CN201495571U - 逆作法地下暗挖工程专用提土设备 - Google Patents
逆作法地下暗挖工程专用提土设备 Download PDFInfo
- Publication number
- CN201495571U CN201495571U CN 200920311450 CN200920311450U CN201495571U CN 201495571 U CN201495571 U CN 201495571U CN 200920311450 CN200920311450 CN 200920311450 CN 200920311450 U CN200920311450 U CN 200920311450U CN 201495571 U CN201495571 U CN 201495571U
- Authority
- CN
- China
- Prior art keywords
- construction
- soil
- underground
- native
- topdown
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型公开了一种逆作法地下暗挖工程专用提土设备,该专用提土设备由用于设置在地下开挖段(1)上并能与地面连通的提土井道(2)和提土吊车(3)组成,提土吊车(3)安装在提土井道(2)上。本实用新型的施工技术与设备相对较简单、施工限制少、出土成本低,可以安全、高效、快捷出土,有效的保证了施工工期及逆作法施工的顺利进行。适用于所有逆作及暗挖工程,如民用建筑地下室逆作、地铁、地下空间暗挖工程等,同时可以适应施工场地窄、无堆土场地、城市限时段施工等复杂施工条件。
Description
技术领域
本实用新型涉及一种逆作法地下暗挖工程专用提土设备,
背景技术
现目前城市建设及旧城改造工程越来越多,但施工用场地也越来越小,逆作法施工技术越来越普及。但逆作法施工最关键在于土方暗挖及出土技术,现阶段暗挖多采用挖机分阶段转土或履带式抓斗取土等方式,以上方式对结构施工影响较大或存在着出土不稳定等情况。
采用多层次、多台挖机通过转土平台转土至地面出土效率低、转土平台放坡范围大、堆积的土方量大,且边坡高度太大,一定程度上影响钢梁安装及相应的逆作施工,同时会造成结构稳定性差,边坡容易失稳,边坡堆积土后续出土工效低、出土成本高的问题。
采用履带式抓斗取土方式出土,反铲挖掘机将泥土转运集中到取土口下方,再由长臂挖掘机挖到地面,装车外运。长臂挖掘机有效挖深仅为6~8米,履带式抓斗取土每次取土的土方量不均匀,单位时间内出土方量得不到保证,工效低且施工成本较高。
发明内容
本实用新型的目的在于:提供一种安全、高效、快捷出土,施工限制少的逆作法地下暗挖工程专用提土设备,以克服现有技术的不足。
本实用新型是这样构成的:该专用提土设备由用于设置在地下开挖段上并能与地面连通的提土井道和提土吊车组成,提土吊车安装在提土井道上。
所述提土吊车构造包括行走钢架,在行走钢架上设有提升小车,提升小车下连接料斗。
在提土吊车旁设有储土区域。
本实用新型将土方从提土井道通过装车、垂直提升、水平行走,直接自动卸载在土方车上,土方车因城市限行时段不能未及时转运的土方量可以卸载在下沉式的储土区域,然后用挖掘机在首层进行转土和装土。整个操作过程中采用全遥控,一名操作人员即可实现提升、水平运行及自主卸土。同现有技术比较,本实用新型的施工技术与设备相对较简单、施工限制少、出土成本低,可以安全、高效、快捷出土,有效的保证了施工工期及逆作法施工的顺利进行。适用于所有逆作及暗挖工程,如民用建筑地下室逆作、地铁、地下空间暗挖工程等,同时可以适应施工场地窄、无堆土场地、城市限时段施工等复杂施工条件。
附图说明
附图1为本实用新型的结构示意图;
附图2为本实用新型提土吊车的结构示意图。
具体实施方式
本实用新型的实施例:如图1所示,按照现有的逆作法地下暗挖技术对地下开挖段1进行土方开挖施工,在地下开挖段1设置与地面连通的提土井道2,在提土井道2上安装提土吊车3。通过提土吊车3将地下开挖段1的泥土提升上去后,倒入运泥土的土方车上,如果土方车因城市限行时段不能未及时转运,在提土吊车3旁设置下沉式的储土区域4,卸载未及时转运的土方量,然后用挖掘机在首层进行转土和装土。
本实施例采用的提土吊车3,构造包括设置在提土井道2上方的行走钢架5,在行走钢架5上安装提升小车6,提升小车6下连接料斗7。料斗7装满泥土后,由提升小车6提升到地面,然后通过行走钢架5平行行走,到土方车或储土区域4位置倾倒出泥土,完成一次出土操作。
正常工作状态下,逆作施工时,采用本实用新型的提土设备提土,该设备提升速度7m/min;水平运行速度20m/min;则每10分钟出土一料斗,一料斗大概5立方,三料斗装一车,提土设备则每小时平均出土2车;按每天工作10小时计算,平均每天出土量约280立方,并设一个储土区域每天储土190立方,则每天一台提土设备可出土470立方。实际工程中,可根据工程的特点及工期要求不同增设提土设备,以确保工程工期的顺利完成。
Claims (3)
1.一种逆作法地下暗挖工程专用提土设备,其特征在于:该专用提土设备由用于设置在地下开挖段(1)上并能与地面连通的提土井道(2)和提土吊车(3)组成,提土吊车(3)安装在提土井道(2)上。
2.根据权利要求1所述的逆作法地下暗挖工程专用提土设备,其特征在于:所述提土吊车(3)构造包括行走钢架(5),在行走钢架(5)上设有提升小车(6),提升小车(6)下连接料斗(7)。
