CN201529467U - Converter smoke purifying saturation spray tower - Google Patents
Converter smoke purifying saturation spray tower Download PDFInfo
- Publication number
- CN201529467U CN201529467U CN2009201879364U CN200920187936U CN201529467U CN 201529467 U CN201529467 U CN 201529467U CN 2009201879364 U CN2009201879364 U CN 2009201879364U CN 200920187936 U CN200920187936 U CN 200920187936U CN 201529467 U CN201529467 U CN 201529467U
- Authority
- CN
- China
- Prior art keywords
- section
- spray nozzle
- expansion segment
- gas
- contraction section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000007921 spray Substances 0.000 title claims abstract description 40
- 239000000779 smoke Substances 0.000 title abstract description 6
- 238000000746 purification Methods 0.000 claims abstract description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 16
- 241000005139 Lycium andersonii Species 0.000 claims abstract description 6
- 239000000411 inducer Substances 0.000 claims description 11
- 238000009413 insulation Methods 0.000 abstract 1
- 239000007789 gas Substances 0.000 description 43
- UGFAIRIUMAVXCW-UHFFFAOYSA-N carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 21
- 239000003546 flue gas Substances 0.000 description 19
- 238000004140 cleaning Methods 0.000 description 13
- 238000001816 cooling Methods 0.000 description 10
- 238000002309 gasification Methods 0.000 description 5
- 238000006297 dehydration reaction Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000003068 static Effects 0.000 description 4
- 238000005406 washing Methods 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000000428 dust Substances 0.000 description 3
- 230000005484 gravity Effects 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 210000001513 Elbow Anatomy 0.000 description 2
- 210000000867 Larynx Anatomy 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000009689 gas atomisation Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Abstract
The utility model discloses a converter smoke purifying saturation spray tower, including a smoke inlet section, an expansion section (3) and a contraction section (7); wherein the inlet section is composed of a heat insulation water jacket (1) and an overflow water tank (2). The utility model is characterized in that the expansion section (3) is arranged on the lower part of the inlet section; upper, middle and lower cylindrical shells (4, 5, 6) are arranged on the lower end of the expansion section (3); the contraction section (7) is positioned on the lower end of a lower cylindrical shell (6); the inlet section and the expansion section (3), the expansion section (3) and the upper cylindrical shell (4), cylindrical shells and the lower cylindrical shell (6) and the contraction section (7) are firmly connected; a draining hole (8) is arranged on the lower end of the contraction section (7); a smoke outlet pipe (9) is arranged on the side surface of the middle cylindrical shell (5); and at least four layers of spray nozzles are arranged in the saturation spray tower. The saturation spray tower has advantages of simple structure, large circulation area, small resistance, low quantity of turbid circulating water and high purification efficiency.
Description
Technical field
The utility model relates to steel plant converter auxiliary equipment field, relates in particular to the converter of a kind of particularly suitable steel plant and adopts first order gas cleaning wash mill in the complete wet flue gas purification system that does not fire method.
Background technology
At present, the wet full flue gas purification system that does not fire method of steel plant's converter adopts double venturi gas cleaning washing system more.This system comprises parts such as gasification cooling flue, first order Venturi tube gas cleaning wash mill, gravity dehydration device, second level Venturi tube gas cleaning wash mill, elbow separator, whirlwind multiple shelves dehydrator and dedusting fan, connects by pipeline between each parts.The high-temperature flue gas that comes out from converter enters first order Venturi tube gas cleaning wash mill by gasification cooling flue, the high-temperature flue gas of about 900 ℃ of gasification cooling flue outlets is reduced to saturated flue gas and reached purification just, enter second level Venturi tube gas cleaning washing facility through the gravity dehydration device, second level Venturi tube adopts can regulate the aditus laryngis aperture, it has further purification and washing flue gas and regulates the effect of tolerance, and when needs reclaim flue gas, by guarantee the quality of recovery flue gas, the minute-pressure that is used to control the converter mouth place is poor, to adapt to the variation of converter mouth exhaust gas volumn.Purification flue gas after handling through second level Venturi tube enters elbow separator, the multiple shelves of whirlwind dehydrator further after the dehydration, enters atmosphere by parts such as dedusting fans.
