CN201447661U - Shock-absorbing and isolation structures applied to prefabricated or prefabricated beam bridges - Google Patents

Shock-absorbing and isolation structures applied to prefabricated or prefabricated beam bridges Download PDF

Info

Publication number
CN201447661U
CN201447661U CN2009200474500U CN200920047450U CN201447661U CN 201447661 U CN201447661 U CN 201447661U CN 2009200474500 U CN2009200474500 U CN 2009200474500U CN 200920047450 U CN200920047450 U CN 200920047450U CN 201447661 U CN201447661 U CN 201447661U
Authority
CN
China
Prior art keywords
shock
absorbing
isolating
cover beam
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200474500U
Other languages
Chinese (zh)
Inventor
刘伟庆
陆伟东
徐秀丽
李雪红
周亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN2009200474500U priority Critical patent/CN201447661U/en
Application granted granted Critical
Publication of CN201447661U publication Critical patent/CN201447661U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00—Adapting or protecting infrastructure or their operation
    • Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种应用于装配式或预制组装式梁桥的减隔震结构,包括桥墩(4)和盖梁(2),其特征是在桥墩(4)和盖梁(2)之间安装有叠层橡胶或铅芯橡胶减隔震支座(3),在盖梁(2)的上部安装有板式橡胶支座(1)。本实用新型的减隔震支座屈服后的低刚度和高阻尼可延长结构自振周期,提高结构阻尼,从而降低结构的地震反应。本实用新型将盖梁与下部墩柱分离,通过隔震支座对盖梁以上的结构构件进行减隔震,不仅满足了桥梁正常使用阶段不约束温度变形的要求,更主要的是大大减少了减隔震支座数量,较大幅度地降低了工程成本,同时也解决了支座安装困难的问题。

Figure 200920047450

A shock-absorbing and isolating structure applied to a prefabricated or prefabricated assembled girder bridge, comprising a bridge pier (4) and a cover beam (2), characterized in that a stack is installed between the bridge pier (4) and the cover beam (2) Rubber or lead core rubber shock-absorbing and isolating support (3), plate type rubber support (1) is installed on the top of cover beam (2). The low stiffness and high damping of the vibration-absorbing and isolating support of the utility model can prolong the natural vibration period of the structure, improve the structural damping, and thereby reduce the seismic response of the structure. The utility model separates the cover beam from the lower pier column, and uses the shock-isolation support to reduce and isolate the structural members above the cover beam. The number of shock-absorbing and isolating supports greatly reduces the engineering cost, and at the same time solves the problem of difficult installation of the supports.

Figure 200920047450

Description

应用于装配式或预制组装式梁桥的减隔震结构 Shock-absorbing and isolation structures applied to prefabricated or prefabricated beam bridges

技术领域technical field

本实用新型涉及一种桥梁的减隔震结构,尤其是一种装配式或预制组装式梁桥结构的减隔震结构,具体地说是一种应用于装配式或预制组装式梁桥的减隔震结构。The utility model relates to a shock-absorbing and isolating structure of a bridge, in particular to a shock-absorbing and isolating structure of an assembled or prefabricated assembled girder bridge structure, in particular to a shock-absorbing and isolating structure applied to an assembled or prefabricated assembled girder bridge. Seismic isolation structure.

背景技术Background technique

目前,在桥梁的减隔震技术应用中,通常是直接将普通桥梁支座替换成减隔震支座,即不论是否为减隔震支座,其支座设置位置和数量基本是相同的。当上部采用装配式或预制组装式结构(如空心板、组合箱梁、T梁)时,一般需设置大量的板式橡胶支座。由于板式橡胶支座的变形量小、与上下部结构间的连接薄弱(仅靠摩擦力),即使在7度抗震设防地区,通常也难以满足《公路桥梁抗震设计细则》(JTG/T B02-01-2008)对支座变形和稳定性的要求,因此需改变结构形式或采用减隔震支座进行减隔震设计。由于减隔震支座的连接要求高,需采用螺栓连接或焊接,但这类装配式桥型支座安装操作空间有限(特别是空心板桥)且支座数量大,给施工带来很大的难度,并且成本较高。对此目前尚无好的解决方法。At present, in the application of seismic isolation technology for bridges, ordinary bridge bearings are usually directly replaced with seismic isolation bearings, that is, whether they are seismic isolation bearings or not, the location and number of the bearings are basically the same. When the upper part adopts prefabricated or prefabricated assembled structures (such as hollow slabs, composite box girders, T beams), it is generally necessary to set a large number of plate rubber bearings. Due to the small amount of deformation of the plate rubber bearing and the weak connection between the upper and lower structures (only by friction), it is usually difficult to meet the "Detailed Rules for Seismic Design of Highway Bridges" (JTG/T B02- 01-2008) on the deformation and stability requirements of the support, so it is necessary to change the structural form or use the shock-absorbing and isolating support for shock-absorbing and isolation design. Due to the high requirements for the connection of shock-absorbing and isolating bearings, bolt connection or welding is required, but the installation and operation space of this type of prefabricated bridge-type bearing is limited (especially for hollow slab bridges) and the number of bearings is large, which brings great impact to the construction. difficult and costly. There is currently no good solution for this.

