CN201505597U - High-pressure suction roll type paint spraying treatment equipment - Google Patents

High-pressure suction roll type paint spraying treatment equipment Download PDF

Info

Publication number
CN201505597U
CN201505597U CN2009200621105U CN200920062110U CN201505597U CN 201505597 U CN201505597 U CN 201505597U CN 2009200621105 U CN2009200621105 U CN 2009200621105U CN 200920062110 U CN200920062110 U CN 200920062110U CN 201505597 U CN201505597 U CN 201505597U
Authority
CN
China
Prior art keywords
water
paint
control system
communicated
spray booth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200621105U
Other languages
Chinese (zh)
Inventor
郑锡辉
罗宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Fung Yu E & M Co ltd
Original Assignee
Dongguan Fung Yu E & M Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Fung Yu E & M Co ltd filed Critical Dongguan Fung Yu E & M Co ltd
Priority to CN2009200621105U priority Critical patent/CN201505597U/en
Application granted granted Critical
Publication of CN201505597U publication Critical patent/CN201505597U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model discloses a high-pressure suction roll type paint spraying treatment equipment, which comprises a filter chamber, a paint spraying chamber, a control system and a paint slag treatment chamber, wherein an air supply groove with a blower is arranged in the filter chamber, the blower is electrically connected with the control system, a support and a robot which is electrically connected with the control system are arranged in the paint spraying chamber, the paint slag treatment chamber comprises a bottom water tank and an air suction groove with an exhaust fan, the blower is electrically connected with the control system, and the bottom water tank is communicated with the paint spraying chamber and the paint slag treatment chamber; the paint slag treatment chamber further comprises a vortex device, a water pump, a rear water tank, a top end basin and a steam-water separator, the vortex device is installed in the bottom end water tank and communicated with the rear water tank, the water pump electrically connected with the control system is installed outside the paint slag treatment chamber and enables the bottom end water tank to be communicated with the vortex device, and the steam-water separator is installed in the top end water tank and communicated with the air draft groove. The utility model discloses a hydrologic cycle absorbs the formation lacquer sediment of lacquer fog and concentrated processing can not cause the pollution to the environment, is favorable to the environmental protection to practice thrift the energy simultaneously.

Description

高压吸卷式喷漆处理设备 High-pressure suction-coil spray paint treatment equipment

技术领域technical field

本实用新型涉及一种喷漆设备,更具体地涉及一种对油漆漆渣进行收集处理的高压吸卷式喷漆处理设备。The utility model relates to a paint spraying device, in particular to a high-pressure suction-coil type paint spraying processing device for collecting and processing paint slag.

背景技术Background technique

我国南方及沿海城市作为我国经济发达地区的前沿城市,有相当数量的产业,如家具、机械装备及汽车制造等产业,在生产过程中不同程度地要使用到油漆,其中大部分为溶剂型油漆。溶剂型油漆由于其工艺成熟、成本相对较低、性能好等特点,在相关行业内被广泛应用。As the frontier cities in my country's economically developed regions, southern and coastal cities in my country have a considerable number of industries, such as furniture, machinery and equipment, and automobile manufacturing. Paint is used to varying degrees in the production process, most of which are solvent-based paints. . Solvent-based paints are widely used in related industries due to their mature technology, relatively low cost, and good performance.

但在喷漆过程中产生的漆雾中含有大量的有机溶剂即有机高分子,而高分子的碳具有粘性,不能随便直接燃烧,以免污染大气环境,也不能任意倾倒,因为这样一则会污染土地,二则容易引起火灾。因此对于在喷漆过程中产生的各种有机溶剂的处理越发受到人们的高度重视。However, the paint mist generated during the painting process contains a large amount of organic solvents, that is, organic polymers, and the carbon of the polymers is sticky and cannot be burned directly to avoid polluting the atmosphere, and it cannot be dumped arbitrarily, because it will pollute the land. , the second is likely to cause a fire. Therefore, people pay more and more attention to the treatment of various organic solvents generated during the painting process.

在传统的生产过程中,将这些漆雾收集起来,使其统一流过装有化学药剂的水槽中,则漆雾中的有机溶剂在化学药剂的作用下凝结成块或沉淀为粉状的颗粒而形成漆渣,然后再集中收集形成的漆渣进行后续处理。但是在这种处理过程中,由于对化学剂的添加位置或添加的剂量均没有明确的规定,导致不少企业在处理过程中随意添加化学药剂,造成人员及药品的浪费,重要的是若不能及时地从药水中分离出漆渣,则可能降低循环药水捕集漆雾的效率,不仅缩短了循环药水的使用周期,而且增加了污染物排放量。另外在进行批量生产时企业引进这些化学药剂需要花费大量的资金,这样不仅不利于降低生产成本也不利于节约能源。In the traditional production process, the paint mist is collected and made to flow uniformly through a tank filled with chemicals, and the organic solvents in the paint mist are agglomerated or precipitated into powdery particles under the action of the chemicals. And form paint slag, then concentrate and collect the formed paint slag for subsequent treatment. However, in this process, because there are no clear regulations on the location or dosage of chemical agents, many companies add chemicals at will during the process, resulting in a waste of personnel and medicines. Timely separation of paint slag from the potion may reduce the efficiency of the circulating potion to capture paint mist, which not only shortens the life cycle of the circulating potion, but also increases the discharge of pollutants. In addition, enterprises need to spend a lot of money to introduce these chemicals when carrying out mass production, which is not conducive to reducing production costs and saving energy.