3.根据权利要求1所述的逆作法地下暗挖工程专用提土设备,其特征在于:在提土吊车(3)旁设有储土区域(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920311450 CN201495571U (zh) | 2009-09-25 | 2009-09-25 | 逆作法地下暗挖工程专用提土设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920311450 CN201495571U (zh) | 2009-09-25 | 2009-09-25 | 逆作法地下暗挖工程专用提土设备 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201495571U true CN201495571U (zh) | 2010-06-02 |
Family
ID=42438779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200920311450 Expired - Fee Related CN201495571U (zh) | 2009-09-25 | 2009-09-25 | 逆作法地下暗挖工程专用提土设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201495571U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544546A (zh) * | 2015-12-03 | 2016-05-04 | 上海建工一建集团有限公司 | 用于地下工程的废弃物清理运输装置及方法 |
CN113023562A (zh) * | 2021-03-05 | 2021-06-25 | 上海建工二建集团有限公司 | 既有建筑地下空间开发的土体取运装置及方法 |
CN113293766A (zh) * | 2021-03-30 | 2021-08-24 | 内蒙古科技大学 | 大型盖挖逆作t型换乘地铁车站综合土方开挖方法 |
-
2009
- 2009-09-25 CN CN 200920311450 patent/CN201495571U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544546A (zh) * | 2015-12-03 | 2016-05-04 | 上海建工一建集团有限公司 | 用于地下工程的废弃物清理运输装置及方法 |
CN113023562A (zh) * | 2021-03-05 | 2021-06-25 | 上海建工二建集团有限公司 | 既有建筑地下空间开发的土体取运装置及方法 |
CN113293766A (zh) * | 2021-03-30 | 2021-08-24 | 内蒙古科技大学 | 大型盖挖逆作t型换乘地铁车站综合土方开挖方法 |
CN113293766B (zh) * | 2021-03-30 | 2022-12-30 | 内蒙古科技大学 | 大型盖挖逆作t型换乘地铁车站综合土方开挖方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102535474B (zh) | 一种深基坑挖土的施工方法 | |
CN102691300B (zh) | 基坑土方的施工方法 | |
EA037864B1 (ru) | Способ строительства городского тоннеля неглубокого залегания в богатом водами карстовом грунте с использованием консольной бурильной машины | |
CN100443672C (zh) | 桩基的地下托换方法 | |
CN204454320U (zh) | 逆作法施工深基坑土方开挖提土装置 | |
CN105421463B (zh) | 一种大跨度密支撑超长深基坑纵向开挖施工方法 | |
CN108755698B (zh) | 一种陡坡松散堆积体大倾斜岩面基础施工方法 | |
CN104847364B (zh) | 一种盾构连续切削桩基础穿越居民楼群施工方法 | |
CN101634375B (zh) | 管道地下安装施工装置及其方法 | |
CN103410152B (zh) | 一种用于狭长深基坑土方开挖的施工方法 | |
CN102758441A (zh) | 一种逆作条件下深基坑平台接力出土方法及结构 | |
CN104762982A (zh) | 一种富水红砂岩地质地下水位控制的施工方法 | |
CN104005571A (zh) | 一种与内支撑体系结合的斜向施工栈桥 | |
CN109339096A (zh) | 一种综合管廊明挖预制拼装施工一体化施工装置及其施工方法 | |
CN103174131A (zh) | 地下工程暗挖导洞小直径桩施工成套设备系统 | |
CN110439011B (zh) | 一种边坡抗滑支护结构及其施工方法 | |
CN201495571U (zh) | 逆作法地下暗挖工程专用提土设备 | |
CN101824825B (zh) | 一种深基坑明挖施工方法 | |
CN102587385A (zh) | 一种换填淤泥质软土的基坑支护方法 | |
CN203782778U (zh) | 逆作法施工地下土外运装置 | |
CN103643678A (zh) | 一种深基坑集装箱式土方挖运方法 | |
CN201695398U (zh) | 踏步式逆作下坑挖土栈桥 | |
CN106241234A (zh) | 一种用于预制综合管廊的自行式运输拼装车 | |
CN203891047U (zh) | 搭设钢平台进行陆上桥梁基础施工设备 | |
CN116695721A (zh) | 一种模块化多装置基坑开挖支护方法及其装备系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100602 Termination date: 20140925 |
|
EXPY | Termination of patent right or utility model |