CN201509015U - Special tools for disassembling and assembling high-voltage lead wires for main transformer overhaul - Google Patents

Special tools for disassembling and assembling high-voltage lead wires for main transformer overhaul Download PDF

Info

Publication number
CN201509015U
CN201509015U CN2009202363841U CN200920236384U CN201509015U CN 201509015 U CN201509015 U CN 201509015U CN 2009202363841 U CN2009202363841 U CN 2009202363841U CN 200920236384 U CN200920236384 U CN 200920236384U CN 201509015 U CN201509015 U CN 201509015U
Authority
CN
China
Prior art keywords
rope
main transformer
screw
disassembling
fixed pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202363841U
Other languages
Chinese (zh)
Inventor
金鑫
罗坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIANSHUI POWER SUPPLY CO Ltd OF JIANGSU ELECTRIC POWER Co
State Grid Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
LIANSHUI POWER SUPPLY CO Ltd OF JIANGSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANSHUI POWER SUPPLY CO Ltd OF JIANGSU ELECTRIC POWER Co filed Critical LIANSHUI POWER SUPPLY CO Ltd OF JIANGSU ELECTRIC POWER Co
Priority to CN2009202363841U priority Critical patent/CN201509015U/en
Application granted granted Critical
Publication of CN201509015U publication Critical patent/CN201509015U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种主变大修高压引线拆装专用工具,该拆装专用工具包括罩体(1)、定滑轮(2)、绳索(3)和螺丝(4),在罩体(1)的底面的中心安装定滑轮(2),绳索(3)穿过定滑轮(2),绳索(3)的一端连接螺丝(4)。使用时,罩体(1)反扣在主变的套管上面,将螺丝(4)接入接线柱(5)的内丝牙,同时将绳索(3)的另一端牵住,就可以放心地扭下接线柱(5)上的固定螺母(6);当拆掉套管后,可以慢慢地放下绳子,在登高座(8)上口拧下接线柱(5)上的螺丝(4),从而可以取到高压引线(7)。本实用新型结构简单,成本低廉,操作方便,省时省力,避免设备损坏现象。

The utility model discloses a special tool for disassembling and assembling high-voltage lead wires for main transformer overhaul. The special tool for disassembling and assembling includes a cover body (1), a fixed pulley (2), a rope (3) and a screw (4). ) fixed pulley (2) is installed in the center of the bottom surface, rope (3) passes fixed pulley (2), and one end of rope (3) connects screw (4). When in use, the cover body (1) is turned upside down on the casing of the main transformer, the screw (4) is inserted into the inner thread of the terminal (5), and the other end of the rope (3) is held at the same time, you can rest assured Unscrew the fixing nut (6) on the terminal post (5) slowly; after the casing is removed, you can slowly put down the rope, and unscrew the screw (4) on the terminal post (5) at the top of the climbing seat (8). ), so that the high voltage lead (7) can be obtained. The utility model has the advantages of simple structure, low cost, convenient operation, time saving and labor saving, and avoids equipment damage.

Description

Main transformer overhaul high-voltage connection tool specially for attaching and detaching
Technical field
The utility model relates to the electric power system service kit, is specifically related to a kind of main transformer overhaul high-voltage connection tool specially for attaching and detaching.
Background technology
As everyone knows, the high-voltage connection on the main transformer is to link to each other by the binding post above the sleeve pipe, and binding post is the inside and outside screw that a tooth is all arranged, binding post fixedly be securing with a big nut.Therefore, carry out in the main transformer disassemble and assemble work at the scene, when we will remove high-voltage connection, at first be hold-down nut will be screwed down, when nut was screwed onto, binding post and high-voltage connection caused equipment may occur damaging because the effect of gravity can be fallen into the transformer body interior, perhaps be not easy again high-voltage connection to be taken out, and in the process of dress, inconvenient phenomenon can occur installing.
Summary of the invention
The purpose of this utility model is: a kind of main transformer overhaul high-voltage connection tool specially for attaching and detaching is provided, adopts the dismounting of the auxiliary high-voltage connection of this instrument, and time saving and energy saving, simple and convenient, be unlikely to damage equipment again.
Technical solution of the present utility model is: this tool specially for attaching and detaching comprises cover body, fixed pulley, rope and screw, at the center of the bottom surface of cover body fixed pulley is installed, and rope passes fixed pulley, an end connecting screw of rope.
During use, the cover body left-hand thread inserts the internal thread tooth of binding post with screw on the sleeve pipe of main transformer, and the other end with rope holds simultaneously, just can turn round down the hold-down nut on the binding post relievedly; Behind the sleeve pipe of dismantling, can put down rope at leisure, at the seat screw of backing out on the binding post suitable for reading of ascending a height, thereby can get high-voltage connection.
The utility model is simple in structure, and is with low cost, easy to operate, time saving and energy saving, avoids the device damage phenomenon.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Among the figure: 1, cover body, 2, fixed pulley, 3, rope, 4, screw, 5, binding post, 6, hold-down nut, 7, high-voltage connection, 8, the seat of ascending a height.
Embodiment
As shown in Figure 1, this tool specially for attaching and detaching comprises cover body 1, fixed pulley 2, rope 3 and screw 4, at the center of the bottom surface of cover body 1 fixed pulley 2 is installed, and rope 3 passes fixed pulley 2, an end connecting screw 4 of rope 3.
During use, cover body 1 left-hand thread is on the sleeve pipe of main transformer, and with the internal thread tooth of screw 4 access binding posts 5, the other end with rope 3 holds simultaneously, just can turn round down the hold-down nut 6 on the binding post 5 relievedly; Behind the sleeve pipe of dismantling, can put down rope at leisure, at seat 8 screws of backing out on the binding post 54 suitable for reading of ascending a height, thereby can get high-voltage connection 7.