因此,急需一种既不需要通过化学药剂处理,又能有效地集中收集处理漆渣使生产过程中产生的漆雾不会污染环境,同时还能降低生产成本的高压吸卷式喷漆处理设备来克服上述缺陷。Therefore, there is an urgent need for a high-pressure suction-type spray paint treatment equipment that does not require chemical treatment, and can effectively collect and treat paint slag so that the paint mist generated during the production process will not pollute the environment, and can also reduce production costs. Overcome the above defects.

实用新型内容Utility model content

本实用新型的目的是提供一种高压吸卷式喷漆处理设备,所述高压吸卷式喷漆处理设备通过水循环吸收喷漆过程中产生的漆雾而形成漆渣,并收集漆渣进行集中处理,不会对环境造成污染,有利于环保。在上述处理过程中不需要通过化学药品来处理漆雾而消耗大量的药品,而且所述喷漆设备结构简单价格低廉易于实现,从而为企业节省了大量的资源并且降低了产品的生产成本。The purpose of this utility model is to provide a high-pressure suction-coil type spray paint treatment equipment, which absorbs the paint mist generated in the process of spraying paint through water circulation to form paint slag, and collects the paint slag for centralized treatment, without It will pollute the environment and is beneficial to environmental protection. In the above treatment process, there is no need to consume a large amount of chemicals to treat the paint mist with chemicals, and the painting equipment is simple in structure, cheap and easy to implement, thereby saving a lot of resources for enterprises and reducing the production cost of products.

为实现上述目的,本实用新型提供一种高压吸卷式喷漆处理设备,包括:过滤室、喷漆室、漆渣处理室及控制系统,所述过滤室的一端设置具有吹风机的供风槽,所述吹风机与所述控制系统电连接,外界鲜风经所述吹风机从所述供风槽进入所述过滤室并在所述过滤室内过滤后进入所述喷漆室,所述喷漆室内设置有支架及与所述控制系统电连接的机器人,待喷漆的工件放置于所述支架上,所述支架可连同所述工件一起在所述喷漆室内移动,所述机器人自动对所述工件进行喷漆,所述漆渣处理室包括底端水槽和具有抽风机的抽风槽,所述抽风机与所述控制系统电连接,所述底端水槽的一端与所述喷漆室连通,所述底端水槽的另一端与所述漆渣处理室的下端连通,所述漆渣处理室的上端与所述抽风槽连通,漆雾中的气体经所述漆渣处理室处理后从所述抽风槽排出。其中,所述漆渣处理室还包括旋涡装置、水泵、后水箱、顶端水盆及汽水分离器,所述旋涡装置固定安装在所述底端水槽内,且所述旋涡装置包括第一旋涡漏斗和第二旋涡漏斗,所述第二旋涡漏斗开设有与所述第一旋涡漏斗的出水口相对应的开口,所述第二旋涡漏斗的出水口与所述后水箱连通,所述后水箱里设置有一刮渣机且所述刮渣机与所述控制系统电连接,所述水泵固定安装于所述喷漆室外,所述水泵与所述控制系统电连接,所述水泵的出水口连接两水管,且所述两水管分别与所述第一旋涡漏斗和所述第二旋涡漏斗连通,所述水泵的入水口与所述底端水槽连通,所述顶端水盆内的水向外溢出形成主水幕,所述底端水槽位于所述主水幕的正下方,所述汽水分离器固定安装在所述顶端水盆内并且一端与所述抽风槽连通。In order to achieve the above purpose, the utility model provides a high-pressure suction-coil type spray paint treatment equipment, including: a filter room, a paint spray room, a paint residue treatment room and a control system. One end of the filter room is provided with an air supply slot with a blower. The blower is electrically connected with the control system, and the outside fresh air enters the filter chamber from the air supply slot through the blower and enters the spray booth after being filtered in the filter chamber. The paint spray booth is provided with brackets and A robot electrically connected to the control system, the workpiece to be painted is placed on the support, and the support can move together with the workpiece in the spray booth, and the robot automatically sprays the workpiece. The paint slag treatment room includes a bottom water tank and an air suction tank with an exhaust fan, the exhaust fan is electrically connected to the control system, one end of the bottom water tank communicates with the spray booth, and the other end of the bottom water tank It communicates with the lower end of the paint slag treatment chamber, and the upper end of the paint slag treatment chamber communicates with the ventilation groove, and the gas in the paint mist is discharged from the ventilation groove after being treated by the paint residue treatment chamber. Wherein, the paint slag treatment chamber also includes a vortex device, a water pump, a rear water tank, a top water basin and a steam-water separator, the vortex device is fixedly installed in the bottom water tank, and the vortex device includes a first vortex funnel and the second vortex funnel, the second vortex funnel is provided with an opening corresponding to the water outlet of the first vortex funnel, the water outlet of the second vortex funnel communicates with the rear water tank, and in the rear water tank A slag scraper is provided and the slag scraper is electrically connected to the control system, the water pump is fixedly installed outside the paint spraying room, the water pump is electrically connected to the control system, and the water outlet of the water pump is connected to two water pipes , and the two water pipes are respectively connected with the first vortex funnel and the second vortex funnel, the water inlet of the water pump is connected with the bottom water tank, and the water in the top water basin overflows outwards to form a main As for the water curtain, the water tank at the bottom is located directly below the main water curtain, the steam-water separator is fixedly installed in the water basin at the top, and one end communicates with the draft groove.

较佳地,所述第一旋涡漏斗设置有面对所述第二旋涡漏斗的开口的弧形挡板。所述弧形挡板对滴落于其上的水和漆渣产生反弹力从而将漆渣连同水一起推送至所述第二旋涡漏斗周围。Preferably, the first vortex funnel is provided with an arc-shaped baffle facing the opening of the second vortex funnel. The arc-shaped baffle generates a rebound force on the water and paint slag dropped thereon so as to push the paint slag together with the water to the periphery of the second vortex funnel.

