CN201556888U - Half tension tensioner - Google Patents

Half tension tensioner Download PDF

Info

Publication number
CN201556888U
CN201556888U CN2009202847252U CN200920284725U CN201556888U CN 201556888 U CN201556888 U CN 201556888U CN 2009202847252 U CN2009202847252 U CN 2009202847252U CN 200920284725 U CN200920284725 U CN 200920284725U CN 201556888 U CN201556888 U CN 201556888U
Authority
CN
China
Prior art keywords
pulley
semi
tension
brake pad
crossing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202847252U
Other languages
Chinese (zh)
Inventor
张日朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUYI POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
XUYI POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUYI POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co filed Critical XUYI POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority to CN2009202847252U priority Critical patent/CN201556888U/en
Application granted granted Critical
Publication of CN201556888U publication Critical patent/CN201556888U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a semi-tension type compensator which comprises a support (1), crossing grooves (2), a brake pad (3) and a pulley (4), wherein a row of crossing grooves (2) are arranged below the support (1); and the brake pad (3) and the pulley (4) are respectively arranged at two inner side edges of the crossing grooves (2), facing to each other. When a cable spans a barrier, the semi-tension type compensator is arranged in front of the barrier, and a lead passes through the crossing grooves (2) and is positioned between the brake pad (3) and the pulley (4). The semi-tension type compensator has simple structure, convenient operation, fast construction speed and adjustable tension; the spanned object is steady; and the safety of despooling workers is greatly improved.

Description

半张力式松紧器 Half tension tensioner

技术领域technical field

本实用新型涉及电力设施的辅助工具,具体涉及一种半张力式松紧器。The utility model relates to an auxiliary tool for electric facilities, in particular to a semi-tension type elastic device.

背景技术Background technique

众所周知,在线路施工中,放线是最基本的工作,张力放线技术是一种常用技术,特别使用于高电压电力线路中。在放线过程中,导线可能要跨越某些障碍物,在导线跨越障碍物之前,为了避免导线损伤或对被跨越物造成损害,需要使用松紧器辅助跨越,而松紧器的张力不宜过大,否则易造成被跨越物倾覆,施工安全得不到保障。As we all know, in the line construction, payout is the most basic work, tension payout technology is a common technology, especially used in high-voltage power lines. During the unwinding process, the wire may have to cross some obstacles. Before the wire crosses the obstacle, in order to avoid damage to the wire or damage to the object to be crossed, it is necessary to use an elastic device to assist the crossing, and the tension of the elastic device should not be too large. Otherwise, it is easy to cause the objects to be overturned, and the construction safety cannot be guaranteed.

发明内容Contents of the invention

本实用新型的目的在于:提供一种半张力松紧器,张力大小可调,增强操作稳定性,保障施工安全。The purpose of the utility model is to provide a half-tension tensioner with adjustable tension, enhanced operational stability, and guaranteed construction safety.

本实用新型的技术解决方案是:该松紧器包括支架、穿越槽、刹车片和滑轮,在支架的下方安装一排穿越槽,穿越槽的两内侧边相向分别安装刹车片和滑轮。The technical solution of the utility model is: the elastic device includes a bracket, a crossing groove, a brake pad and a pulley, a row of crossing grooves is installed under the bracket, and brake pads and pulleys are respectively installed on the two inner sides of the crossing groove.

本实用新型的半张力式松紧器中,在穿越槽的内侧边安装一字排列的一组滑轮。In the semi-tension type elastic device of the present utility model, a group of pulleys arranged in a line are installed on the inner side of the crossing groove.

当电缆跨越障碍物时,在障碍物前安装此半张力式松紧器,让导线穿过穿越槽位于刹车片和滑轮之间。When the cable crosses the obstacle, install this half-tension tensioner in front of the obstacle, and let the wire go through the crossing slot between the brake pad and the pulley.

本实用新型具有以下优点:1、结构简单,操作方便,施工速度快;2、张力可调,被跨越物稳定,放线人员安全性大大的提高。The utility model has the following advantages: 1. The structure is simple, the operation is convenient, and the construction speed is fast; 2. The tension is adjustable, the objects to be spanned are stable, and the safety of the pay-off personnel is greatly improved.

附图说明Description of drawings

图1为本实用新型的结构示意图Fig. 1 is the structural representation of the utility model

图中:1、支架,2、穿越槽,3、刹车片,4、滑轮。Among the figure: 1, bracket, 2, crossing groove, 3, brake pad, 4, pulley.

具体实施方式Detailed ways

如图1所示,该松紧器包括支架1、穿越槽2、刹车片3和滑轮4,在支架1的下方安装一排穿越槽2,穿越槽2的两内侧边相向分别安装刹车片3和滑轮4。As shown in Figure 1, the tensioner includes a bracket 1, a crossing groove 2, a brake pad 3 and a pulley 4, a row of crossing grooves 2 is installed under the bracket 1, and brake pads 3 are respectively installed on the two inner sides of the crossing groove 2 facing each other. and pulley 4.

