CN201474296U - 楼板后浇洞口模板支撑结构 - Google Patents

楼板后浇洞口模板支撑结构 Download PDF

Info

Publication number
CN201474296U
CN201474296U CN2009201734986U CN200920173498U CN201474296U CN 201474296 U CN201474296 U CN 201474296U CN 2009201734986 U CN2009201734986 U CN 2009201734986U CN 200920173498 U CN200920173498 U CN 200920173498U CN 201474296 U CN201474296 U CN 201474296U
Authority
CN
China
Prior art keywords
hole
moulding board
transmission rod
bamboo
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201734986U
Other languages
English (en)
Inventor
孟鲁生
童建民
王佳兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING TIANRUN CONSTRUCTION ENGINEERING Co Ltd
MCC Jingtang Construction Co Ltd
Original Assignee
BEIJING TIANRUN CONSTRUCTION ENGINEERING Co Ltd
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING TIANRUN CONSTRUCTION ENGINEERING Co Ltd, MCC Jingtang Construction Co Ltd filed Critical BEIJING TIANRUN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2009201734986U priority Critical patent/CN201474296U/zh
Application granted granted Critical
Publication of CN201474296U publication Critical patent/CN201474296U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

本实用新型涉及建筑施工模板支撑体系,特别是一种楼板后浇洞口模板支撑结构。包括传力杆件、竹胶模板,所述传力杆件以洞口周边楼板为支座横担于后浇洞口上部;所述竹胶模板面积稍大于洞口面积,其以覆盖洞口方式置于洞口下部并通过吊挂钢丝与所述传力杆件拉紧连接,所述吊挂钢丝下端穿过竹胶模板上的通孔并通过插入其端头环扣内的销钉与竹胶模板卡接。本实用新型结构简单,操作方便,省工省时,与传统立杆支撑模板结构相比,可提高效率6-8倍。本实用新型整个模板体系均在楼板的上下两个面上,所以便于成品保护,所有构件均可采用现场废旧材料,既有效控制了成本,又实现了废物再利用。

Description

楼板后浇洞口模板支撑结构
技术领域:
本实用新型涉及建筑施工模板支撑体系,特别是一种楼板后浇洞口模板支撑结构。
背景技术:
在建筑施工中,楼板上施工预留洞口的后浇封堵是影响主体结构施工能否及时进行地面施工的重要原因,特别是在高层建筑施工中,泵管预留洞,测量观测孔等数量庞大,施工不便。当前绝大多数都是采用立杆从底层进行模板的顶托支撑方式,存在的缺陷是:①由于后浇洞口面积不大,立杆支撑基本没有水平拉杆,因此立杆容易失稳变形,质量不好控制;②浇注完毕后,工人在工作面上作业时容易碰撞,造成破坏,不利于成品保护;③支撑立杆的调节、加固等工序的完成,比较费时,工作效率低;④支撑立杆产生租赁费用,不利于成本控制。
发明内容:
本实用新型旨在解决现有后浇洞口模板支撑方式存在的上述缺陷,而提供一种能快捷、方便、高效进行洞口封堵,保证楼板施工质量、确保工期的楼板后浇洞口模板支撑结构。
本实用新型采用的技术方案是:一种楼板后浇洞口模板支撑结构,包括传力杆件、竹胶模板,所述传力杆件以洞口周边楼板为支座横担于后浇洞口上部;所述竹胶模板面积稍大于洞口面积,其以覆盖洞口方式置于洞口下部并通过吊挂钢丝与所述传力杆件拉紧连接,所述吊挂钢丝下端穿过竹胶模板上的通孔并通过插入其端头环扣内的销钉与竹胶模板卡接。
与现有技术相比,本实用新型的有益效果是:结构简单,操作方便,省工省时。经验证,采用传统立杆支撑模板结构,一次支设大概需要120-180分钟,而本实用新型一次支设仅需20-30分钟,提高效率6-8倍。本实用新型整个模板体系均在楼板的上下两个面上,所以便于成品保护,所有构件均可采用现场废旧材料,既有效控制了成本,又实现了废物再利用。
附图说明:
图1为本实用新型的结构示意图。
图中:传力杆件1,吊挂钢丝2,竹胶模板3,销钉4,后浇洞口5,楼板6。
具体实施方式:
以下结合附图给出的实施例对本实用新型作进一步说明。
本实施例给出的楼板后浇洞口模板支撑结构,其传力杆件1可选用施工现场产生的废旧木方或钢筋,以后浇洞口5周边楼板6为支座横担于后浇洞口5上部;其竹胶模板3同样选用施工现场产生的废旧竹胶板,面积稍大于后浇洞口5面积,其覆盖在后浇洞口5下部,通过吊挂钢丝2与传力杆件1拉紧连接,吊挂钢丝2下端穿过竹胶模板3上的通孔并通过插入其端头环扣内的销钉4与竹胶模板3卡接,销钉4可选用水泥钉。实际操作时,可通过旋转传力杆件1而拉紧吊挂钢丝2,对吊着的竹胶模板3进行调节和加固,之后,即可进行混凝土浇注。模板拆除时,只需将吊挂钢丝2剪断即可。