较佳地,所述漆渣处理室还包括多个风道隔板,相邻风道隔板之间形成汽水通道,所述汽水通道的上端与所述顶端水盆连通,下端与所述底端水槽连通。喷漆过程产生的漆雾与水在所述风道隔板之间的汽水通道内充分混合,以保证水对所述漆雾进行充分吸收。Preferably, the paint slag treatment chamber further includes a plurality of air duct partitions, and steam water channels are formed between adjacent air duct partition boards, the upper ends of the steam water channels communicate with the top basin, and the lower ends communicate with the bottom basin. End sink connection. The paint mist generated during the painting process is fully mixed with water in the steam-water channel between the air duct partitions, so as to ensure that the water fully absorbs the paint mist.

较佳地,所述漆渣处理室还包括与所述顶端水盆连通的侧水盆,所述侧水盆位于所述顶端水盆两侧,所述侧水盆内的水向外溢出形成侧水幕,所述侧水幕位于所述底端水槽正上方。Preferably, the paint slag treatment chamber further includes side water basins connected to the top water basin, the side water basins are located on both sides of the top water basin, and the water in the side water basins overflows outwards to form A side water curtain, the side water curtain is located directly above the water tank at the bottom.

较佳地,所述底端水槽的顶端设有一开口,所述开口设于所述第一旋涡漏斗的正上方且所述开口的一端与所述主水幕的一端连接。在喷漆过程中产生的漆雾经所述开口进入所述底端水槽并与所述底端水槽中的水初步混合,而且经所述分离器分离后的大部分液体在所述顶端水盆内向外溢形成主水幕流下通过所述开口流入所述第一旋涡漏斗内。Preferably, an opening is provided at the top of the bottom water tank, the opening is provided directly above the first vortex funnel, and one end of the opening is connected to one end of the main water curtain. The paint mist generated during the painting process enters the bottom water tank through the opening and is initially mixed with the water in the bottom water tank, and most of the liquid separated by the separator flows outward in the top water basin The overflow forms a main water curtain to flow down through the opening and into the first vortex funnel.

较佳地,所述抽风机为高压抽风机。在喷漆过程中产生的漆雾经底端水槽中的水初步吸收形成漆渣后,剩余部分连同水一起被所述高压抽风机抽送至所述顶端水盆,并且在抽送过程中使所述漆雾与水进一步混合并吸收。Preferably, the exhaust fan is a high-pressure exhaust fan. After the paint mist generated during the painting process is initially absorbed by the water in the water tank at the bottom to form paint slag, the remaining part together with the water is pumped to the top water basin by the high-pressure exhaust fan, and the paint mist is pumped during the pumping process. The mist is further mixed with water and absorbed.

较佳地,所述汽水分离器由第一分离部分和第二分离部分组成,所述第一分离部分与所述第二分离部分相互垂直连接,所述第一分离部分位于所述主水幕与所述顶端水盆之间,所述第二分离部分与所述抽风槽连通。所述汽水分离器的第一分离部分对所述混合后的漆雾与水进行第一次分离,经第一次分离后达到排放标准的气体中可能还粘附有少量的水分,因此所述第二分离部分对其进行再次分离,确保汽水分离操作充分彻底。Preferably, the steam-water separator is composed of a first separation part and a second separation part, the first separation part and the second separation part are vertically connected to each other, and the first separation part is located at the main water curtain Between the water basin at the top, the second separation part communicates with the draft groove. The first separation part of the steam-water separator separates the mixed paint mist and water for the first time, and a small amount of moisture may still adhere to the gas that meets the emission standard after the first separation, so the The second separation part separates it again to ensure that the steam-water separation operation is fully and thoroughly.

较佳地,所述过滤室与所述喷漆室之间设有过滤网,所述过滤网过滤进入所述喷漆室的外界鲜风。Preferably, a filter screen is provided between the filter chamber and the paint spray booth, and the filter screen filters the external fresh air entering the paint spray booth.

较佳地,所述喷漆室还包括自动门,所述自动门与所述控制系统电连接,所述控制系的控制所述自动门自动开启以供所述工件出入所述喷漆室。Preferably, the spray booth further includes an automatic door, the automatic door is electrically connected to the control system, and the control system controls the automatic door to automatically open for the workpiece to enter and exit the spray booth.

较佳地,所述高压吸卷式喷漆处理设备还包括与所述控制系统电连接的照明装置,所述照明装置安装于所述喷漆室的顶端。所述照明装置可方便工作人员对喷漆过程进行有效的监视。Preferably, the high-pressure suction-type paint spraying treatment equipment further includes an illuminating device electrically connected to the control system, and the illuminating device is installed on the top of the spray booth. The lighting device can facilitate staff to effectively monitor the painting process.

