CN201541084U - Hanger for power line spanning construction - Google Patents

Hanger for power line spanning construction Download PDF

Info

Publication number
CN201541084U
CN201541084U CN200920176981XU CN200920176981U CN201541084U CN 201541084 U CN201541084 U CN 201541084U CN 200920176981X U CN200920176981X U CN 200920176981XU CN 200920176981 U CN200920176981 U CN 200920176981U CN 201541084 U CN201541084 U CN 201541084U
Authority
CN
China
Prior art keywords
construction
bolt
power line
ring
saving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920176981XU
Other languages
Chinese (zh)
Inventor
朱智平
冯明勇
邹元
代玉飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZIGONG ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Original Assignee
ZIGONG ELECTRIC POWER BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIGONG ELECTRIC POWER BUREAU filed Critical ZIGONG ELECTRIC POWER BUREAU
Priority to CN200920176981XU priority Critical patent/CN201541084U/en
Application granted granted Critical
Publication of CN201541084U publication Critical patent/CN201541084U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to a line-lifting device for crossing construction of a power line. The position close to a sealing end of a U-shaped lifting ring is fixedly connected with a cross rod to form a ring-hanging hole for fastening a rope; a hole close to an opening end of the U-shaped lifting ring is hung with a bolt in a penetrating manner; and the part of the bolt within the opening end of the U-shaped lifting ring is provided with a bearing. The line-lifting device has the characteristics of simple and reliable structure, labor-saving and time-saving properties and convenient construction.

Description

电力线路跨越施工用吊线器 Hanger for power line spanning construction

技术领域technical field

本实用新型涉及吊线器具,特别是用于电力线路施工时保护下跨物而将吊线或地线吊起的器具。The utility model relates to a wire-suspending appliance, in particular to an appliance used to protect the underspan objects during power line construction and hoist the hanging wire or the ground wire.

背景技术Background technique

在输电线路检修工作中常常遇到更换导地线和拆除导地线的工作,在工作中如何处理和保护下跨物往往是一个核心问题,随着社会经济发展,电力线路施工中遇到跨越的种类越来越多,如:跨越高速公路、铁路、电力线路等。在以往的施工中,常常采用以下几种处理方法:1、松线法:主体施工前将下跨线路松到地面,待主体施工完成后在恢复下跨线路。此方法安全可靠,但施工复杂,施工耗时、耗费多;2、跨越架法:在下跨点处搭设跨越架,跨越架分为单边式跨越架和封闭式跨越架(封闭式跨越架多用于带电跨越施工)。此方法安全性较高,但受地形,下跨线路对地高度等影响,局限性大,施工复杂,施工耗时、耗费多。In the maintenance work of transmission lines, the work of replacing and removing the ground wires is often encountered. How to deal with and protect the lower crossings in the work is often a core issue. With the development of society and economy, crossings are encountered in power line construction There are more and more types, such as: crossing highways, railways, power lines, etc. In previous constructions, the following processing methods were often used: 1. Loosening method: loosen the underspan line to the ground before the main body construction, and restore the underspan line after the main body construction is completed. This method is safe and reliable, but the construction is complicated, time-consuming and costly; 2. Spanning method: set up a spanning frame at the lower span point, and the spanning frame is divided into unilateral spanning frame and closed spanning frame (closed spanning frame is multi-purpose For live across the construction). This method has high safety, but due to the influence of the terrain and the height of the underspan line to the ground, etc., it has great limitations, complicated construction, time-consuming and expensive construction.

实用新型内容Utility model content

本实用新型的目的是提供一种省工、省时、施工方便的电力线路跨越施工用吊线器。The purpose of the utility model is to provide a labor-saving, time-saving and convenient construction of a power line spanning wire hanger.

本新型的目的是这样实现的:一种电力线路跨越施工用吊线器,U形吊环封口端邻近处固联有一横杆而形成拴绳索的挂环孔,U形吊环开口端邻近处的孔中穿挂有一螺栓,螺栓上U形吊环开口端以内位置处设置有一个轴承。The purpose of this new model is achieved in the following way: a power line spans a wire hanger for construction, a cross bar is fixedly connected near the sealing end of the U-shaped lifting ring to form a hanging ring hole for tying the rope, and the hole near the opening end of the U-shaped lifting ring A bolt is worn and hung, and a bearing is arranged at a position inside the open end of the U-shaped suspension ring on the bolt.

