CN201525697U - Crane bridge - Google Patents

Crane bridge Download PDF

Info

Publication number
CN201525697U
CN201525697U CN2009201719149U CN200920171914U CN201525697U CN 201525697 U CN201525697 U CN 201525697U CN 2009201719149 U CN2009201719149 U CN 2009201719149U CN 200920171914 U CN200920171914 U CN 200920171914U CN 201525697 U CN201525697 U CN 201525697U
Authority
CN
China
Prior art keywords
chord member
section
cavity
crane
web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201719149U
Other languages
Chinese (zh)
Inventor
陈金根
叶勇强
程奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI SHUNDA ELECTRIC POWER EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
ANHUI SHUNDA ELECTRIC POWER EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI SHUNDA ELECTRIC POWER EQUIPMENT MANUFACTURING Co Ltd filed Critical ANHUI SHUNDA ELECTRIC POWER EQUIPMENT MANUFACTURING Co Ltd
Priority to CN2009201719149U priority Critical patent/CN201525697U/en
Application granted granted Critical
Publication of CN201525697U publication Critical patent/CN201525697U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model belongs to the technical field of crane machinery, and particularly relates to a bridge frame of a truss-type gantry crane. The crane bridge frame is formed by sequentially connecting a plurality of branch bridge frames; a cavity body is arranged at the end portion of a chord member forming each branch bridge frame; the opening position of the cavity body is positioned at the end surface position of the chord member; a rod post in insertion engagement with the cavity body is arranged at the end portion of another adjacent chord member matching with the chord member; and a positioning device for limiting the cavity body and the rod post from separating is arranged at the overlapped position of the cavity body and the rod post. According to the technical scheme, the crane bridge frame adopts the cavity body arranged at the end portion of the chord member of a branch bridge frame and the rod post in insertion engagement with the cavity body arranged at the end portion of another adjacent chord member matching with the chord member. The crane bridge frame can be directly inserted and engaged when in assembly through the insertion engagement of the rod post and the cavity body and by additionally arranging the positioning device for limiting the cavity body and the rod post from separating at the overlapped position of the cavity body and the rod post, and then fixed by the positioning device. When in disassembly, the positioning device can be directly loosened, thereby realizing easy separation of two branch bridge frames.

