takes place to burst certain liquid tank jar, the alkaline liquid that leaks is controlled in the safe ditch scope on every side of wet production workshop, and can well dredge effusive alkali lye and slip, make the alkali lye and the slip of loss obtain recycling, reduce the waste of raw material; Can prevent also simultaneously that alkali lye and slip from polluting the environment around the wet production workshop.The utility model also has simple in structure, easy construction, the characteristics that the duration is short.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Being labeled as in the accompanying drawing: 1-wet production workshop, 2-safety ditch, 3-water collecting basin, 4-pitting, 5-submersible pump, 6-pipeline, 7-overflow port, 8-waterways.
Embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Embodiment.The accident emergency facility in a kind of alumina producer wet production workshop, as shown in Figure 1.This facility comprises the 1 safe ditch 2 that is provided with around factory wet production workshop; Safe ditch 2 is connected with water collecting basin 3, and water collecting basin 3 bottoms are provided with pitting 4, and water collecting basin 3 bottoms are provided with 〉=1% the gradient, pitting 4 is positioned at position, the end, slope.Be provided with submersible pump 5 in the pitting 4, submersible pump 5 is the alkaline-resisting sump pump of 100RV-SPI type, and wherein 100 expression hour pump-outs can determine to select for use one or more according to actual amount of water.The water port of submersible pump 5 is connected with the feeder system of production system with pipeline 6.The top of water collecting basin 3 is provided with overflow port 7, and overflow port 78 is connected with water exhaust system through the waterways.Described safe ditch 2, water collecting basin 3, waterways 8 are alkali-resistant concrete and make.
When specifically carrying out the construction in safe ditch 2, water collecting basin 3, waterways 8, used cement and steel should all adopt alkaline-resisting material, to prevent alkali lye it are corroded.Burst when leaking in order to guarantee a wherein maximum liquid tank jar of wet production workshop 1, the liquid slip that runs off can all flow in the water collecting basin in 3 hours, the handling capacity Q of safe ditch 〉=Q1+Q2, wherein: Q1 is wherein liquid capacity whole unit water displacement of discharging in 3 hours of a maximum liquid tank jar of wet production workshop 1, so Q1=Vmax/10800 (l/s); Q2 is safe ditch 2 collective area S and the local product that designs the rainfall intensity q of reoccurrence period (to the critical facility of large-scale factory, getting 5 years), i.e. Q2=S*q (l/s).The minimum capacity of water collecting basin 3 should be greater than the volume of a wherein maximum liquid tank jar of alumina producer wet production workshop 1.The transport capacity of submersible pump 5 and pipeline 6 should satisfy liquid slip and the rainwater in 24 hours water collecting basin collected and all carry go back to the production system.When the leakage accident of bursting takes place when occurring surpassing the extra torrential rain that designs the reoccurrence period simultaneously, submersible pump 5 and back have pipeline 6 all not to be pumped to production system to whole liquid slips and rainwater in time, and at this moment, the spill-over situation may appear in water collecting basin 3.The effect in overflow port 7 and waterways 8 is exactly in an organized way to prevent the contaminated liquid of overflow sinuous flow everywhere, and its drainability is not less than the water inlet ability of safe ditch 2.
When the liquid tank jar in alumina producer wet production workshop 1 normally moves, may be because Maintenance and Repair have the small amount of liquid slip to be scattered in around the 1 groove tank field, wet production workshop, but because amount is few, differing flows in the water collecting basin 3 surely, but when rainfall, these slips can be by rain-out, and and rainwater flow into together in the water collecting basin 3, at this moment, by submersible pump 5 and the pipeline 6 in the pitting 4, the contaminated rainwater of collecting is all carried go back to the production system, prevent the pollution of the environment effectively.Under worst situation, the leakage accident of bursting promptly takes place when occurring surpassing the extra torrential rain that designs the reoccurrence period simultaneously, submersible pump 5 and back have pipeline 6 can not be in time whole liquid slips and rainwater pumping meeting production system all, at this moment, the spill-over situation may appear in water collecting basin 3.The effect in overflow port 7 and waterways 8 is exactly to prevent the contaminated liquid of overflow sinuous flow everywhere, can in an organized way enter the downstream water body, because the diluting effect of extra torrential rain amount, the pollution level of downstream water body is low weight.