Claims (1)

1.主变大修高压引线拆装专用工具,其特征在于:该拆装专用工具包括罩体(1)、定滑轮(2)、绳索(3)和螺丝(4),在罩体(1)的底面的中心安装定滑轮(2),绳索(3)穿过定滑轮(2),绳索(3)的一端连接螺丝(4)。1. The special tool for disassembling and assembling high-voltage lead wires for main transformer overhaul, characterized in that the special tool for disassembling and assembling includes a cover body (1), a fixed pulley (2), a rope (3) and screws (4), and the cover body (1) Fixed pulley (2) is installed in the center of the bottom surface, and rope (3) passes fixed pulley (2), and one end of rope (3) connects screw (4).
CN2009202363841U 2009-09-28 2009-09-28 Special tools for disassembling and assembling high-voltage lead wires for main transformer overhaul Expired - Fee Related CN201509015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202363841U CN201509015U (en) 2009-09-28 2009-09-28 Special tools for disassembling and assembling high-voltage lead wires for main transformer overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202363841U CN201509015U (en) 2009-09-28 2009-09-28 Special tools for disassembling and assembling high-voltage lead wires for main transformer overhaul

Publications (1)

Publication Number Publication Date
CN201509015U true CN201509015U (en) 2010-06-16

Family

ID=42470137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202363841U Expired - Fee Related CN201509015U (en) 2009-09-28 2009-09-28 Special tools for disassembling and assembling high-voltage lead wires for main transformer overhaul

Country Status (1)

Country Link
CN (1) CN201509015U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103247953A (en) * 2013-05-22 2013-08-14 国家电网公司 Special tool for sleeve lead-out line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103247953A (en) * 2013-05-22 2013-08-14 国家电网公司 Special tool for sleeve lead-out line
CN103247953B (en) * 2013-05-22 2016-06-15 国家电网公司 Special tool for sleeve lead-out line

Similar Documents

Publication Publication Date Title
CN201509015U (en) Special tools for disassembling and assembling high-voltage lead wires for main transformer overhaul
CN204271509U (en) A disassembly tool for transformer lead wire
CN203650406U (en) Disassembling tool for ring main unit plugging and unplugging head
CN203099733U (en) Detachable lamp power supply for home illuminating lamp
CN201093195Y (en) Electric torch
CN202474932U (en) 5V-output USB (universal serial bus) charge device for motorcycle
CN202070243U (en) Filter casing
CN210879471U (en) Guide vane servomotor fixing pin dismounting device
CN203617099U (en) Novel guide rod type sleeving pressure equalizing ball mounting structure
CN202129245U (en) Cleaning tool applied to storage battery output terminal
CN202985428U (en) Auxiliary structure for installing turbine
CN205043720U (en) Strong and weak electroplax assembly fixture of stake charges
CN218770595U (en) Secondary cable is fixer
CN202544252U (en) Pull-down skylight based on ceiling inspection hole
CN205573913U (en) New energy batteries assembly quality
CN219735427U (en) Solid heat accumulation heating equipment based on wind power generation
CN202412164U (en) Special dismantling device for protective covers of screws for battery-connecting plates
CN201413952Y (en) Tapered AMP Clamp Removal Tool
CN200997339Y (en) Improved wall switch
CN201532862U (en) Aluminum casing with external screw at bottom for aluminum electrolytic capacitor
CN202736604U (en) Voltage transformer matched with GIS and disc type insulator structure of voltage transformer
CN201774028U (en) Plug
CN202412147U (en) Solar rechargeable electric wrench
CN202262145U (en) Power supply filter easy and convenient to install
CN109861464A (en) A kind of integrated motor system of integrated manipulator and charger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY STATE GRID CORPORAT

Effective date: 20121203

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121203

Address after: 223400 Lianshui County, Huaian County, Jiangsu province Lianshui county power supply company

Patentee after: Lianshui Power Supply Co., Ltd. of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 223400 Lianshui County, Huaian County, Jiangsu province Lianshui county power supply company

Patentee before: Lianshui Power Supply Co., Ltd. of Jiangsu Electric Power Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100616

Termination date: 20170928

CF01 Termination of patent right due to non-payment of annual fee