发明内容Contents of the invention

本实用新型的目的是针对现有的装配式或预制组装式梁桥的减隔震效果差、安装使用不便的问题,设计一种既可减少减隔震支座的数量,大大降低工程造价,又可降低减隔震支座的施工难度的应用于装配式或预制组装式梁桥的减隔震结构。The purpose of this utility model is to solve the problem of poor shock absorption and isolation effect and inconvenient installation and use of existing assembled or prefabricated assembled girder bridges, and to design a structure that can reduce the number of shock absorption and isolation supports and greatly reduce the construction cost. It can also reduce the construction difficulty of the shock-absorbing and isolating bearings and is applied to the shock-absorbing and isolating structures of prefabricated or prefabricated beam bridges.

本实用新型的技术方案是:The technical scheme of the utility model is:

一种应用于装配式或预制组装式梁桥的减隔震结构,包括桥墩4和盖梁2,其特征是在桥墩4和盖梁2之间安装有叠层橡胶或铅芯橡胶减隔震支座3,在盖梁2的上部安装有板式橡胶支座1。A shock-absorbing and isolating structure applied to prefabricated or prefabricated assembled girder bridges, comprising pier 4 and cover girder 2, characterized in that laminated rubber or lead rubber is installed between pier 4 and cover girder 2 for shock-absorbing isolation The bearing 3 is equipped with a plate type rubber bearing 1 on the top of the cover beam 2 .

所述的减隔震支座3的底部设有下连接钢板8,连接钢板8通过焊接或连接螺栓6与桥墩4上预埋的墩顶预埋钢板9相连;所述的减隔震支座3的上部设有上连接钢板10,连接钢板10也可通过焊接或连接螺栓6与盖梁2下部预埋的盖梁预埋钢板5相连。The bottom of the shock-absorbing and isolating support 3 is provided with a lower connecting steel plate 8, and the connecting steel plate 8 is connected to the pre-embedded pier top pre-embedded steel plate 9 on the pier 4 by welding or connecting bolts 6; The upper part of 3 is provided with upper connection steel plate 10, and connection steel plate 10 also can link to each other with the cover beam pre-embedded steel plate 5 embedded in cover beam 2 bottom by welding or connection bolt 6.

在所述的盖梁2的两侧各设有一个高出其上表面的挡块7以防止铺设在盖梁2上的梁体滑落。Both sides of the cover beam 2 are respectively provided with a stopper 7 higher than its upper surface to prevent the beam body laid on the cover beam 2 from slipping.

每个桥墩4上至少安装有一个减隔震支座3。并需设置锚栓或采取其他措施确保地震作用下主梁的纵向水平地震作用能有效传递给盖梁2。At least one shock-absorbing and isolating bearing 3 is installed on each pier 4 . It is also necessary to set anchor bolts or take other measures to ensure that the longitudinal and horizontal seismic action of the main girder under the earthquake can be effectively transmitted to the cover beam 2 .

本实用新型的有益效果:The beneficial effects of the utility model:

1、本实用新型首次将板式橡胶支座支承的装配式或预制组装式上部结构(空心板、组合箱梁、T梁)的梁式桥的盖梁与墩柱分离,在盖梁和墩柱间设置减隔震支座,不仅满足了桥梁正常使用阶段不约束温度变形的要求,更主要的是大大减少了减隔震支座的数量,较大幅度地降低了工程成本,同时也解决了支座安装困难的问题。1. For the first time, the utility model separates the cover beam and the pier column of the girder bridge of the assembled or prefabricated assembled superstructure (hollow slab, combined box girder, T beam) supported by the plate rubber bearing, and sets the cover beam and the pier column between the cover beam and the pier column The shock-absorbing and isolating bearing not only meets the requirement of not constraining the temperature deformation during the normal use of the bridge, but more importantly, it greatly reduces the number of shock-absorbing and isolating bearings, greatly reduces the engineering cost, and also solves the problem of bearing Difficult installation problems.