Claims (5)

1. the accident emergency facility in an alumina producer wet production workshop is characterized in that: this facility comprises the safe ditch (2) that is provided with around factory wet production workshop (1); Safe ditch (2) is connected with water collecting basin (3), and water collecting basin (3) bottom is provided with pitting (4), is provided with submersible pump (5) in the pitting (4), and the water port of submersible pump (5) is connected with the feeder system of production system with pipeline (6).
2. according to the accident emergency facility in the described alumina producer wet production of claim 1 workshop, it is characterized in that: the top of described water collecting basin (3) is provided with overflow port (7), and (8) are connected with water exhaust system overflow port (7) through the waterways.
3. according to the accident emergency facility in the described alumina producer wet production of claim 2 workshop, it is characterized in that: described water collecting basin (3) bottom is provided with 〉=1% the gradient, pitting (4) is positioned at position, the end, slope.
4. the accident emergency facility in alumina producer wet production according to claim 3 workshop is characterized in that: described submersible pump (5) is the alkaline-resisting sump pump of 100RV-SPI type.
5. according to the accident emergency facility in claim 1,2 or 3 described alumina producer wet production workshops, it is characterized in that: described safe ditch (2), water collecting basin (3), waterways (8) are alkali-resistant concrete and make.
CN2009203188182U 2009-12-29 2009-12-29 Accident emergency facility for alumina plant wet-process production workshop Expired - Lifetime CN201620037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203188182U CN201620037U (en) 2009-12-29 2009-12-29 Accident emergency facility for alumina plant wet-process production workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203188182U CN201620037U (en) 2009-12-29 2009-12-29 Accident emergency facility for alumina plant wet-process production workshop

Publications (1)

Publication Number Publication Date
CN201620037U true CN201620037U (en) 2010-11-03

Family

ID=43023493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203188182U Expired - Lifetime CN201620037U (en) 2009-12-29 2009-12-29 Accident emergency facility for alumina plant wet-process production workshop

Country Status (1)

Country Link
CN (1) CN201620037U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103111463A (en) * 2013-02-01 2013-05-22 深圳市先科环保有限公司 Remediation method of heavy metal contaminated soil
CN103466535A (en) * 2013-09-17 2013-12-25 湖南华信有色金属有限公司 Tank truck filling device of sulfuric acid
CN108502837A (en) * 2017-02-28 2018-09-07 西安长庆科技工程有限责任公司 A kind of gas field unloading system and its technique

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103111463A (en) * 2013-02-01 2013-05-22 深圳市先科环保有限公司 Remediation method of heavy metal contaminated soil
CN103111463B (en) * 2013-02-01 2017-10-10 深圳市先科环保有限公司 The restorative procedure of heavy-metal contaminated soil
CN103466535A (en) * 2013-09-17 2013-12-25 湖南华信有色金属有限公司 Tank truck filling device of sulfuric acid
CN103466535B (en) * 2013-09-17 2015-11-18 湖南华信稀贵科技有限公司 The tank wagon charging device of sulfuric acid
CN108502837A (en) * 2017-02-28 2018-09-07 西安长庆科技工程有限责任公司 A kind of gas field unloading system and its technique

Similar Documents

Publication Publication Date Title
CN206233333U (en) Initial rainwater filtering, precipitating, discarding and collecting treatment system
CN101746909B (en) Method for pretreating machining waste emulsion liquid and equipment therefor
CN203924320U (en) Floatage-type rainwater flow-discarding device
CN201620037U (en) Accident emergency facility for alumina plant wet-process production workshop
CN201333428Y (en) Oil-removing sand-removing separator
CN101474496A (en) Recovery system for floating oil in collecting well
CN203008967U (en) Intelligent discharge device for pipeline ponding
CN202017029U (en) Short-flow stuffy slag water returning device
CN201376918Y (en) Large area hydrolysis acidification tank sludge discharge device
CN201882993U (en) Oily sewage settling treatment device
CN202729851U (en) Buoy submergence type floating oil absorption device
CN201981036U (en) Floating oil collecting device for water collecting well of hydroelectric power station
CN213555500U (en) Light oil water separation system
CN205894042U (en) Discharge system of slurry leakage water
CN201144458Y (en) Overflow type recharging well of wet red mud disposal site
CN204661469U (en) A kind of tunnel counter-slope draws water refining plant
CN206396856U (en) A kind of roof rain water collecting treatment for reuse system
CN205850325U (en) Strain ability of swimming to give up muddy water recovery pond
CN207210224U (en) A kind of anaerobic sludge digestion foam automaton
CN210559602U (en) Physical automatic defoaming system of nitrification tank
CN202484404U (en) Oil-cutting drainage valve
CN201578929U (en) Device for recycling back washing water in siphon filter tank
CN201158445Y (en) Oil spill emergency recovery engineering ship
CN202052405U (en) Novel sewage pump station
CN217682179U (en) Water circulation cooling descaling system for mining extraction pump station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110608

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO. 2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110608

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CX01 Expiry of patent term

Granted publication date: 20101103

CX01 Expiry of patent term