上述螺栓的螺杆外端处设置有开口销。Cotter pins are arranged at the outer ends of the screw rods of the above-mentioned bolts.

本新型的具体使用方法:The specific method of use of this new type:

施工人员登上被跨越点两旁的杆塔,在杆塔上将吊环逐一安装在需更换的导(地)线上,并将牵引绳系在吊环的挂环上。下方施工人员拉牵引绳,将吊环拉至跨越点下方,施工过程中根据需要,吊环的位置和数量可根据实际需要进行调整。松线时,被松的导(地)线通过绳索和吊环搭在未松的导(地)线上,保证了对跨越物的距离后,下方的跨越基本不受施工影响。施工结束后,再回拉牵引绳,拆除吊环。The construction personnel boarded the towers on both sides of the crossed point, installed the suspension rings on the towers one by one on the guide (ground) wires to be replaced, and tied the traction rope to the hanging rings of the suspension rings. The construction personnel below pull the traction rope to pull the suspension rings below the crossing point. During the construction process, the position and number of suspension rings can be adjusted according to actual needs. When the wire is loosened, the loose guide (ground) wire is placed on the unloose guide (ground) wire through the rope and the lifting ring, after ensuring the distance to the spanning object, the span below is basically not affected by the construction. After the construction is finished, pull back the traction rope and remove the lifting ring.

与现有技术相比,本新型的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

1、本新型结构简单可靠,现场施工方便,下方的跨越安全不受施工影响。1. The structure of this new type is simple and reliable, and the on-site construction is convenient, and the safety of the crossing below is not affected by the construction.

2、省工、省时、节约开支2. Labor-saving, time-saving and cost-saving

与松线法相比,勿需将下跨线路松至地面,本新型具有省工、省时、节省开支的优点;与跨越架法相比,勿需搭投跨越架,本新型具有不受地理限制、省工、省时和节约开支的优点。Compared with the loosening method, there is no need to loosen the lower span line to the ground. This new type has the advantages of labor saving, time saving and cost saving; , labor saving, time saving and cost saving advantages.

附图说明Description of drawings

图1是本新型的结构图;Fig. 1 is a structural diagram of the present invention;

图2是使用本新型进行施工(称吊环法施工)时的示意图。Fig. 2 is the schematic diagram when using the new model to carry out construction (claiming ring method construction).

具体实施方式Detailed ways

图1示出,U形吊环1封口端邻近处固联有一横杆2而形成拴绳索的挂环孔,U形吊环开口端邻近处的孔中穿挂有一螺栓3,螺栓3上U形吊环开口端以内位置处设置有一个轴承4。螺栓由螺杆和螺母组成。螺栓3的螺杆外端处设置有开口销。开口销插接在螺杆的孔中。Figure 1 shows that a cross bar 2 is fixedly connected to the vicinity of the sealing end of the U-shaped suspension ring 1 to form a hanging ring hole for tying the rope, and a bolt 3 is hung in the hole adjacent to the open end of the U-shaped suspension ring, and the U-shaped suspension ring is mounted on the bolt 3. A bearing 4 is arranged at the position inside the open end. Bolt is made up of screw rod and nut. A cotter pin is arranged at the outer end of the screw rod of the bolt 3 . The cotter pin is inserted in the hole of the screw rod.

U形吊环采用Q235碳素钢制造,开口处采用螺栓封口,并使用开口销防止螺栓退出,上部横杆形成挂环,用于拴吊环绳索。The U-shaped lifting ring is made of Q235 carbon steel, and the opening is sealed with bolts, and a cotter pin is used to prevent the bolts from withdrawing. The upper cross bar forms a hanging ring for fastening the ring rope.

图2示出,用吊环、绳索在跨越点处采用以线吊线(导线吊地线、地线吊导线、导线吊导线)的方法,使导地线远离下跨的线路,从而起到保护下跨物的作用。此方法简单,可行性高,耗时少。Figure 2 shows that the method of hanging the wire (the wire hanging the ground wire, the ground wire hanging wire, and the wire hanging wire) is adopted at the crossing point with the ring and the rope, so that the ground wire is far away from the line under the span, so as to protect the lower span. The role of cross-things. This method is simple, highly feasible and less time-consuming.