本实用新型高压吸卷式喷漆处理设备的涡旋装置的第二旋涡漏斗使所述底端水槽内的水产生大量的旋涡,从而使进入所述底端水槽内的漆雾与水初步混合并被水吸收而形成漆渣;经初步混合吸收后的漆雾、水及漆渣在所述高压抽风机的作用下被一起抽送到所述顶端水盆,在抽送过程中再次进行混合吸收;所述汽水分离器对经多次混合吸收后的漆雾进行双重过滤,过滤后达到排放标准的少量气体从所述抽风槽内排出,其它被水吸收而形成的漆渣通过第一旋涡漏斗和第二旋涡漏斗的推送与吸取并被所述刮渣机集中收集于所述后水箱内进行集中处理。因此,与现有技术相比,本实用新型对漆雾的处理完全通过水的循环吸收来处理,而不需要通过化学药品来处理而消耗大量的药品,排放的少量气体也完全符合环保排放的标准,不会污染大气,而且上述高压吸卷式喷漆处理设备结构简单价格低廉易于实现,因此节省了大量的能源并且降低了产品的生产成本,同时也有利于环保。The second vortex funnel of the vortex device of the high-pressure suction type paint spraying processing equipment of the utility model makes the water in the bottom water tank generate a large number of vortexes, so that the paint mist entering the bottom water tank is initially mixed with the water Absorbed by water to form paint slag; the paint mist, water and paint slag after preliminary mixing and absorption are pumped together to the top water basin under the action of the high-pressure exhaust fan, and are mixed and absorbed again during the pumping process; The steam-water separator double-filters the paint mist that has been mixed and absorbed for many times. After filtering, a small amount of gas that meets the discharge standard is discharged from the exhaust tank, and other paint residues formed by being absorbed by water pass through the first vortex funnel and the second The push and suction of the two vortex funnels are collectively collected by the slag scraper in the rear water tank for centralized treatment. Therefore, compared with the prior art, the treatment of the paint mist in the utility model is completely processed through the circulation and absorption of water, without the need to consume a large amount of chemicals for treatment by chemicals, and the small amount of gas discharged is also fully in line with the requirements of environmental protection. Standard, will not pollute the atmosphere, and the above-mentioned high-pressure suction-coil paint spraying treatment equipment is simple in structure, low in price and easy to implement, so it saves a lot of energy and reduces the production cost of products, and is also conducive to environmental protection.

通过以下的描述并结合附图,本实用新型将变得更加清晰,这些附图用于解释本实用新型的实施例。The utility model will become clearer through the following description in conjunction with the accompanying drawings, which are used to explain the embodiments of the utility model.

附图说明Description of drawings

图1为本实用新型高压吸卷式喷漆处理设备的结构示意图。Fig. 1 is a structural schematic diagram of a high-pressure suction-coil type paint spraying treatment equipment of the present invention.

图2为本实用新型高压吸卷式喷漆处理设备的另一角度的结构示意图。Fig. 2 is a structural schematic diagram of another angle of the high-pressure suction-coil type paint spraying treatment equipment of the present invention.

图3为本实用新型高压吸卷式喷漆处理设备的又一角度的结构示意图。Fig. 3 is a structural schematic diagram of another angle of the high-pressure suction-coil type paint spraying treatment equipment of the present invention.

具体实施方式Detailed ways

现在参考附图描述本实用新型的实施例,附图中类似的元件标号代表类似的元件。如上所述,本实用新型提供了一种高压吸卷式喷漆处理设备,所述高压吸卷式喷漆处理设备通过水循环吸收喷漆过程中产生的漆雾形成漆渣并收集漆渣进行集中处理,不会对环境造成污染,有利于环保。Embodiments of the present invention will now be described with reference to the drawings, in which like reference numerals represent like elements. As mentioned above, the utility model provides a high-pressure suction-coil type paint spraying treatment equipment. The high-pressure suction-coil type paint spraying treatment equipment absorbs the paint mist generated during the painting process through water circulation to form paint slag and collects the paint slag for centralized treatment. It will pollute the environment and is beneficial to environmental protection.

参考图1-3,本实用新型高压吸卷式喷漆处理设备,包括:过滤室100、喷漆室200、漆渣处理室300、照明装置400及控制系统。所述过滤室100与所述喷漆室200连通,所述喷漆室200与所述漆渣处理室300连通,所述照明装置400固定安装在所述喷漆室200的顶端并且与所述控制系统电连接,所述控制系统控制所述照明装置400的开启与关闭,所述照明装置400保证所述喷漆室200内的喷漆过程清晰可见可,方便工作人员在喷漆过程中对喷漆质量进行有效的监视,在发生异常情况时可及时进行调整。Referring to Figures 1-3, the high-pressure suction-coil spray paint treatment equipment of the present invention includes: a filter room 100, a paint spray room 200, a paint residue treatment room 300, a lighting device 400 and a control system. The filter chamber 100 communicates with the paint spray booth 200, the paint spray booth 200 communicates with the paint residue treatment chamber 300, and the lighting device 400 is fixedly installed on the top of the paint spray booth 200 and is electrically connected to the control system. connected, the control system controls the opening and closing of the lighting device 400, and the lighting device 400 ensures that the painting process in the painting booth 200 is clearly visible, so that the staff can effectively monitor the painting quality during the painting process , and can be adjusted in time when an abnormal situation occurs.

所述过滤室100的一端设置具有吹风机(图未示)的供风槽110,所述控制系统与所述吹风机电连接并控制所述吹风机的开启与关闭。外界鲜风在所述吹风机的吹动下,从所述吹风槽110进入所述过滤室100,所述吹风机吹动外界鲜风流动,一方面可加速干燥喷涂在工件表面的油漆,另一方面还将吹导喷涂过程中产生的漆雾进入到所述漆渣处理室300内。在所述过滤室100与所述喷漆室200之间设置有过滤网120,所述过滤网120能有效过滤进入所述喷漆室200内的鲜风中的灰尘杂质等,防止灰尘杂质等进入所述喷漆室200内而影响喷漆效果,从而保证喷漆的质量。One end of the filter chamber 100 is provided with an air supply slot 110 with a blower (not shown), and the control system is electrically connected with the blower and controls the opening and closing of the blower. The outside fresh wind enters the filter chamber 100 from the blowing slot 110 under the blowing of the blower, and the blower blows the flow of the outside fresh wind, which can accelerate the drying of the paint sprayed on the workpiece surface on the one hand, and on the other hand The paint mist generated during the spraying process will also enter into the paint residue treatment chamber 300 . A filter screen 120 is arranged between the filter chamber 100 and the paint spray booth 200, and the filter screen 120 can effectively filter the dust and impurities in the fresh air entering the paint spray booth 200 to prevent dust and impurities from entering the The above-mentioned spray booth 200 affects the painting effect, thereby ensuring the quality of the painting.