Description

Crane bridge
Technical field
The utility model belongs to the elevator machinery technical field, is specifically related to a kind of crane span structure of truss-like gauntry crane.
Background technology
At present, domestic truss-like gauntry crane crane span structure generally is made up of 5 joint crane span structures, one joint cantilever, every joint crane span structure is again to surround a cuboid by 4 truss (2 T shape top boom and 2 T shape lower booms and some web members), the internode connector of adjacent crane span structure generally adopts clamping plate high strength bolt fastening means to connect, owing to be that high strength bolt connects, so the planeness to the connecting portion of last lower boom is had relatively high expectations, and the fastening need of high strength bolt tighten to regulation moment in advance with special wrench, dismounting is inconvenience very, wastes time and energy.
Summary of the invention
The purpose of this utility model provides a kind of easy accessibility, crane bridge efficiently.
For achieving the above object, the utility model has adopted following technical scheme: crane bridge is connected in sequence by some minutes crane span structures, constitute and divide a chord member end of crane span structure to be provided with cavity, the opening part of cavity is positioned at the end of chord member, another adjacent chord member end of Pei Heing is provided with cavity and constitutes the roofbolt that sleeve cooperates with it, and cavity is provided with the overlapping part of roofbolt and limits the registration device that both separate.
As shown from the above technical solution, the utility model adopts in the end of a chord member of minute crane span structure and is provided with cavity, the end of another adjacent chord member of Pei Heing is provided with cavity and constitutes the roofbolt that sleeve cooperates with it, cooperate with the sleeve of cavity by roofbolt, add that the overlapping part at both is provided with the registration device that limits both separation, directly sleeve cooperates when mounted, fix with registration device then, when dismounting, directly unclamp registration device, can realize the light disengaging that two joints divide crane span structure.
Description of drawings
Fig. 1 is the front view of the utility model chord member;
Fig. 2 is the A-A cutaway view of Fig. 1;
Fig. 3 is the B-B cutaway view of Fig. 1;
Fig. 4 is the front view of another chord member of matching with Fig. 1 chord member;
Fig. 5 is the C-C cutaway view of Fig. 4;
Fig. 6 is the D-D cutaway view of Fig. 4;
Fig. 7 is the front view of the utility model another program chord member;
Fig. 8 is the E-E cutaway view of Fig. 7;
Fig. 9 is the F-F cutaway view of Fig. 7;
Figure 10 is the front view of another chord member of matching with Fig. 7;
Figure 11 is the G-G cutaway view of Figure 10;
Figure 12 is the H-H cutaway view of Figure 10;
Figure 13 is the structural representation of adapter shaft.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further:
As Fig. 1, Fig. 4, Fig. 7, shown in Figure 10, a kind of crane bridge, be connected in sequence by some minutes crane span structures, constitute and divide a chord member 10 ends of crane span structure to be provided with cavity 70, the opening part of cavity 70 is positioned at the end of chord member 10, another adjacent chord member 20 ends of Pei Heing are provided with cavity 70 and constitute the roofbolt 80 that sleeve cooperates with it, cavity 70 is provided with the overlapping part of roofbolt 80 and limits the registration device that both separate, shown in Figure 13 c, described registration device comprises adapter shaft 100, and adapter shaft 100 connects the connecting bore 12,81 on chord member 10 and the roofbolt 80 simultaneously.
Embodiment one:
As Fig. 1, Fig. 2, shown in Figure 3, chord member 10,20 is welded as a whole by the mode parallel connection that its web 33 is arranged in parallel by two identical I-beam sections 30 in cross section, the upper and lower wing plate 31,32 and the web 33 of two I-beam sections 30 surround cavity 70, the cross section of cavity 70 is an oblong, as Fig. 4, Fig. 5, shown in Figure 6, one section of roofbolt 80 is positioned at adjacent chord member 20 and captive joint, overhangs in the cavity 70 of chord member 20 exterior another section insertion chord members 10 ends.The recess that web 33 outsides of two I-beam sections 30 and upper and lower wing plate 31,32 form is provided with brace panel 50 along the bar length direction of chord member 10,20, and brace panel 50 is provided with U-shaped opening 51 at the place, the end of matching away from chord member 10,20.It is the effect of playing a reinforced rib for the overlapping part at cavity 70 and roofbolt 80 that brace panel 50 is set, and is provided with the U-shaped opening in addition on brace panel 50, is in order to increase the weld length of brace panel 50 and chord member 10, to make the more firm of both combinations.Be provided with the dividing plate 11 perpendicular to the bar length direction in the cavity 70 of chord member 10, dividing plate 11 to the distance of chord member 10 end faces matches in chord member 20 exterior roofbolt 80 length with overhanging.Because two I-beam sections 30 are arranged in parallel, spacing between the upper and lower wing plate 31,32 of the width of roofbolt 80 and I-beam section 30 matches, so the gap must be left in the junction at the upper and lower wing plate 31,32 of two I-beam sections 30, it is to play a sealing process that dividing plate 11 is set, and can stop the rainwater that fallen by the gap or dust etc.
Embodiment two:
As Fig. 7, Fig. 8, shown in Figure 9, chord member 10,20 is welded as a whole by the relative mode parallel connection of its opening by two identical channel-section steels 40 in cross section, the upper and lower wing plate 41,42 and the web 43 of two channel-section steels 40 surround cavity 70, the cross section of cavity 70 is an oblong, as Figure 10, Figure 11, shown in Figure 12, one section of roofbolt 80 is positioned at adjacent chord member 20 and captive joint, overhangs in the cavity 70 of chord member 20 exterior another section insertion chord members 10 ends.Web 43 inboards of two channel-section steels 40 are provided with brace panel 60 along the bar length direction of chord member 10,20, and web 43 is provided with waist shaped hole 431 at itself and brace panel 60 overlapping positions.Because brace panel 60 is provided in a side of the inboard of the web 43 of channel-section steel 40, so be chosen in and offer waist shaped hole 431 on the web 43, its effect also is in order to increase both weld lengths, owing to channel-section steel 40 is that opening is provided with relatively, the width of roofbolt 80 is less than the spacing between the upper and lower wing plate 41,42 of channel-section steel 40 in addition, so very close to each other between the upper and lower wing plate 41,42, just do not need to be provided with as dividing plate mentioned among the embodiment one 11 these parts yet.
As preferred version of the present utility model, the tonnage that will be provided with according to crane bridge, selection is welded as a whole by two identical I-beam sections 30 in cross section the top boom of chord member 10,20 by the mode parallel connection that its web 33 is arranged in parallel, it is the structure of embodiment one, the lower boom of chord member 10,20 is welded as a whole by the relative mode parallel connection of its opening by two identical channel-section steels 40 in cross section, i.e. the structure of embodiment two.The connecting bore 81 that is provided with on connecting bore 12 that is provided with on while adapter shaft 100 perforation chord members 10 and the brace panel 50 and the roofbolt 80, described adapter shaft 100 is a bearing pin, the number of bearing pin is two, adopts two bearing pins to guarantee to connect by failure-free, and it also is feasible being provided with one or more.As shown in figure 13,10, according to the described crane bridge of arbitrary claim among the claim 1-9, it is characterized in that: the head of adapter shaft 100 is provided with groove in its edge, and the block 90 that matches with groove is fixed on the web 43 of brace panel 50 or channel-section steel 40.Be to offer a groove at the head edge place of bearing pin 100 specifically, the bottom land part of groove leans with the edge of block 90, has limited the rotation of bearing pin 100.
In actual production, or the parameter difference that require different according to the tonnage of hoisting crane can be divided hoisting crane the top boom of chord member of crane span structure or the structure that embodiment one or embodiment two are arranged in the lower boom unification.
In sum, the utility model is no matter be the technology that adopts two I-beam sections, 30 welding in parallel of embodiment one, still adopt the technology of two channel-section steels, 40 welding in parallel of embodiment two, what all adopt is the sleeve cooperation of cavity 70 and roofbolt 80, adopt the connection locate mode of male and female pins shaft type to limit both separation then, this mode is all more simple than existing high strength bolt ways of connecting when assembling or dismounting, practicality, and also cost is low.