Claims (2)

1.一种电力线路跨越施工用吊线器,其特征是:U形吊环(1)封口端邻近处固联有一横杆(2)而形成拴绳索的挂环孔,U形吊环开口端邻近处的孔中穿挂有一螺栓(3),螺栓(3)上U形吊环开口端以内位置处设置有一个轴承(4)。1. A wire hanger for power line spanning construction is characterized in that: a cross bar (2) is fixedly connected to the vicinity of the sealing end of the U-shaped suspension ring (1) to form a hanging ring hole for tying the rope, and the vicinity of the open end of the U-shaped suspension ring A bolt (3) is hung in the hole of the bolt (3), and a bearing (4) is arranged at the position within the open end of the U-shaped suspension ring on the bolt (3). 2.根据权利要求1所述电力线路跨越施工用吊线器,其特征是:所述螺栓(3)的螺杆外端处设置有开口销。2. The wire hanger for power line crossing construction according to claim 1, characterized in that: the outer end of the screw rod of the bolt (3) is provided with a cotter pin.
CN200920176981XU 2009-09-23 2009-09-23 Hanger for power line spanning construction Expired - Lifetime CN201541084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920176981XU CN201541084U (en) 2009-09-23 2009-09-23 Hanger for power line spanning construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920176981XU CN201541084U (en) 2009-09-23 2009-09-23 Hanger for power line spanning construction

Publications (1)

Publication Number Publication Date
CN201541084U true CN201541084U (en) 2010-08-04

Family

ID=42592540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920176981XU Expired - Lifetime CN201541084U (en) 2009-09-23 2009-09-23 Hanger for power line spanning construction

Country Status (1)

Country Link
CN (1) CN201541084U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842869A (en) * 2012-09-11 2012-12-26 武绍模 Method for replacing overhead ground wire or conducting wire rapidly
CN103354333A (en) * 2013-06-19 2013-10-16 国家电网公司 Flexible lead protection rope lockset

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842869A (en) * 2012-09-11 2012-12-26 武绍模 Method for replacing overhead ground wire or conducting wire rapidly
CN103354333A (en) * 2013-06-19 2013-10-16 国家电网公司 Flexible lead protection rope lockset
CN103354333B (en) * 2013-06-19 2017-04-26 国家电网公司 Flexible lead protection rope lockset

Similar Documents

Publication Publication Date Title
CN202424003U (en) Specially-used pulley for electrified crossing frame of insulating rope bridge
CN102661057B (en) Power angle tower pull leg main material changing method and special main material clamp
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN201541084U (en) Hanger for power line spanning construction
CN101908739B (en) Trolley used for maintenance of electricity overhead power transmission line
CN204266133U (en) A kind of pier stud reinforcing cage whole lifting structure
CN204569267U (en) Equipment unit dismounting is with hanging pull tool
CN204615259U (en) Ground wire broken strand emergency treatment tool
CN204167793U (en) Straight line steel tube tower side, double loop cross-arm jig
CN204180593U (en) A kind of insulating pruning shears
CN202856246U (en) Insulator replacement device
CN104242142A (en) Installation method of suspension type tubular busbar
CN205004685U (en) Distribution overhead line stridees across line changing plumb -line device
CN101692550A (en) Rope hoister for spanning construction of electric line
CN204124396U (en) Steel frame pipe bundling device
CN204131005U (en) Double loop tangent tower steeple head cross-arm jig
CN207259096U (en) A kind of power cable Well cover unlatching tool
CN201498948U (en) new towing tool
CN204680993U (en) A kind of device changing porcelain vase for straight corner bar
CN207046668U (en) A kind of instrument for opening drainage pipeline well lid
CN205622141U (en) Electrified specialized tool that changes of bar type insulator
CN207087759U (en) A kind of shaft device of pulling pin suitable for hydraulic support
CN205025185U (en) Iron tower tower material shield jig
CN224062292U (en) A portable anti-disengagement device for vehicles
CN201266687Y (en) Diverter for grounding wire

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20131226

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131226

Address after: 643000 Zigong city of Sichuan Province, Ziliujing District tanmulin Street No. 115

Patentee after: Zigong Electric Power Bureau

Patentee after: State Grid Corporation of China

Address before: Zigong City, Sichuan province 643000 tanmulin Street No. 115

Patentee before: Zigong Electric Power Bureau

CX01 Expiry of patent term

Granted publication date: 20100804

CX01 Expiry of patent term