所述喷漆室200内设置有一支架220、机器人210及一组自动门240。待喷漆的工件230放置于所述支架220上,所述支架220可带动所述工件230一起移动;所述机器人210和所述自动门240分别与所述控制系统电连接。工作时,设置在所述喷漆室200前端的一扇自动门240在所述控制系统的控制下自动打开,所述支架220装载着所述工件230移动到所述喷漆室200内的合适位置,在所述控制系统的操作控制下,所述自动门240自动关闭同时所述机器人210开始自动对所述工件230进行喷漆;喷漆完毕后,所述喷漆室200两端的自动门240在所述控制系统的操作控制下均自动打开,喷漆完毕的所述工件230连同所述支架220一起经所述喷漆室200后端的自动门240移出所述喷漆室200,同时下一个待喷漆的工件(图未示)连同另一个支架(图未示)一起从所述喷漆室200前端的自动门240进入所述喷漆室合适的位置,然后所述喷漆室200两端的自动门240均自动关闭,如此循环,直到所有工件230喷漆完毕。A bracket 220 , a robot 210 and a set of automatic doors 240 are arranged in the spray booth 200 . The workpiece 230 to be painted is placed on the support 220, and the support 220 can drive the workpiece 230 to move together; the robot 210 and the automatic door 240 are respectively electrically connected to the control system. During work, an automatic door 240 arranged at the front end of the spray booth 200 is automatically opened under the control of the control system, and the bracket 220 is loaded with the workpiece 230 and moved to a suitable position in the spray booth 200, Under the operation control of the control system, the automatic door 240 is automatically closed and at the same time the robot 210 starts to automatically spray paint on the workpiece 230; All are automatically opened under the operation control of the system, and the workpiece 230 that has been painted is moved out of the spray booth 200 through the automatic door 240 at the rear end of the spray booth 200 together with the support 220, and the next workpiece to be painted (not shown in the figure) shown) together with another support (not shown) from the automatic door 240 at the front end of the spray booth 200 to enter the appropriate position of the spray booth, and then the automatic doors 240 at both ends of the spray booth 200 are automatically closed, and the cycle is like this, Until all workpieces 230 are painted.

所述漆渣处理室300包括底端水槽310、具有高压抽风机(图未示)的抽风槽320、旋涡装置330、顶端水盆340、侧水盆341、汽水分离器350、水泵360、多个风道隔板370、后水箱312及刮渣机(图未示)。所述底端水槽310的顶端设置有开口311,所述开口311使所述喷漆室200与所述漆渣处理室300连通,喷漆过程产生的漆雾通过所述开口311进入到所述底端水槽310内。所述侧水盆341位于所述顶端水盆340两侧并且所述侧水盆341与所述顶端水盆340连通。所述旋涡装置330固定安装在所述底端水槽310内并包括并列安装的第一旋涡漏斗331和第二旋涡漏斗332。其中,所述第一旋涡漏斗331包括弧形挡板331a、出水管331b及进水管331c,在所述第一旋涡漏斗331的出水管331b上设置有弧形挡板331a,并且所述弧形挡板331a固定安装于所述出水管33b的弯曲处;所述第二旋涡漏斗332包括进水管332a、出水管332b及设于所述进水管332a与出水管332b之间的开口332c的,所述开口332c面对所述第一旋涡漏斗331的弧形挡板331a。所述水泵360固定安装于所述漆渣处理室300外并与所述控制系统电连接。所述水泵360的出水口连接两个出水管,其中,一个出水管与所述第一旋涡漏斗331的进水管331c连接,另一出水管与所述第二旋涡漏斗332的进水管332a连接,所述水泵360的两个出水管分别将水抽至所述第一旋涡漏斗331和第二旋涡漏斗332内;所述水泵360的进水管与所述底端水槽310连通。所述多个风道隔板370设置安装在所述底端水槽310与所述顶端水盆340之间,相邻所述风道隔板370之间形成汽水通道371;所述汽水分离器350固定安装在所述顶端水盆340内并包括第一分离部分351和第二分离部分352,所述第一分离部分351与所述第二分离部分352垂直连接,所述第一分离部分351的底端连接一水幕板382,所述第二分离部分352与所述抽风槽320连通;所述高压抽风机(图未示)固定安装在所述抽风槽320内并且与所述控制系统电连接,所述控制系统控制所述高压抽风机的启动与停止。所述顶端水盆340内的水向外溢出并且在所述水幕板382的引导下在所述第一分离部分351的底端与所述底端水槽310上的开口311之间形成主水幕381,所述主水幕381的一端与所述底端水槽310的开口311连接。所述侧水盆341内的水向外溢出形成侧水幕(图未示)。所述刮渣机固定安装于所述后水箱312内并与所述控制系统电连接,所述刮渣机在所述控制系统的控制下收集形成的漆渣。The paint slag treatment chamber 300 includes a bottom water tank 310, a draft tank 320 with a high-pressure exhaust fan (not shown), a vortex device 330, a top water basin 340, a side water basin 341, a steam-water separator 350, a water pump 360, multiple An air channel partition 370, a rear water tank 312 and a slag scraper (not shown). The top of the bottom tank 310 is provided with an opening 311, and the opening 311 communicates the paint spray booth 200 with the paint residue treatment room 300, and the paint mist generated during the painting process enters the bottom end through the opening 311. Inside the sink 310 . The side water basins 341 are located on both sides of the top water basin 340 and the side water basins 341 communicate with the top water basin 340 . The vortex device 330 is fixedly installed in the bottom tank 310 and includes a first vortex funnel 331 and a second vortex funnel 332 installed side by side. Wherein, the first vortex funnel 331 includes an arc-shaped baffle 331a, an outlet pipe 331b and an inlet pipe 331c, an arc-shaped baffle 331a is arranged on the outlet pipe 331b of the first vortex funnel 331, and the arc-shaped The baffle plate 331a is fixedly installed at the bend of the outlet pipe 33b; the second vortex funnel 332 includes an inlet pipe 332a, an outlet pipe 332b, and an opening 332c between the inlet pipe 332a and the outlet pipe 332b. The opening 332c faces the arc-shaped baffle 331a of the first vortex funnel 331 . The water pump 360 is fixedly installed outside the paint residue treatment chamber 300 and electrically connected with the control system. The water outlet of the water pump 360 is connected to two water outlet pipes, wherein one outlet pipe is connected to the water inlet pipe 331c of the first vortex funnel 331, and the other water outlet pipe is connected to the water inlet pipe 332a of the second vortex funnel 332, The two outlet pipes of the water pump 360 pump water into the first vortex funnel 331 and the second vortex funnel 332 respectively; the water inlet pipe of the water pump 360 communicates with the bottom tank 310 . The plurality of air duct partitions 370 are arranged and installed between the bottom water tank 310 and the top water basin 340, and a steam-water channel 371 is formed between the adjacent air duct partitions 370; the steam-water separator 350 Fixedly installed in the top water basin 340 and includes a first separation part 351 and a second separation part 352, the first separation part 351 is vertically connected to the second separation part 352, the first separation part 351 The bottom end is connected with a water curtain plate 382, and the second separation part 352 communicates with the air draft groove 320; connected, the control system controls the start and stop of the high-pressure exhaust fan. The water in the top water basin 340 overflows outwards and forms main water between the bottom end of the first separation part 351 and the opening 311 on the bottom water tank 310 under the guidance of the water curtain plate 382 A curtain 381 , one end of the main water curtain 381 is connected to the opening 311 of the bottom water tank 310 . The water in the side water basin 341 overflows outwards to form a side water curtain (not shown). The slag scraper is fixedly installed in the rear water tank 312 and electrically connected to the control system, and the slag scraper collects the formed paint slag under the control of the control system.

