CN201486127U - Embedded adhering device of climbing scaffold - Google Patents
Embedded adhering device of climbing scaffold Download PDFInfo
- Publication number
- CN201486127U CN201486127U CN2009200366703U CN200920036670U CN201486127U CN 201486127 U CN201486127 U CN 201486127U CN 2009200366703 U CN2009200366703 U CN 2009200366703U CN 200920036670 U CN200920036670 U CN 200920036670U CN 201486127 U CN201486127 U CN 201486127U
- Authority
- CN
- China
- Prior art keywords
- climbing scaffold
- embedded
- buried
- wall
- attachment device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 23
- 239000002184 metal Substances 0.000 abstract 5
- 238000005266 casting Methods 0.000 abstract 1
- 238000009987 spinning Methods 0.000 description 2
- 241000208140 Acer Species 0.000 description 1
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- 239000010962 carbon steel Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
An embedded adhering device of a climbing scaffold is characterized in that a long screw is embedded when casting a concrete wall, thread of the long screw extends out of the wall, the embedded adhering device is provided with a U-shaped metal component, and cut grooves which are symmetrical up and down are arranged at the left end of the U-shaped metal component. Two ends of a strip plate with a round hole at the center are clamped in the cut grooves of the U-shaped metal component, the screw extends from the round hole of the strip plate, and the U-shaped metal component is fixed on the outer side of the wall after nuts are screwed. The upper portion and the lower portion of the right side of the U-shaped metal component are respectively provided with an inner threaded hole, and the screw is screwed in the threaded holes and locked via fastening nuts. Two clamping plates are arranged at the right end of the screw and clamped on two crossbars on the inner side of the climbing scaffold, and two sides of each clamping plate are fixed via nuts. By aid of the structure, the climbing scaffold can be fixed on the wall via the embedded screw. The embedded adhering device of a climbing scaffold is compact in structure, convenient in operation and reliable in adhering.
Description
Affiliated technical field
The utility model relates to the climbing scaffold pre-buried type attachment device that building operations is used.
Background technology
The climbing scaffold that building operations is used, on body of wall, traditional attachment device is at the body of wall installation accessories, again annex and climbing scaffold is carried out the machine maple and is connected.Its weak point is: structure is loaded down with trivial details, inconvenient operation, and adhere to very unreliable.
The utility model content
The purpose of this utility model is to provide climbing scaffold pre-buried type attachment device in order to overcome above-mentioned weak point, and compact conformation is easy to operate, and adheres to very reliable.
The technical scheme that its technical problem that solves the utility model adopts is: climbing scaffold pre-buried type attachment device is the pre-buried long bolt of elder generation when the placing of concrete body of wall, and the screw thread of pre-buried long bolt stretches out outside the wall; For screw rod has bigger tensile force, pre-buried long bolt is embedded in concrete inner end and is added with snap ring.Have] the shape hardware ,] left end of shape hardware has laterally zygomorphic grooving.Two that central authorities have the stripe board of circular hole is stuck in] in the grooving of shape hardware, pre-buried long bolt stretches out from the circular hole of stripe board, screws nut, makes] the shape hardware is fixed on wall outer side.] respectively there is internal thread hole the upper and lower on shape hardware right side, screw rod is spun in the screwed hole, and pins with piecing together jack panel.For screw rod is convenient to spinning in and out, the side of having falcon on screw rod.Right-hand member at screw rod has two clamping plates, and clamping plate are clipped on two cross bars of climbing scaffold inboard, and respectively there is nut screwing clamping on the both sides of clamping plate, are added with pad in the nut inboard.Like this, climbing scaffold just is fixed on the body of wall by pre embedded bolt.
Effective effect of the present utility model is, uses climbing scaffold pre-buried type attachment device of the present utility model, and compact conformation is easy to operate, and adheres to very reliable.
Description of drawings
Figure is the structural representation of climbing scaffold pre-buried type attachment device of the present utility model.1-snap ring among the figure, the 2-concrete wall, the pre-buried long bolt of 3-, the 4-stripe board, the 5-pad, the 6-nut, 7-scaffold inboard rail, the right clamping plate of 8-, the inboard montant 10-of 9--scaffold left side clamping plate, 11-side falcon, the 12--screw rod, 13-pieces together jack panel, 14--] the shape hardware.
The specific embodiment
Climbing scaffold pre-buried type attachment device is elder generation's pre-buried long bolt (3) when the placing of concrete body of wall, and pre-buried long bolt (3) is M22, makes with the high-quality carbon steel, and the screw thread of pre-buried long bolt (3) stretches out outside the wall; Pre-buried long bolt (3) is embedded in concrete inner end and is added with snap ring (1), is to have bigger tensile force for screw rod.Have] shape hardware (14) ,] left end of shape hardware (14) has laterally zygomorphic grooving.Two that central authorities have the stripe board (4) of circular hole is stuck in] in the grooving of shape hardware (14), pre-buried long bolt (3) stretches out from the circular hole of stripe board (4), screws nut (6), makes] shape hardware (14) is fixed on wall outer side.Be added with pad (5) in nut (6) inboard.] respectively there is internal thread hole the upper and lower on shape hardware (14) right side, screw rod (12) is spun in the screwed hole, and pins with piecing together jack panel (13).For screw rod (12) is convenient to spinning in and out, the side of having falcon (11) on screw rod (12).Right-hand member at screw rod (12) has two clamping plates, left clamping plate (10) and right clamping plate (8), and clamping plate are clipped on two climbing scaffold inboard rail (7), and respectively there is nut screwing clamping on the both sides of clamping plate, are added with pad in the nut inboard.Like this, climbing scaffold just is fixed on the body of wall by pre embedded bolt.
