CN201443339U - Well repair device with pressure in oil field - Google Patents

Well repair device with pressure in oil field Download PDF

Info

Publication number
CN201443339U
CN201443339U CN2009200288653U CN200920028865U CN201443339U CN 201443339 U CN201443339 U CN 201443339U CN 2009200288653 U CN2009200288653 U CN 2009200288653U CN 200920028865 U CN200920028865 U CN 200920028865U CN 201443339 U CN201443339 U CN 201443339U
Authority
CN
China
Prior art keywords
oil
clamping device
pipe
preventer
pipe clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200288653U
Other languages
Chinese (zh)
Inventor
亓和平
王刚
王运伟
何金珊
邵宝华
张兴瑞
徐元信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Linqu Qiancheng Petroleum Machinery Co., Ltd.
Original Assignee
徐元信
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐元信 filed Critical 徐元信
Priority to CN2009200288653U priority Critical patent/CN201443339U/en
Application granted granted Critical
Publication of CN201443339U publication Critical patent/CN201443339U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a well repair device with pressure in an oil field, which comprises a bearing bracket. The bottom part of the bearing bracket is connected with a brace and the lower part thereof is fixedly connected with a bearing plate; the bearing plate is provided with an oil pipe channel and the lower face of the bearing plate is fixedly connected with a blowout preventer; the blowout preventer is connected with a wellhead flange; the upper face of the bearing plate is fixedly connected with a lower fixed pipe blocking device which is connected with a joint alerter; from top to bottom, the lower fixed pipe blocking device is connected with a lower annular blowout preventer, a connecting pipe, an upper annular blowout preventer, an upper fixed pipe blocking device and a high-pressure self-cover in series in sequence; the connecting pipe is connected with a pressure release valve; both sides of the bearing plate are respectively fixedly connected with an oil cylinder which is fixedly connected with a lifting beam; the lifting beam is provided with an oil pipe passing hole; the upper side and the lower side of the lifting beam are fixedly connected with a movable pipe blocking device and a slip rotating mechanism; and the device also comprises an operation and control system. Even when the oil well has pressure, the device can conduct well repair operation without blowout or well killing and has the advantages of saving energy, preventing pollution and saving operation time.