Claims (10)

1. crane bridge, be connected in sequence by some minutes crane span structures, it is characterized in that: constitute and divide a chord member (10) end of crane span structure to be provided with cavity (70), the opening part of cavity (70) is positioned at the end of chord member (10), adjacent another chord member (20) end of Pei Heing is provided with cavity (70) and constitutes the roofbolt (80) that sleeve cooperates with it, and cavity (70) is provided with the overlapping part of roofbolt (80) and limits the registration device that both separate.
2. crane bridge according to claim 1, it is characterized in that: described chord member (10), (20) are welded as a whole by the mode parallel connection that its web (33) is arranged in parallel by two identical I-beam sections (30) in cross section, the upper and lower wing plate (31) of two I-beam sections (30), (32) and web (33) surround cavity (70), the cross section of cavity (70) is an oblong, one section of roofbolt (80) is positioned at adjacent chord member (20) and captive joint, overhangs in the cavity (70) of chord member (20) exterior another section insertion chord member (10) end.
3. crane bridge according to claim 1, it is characterized in that: described chord member (10), (20) are welded as a whole by the relative mode parallel connection of its opening by two identical channel-section steels (40) in cross section, the upper and lower wing plate (41) of two channel-section steels (40), (42) and web (43) surround cavity (70), the cross section of cavity (70) is an oblong, one section of roofbolt (80) is positioned at adjacent chord member (20) and captive joint, overhangs in the cavity (70) of chord member (20) exterior another section insertion chord member (10) end.
4. crane bridge according to claim 1 is characterized in that: described registration device comprises adapter shaft (100), and adapter shaft (100) connects connecting bore (12), (81) on chord member (10) and the roofbolt (80) simultaneously.
5. crane bridge according to claim 2, it is characterized in that: the recess that web (33) outside of two I-beam sections (30) and upper and lower wing plate (31), (32) form is provided with brace panel (50) along the bar length direction of chord member (10), (20), and brace panel (50) is provided with U-shaped opening (51) at the place, the end of matching away from chord member (10), (20).
6. crane bridge according to claim 2, it is characterized in that: be provided with the dividing plate (11) perpendicular to the bar length direction in the cavity (70) of chord member (10), dividing plate (11) to the distance of chord member (10) end face matches in the exterior roofbolt of chord member (20) (80) length with overhanging.
7. crane bridge according to claim 3, it is characterized in that: the inboard bar length direction along chord member (10), (20) of the web (43) of two channel-section steels (40) is provided with brace panel (60), and web (43) is provided with waist shaped hole (431) at the overlapping position of itself and brace panel (60).
8. according to the described crane bridge of arbitrary claim among the claim 1-6, it is characterized in that: adapter shaft (100) connects chord member (10) simultaneously and brace panel (50) is gone up the connecting bore (12) of setting and the connecting bore (81) that roofbolt (80) upward is provided with.
9. described according to Claim 8 crane bridge, it is characterized in that: the top boom of chord member (10), (20) is welded as a whole by the mode parallel connection that its web (33) is arranged in parallel by two identical I-beam sections (30) in cross section, and the lower boom of chord member (10), (20) is welded as a whole by the relative mode parallel connection of its opening by two identical channel-section steels (40) in cross section.
10. crane bridge according to claim 8 is characterized in that: the head of adapter shaft (100) is provided with groove in its edge, and the block that matches with groove (90) is fixed on the web (43) of brace panel (50) or channel-section steel (40).
CN2009201719149U 2009-05-05 2009-05-05 Crane bridge Expired - Lifetime CN201525697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201719149U CN201525697U (en) 2009-05-05 2009-05-05 Crane bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201719149U CN201525697U (en) 2009-05-05 2009-05-05 Crane bridge