2、本实用新型有利于减少减隔震支座的数量,降低工程造价。2. The utility model is beneficial to reduce the number of shock-absorbing and isolating bearings and reduce the engineering cost.

3、本实用新型的盖梁与墩间有足够的空间,便于减隔震支座的施工安装。3. There is enough space between the cover beam and the pier of the utility model, which is convenient for the construction and installation of the shock-absorbing and isolating bearing.

4、本实用新型在盖梁的上部保留板式橡胶支座,保证了正常使用阶段结构具有一定的温度变形能力。4. The utility model retains the plate-type rubber bearing on the upper part of the cover beam, which ensures that the structure has a certain temperature deformation capacity in the normal use stage.

5、本实用新型将板式橡胶支座与减隔震支座进行有机的串连使用,进一步降低了结构的侧向刚度,提高了对上部结构的隔震效果。5. The utility model organically connects the plate-type rubber bearing and the vibration-absorbing and isolating bearing in series, which further reduces the lateral stiffness of the structure and improves the vibration-isolation effect of the upper structure.

附图说明Description of drawings

图1是本实用新型的减隔震结构示意图。Fig. 1 is a schematic view of the shock-absorbing and isolating structure of the present utility model.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型作进一步的说明。Below in conjunction with accompanying drawing and embodiment the utility model is described further.

如图1所示。As shown in Figure 1.

一种应用于装配式或预制组装式梁桥的减隔震结构,它至少包括一个桥墩4和支承在桥墩4上的盖梁2,在桥墩4和盖梁2之间安装有叠层橡胶或铅芯橡胶式减隔震支座3(可采用无锡圣丰减震器有限公司所生产的减隔震支座,既可采用无芯叠层橡胶式结构的隔震支座LNR600、LNR700、LNR800…,也可采用铅芯叠层橡胶式结构的减隔震支座LRB600、LRB700、LRB800…),每个桥墩4上至少安装一个减隔震支座3,在盖梁2的上部安装有板式橡胶支座1。减隔震支座3与盖梁2及桥墩4的连接结构如下:减隔震支座3的底部设有下连接钢板8并通过连接螺栓6(也可通过焊接的方法直接)与桥墩4上预埋的墩顶预埋钢板9相连;所述的减隔震支座3的上部设有上连接钢板10并通过连接螺栓6(也可通过焊接的方法直接)与盖梁2下部预埋的盖梁预埋钢板5相连。在所述的盖梁2的两侧各设有一个高出其上表面的挡块7以防止铺设在盖梁2上的梁体滑落,如图1所示。本实用新型的减隔震支座3可提供较小的侧向刚度和较高的阻尼(0.265),延长上部结构在地震作用时的自振周期(约为原来的2倍以上),增加结构阻尼(阻尼比提高15%左右),明显减小结构地震反应。A shock-absorbing and isolating structure applied to a prefabricated or prefabricated assembled girder bridge, which at least includes a pier 4 and a cover girder 2 supported on the pier 4, and laminated rubber or Lead-core rubber type vibration-absorbing and isolating bearing 3 (the vibration-absorbing and isolating bearing produced by Wuxi Shengfeng Shock Absorber Co., Ltd. can be used, and the vibration-isolating bearing LNR600, LNR700, and LNR800 with coreless laminated rubber structure can be used. ..., lead-core laminated rubber-type vibration-absorbing bearings LRB600, LRB700, LRB800...), at least one vibration-absorbing bearing 3 is installed on each pier 4, and a plate type is installed on the upper part of the cover beam 2 Rubber bearing 1. The connection structure between the shock-absorbing and isolating support 3 and the cover beam 2 and the bridge pier 4 is as follows: the bottom of the shock-isolating support 3 is provided with a lower connecting steel plate 8 and connected to the upper part of the pier 4 by connecting bolts 6 (also directly by welding). The pre-embedded pier top pre-embedded steel plate 9 is connected; the upper part of the shock-absorbing and isolating support 3 is provided with an upper connecting steel plate 10 and is connected to the pre-embedded lower part of the cover beam 2 by connecting bolts 6 (also directly by welding). The cover beam pre-embedded steel plate 5 is connected. Both sides of the cover beam 2 are respectively provided with a stopper 7 higher than its upper surface to prevent the beam body laid on the cover beam 2 from slipping, as shown in FIG. 1 . The shock-absorbing and isolating bearing 3 of the present utility model can provide smaller lateral stiffness and higher damping (0.265), prolong the natural vibration period of the upper structure (about twice the original) when the earthquake acts, and increase the structural Damping (the damping ratio is increased by about 15%), which can obviously reduce the seismic response of the structure.