First order Venturi tube gas cleaning wash mill in the above-mentioned converter gas purification system generally is made up of inducer, contraction section, aditus laryngis section, expansion segment, wherein inducer adopts the mode of insulated water jacket and the combination of overflow tank, is provided with one deck bowl-type nozzle in the aditus laryngis section.In the converter gas washing, first order Venturi tube gas cleaning wash mill plays a part cooling and dedusting, in aditus laryngis section part, first order Venturi tube causes bigger relative velocity with certain gas speed and water speed, make the high-temperature gas and the heat transfer water mass transfer that enter, simultaneously, clashed into cohesion by grit in the water droplet group of aditus laryngis high-speed gas atomization and the air-flow, become the dirt aqueous mixtures, make gas-water separation through the gravity dehydration device then.The characteristics of first order Venturi tube are: efficient is higher, and water is less, but resistance is bigger.Because after flue gas flows to the contraction section of first order Venturi tube, the flue gas static pressure progressively descends.In the difference of aditus laryngis section part with larynx speed, minimum is in various degree reduced in flue gas static pressure to aditus laryngis section outlet, flue gas enters in the expansion segment, the flue gas static pressure progressively is restored again, physical dimension and structure according to different Venturi tubes, expanding the expansion segment exit, the big activation of flue gas static pressure returns to about 60-85%.
From the course of work of above-mentioned first order Venturi tube is described as can be known, the resistance of first order Venturi tube (pressure loss) means that gas enters in the pipe and friction such as tube wall, and aqueous vapor kinetic energy transmits the gas pressure that (water droplet quicken absorbed energy and its energy of emitting) etc. lost in anemostat in trunnion.The resistance of first order Venturi tube comprises its dried resistance and wet resistance, if be provided with the overflow water seal at first order venturi inlet place, also has spillage drag.The size decision of dried resistance and larynx speed, geometry and the machining accuracy of aditus laryngis section; The size of wet resistance also determines and steam ratio, water discharge pattern etc., and these resistance sums are the drag overall by first order Venturi tube.
The calculating resistance of converter gas purification system first order Venturi tube gas cleaning wash mill is generally all at 300mmH
2About O.
The utility model content
The purpose of this utility model is to provide a kind of saturated spray column of gas cleaning that substitutes the effect of first order Venturi tube gas cleaning wash mill in the converter gas purification system that is applicable to, this saturated spray column circulation area is big, and resistance is little, purification efficiency is high.
For achieving the above object, the saturated spray column of converter gas purification of the present utility model comprises gas approach section, expansion segment and contraction section, and wherein inducer is made up of insulated water jacket and overflow tank, and its structural feature is: expansion segment is positioned at the inducer below; Be provided with the upper, middle and lower cylindrical shell in the expansion segment lower end; Contraction section is positioned at the lower shell lower end; Between inducer and the expansion segment, between expansion segment and the upper shell, adopt between each cylindrical shell and between lower shell and the contraction section and be fastened and connected; Be provided with osculum in the contraction section lower end, be provided with the exhanst gas outlet pipeline in the middle cylinder body side; 4 layers of spray nozzle also are set in saturated spray Tata at least.
The utility model structure compared with prior art its advantageous effect is as follows:
Because the saturated spray column of the utility model adopts the tube structure form, circulation area is big, and directly cooling down high-temperature gas captures the coarse grain dust; Owing in tower, be provided with at least 4 layers of spray nozzle, form the water smoke film by nozzle like this, the cooling of the gas that reaches a high temperature and dedusting again.The pressure loss of this dedusting is extremely low, and the plan pressure loss is at 50mmH
2Below the O.So advantage simple and reasonable, that resistance is little, the turbid circulating water consumption is little and purification efficiency is high that the saturated spray column of the utility model structure has.
Description of drawings
The utility model is described in more detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is the structural representation of the saturated spray column of the utility model converter gas purification.