Publications (1)

Publication Number Publication Date
CN201525697U true CN201525697U (en) 2010-07-14

Family

ID=42516990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201719149U Expired - Lifetime CN201525697U (en) 2009-05-05 2009-05-05 Crane bridge

Country Status (1)

Country Link
CN (1) CN201525697U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103434929A (en) * 2013-08-08 2013-12-11 无锡市恒畅起重物流机械有限公司 Crane truss
CN106115478A (en) * 2016-08-29 2016-11-16 宁夏巨能机器人股份有限公司 A kind of gantry truss pallet arrangement of improvement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103434929A (en) * 2013-08-08 2013-12-11 无锡市恒畅起重物流机械有限公司 Crane truss
CN106115478A (en) * 2016-08-29 2016-11-16 宁夏巨能机器人股份有限公司 A kind of gantry truss pallet arrangement of improvement
CN106115478B (en) * 2016-08-29 2018-11-09 宁夏巨能机器人股份有限公司 A kind of improved gantry truss pallet arrangement

Similar Documents

Publication Publication Date Title
CN103132458B (en) Overall installation method of double-body separable combined beam
CN202248298U (en) Section steel concrete frame node
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN210194900U (en) I-shaped steel beam quick connection structure
CN108104267A (en) H profile steel column and I-beam flat push type dovetail assembling frame Joint design method
CN103015596A (en) Detachable steel structure platform and construction method thereof
CN201525697U (en) Crane bridge
CN110158808A (en) A kind of assembled steel tube bank vertical node type of attachment of concrete
CN203255896U (en) Sectional type crane jib
CN208039011U (en) A kind of steel structure bridge node connecting structure
CN202227275U (en) Pier template for constructing faced concrete pier
CN205099207U (en) End beam of bridge crane
CN203188120U (en) Main girder structure of truss type bridge girder erection machine and trussed type bridge girder erection machine
CN102966032A (en) Structural member of aluminum alloy passenger foot-bridge
CN219060611U (en) Connecting structure of bored pile steel bars
CN202945540U (en) Aluminum alloy structural member for pedestrian overcrossing
CN205527355U (en) Rectangle honeycomb formula main longitudinal grider
CN204738401U (en) Assemble integral steel construction secondary beam and absolutely dry formula connection structure of concrete girder lateral part rigid connection
CN202248299U (en) H-shaped steel frame joint
CN210086738U (en) Modular raised floor assembly supporting beam
CN220888281U (en) A universal truss unit
CN200943261Y (en) Ultra-large movable building structure
CN215519146U (en) Assembled outer wall connected node
CN215331455U (en) Frame body structure for large-span high formwork
CN112661028A (en) Tower crane standard festival and connecting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100714