下面结合图1和图3描述本实用新型高压吸卷式喷漆处理设备的工作过程。图1所示箭头方向表示气体的流向。首先启动所述控制系统,使整个高压吸卷式喷漆处理设备在所述控制系统的控制下而配合工作。在所述喷漆室200内对所述工件230进行喷漆时将产生大量的漆雾,所述漆雾在所述吹风机的吹送及所述高压抽风机抽送的作用下大部分直接经所述底端水槽310上的开口311进入所述底端水槽310内,另外少部分流动速度较快的则流动到所述主水幕381附近并与所述主水幕381形成汽水混合物而经所述开口311进入所述底端水槽310内;由于所述水泵360连续向所述旋涡装置330的第二旋涡漏斗332抽送水,因此所述第二旋涡漏斗332不间断地在所述底端水槽310内产生旋涡,从而使所述底端水槽310内的水与所述漆雾初步混合并吸收部分漆雾而形成漆渣;由漆渣、漆雾和水组成的混合物被所述高压电机以龙卷的形式抽送至所述顶端水盆340内,在抽送过程中水和漆雾在由所述风道隔板370形成的汽水通道371内进行再次混合吸收并再次形成漆渣;所述混合物经所述汽水分离器350的第一分离部分351和第二分离部分352的双重分离后,少量的气体通过所述抽风槽320排出,同时大部的水和漆渣的混合物在所述水幕板382的引导下形成主水幕381并流入所述第一旋涡漏斗331内,其余部分的混合物在所述侧水盆341内向外溢出形成侧水幕并流回所述底端水槽310内;流入所述第一旋涡漏斗331内的混合物滴落到所述弧形挡板331a上,所述弧形挡板331a对混合物产生反弹力,经所述水泵360不断抽送至所述第一旋涡漏斗331进水管331c内的水不断对上述混合物产生冲击力,上述混合物在反弹力和冲击力作用下被推送至所述第二旋涡漏斗332的开口332c附近;经所述水泵360不断抽送至所述第二旋涡漏斗332进水管331a内的水向下流动在所述第二旋涡漏斗332的开口332c周围产生旋涡,导致所述开口332c周围的混合物被吸至所述第二旋涡漏斗332内,被吸至所述第二旋涡漏斗332内的混合物在水的推压作用下由所述第二旋涡漏斗332的出水管332b被送至所述后水箱312的前端;所述后水箱312内的刮渣机将混合物里的漆渣收集起来进行集中处理;如此循环直到所有漆雾均被处理完毕。由上述描述可知,所述漆雾在所述漆渣处理室300内通过高压抽风机的作用与水不停地循环流动并被水吸收形成漆渣,形成的漆渣经过所述第一旋涡漏斗331和第二旋涡漏斗332的推送与吸取而被所述刮渣机集中收集于所述后水箱312内进行集中处理,如此循环,直到喷漆过程结束并且所有漆雾被处理完毕,关闭所述控制系统,整个设备停止工作。The working process of the utility model high-pressure suction-coil type paint spraying treatment equipment is described below in conjunction with Fig. 1 and Fig. 3 . The direction of the arrow shown in Figure 1 indicates the flow direction of the gas. First start the control system, so that the entire high-pressure suction-coil type paint spraying treatment equipment works together under the control of the control system. When the workpiece 230 is sprayed in the spray booth 200, a large amount of paint mist will be generated, and most of the paint mist directly passes through the bottom end under the blowing of the blower and the pumping of the high-pressure exhaust fan. The opening 311 on the water tank 310 enters into the bottom water tank 310, and a small part of the faster flowing water flows to the vicinity of the main water curtain 381 and forms a steam-water mixture with the main water curtain 381 and passes through the opening 311. into the bottom water tank 310; since the water pump 360 pumps water to the second vortex funnel 332 of the vortex device 330 continuously, the second vortex funnel 332 is continuously generated in the bottom water tank 310 Vortex, so that the water in the bottom water tank 310 is initially mixed with the paint mist and absorbs part of the paint mist to form paint slag; the mixture composed of paint slag, paint mist and water is tornado by the high-voltage motor The form is pumped into the top water basin 340. During the pumping process, water and paint mist are mixed and absorbed again in the steam-water channel 371 formed by the air duct partition 370 and form paint residue again; the mixture passes through the After the double separation of the first separation part 351 and the second separation part 352 of the steam-water separator 350, a small amount of gas is discharged through the air suction groove 320, and most of the mixture of water and paint residue is in the water curtain plate 382. Guided to form the main water curtain 381 and flow into the first vortex funnel 331, the rest of the mixture overflows outwards in the side water basin 341 to form a side water curtain and flows back into the bottom water tank 310; The mixture in the first vortex funnel 331 drops onto the arc-shaped baffle 331a, and the arc-shaped baffle 331a produces a rebound force on the mixture, and is continuously pumped to the water inlet pipe of the first vortex funnel 331 by the water pump 360 The water in 331c continuously produces impact force on the above-mentioned mixture, and the above-mentioned mixture is pushed to the vicinity of the opening 332c of the second vortex funnel 332 under the action of rebound force and impact force; it is continuously pumped to the second vortex funnel by the water pump 360 The water in the water inlet pipe 331a of the funnel 332 flows downward to generate a vortex around the opening 332c of the second vortex funnel 332, causing the mixture around the opening 332c to be sucked into the second vortex funnel 332 and to the The mixture in the second vortex funnel 332 is sent to the front end of the rear water tank 312 by the outlet pipe 332b of the second vortex funnel 332 under the push of water; the slag scraper in the rear water tank 312 will The paint scum in the mixture is collected for centralized treatment; the cycle is repeated until all the paint mist has been treated. It can be known from the above description that the paint mist circulates continuously with the water through the action of the high-pressure exhaust fan in the paint residue treatment chamber 300 and is absorbed by the water to form paint residue, and the formed paint residue passes through the first vortex funnel 331 and the push and suction of the second vortex funnel 332 are collected by the slag scraper in the rear water tank 312 for centralized treatment, and so on, until the painting process is over and all the paint mist is processed, the control is turned off system, the entire device stops working.