The specific embodiment
As seen from Figure 1, the saturated spray column of converter gas purification of the present utility model comprises gas approach section, expansion segment 3 and contraction section 7, and wherein inducer is made up of insulated water jacket 1 and overflow tank 2.Wherein expansion segment 3 is positioned at the inducer below; Be provided with upper, middle and lower cylindrical shell 4,5,6 in expansion segment 3 lower ends; Contraction section 7 is positioned at lower shell 6 lower ends; Between inducer and the expansion segment 3, between expansion segment 3 and the upper shell 4, adopt between each cylindrical shell and between lower shell 6 and the contraction section 7 and be fastened and connected, have a cylindrical shell of one's own; Be provided with osculum 8 in contraction section 7 lower ends, be provided with exhanst gas outlet pipeline 9 in middle cylinder body 5 sides.
In the saturated spray Tata of the utility model, 4 layers of spray nozzle are set at least, be that example describes so that 4 layers of spray nozzle to be set in the present embodiment: the single-phase spray nozzle 10 of ground floor promptly is set on expansion segment 3, second layer two-phase spray nozzle 11 is set on upper shell 4, the 3rd layer of single-phase spray nozzle 12 is set on middle cylinder body 5, the 4th layer of single-phase spray nozzle 13 is set on lower shell 6, except that the single-phase spray nozzle 10 of ground floor, the spray nozzle of other each layer adopts the ring pipe way of supplying water.
The saturated spray column of converter gas purification of the present utility model is to substitute first order Venturi tube gas cleaning wash mill to be used in the converter gas purification system, when adopting this saturated spray column, its gas approach insulated water jacket 1 links to each other with the gasification cooling flue in the converter gas purification system is terminal, its osculum 8 links to each other with water seal discharge outlet in the converter gas purification system, and its exhanst gas outlet pipeline 9 links to each other with second level Venturi tube in the converter gas purification system.
When the converter gas purification system works, high-temperature flue gas from converter enters gasification cooling flue, after flue-gas temperature is reduced to about 900 ℃, enter the saturated spray column of the utility model as the first order equipment in the gas cleaning flow process, the high temperature dry flue gas is cooled to saturation temperature, and flue gas enters the bottom by top and discharges.Do wet interface for eliminating, the porch of tower is provided with overflow tank 2, can play antiseized ash, venting of dust explosion, the effect of flue gas expansion and displacement before the absorption tower.
The direct cooling down high-temperature gas of the saturated spray column of the utility model (about 900 ℃), target are to capture the coarse grain dust; 4 layers of nozzle are set, by nozzle feedwater and form the water smoke film, the cooling of the gas that reaches a high temperature and dedusting in the tower.The pressure loss of this dedusting is extremely low, and the plan pressure loss is at 50mmH
2Below the O.
Converter gas after the saturated spray column of the utility model is handled, second level Venturi tube general and in the converter gas purification system is connected, and further cools and smart dedusting in the hope of making.
Claims (2)
1. the saturated spray column of converter gas purification comprises gas approach section, expansion segment (3) and contraction section (7), and wherein inducer is made up of insulated water jacket (1) and overflow tank (2), it is characterized in that: described expansion segment (3) is positioned at the inducer below; Be provided with upper, middle and lower cylindrical shell (4,5,6) in expansion segment (3) lower end; Contraction section (7) is positioned at lower shell (6) lower end; Between inducer and the expansion segment (3), between expansion segment (3) and the upper shell (4), adopt between each cylindrical shell and between lower shell (6) and the contraction section (7) and be fastened and connected; Described contraction section (7) lower end is provided with osculum (8), is provided with exhanst gas outlet pipeline (9) in middle cylinder body (5) side; 4 layers of spray nozzle also are set in saturated spray Tata at least.