本实用新型的实质是将采用板式橡胶支座支承的装配式或预制组装式混凝土梁桥在盖梁和墩间截断并增设减隔震支座,避免在主梁底部直接安装隔震支座,将上部主梁和板式橡胶支座作为整体一并进行隔震。The essence of the utility model is to cut off the assembled or prefabricated concrete girder bridge supported by the plate rubber bearing between the cover beam and the pier and add a shock-absorbing and isolating support to avoid directly installing the shock-isolating support at the bottom of the main girder. The upper main girder and the plate rubber bearing are used as a whole for vibration isolation.

以下是与上述结构相配的具体的减隔震方法:The following are the specific shock absorption and isolation methods that match the above structure:

一种应用于装配式或预制组装式梁桥的减隔震方法,它包括以下步骤:A method for shock absorption and isolation applied to a prefabricated or prefabricated assembled girder bridge comprises the following steps:

首先,将盖梁2与桥墩4分开制成两个独立的部件,并分别在盖梁2的底部和桥墩4的顶部预埋连接钢板,必要时还可在盖梁2的两侧边各设置一个高出其上表面的挡块7,以防止遇到强烈地震(如里氏7级以上的地震)时梁体的滑落;Firstly, the cover girder 2 and the pier 4 are separated to make two independent parts, and the connecting steel plates are embedded in the bottom of the cover girder 2 and the top of the pier 4 respectively, and can be installed on both sides of the cover girder 2 if necessary A stopper 7 higher than its upper surface, to prevent the girder body from slipping when encountering a strong earthquake (such as an earthquake above magnitude 7 on the Richter scale);

其次,在盖梁2与桥墩4之间增设减隔震支座3(可采用无锡圣丰减震器有限公司所生产的减隔震支座,既可采用无芯叠层橡胶式结构的隔震支座,型号可为LNR600、LNR700、LNR800…,也可采用铅芯叠层橡胶式结构的减隔震支座,型号可为LRB600、LRB700、LRB800…)以提供较小的侧向刚度和较高的阻尼,延长上部结构在地震作用时的自振周期,增加结构阻尼,减小结构地震反应;同时在减隔震支座3的上下表面分别设置上连接钢板10和下连接钢板8,使上连接钢板10及下连接钢板8分别与盖梁2及桥墩4上的预埋钢板相连;Secondly, add a shock-absorbing and isolating support 3 between the cover beam 2 and the pier 4 (the shock-absorbing and isolating support produced by Wuxi Shengfeng Shock Absorber Co., Ltd. can be used, and the coreless laminated rubber structure can be used. Vibration support, the model can be LNR600, LNR700, LNR800..., also can use the lead core laminated rubber type shock absorbing support, the model can be LRB600, LRB700, LRB800...) to provide small lateral stiffness and Higher damping prolongs the natural vibration period of the upper structure under earthquake action, increases structural damping, and reduces structural seismic response; at the same time, an upper connecting steel plate 10 and a lower connecting steel plate 8 are respectively arranged on the upper and lower surfaces of the shock-absorbing and isolating support 3, Connect the upper connecting steel plate 10 and the lower connecting steel plate 8 to the pre-embedded steel plates on the cover beam 2 and the pier 4 respectively;

第三,在盖梁2的上表面铺设板式橡胶支座1以满足温度变形的要求,然后在板式橡胶支座1的表面铺设桥面结构,从而使盖梁2上部的板式橡胶支座1与其下部的减隔震支座3形成一个整体的减隔震体系。Thirdly, the plate rubber bearing 1 is laid on the upper surface of the cover beam 2 to meet the temperature deformation requirements, and then the bridge deck structure is laid on the surface of the plate rubber bearing 1, so that the plate rubber bearing 1 on the upper part of the cover beam 2 and the The shock-absorbing and isolating bearing 3 at the bottom forms an integral shock-absorbing and isolating system.