以上结合最佳实施例对本实用新型进行了描述,但本实用新型并不局限于以上揭示的实施例,而应当涵盖各种根据本实用新型的本质进行的修改、等效组合。The utility model has been described above in conjunction with the best embodiments, but the utility model is not limited to the above-disclosed embodiments, but should cover various modifications and equivalent combinations based on the essence of the utility model.

Claims (10)

1. a high pressure is inhaled the rolling treatment facility that sprays paint, comprise the filter chamber, the paint spray booth, lacquer slag process chamber and control system, one end setting of described filter chamber has the air feed groove of hair-dryer, described hair-dryer is electrically connected with described control system, extraneous bright wind enters described filter chamber and enter described paint spray booth behind described filter chamber inner filtration from described air feed groove through described hair-dryer, the robot that is provided with support in the described paint spray booth and is electrically connected with described control system, workpiece to be sprayed paint is positioned on the described support, described support can move in described paint spray booth together with described workpiece, described robot sprays paint to described workpiece automatically, described lacquer slag process chamber comprises the bottom tank and has the exhausting groove of air exhauster, described air exhauster is electrically connected with described control system, one end of described bottom tank is communicated with described paint spray booth, the other end of described bottom tank is communicated with the lower end of described lacquer slag process chamber, the upper end of described lacquer slag process chamber is communicated with described exhausting groove, gas in the coating cloud is discharged from described exhausting groove after described lacquer slag process chamber is handled, it is characterized in that: described lacquer slag process chamber also comprises the vortex device, water pump, rear water box, top basin and steam-water separator, described vortex device is fixedly mounted in the tank of described bottom, and described vortex device comprises the first vortex funnel and the second vortex funnel, the described second vortex funnel offers and the corresponding opening of the delivery port of the described first vortex funnel, the delivery port of the described second vortex funnel is communicated with described rear water box, be provided with a Slag Scraping Device in the described rear water box, and described Slag Scraping Device is electrically connected with described control system, described water pump is fixedly installed in outside the described paint spray booth, described water pump is electrically connected with described control system, the delivery port of described water pump connects two water pipes, and described two water pipes are communicated with described first vortex funnel and the described second vortex funnel respectively, the water inlet of described water pump is communicated with described bottom tank, water in the basin of described top outwards overflows and forms main water curtain, described bottom tank be positioned at described main water curtain under, described steam-water separator is fixedly mounted in the basin of described top and an end is communicated with described exhausting groove.
2. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, and it is characterized in that: the described first vortex funnel is provided with the curved baffle in the face of the opening of the described second vortex funnel.
3. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, it is characterized in that: described lacquer slag process chamber also comprises a plurality of air channels dividing plate, form steam-water channel between the dividing plate of adjacent air channel, the upper end of described steam-water channel is communicated with described top basin, and the lower end is communicated with described bottom tank.
4. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, it is characterized in that: described lacquer slag process chamber also comprises the side basin that is communicated with described top basin, described side basin is positioned at basin both sides, described top, water in the described side basin outwards overflows and forms the side water curtain, and described side water curtain is positioned at directly over the tank of described bottom.
5. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, and it is characterized in that: the top of described bottom tank is provided with an opening, described opening be located at the described first vortex funnel directly over and an end of described opening be connected with an end of described main water curtain.
6. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, and it is characterized in that: described air exhauster is the high pressure air exhauster.
7. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, it is characterized in that: described steam-water separator is made up of first separating part and second separating part, described first separating part and mutual vertical connection of described second separating part, described first separating part is between described main water curtain and described top basin, and described second separating part is communicated with described exhausting groove.
8. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, and it is characterized in that: be provided with screen pack between described filter chamber and the described paint spray booth, described screen pack filtration enters the extraneous bright wind of described paint spray booth.
9. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, it is characterized in that: described paint spray booth also comprises automatically-controlled door, described automatically-controlled door is electrically connected with described control system, and described control system is controlled described automatically-controlled door and automatically opened for the described workpiece described paint spray booth of coming in and going out.
10. high pressure as claimed in claim 1 is inhaled the rolling treatment facility that sprays paint, and it is characterized in that: also comprise the lighting device that is electrically connected with described control system, described lighting device is installed on the top of described paint spray booth.
CN2009200621105U 2009-08-11 2009-08-11 High-pressure suction roll type paint spraying treatment equipment Expired - Fee Related CN201505597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200621105U CN201505597U (en) 2009-08-11 2009-08-11 High-pressure suction roll type paint spraying treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200621105U CN201505597U (en) 2009-08-11 2009-08-11 High-pressure suction roll type paint spraying treatment equipment