本实用新型的半张力式松紧器中,在穿越槽2的内侧边安装一字排列的一组滑轮4。In the semi-tension type elastic device of the present utility model, a group of pulleys 4 arranged in a line are installed on the inner side of the crossing groove 2 .

当电缆跨越障碍物时,在障碍物前安装此半张力式松紧器,让导线穿过穿越槽2位于刹车片3和滑轮4之间。When the cable crosses an obstacle, install the semi-tension type tensioner before the obstacle, and allow the wire to pass through the crossing groove 2 and be located between the brake pad 3 and the pulley 4.

Claims (2)

1.半张力式松紧器,其特征在于:该松紧器包括支架(1)、穿越槽(2)、刹车片(3)和滑轮(4),在支架(1)的下方安装一排穿越槽(2),穿越槽(2)的两内侧边相向分别安装刹车片(3)和滑轮(4)。1. A semi-tension tensioner, characterized in that the tensioner includes a bracket (1), a crossing groove (2), a brake pad (3) and a pulley (4), and a row of crossing grooves is installed under the bracket (1) (2), the two inner sides of the crossing groove (2) are oppositely installed with brake pads (3) and pulleys (4). 2.根据权利要求1所述的半张力松紧器,其特征在于:在穿越槽(2)的内侧边安装一字排列的一组滑轮(4)。2. The semi-tension tensioner according to claim 1, characterized in that: a set of pulleys (4) arranged in line are installed on the inner side of the crossing groove (2).
CN2009202847252U 2009-12-07 2009-12-07 Half tension tensioner Expired - Fee Related CN201556888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202847252U CN201556888U (en) 2009-12-07 2009-12-07 Half tension tensioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202847252U CN201556888U (en) 2009-12-07 2009-12-07 Half tension tensioner

Publications (1)

Publication Number Publication Date
CN201556888U true CN201556888U (en) 2010-08-18

Family

ID=42616578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202847252U Expired - Fee Related CN201556888U (en) 2009-12-07 2009-12-07 Half tension tensioner

Country Status (1)

Country Link
CN (1) CN201556888U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941647A (en) * 2010-09-09 2011-01-12 常熟市电力机具有限公司 High-speed hoisting tackle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941647A (en) * 2010-09-09 2011-01-12 常熟市电力机具有限公司 High-speed hoisting tackle
CN101941647B (en) * 2010-09-09 2012-09-05 常熟市电力机具有限公司 High-speed hoisting tackle

Similar Documents

Publication Publication Date Title
CN102772870B (en) Fire hose binding device
CN203445539U (en) Line laying corner pulley rack
CN203659527U (en) Cable traction line pressing device
CN203510493U (en) Auxiliary tool discharging broken line connecting joints of cutting steel wire for silicon block
CN204793847U (en) Frame is strideed across to portable unwrapping wire
CN204886018U (en) Intraductal area silk device of wearing of building electrical engineering
CN203652997U (en) Tensioning device of speed limiter steel wire rope
CN202423984U (en) Line cleaner with simple structure
CN208608633U (en) Wellhead Block for Cable Erection
CN202837643U (en) Anti-wire jumping and wire clamping optical cable linear tackle
CN205845596U (en) A kind of cable twist device
CN202026035U (en) Wire fixing device for live line work of overhead line
CN202646927U (en) Turning support of cable bridge
CN202550415U (en) Cable laying distributor
CN202318694U (en) Rubber drawing machine with safe protecting cover
CN208265506U (en) A kind of cable paying-off device
CN203289002U (en) An end portion clamping device used for electric power conducting wire pulling
CN203660481U (en) Bucket wheel machine roller power supply cable guiding device
CN204809752U (en) Four -wire tensioner bullwheel is used in built on stilts distribution lines construction of low pressure
CN203398650U (en) Bidirectional line fastening pulley
CN201191325Y (en) Large-diameter combined pulley for optical cable construction
CN202651742U (en) A Synchronous Payoff
CN205479724U (en) Cable clamp
CN202238958U (en) Mess proof guide device for steel wire rod
CN220306879U (en) Bridge section cable of railway bridge device of unloading

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY STATE GRID CORPORAT

Effective date: 20121127

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121127

Address after: Xu City 211700 Huaian city Jiangsu province Xuyi Huaihe County Road No. 66

Patentee after: Xuyi Power Supply Company of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: Xu City 211700 Huaian city Jiangsu province Xuyi Huaihe County Road No. 66

Patentee before: Xuyi Power Supply Company of Jiangsu Electric Power Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100818

Termination date: 20171207

CF01 Termination of patent right due to non-payment of annual fee