Description

The oil field band is pressed well repairing device
Technical field
The utility model relates to a kind of oil field band and presses well repairing device.
Background technology
At present, in China during to the oil in oil field, gas, well upkeep operation, if in the well pressure is arranged, usually adopt open flow and kill-job dual mode that borehole pressure is discharged, carry out workover treatment then, its shortcoming is that open flow causes the loss of stratum energy and environment is polluted, and the open flow time is long, causes well workover efficient low; Kill-job then causes the destruction on stratum and pollution.
The utility model content
The technical problems to be solved in the utility model is at above-mentioned deficiency, provides a kind of oil field band to press well repairing device, utilizes this device, has at oil well under the situation of pressure, does not need open flow and kill-job just can carry out workover treatment.
In order to solve the problems of the technologies described above, the utility model provides a kind of oil field band of following structure to press well repairing device, comprise carrier, the bottom of carrier is connected with Height Adjustable support, the bottom of carrier is connected with loaded plate, loaded plate is provided with the oil pipe passage, be connected with preventer on the soffit of loaded plate, be connected with on the preventer and be used for the wellhead flange that is connected with well head, be connected with down fixedly pipe clamping device on the upper surface of loaded plate, preventer is with fixedly the inner chamber of pipe clamping device is corresponding with the oil pipe passage down; Down fixedly be connected with the box cupling alarm on the pipe clamping device, be serially connected with down successively from bottom to top on the following fixedly pipe clamping device belt preventer, tube connector, upward belt preventer, on fixedly pipe clamping device and high pressure are self-styled, be connected to pressure release valve on the tube connector; The both sides of loaded plate respectively are connected with oil cylinder, be connected with the lifting crossbeam on the piston rod of oil cylinder, the lifting crossbeam is provided with the oil pipe via hole, top and following the move about pipe clamping device and the slips rotating mechanism of being connected with respectively of lifting crossbeam, the inner chamber of pipe clamping device and slips rotating mechanism of moving about is corresponding with the oil pipe via hole, and this device also comprises control system.
Described slips rotating mechanism comprises with the affixed fixed cover of lifting crossbeam and is screwed onto movable sleeve on the fixed cover, is bolted with the leading screw that is used to clamp oil pipe on the movable sleeve.
The oil field band of said structure presses the use of well repairing device as follows: at first press the oil field band well repairing device to place the top of oil well, the height of adjusting the support of carrier bottom then is tightly connected wellhead flange and well head.In the time need from oil well, proposing the oil pipe in the oil well to change or repair, guide the connection of oil pipe earlier, promptly earlier an Oil-saving pipe is connected with oil pipe in the oil well with this device.The connection of guiding oil pipe is achieved in that by the control system driving oil cylinder rises, the guiding oil pipe is pierced into the pipe clamping device and it is passed of moving about from the slips rotating mechanism, start the pipe clamping device that moves about and block the guiding oil pipe, and then descend by the control system driving oil cylinder, pierce into successively in the process that the guiding oil pipe descends with oil cylinder high pressure self-styled, on fixedly pipe clamping device, upward go in ring preventer, tube connector, down belt preventer, fixedly pipe clamping device and preventer and oil pipe final and in the oil well dock down; If oil cylinder drops to low level time guiding oil pipe does not still dock with oil pipe in the oil well, starting upward this moment fixedly, pipe clamping device blocks the guiding oil pipe and makes the pipe clamping device that moves about unclamp the guiding oil pipe, starting oil cylinder then makes it to rise, after oil cylinder rises to certain altitude, make the pipe clamping device that moves about block the guiding oil pipe again and make fixedly that pipe clamping device unclamps, then make oil cylinder drive the guiding oil pipe and descend, move about like this pipe clamping device and the alternation of last fixedly pipe clamping device are docked with oil pipe in the oil well until the guiding oil pipe; The guiding oil pipe is with after oil pipe in the oil well docks, clamping move about pipe clamping device and last fixedly pipe clamping device of guiding oil pipe and making with the slips rotating mechanism unclamps, clamp the guiding oil pipe with Power Tong then, the rotational power pincers make in the screw thread of the box cupling of oil pipe in the guiding tube precession oil well, and the connection of guiding oil pipe has just been finished.After the connection of guiding oil pipe is finished, block the guiding oil pipe and unclamp the slips rotating mechanism with the pipe clamping device that moves about, start oil cylinder and drive move about pipe clamping device and the rising of guiding oil pipe, when oil cylinder rises to extreme position, use fixedly pipe clamping device chucking guiding oil pipe, the pipe clamping device that moves about unclamps and drops to behind the low level chucking guiding oil pipe again with oil cylinder, unclamp fixedly pipe clamping device and oil cylinder is risen once more this moment, after the guiding oil pipe is thus lifted to assigned address, it is screwed off, and then utilize the alternation of move about pipe clamping device and last fixedly pipe clamping device, just can propose the oil pipe in the oil well one successively, oil pipe proposes the back just can be to the oil well repairing of being correlated with.In above-mentioned oil pipe proposition process, when approaching time belt preventer of tubing coupling, the box cupling alarm sends signal, belt preventer is opened and the preventer that goes in ring is cut out by control system, after belt preventer is passed down in tubing coupling, again by belt preventer cutting out and the preventer that goes in ring is opened, the alternation by go in ring down preventer and last belt preventer realizes from the well inner high voltage to the conversion of normal pressure overseas.Down the purpose that alternately opens and closes of belt preventer and last belt preventer is to realize the conversion from the well inner high voltage to normal pressure overseas and cross box cupling, box cupling is through following belt preventer or go up when going in ring preventer, the corresponding preventer that goes in ring will be opened, the purpose of opening is the seal that prevents the belt preventer of box cupling damage, guarantees the durability of seal.The effect of preventer is to utilize its corresponding valve plate to cooperate with oil pipe so that shunt in a well after shunt in a well in the oil pipe lifting process blowout prevention and the whole propositions of oil pipe.High pressure is self-styled to be general sealing when being used for carrying on the oil pipe or transferring.Pressure release valve be used for the tube connector internal pressure when high to its pressure release.Following fixing pipe clamping device standby as last fixedly pipe clamping device, oil pipe are when fixedly pipe clamping device is not easy to tighten oil pipe on specific position, and can utilizing down fixedly, pipe clamping device tightens oil pipe.Oil pipe proposes process as mentioned above, and the process of transferring of oil pipe is opposite with the operating sequence that oil pipe proposes, and concrete operations do not repeat them here referring to the top description that the guiding oil pipe is connected.
From above-mentioned description, be not difficult to draw to use, oil field provided by the utility model band is pressed well repairing device, have at oil well and have under the situation of pressure, do not need open flow and kill-job just can carry out the advantage of workover treatment, brought energy conservation thus, prevent to pollute, save the beneficial effect of activity duration.
Description of drawings
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described in further detail:
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment
The oil field band is pressed well repairing device as shown in drawings, comprise carrier 1, the bottom of carrier 1 is connected with Height Adjustable support 2, the bottom of carrier 1 is connected with loaded plate 3, loaded plate 3 is provided with oil pipe passage 4, is connected with preventer 5 on the soffit of loaded plate 3, is connected with on the preventer 5 to be used for the wellhead flange 19 that is connected with well head, be connected with down fixedly pipe clamping device 6 on the upper surface of loaded plate 3, preventer 5 is with fixedly the inner chamber of pipe clamping device 6 is corresponding with oil pipe passage 4 down; Down fixedly be connected with box cupling alarm 7 on the pipe clamping device 6, be serially connected with down successively from bottom to top on the following fixedly pipe clamping device 6 belt preventer 8, tube connector 9, upward belt preventer 10, on fixedly pipe clamping device 11 and high pressure are self-styled 12, be connected to pressure release valve 20 on the tube connector 9; The both sides of loaded plate 3 respectively are connected with oil cylinder 13, be connected with lifting crossbeam 14 on the piston rod of oil cylinder 13, lifting crossbeam 14 is provided with oil pipe via hole 15, top and following the move about pipe clamping device 16 and the slips rotating mechanism 17 of being connected with respectively of lifting crossbeam 14, the inner chamber of pipe clamping device 16 and slips rotating mechanism 17 of moving about is corresponding with oil pipe via hole 15, and this device also comprises control system 18.Above-mentioned slips rotating mechanism 17 comprises with the affixed fixed cover 171 of lifting crossbeam 14 and is screwed onto movable sleeve 172 on the fixed cover 171, is bolted with the leading screw 173 that axis and radially consistent being used to of movable sleeve 172 clamp oil pipe on the movable sleeve 172.Preventer 5, down fixedly pipe clamping device 6, down belt preventer 8, upward go in ring preventer 10, on fixedly pipe clamping device 11, move about pipe clamping device 16 and box cupling alarm 7 are existing product, its structure is the person of ordinary skill in the field to be known, and does not repeat them here.Preventer 5, down fixedly pipe clamping device 6, down belt preventer 8, upward go in ring preventer 10, on fixedly the action of pipe clamping device 11, move about pipe clamping device 16 and oil cylinder 13 is by control system 18 controls, box cupling alarm 7 is electrically connected with control system 18.The control principle of control system 18 is a known technology also, also repeats no more at this.