Publications (1)

Publication Number Publication Date
CN201505597U true CN201505597U (en) 2010-06-16

Family

ID=42466732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200621105U Expired - Fee Related CN201505597U (en) 2009-08-11 2009-08-11 High-pressure suction roll type paint spraying treatment equipment

Country Status (1)

Country Link
CN (1) CN201505597U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102728508A (en) * 2012-07-17 2012-10-17 昆山华恒焊接股份有限公司 Robot coating system
CN104259040A (en) * 2014-10-30 2015-01-07 江苏诺升环保科技有限公司 Water curtain type coating production line paint spraying room
CN109225738A (en) * 2018-10-29 2019-01-18 江苏欧迈机械工程有限公司 A kind of energy saving and environment friendly coating paint spraying system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102728508A (en) * 2012-07-17 2012-10-17 昆山华恒焊接股份有限公司 Robot coating system
CN104259040A (en) * 2014-10-30 2015-01-07 江苏诺升环保科技有限公司 Water curtain type coating production line paint spraying room
CN104259040B (en) * 2014-10-30 2016-08-17 江苏诺升环保科技有限公司 A kind of water curtain type paint line paint spray booth
CN109225738A (en) * 2018-10-29 2019-01-18 江苏欧迈机械工程有限公司 A kind of energy saving and environment friendly coating paint spraying system
CN109225738B (en) * 2018-10-29 2023-08-18 江苏欧迈机械工程有限公司 Energy-saving and environment-friendly type coating and paint spraying system

Similar Documents

Publication Publication Date Title
CN201832755U (en) Water curtain workpiece spraying room
CN105689183B (en) A kind of Water Rotation Painting Booth
CN203991070U (en) A kind of spray room
CN201168670Y (en) Pump-free water curtain spray room
CN101125319A (en) Multi-layer water curtain spray room
CN103263812A (en) Water curtain type paint mist filter
CN104259040A (en) Water curtain type coating production line paint spraying room
CN201102006Y (en) Multi-layer water curtain spray room
CN208643078U (en) A kind of multifunctional spraying japanning room
CN108514788A (en) Integrated cascade waste gas treatment equipment
CN204685374U (en) Novel two stage cascade spray booth
CN205673120U (en) A kind of water curtain water rotation coating cloud trapping ring protection device
CN203315918U (en) Water-screen-type paint mist filter
CN203030453U (en) Spraying baking integrated room recoil type wet process paint mist filtering device
CN108654265A (en) A kind of workshop disordered exhaust gas collection device
CN210786635U (en) Novel water curtain paint mist treatment equipment
CN205613631U (en) Extra income revolves environmental protection spray booth
CN204429570U (en) A kind of coating cloud water curtain cleaning system
CN210994945U (en) Adsorption type environment-friendly paint spraying cabinet
CN212166874U (en) Water curtain system for paint mist trapping
CN202427304U (en) Coating waste gas integrated treatment cabinet
CN206613311U (en) A kind of paint mist treatment device
CN106039886A (en) Painting waste gas treatment equipment
CN205949157U (en) Cascade spouts gluey room
CN205461620U (en) No pump water curtain clean system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: High-voltage absorbing scrolling type painting process equipment

Effective date of registration: 20130819

Granted publication date: 20100616

Pledgee: Dongguan rural commercial bank, Limited by Share Ltd, Tangxia branch

Pledgor: Dongguan Fengyu Motor Co., Ltd.

Registration number: 2013990000589

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20150209

Granted publication date: 20100616

Pledgee: Dongguan rural commercial bank, Limited by Share Ltd, Tangxia branch

Pledgor: Dongguan Fengyu Motor Co., Ltd.

Registration number: 2013990000589

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: High-voltage absorbing scrolling type painting process equipment

Effective date of registration: 20150226

Granted publication date: 20100616

Pledgee: CITIC Bank, Limited by Share Ltd, Dongguan branch

Pledgor: Dongguan Fengyu Motor Co., Ltd.

Registration number: 2015990000159

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100616

Termination date: 20160811

CF01 Termination of patent right due to non-payment of annual fee