Claims (4)
1. climbing scaffold pre-buried type attachment device is characterized in that: pre-buried long bolt earlier when the placing of concrete body of wall, and the screw thread of pre-buried long bolt stretches out outside the wall; ] left end of shape hardware has laterally zygomorphic grooving, two that central authorities have the stripe board of circular hole is stuck in] in the grooving of shape hardware, pre-buried long bolt stretches out from the circular hole of stripe board, screws nut; ] respectively there is internal thread hole the upper and lower on shape hardware right side, screw rod is spun in the screwed hole, and pins with piecing together jack panel, at the right-hand member of screw rod two clamping plates is arranged, and clamping plate are clipped on two cross bars of climbing scaffold inboard, and respectively there is nut screwing clamping on the both sides of clamping plate.
2. climbing scaffold pre-buried type attachment device according to claim 1, it is characterized in that: pre-buried long bolt is embedded in concrete inner end and is added with snap ring.
3. climbing scaffold pre-buried type attachment device according to claim 1 is characterized in that: the side of having falcon on screw rod.
4. climbing scaffold pre-buried type attachment device according to claim 1 is characterized in that: be added with pad in the nut inboard.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009200366703U CN201486127U (en) | 2009-03-05 | 2009-03-05 | Embedded adhering device of climbing scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009200366703U CN201486127U (en) | 2009-03-05 | 2009-03-05 | Embedded adhering device of climbing scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201486127U true CN201486127U (en) | 2010-05-26 |
Family
ID=42425012
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009200366703U Expired - Lifetime CN201486127U (en) | 2009-03-05 | 2009-03-05 | Embedded adhering device of climbing scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201486127U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102535830A (en) * | 2012-01-12 | 2012-07-04 | 深圳市鹏城建筑集团有限公司 | Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building |
| CN103243899A (en) * | 2013-05-02 | 2013-08-14 | 标力建设集团有限公司 | Constructional scaffold overall rachel device |
| CN104164968A (en) * | 2013-08-20 | 2014-11-26 | 北京市建筑工程研究院有限责任公司 | Novel shiftable through-wall (or embedded) type double-point adhering device |
| CN106315341A (en) * | 2016-11-18 | 2017-01-11 | 天津京龙工程机械有限公司 | Sliding wall attaching frame of underground elevator |
| CN112376887A (en) * | 2020-11-17 | 2021-02-19 | 浙江铠甲建筑科技有限公司 | System for stabilizing climbing scaffold |
-
2009
- 2009-03-05 CN CN2009200366703U patent/CN201486127U/en not_active Expired - Lifetime
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102535830A (en) * | 2012-01-12 | 2012-07-04 | 深圳市鹏城建筑集团有限公司 | Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building |
| CN102535830B (en) * | 2012-01-12 | 2013-06-26 | 深圳市鹏城建筑集团有限公司 | Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building |
| CN103243899A (en) * | 2013-05-02 | 2013-08-14 | 标力建设集团有限公司 | Constructional scaffold overall rachel device |
| CN103243899B (en) * | 2013-05-02 | 2015-11-18 | 标力建设集团有限公司 | The complete drawknot device of building scaffold |
| CN104164968A (en) * | 2013-08-20 | 2014-11-26 | 北京市建筑工程研究院有限责任公司 | Novel shiftable through-wall (or embedded) type double-point adhering device |
| CN106315341A (en) * | 2016-11-18 | 2017-01-11 | 天津京龙工程机械有限公司 | Sliding wall attaching frame of underground elevator |
| CN112376887A (en) * | 2020-11-17 | 2021-02-19 | 浙江铠甲建筑科技有限公司 | System for stabilizing climbing scaffold |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201486127U (en) | Embedded adhering device of climbing scaffold | |
| CN201753501U (en) | FRP (fiber reinforced plastic) rib tensioning and anchoring device | |
| CN206319575U (en) | A kind of support attachment means | |
| CN201155205Y (en) | Novel scaffold steel tube cross rod coupling assembly | |
| CN202117299U (en) | Tool type support system of cantilever scaffold | |
| CN201144516Y (en) | Scaffold for high-rise building construction | |
| CN219711104U (en) | Adjustable centering jacking of steel pipe scaffold | |
| CN203821765U (en) | Multilayer elastic hook anchor bolt | |
| CN201236476Y (en) | Scaffold attached to wall window | |
| CN201236477Y (en) | Integral climbing scaffold for high-rise building | |
| CN201268949Y (en) | Adjustable support bracket double-fastener | |
| CN201321719Y (en) | Scaffold fastener for buildings | |
| CN202866285U (en) | Adjustable template connecting component | |
| CN201573034U (en) | Cross head pin detaching tool | |
| CN202763754U (en) | Universal dismounting device | |
| CN200940627Y (en) | T-shape bolt of fastener | |
| CN201307744Y (en) | Strain clamp | |
| CN201206325Y (en) | Multifunction structure adhering component | |
| CN218862163U (en) | Outer wall locator | |
| CN2725434Y (en) | UT guy clamp antitheft device | |
| CN217915093U (en) | Pole steel reinforcement cage snap ring installation device | |
| CN201794893U (en) | Novel whole-body bolt | |
| CN2594380Y (en) | Constructioning fastener | |
| CN2714872Y (en) | Demountable expansion bolt | |
| CN2571916Y (en) | Locking board for building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20100526 |
|
| CX01 | Expiry of patent term |