Claims (2)

1. an oil field band is pressed well repairing device, it is characterized in that this device comprises carrier (1), the bottom of carrier (1) is connected with Height Adjustable support (2), the bottom of carrier (1) is connected with loaded plate (3), loaded plate (3) is provided with oil pipe passage (4), be connected with preventer (5) on the soffit of loaded plate (3), be connected with on the preventer (5) and be used for the wellhead flange (19) that is connected with well head, be connected with down fixedly pipe clamping device (6) on the upper surface of loaded plate (3), preventer (5) is with fixedly the inner chamber of pipe clamping device (6) is corresponding with oil pipe passage (4) down; Fixedly be connected with box cupling alarm (7) on the pipe clamping device (6) down, fixedly be serially connected with down successively from bottom to top on the pipe clamping device (6) down belt preventer (8), tube connector (9), upward belt preventer (10), on fixedly pipe clamping device (11) and high pressure self-styled (12), be connected to pressure release valve (20) on the tube connector (9); The both sides of loaded plate (3) respectively are connected with oil cylinder (13), be connected with lifting crossbeam (14) on the piston rod of oil cylinder (13), lifting crossbeam (14) is provided with oil pipe via hole (15), top and the following pipe clamping device that moves about (16) and the slips rotating mechanism (17) of being connected with respectively of lifting crossbeam (14), the inner chamber of pipe clamping device (16) and slips rotating mechanism (17) of moving about is corresponding with oil pipe via hole (15), and this device also comprises control system (18).
2. oil field according to claim 1 band is pressed well repairing device, it is characterized in that: described slips rotating mechanism (17) comprises with the affixed fixed cover (171) of lifting crossbeam (14) and is screwed onto movable sleeve (172) on the fixed cover (171), is bolted with the leading screw (173) that is used to clamp oil pipe on the movable sleeve (172).
CN2009200288653U 2009-06-27 2009-06-27 Well repair device with pressure in oil field Expired - Fee Related CN201443339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200288653U CN201443339U (en) 2009-06-27 2009-06-27 Well repair device with pressure in oil field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200288653U CN201443339U (en) 2009-06-27 2009-06-27 Well repair device with pressure in oil field

Publications (1)

Publication Number Publication Date
CN201443339U true CN201443339U (en) 2010-04-28

Family

ID=42548015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200288653U Expired - Fee Related CN201443339U (en) 2009-06-27 2009-06-27 Well repair device with pressure in oil field

Country Status (1)