本实用新型未涉及部分均与现有技术相同或可采用现有技术加以实现。The parts not involved in the utility model are all the same as the prior art or can be realized by adopting the prior art.

Claims (4)

1.一种应用于装配式或预制组装式梁桥的减隔震结构,包括桥墩(4)和盖梁(2),其特征是在桥墩(4)和盖梁(2)之间安装有叠层橡胶或铅芯橡胶减隔震支座(3),在盖梁(2)的上部安装有板式橡胶支座(1)。1. A shock-absorbing and isolating structure applied to prefabricated or prefabricated assembled girder bridges, comprising piers (4) and cover beams (2), characterized in that a A laminated rubber or lead rubber shock-absorbing support (3) is provided with a plate-type rubber support (1) on the top of the cover beam (2). 2.根据权利要求1所述的减隔震结构,其特征是所述的减隔震支座(3)的底部设有下连接钢板(8),下连接钢板(8)通过焊接或连接螺栓(6)与桥墩(4)上预埋的墩顶预埋钢板(9)相连;所述的减隔震支座(3)的上部设有上连接钢板(10),上连接钢板(10)通过焊接或连接螺栓(6)与盖梁(2)下部预埋的盖梁预埋钢板(5)相连。2. The shock-absorbing and isolating structure according to claim 1, characterized in that the bottom of the shock-absorbing and isolating support (3) is provided with a lower connecting steel plate (8), and the lower connecting steel plate (8) is welded or connected with bolts (6) It is connected with the pre-buried steel plate (9) on the top of the pier (4); the upper part of the shock-absorbing and isolation support (3) is provided with an upper connecting steel plate (10), and the upper connecting steel plate (10) The cover beam pre-embedded steel plate (5) embedded in the lower part of the cover beam (2) is connected by welding or connecting bolts (6). 3.根据权利要求1所述的减隔震结构,其特征是在所述的盖梁(2)的两侧各设有一个高出其上表面的挡块(7)以防止铺设在盖梁(2)上的梁体滑落。3. The shock-absorbing and isolating structure according to claim 1, characterized in that a block (7) higher than the upper surface of the cover beam (2) is provided on both sides of the cover beam (2) to prevent laying on the cover beam (2) The upper beam body slides off. 4.根据权利要求1所述的减隔震结构,其特征是每个桥墩(4)上至少安装有一个减隔震支座(3)。4. The shock-absorbing and isolating structure according to claim 1, characterized in that at least one shock-absorbing and isolating support (3) is installed on each pier (4).
CN2009200474500U 2009-07-16 2009-07-16 Shock-absorbing and isolation structures applied to prefabricated or prefabricated beam bridges Expired - Lifetime CN201447661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200474500U CN201447661U (en) 2009-07-16 2009-07-16 Shock-absorbing and isolation structures applied to prefabricated or prefabricated beam bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200474500U CN201447661U (en) 2009-07-16 2009-07-16 Shock-absorbing and isolation structures applied to prefabricated or prefabricated beam bridges

Publications (1)

Publication Number Publication Date
CN201447661U true CN201447661U (en) 2010-05-05

Family

ID=42552377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200474500U Expired - Lifetime CN201447661U (en) 2009-07-16 2009-07-16 Shock-absorbing and isolation structures applied to prefabricated or prefabricated beam bridges

Country Status (1)