Claims (1)

1.一种楼板后浇洞口模板支撑结构,包括传力杆件、竹胶模板,其特征在于,所述传力杆件以洞口周边楼板为支座横担于后浇洞口上部;所述竹胶模板面积稍大于洞口面积,其以覆盖洞口方式置于洞口下部并通过吊挂钢丝与所述传力杆件拉紧连接,所述吊挂钢丝下端穿过竹胶模板上的通孔并通过插入其端头环扣内的销钉与竹胶模板卡接。
CN2009201734986U 2009-09-11 2009-09-11 楼板后浇洞口模板支撑结构 Expired - Fee Related CN201474296U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201734986U CN201474296U (zh) 2009-09-11 2009-09-11 楼板后浇洞口模板支撑结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201734986U CN201474296U (zh) 2009-09-11 2009-09-11 楼板后浇洞口模板支撑结构

Publications (1)

Publication Number Publication Date
CN201474296U true CN201474296U (zh) 2010-05-19

Family

ID=42410542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201734986U Expired - Fee Related CN201474296U (zh) 2009-09-11 2009-09-11 楼板后浇洞口模板支撑结构

Country Status (1)

Country Link
CN (1) CN201474296U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590218A (zh) * 2018-03-16 2018-09-28 北京首钢建设集团有限公司 一种发泡胶压力灌注孔洞气密性封堵方法
CN109184195A (zh) * 2018-10-09 2019-01-11 中建四局第六建筑工程有限公司 一种混凝土外墙洞口封堵方法
CN112963009A (zh) * 2021-03-20 2021-06-15 上海宝冶集团有限公司 一种华夫板孔洞的混凝土浇筑封堵方法
CN113700301A (zh) * 2021-08-27 2021-11-26 山东建科特种建筑工程技术中心有限公司 装配式构件灌浆层封堵方法及装配式构件连接施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590218A (zh) * 2018-03-16 2018-09-28 北京首钢建设集团有限公司 一种发泡胶压力灌注孔洞气密性封堵方法
CN109184195A (zh) * 2018-10-09 2019-01-11 中建四局第六建筑工程有限公司 一种混凝土外墙洞口封堵方法
CN109184195B (zh) * 2018-10-09 2020-06-23 中建四局第六建筑工程有限公司 一种混凝土外墙洞口封堵方法
CN112963009A (zh) * 2021-03-20 2021-06-15 上海宝冶集团有限公司 一种华夫板孔洞的混凝土浇筑封堵方法
CN113700301A (zh) * 2021-08-27 2021-11-26 山东建科特种建筑工程技术中心有限公司 装配式构件灌浆层封堵方法及装配式构件连接施工方法

Similar Documents

Publication Publication Date Title
CN201474296U (zh) 楼板后浇洞口模板支撑结构
CN104895193B (zh) 预制外墙板连接盒及连接节点
CN104895279B (zh) 预制外墙板与预制梁的干挂连接结构及其施工方法
CN104947719A (zh) 地下室顶板后浇带吊支模结构及其后浇带施工方法
CN102383593A (zh) 厨卫间翻边混凝土一次成型支模装置及施工方法
CN103806647A (zh) 大跨度混凝土双向密肋梁模壳的安装和拆除工艺
CN104060760B (zh) 高层建筑结构转换层混凝土超大梁分层施工方法
CN204081445U (zh) 悬挑工字钢锚固装置
CN203961238U (zh) 螺栓锚板可调工具式悬挑脚手架
CN201362959Y (zh) 楼板预留洞装置
CN107100322B (zh) 后张法竖向预应力现浇混凝土柱结构及施工方法
CN203846523U (zh) 一种组合式塔机基础
CN105275198B (zh) 一种剪力墙加固模板结构及其施工方法
CN205063248U (zh) 预制外墙板与预制梁的干挂连接结构
CN110056190A (zh) 一种两段式楼板厚度控制止水螺杆
CN207919773U (zh) 一种装配式卫生间挡水导墙
CN203285056U (zh) 楼梯模板支撑底座
CN203145040U (zh) 一种便于拆卸运输的预制板铁塔基础
CN104912231A (zh) 预制外墙板与剪力墙的干挂连接结构及其施工方法
CN201381516Y (zh) 大直径地脚螺栓安装用预埋支架
CN203668894U (zh) 可快速安装的混凝土预制模板结构
CN208633518U (zh) 预应力混凝土叠合楼板吊模浇筑施工结构
CN202745377U (zh) 一种剪力墙接茬模板加固螺栓
CN103206084A (zh) 一种可以节省材料的现浇楼板的施工方法
CN102943484B (zh) 一种大中型设备安装斜铁坐浆快速找平法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20120911