Country Link
CN (1) CN201443339U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561975A (en) * 2012-01-04 2012-07-11 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Lifting pressurized well-repairing technology in closed oil pipe
CN103362469A (en) * 2012-03-29 2013-10-23 卞康群 Automatic control device of reverse tubular column coupling of belt pressure operation device
CN103362468A (en) * 2012-03-26 2013-10-23 卞康群 Automatic control device for safely pulling tube column coupling out of snubbing operation device
CN103993849A (en) * 2013-03-26 2014-08-20 托普威尔石油技术股份公司 Wellhead stabilizer
CN104343400A (en) * 2013-08-09 2015-02-11 大港油田集团有限责任公司 Snubbing controllable workover operation equipment and operation method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561975A (en) * 2012-01-04 2012-07-11 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Lifting pressurized well-repairing technology in closed oil pipe
CN102561975B (en) * 2012-01-04 2014-08-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Lifting pressurized well-repairing technology in closed oil pipe
CN103362468A (en) * 2012-03-26 2013-10-23 卞康群 Automatic control device for safely pulling tube column coupling out of snubbing operation device
CN103362468B (en) * 2012-03-26 2017-10-03 盐城市华谊石油机械有限公司 The safety of operation device under pressure crosses the automaton of string collar
CN103362469A (en) * 2012-03-29 2013-10-23 卞康群 Automatic control device of reverse tubular column coupling of belt pressure operation device
CN103362469B (en) * 2012-03-29 2017-07-04 盐城市华谊石油机械有限公司 The automaton for crossing string collar of operation device under pressure
CN103993849A (en) * 2013-03-26 2014-08-20 托普威尔石油技术股份公司 Wellhead stabilizer
CN104343400A (en) * 2013-08-09 2015-02-11 大港油田集团有限责任公司 Snubbing controllable workover operation equipment and operation method thereof
CN104343400B (en) * 2013-08-09 2018-03-09 大港油田集团有限责任公司 The controllable workover treatment equipment of no killing well and its operational method

Similar Documents

Publication Publication Date Title
CN201443339U (en) Well repair device with pressure in oil field
CN201087717Y (en) Integral high-pressure oil water well operation device under pressure
CN101644149B (en) Integral type level oil extraction wellhead equipment
CN101487380B (en) Vehicle-mounted full-automatic under-pressure minor overhaul operation combined unit and its construction method
CN110821439B (en) Coiled tubing dynamic seal device
CN202215185U (en) Five-combination blowout preventer
CN204944764U (en) Preventer hermetic seal test unit
CN2779047Y (en) Sealed type oil-water well under-pressure operation equipment
CN110735609B (en) Application method of device for petroleum industry
CN101429818B (en) Inorganic material pressurization grouter used for mending concrete hole and seam
CN202531159U (en) Hydraulic blow-out preventer field pressure testing device
CN207686628U (en) A kind of auxiliary suitable for workover treatment with pressure removes tube apparatus
CN201567999U (en) Hydraulic electric control no-killing operation unit
CN201068746Y (en) Wellhead oil conduit stationary slip device
CN111021978B (en) Petroleum industry well head prosthetic devices
CN2551765Y (en) Pressure operator for water injection well
CN202510087U (en) Retrievable subsurface safety valve
CN210937976U (en) Special extracting tool of packer hydraulic anchor
CN211573448U (en) Protection device for area pressure operation
CN108302279A (en) Emergent pipeline quick blocking equipment and its construction method temporarily
CN201526282U (en) Blowout control connecting-tripping device
CN201416405Y (en) Rush spray operation machine
CN203129988U (en) Drilling system for coal mine underground tunnel water prevention and control
CN203594403U (en) Mandrel hanger hydraulic stopper operating under pressure
CN201546692U (en) Device for avoiding overpressure work of hydraulic drilling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANDONG LINQU QIANCHENG PETROLEUM MACHINERY CO.,

Free format text: FORMER OWNER: XU YUANXIN

Effective date: 20101108

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 262600 WEIFANG QIANCHENG PETROLEUM MACHINERY CO., LTD., NO.34, CHENGNAN STREET, LINQU COUNTY, WEIFANG CITY, SHANDONG PROVINCE TO: 262600 NO.34, CHENGNAN ROAD, LINQU COUNTY, WEIFANG CITY, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20101108

Address after: 262600 No. 34, South County Road, Weifang, Shandong, Linqu

Patentee after: Shandong Linqu Qiancheng Petroleum Machinery Co., Ltd.

Address before: 262600 Weifang dry Petroleum Machinery Co., Ltd., 34 South Street, Linqu County, Weifang, Shandong

Patentee before: Xu Yuanxin

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100428

Termination date: 20160627