Country Link
CN (1) CN201447661U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191817A (en) * 2011-03-31 2011-09-21 华丰建设股份有限公司 Lead rubber bearing
CN103352421A (en) * 2013-07-17 2013-10-16 大连海事大学 Seismic-isolated bridge structure system with buckling-restrained braces and seismic-isolated rubber bearings
CN103966946A (en) * 2014-05-20 2014-08-06 上海市城市建设设计研究总院 Spring rubber seismic reduction and isolation system of bridge
CN103993678A (en) * 2014-05-28 2014-08-20 南京师范大学 Composite shear plate damper
CN104278678A (en) * 2013-07-05 2015-01-14 天津城建设计院有限公司 Horizontal displacement control device of large foundation ditch bracket column
CN108982032A (en) * 2018-04-26 2018-12-11 上海市政交通设计研究院有限公司 A kind of experimental rig and its method suitable for highly seismic region precast assembly bridge pier
CN113882237A (en) * 2021-10-15 2022-01-04 中国建筑第五工程局有限公司 A double-column bridge structure and construction method with energy consumption self-reset function
CN116201002A (en) * 2023-03-13 2023-06-02 合肥工业大学 Transverse toughness earthquake-resistant structure of bent bridge pier and installation method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191817A (en) * 2011-03-31 2011-09-21 华丰建设股份有限公司 Lead rubber bearing
CN102191817B (en) * 2011-03-31 2012-07-25 华丰建设股份有限公司 Lead rubber vibration insulation bearing
CN104278678A (en) * 2013-07-05 2015-01-14 天津城建设计院有限公司 Horizontal displacement control device of large foundation ditch bracket column
CN103352421A (en) * 2013-07-17 2013-10-16 大连海事大学 Seismic-isolated bridge structure system with buckling-restrained braces and seismic-isolated rubber bearings
CN103966946A (en) * 2014-05-20 2014-08-06 上海市城市建设设计研究总院 Spring rubber seismic reduction and isolation system of bridge
CN103993678A (en) * 2014-05-28 2014-08-20 南京师范大学 Composite shear plate damper
CN108982032A (en) * 2018-04-26 2018-12-11 上海市政交通设计研究院有限公司 A kind of experimental rig and its method suitable for highly seismic region precast assembly bridge pier
CN113882237A (en) * 2021-10-15 2022-01-04 中国建筑第五工程局有限公司 A double-column bridge structure and construction method with energy consumption self-reset function
CN113882237B (en) * 2021-10-15 2023-09-08 中国建筑第五工程局有限公司 A double-column bridge structure and construction method with energy-consuming self-resetting function
CN116201002A (en) * 2023-03-13 2023-06-02 合肥工业大学 Transverse toughness earthquake-resistant structure of bent bridge pier and installation method

Similar Documents

Publication Publication Date Title
CN101424071B (en) Supporting system of long span stayed-cable bridge
CN202626822U (en) Concrete filled steel tube pier with self-reset function
CN106368115B (en) A kind of shock isolation system suitable for medium and small span beam bridge
CN204000572U (en) Friction-type steel concrete Antivibration block
CN101230598A (en) Buckling-constrained rocking shock-absorbing columns
CN101613989A (en) Seismic reduction and isolation method and structure applied to prefabricated or prefabricated assembled girder bridges
CN206521689U (en) A kind of energy-dissipating type Antivibration block device
CN101922158A (en) An overall underpinning vibration isolation device and method for passing through a building foundation under a subway
CN107190639A (en) The function divergence type combined isolation bearing and its construction method of a kind of steely stop block structure
CN111236057A (en) Connecting device for anti-seismic support of viaduct panel and bridge panel
CN103352421B (en) Seismic-isolated bridge structure system with buckling-restrained braces and seismic-isolated rubber bearings
CN204455790U (en) Improve the cable stayed bridge of outer end bay without suspension cable of lateral dynamics stress performance
CN203603042U (en) Function separation type large-span continuous beam isolation bearing
CN110847010B (en) Construction and construction method suitable for large-span abutment rigid frame bridge
CN206298825U (en) A kind of high-strength anti-seismic bridge attachment means
CN102747679A (en) Economic arrangement method for inhaul cable shock mounts of continuous girder bridge
CN106351118A (en) Earthquake isolation and reduction structure and earthquake reduction method thereof
CN112112198B (en) Rigid-flexible combined damper device and construction method thereof
CN110016868A (en) A kind of steel trestle platform damping and de-noising method
CN212270655U (en) Connecting device for anti-seismic support of viaduct panel and bridge panel
CN213142770U (en) X-shaped viaduct shock-absorbing support
CN204475178U (en) A kind of flush type steel anchor box
CN203238538U (en) Flat spring plate type rubber expansion joint
CN206784159U (en) A kind of bridge girder anti-seismic bearing
CN102787553B (en) Transverse compound pier anti-seismic stop structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20100505

Effective date of abandoning: 20090716

AV01 Patent right actively abandoned

Granted publication date: 20100505

Effective date of abandoning: 20090716