2. the saturated spray column of converter gas purification according to claim 1, it is characterized in that: described 4 layers of spray nozzle are provided with respectively: the single-phase spray nozzle of ground floor (10) promptly is set on expansion segment (3), second layer two-phase spray nozzle (11) is set on upper shell (4), the 3rd layer of single-phase spray nozzle (12) is set on middle cylinder body (5), the 4th layer of single-phase spray nozzle (13) is set on lower shell (6); The described second layer, the 3rd layer and the 4th layer of spray nozzle employing ring pipe way of supplying water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201879364U CN201529467U (en) | 2009-09-30 | 2009-09-30 | Converter smoke purifying saturation spray tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201879364U CN201529467U (en) | 2009-09-30 | 2009-09-30 | Converter smoke purifying saturation spray tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201529467U true CN201529467U (en) | 2010-07-21 |
Family
ID=42524878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201879364U Expired - Fee Related CN201529467U (en) | 2009-09-30 | 2009-09-30 | Converter smoke purifying saturation spray tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201529467U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104645748A (en) * | 2013-11-20 | 2015-05-27 | 铜陵市大成轧辊有限责任公司 | Leakage-proof water film deduster |
CN106669325A (en) * | 2017-03-03 | 2017-05-17 | 安徽欣创节能环保科技股份有限公司 | Efficient energy-saving water-saving spraying system for new one-time de-dusting OG system of converter |
-
2009
- 2009-09-30 CN CN2009201879364U patent/CN201529467U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104645748A (en) * | 2013-11-20 | 2015-05-27 | 铜陵市大成轧辊有限责任公司 | Leakage-proof water film deduster |
CN106669325A (en) * | 2017-03-03 | 2017-05-17 | 安徽欣创节能环保科技股份有限公司 | Efficient energy-saving water-saving spraying system for new one-time de-dusting OG system of converter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101993964B (en) | Metallurgical molten slag dry granulating and heat recovering system | |
CN104791823A (en) | Heat supplying device for smoke purification and waste heat recovery | |
CN204629542U (en) | Gas cleaning and waste heat recovery heating plant | |
CN101428196A (en) | In-hollow column intercrystalline ammonia process of desulfurization, recovery system and method thereof | |
CN102580437A (en) | Converter primary flue gas dual-tower purification method and converter primary flue gas purification tower | |
CN107042061A (en) | A kind of method and device that chimney white cigarette is eliminated applied to coal-burning power plant | |
CN208990512U (en) | A kind of flue gas of wet desulphurization disappears white system | |
CN105214331B (en) | A kind of high-efficiency condensation tube bank demister and application | |
CN102600693A (en) | Method for waste steam recycling system | |
CN201529467U (en) | Converter smoke purifying saturation spray tower | |
CN108800975A (en) | A kind of flue gas cooling heat exchanger of the desulfurization duct mouth with refrigerating plant | |
CN203100463U (en) | Waste heat recycling device for titanium dioxide calcining tail gas | |
CN104832934B (en) | A kind of boiler smoke dedusting waste heat recovering energy conserving device | |
CN207922266U (en) | Wet desulfurization flue gas is dehydrated reheating UTILIZATION OF VESIDUAL HEAT IN minimum discharge system | |
CN203384997U (en) | Recycling system for waste heat and condensates of desulfurization tail flue gas | |
CN112791579B (en) | System and process for utilizing waste heat of multistage flash evaporation of desulfurized slurry | |
CN210801228U (en) | Flue gas moisture recovery, flue gas purification and waste heat utilization combined system device | |
CN112426853A (en) | Efficient composite flue gas moisture recovery system and method | |
CN208269182U (en) | Lignite efficiency power generation equipment | |
CN208011750U (en) | Coal fired boiler of power plant smoke discharging residual heat and moisture reclaiming system | |
CN102287841B (en) | Method for smoke discharge, condensation and dust removal of supercharged oxygen-enriched coal-fired boiler | |
CN202532514U (en) | Energy-conservation and environment-friendly integrated device of industrial boiler | |
CN110864342A (en) | Water replenishing system and method for indirectly heating heat supply network by using low-temperature waste heat of flue gas | |
CN211650305U (en) | High-temperature tail gas purification and waste heat recovery system | |
CN209771770U (en) | Wet curtain solution dehydrator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100721 Termination date: 20140930 |
|
EXPY | Termination of patent right or utility model |