- CN201437586U CN201437586U CN2009201101911U CN200920110191U CN201437586U CN 201437586 U CN201437586 U CN 201437586U CN 2009201101911 U CN2009201101911 U CN 2009201101911U CN 200920110191 U CN200920110191 U CN 200920110191U CN 201437586 U CN201437586 U CN 201437586U
- Authority
- CN
- China
- Prior art keywords
- pier
- energy dissipation
- tunnel
- shaft
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000021715 photosynthesis, light harvesting Effects 0.000 title claims abstract description 69
- 238000005260 corrosion Methods 0.000 title claims abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 94
- 230000008602 contraction Effects 0.000 claims abstract description 10
- 230000000694 effects Effects 0.000 abstract description 12
- 238000010276 construction Methods 0.000 abstract description 9
- 238000000889 atomisation Methods 0.000 abstract description 5
- 238000005536 corrosion prevention Methods 0.000 abstract description 5
- 238000012423 maintenance Methods 0.000 abstract description 2
- 230000006872 improvement Effects 0.000 description 14
- 238000010586 diagram Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 5
- 230000009471 action Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 4
- 238000010008 shearing Methods 0.000 description 4
- 238000011144 upstream manufacturing Methods 0.000 description 3
- 238000009423 ventilation Methods 0.000 description 3
- 238000005273 aeration Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 238000006424 Flood reaction Methods 0.000 description 1
- 240000001549 Ipomoea eriocarpa Species 0.000 description 1
- 235000005146 Ipomoea eriocarpa Nutrition 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000009991 scouring Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及一种旋流环形堰防蚀、消能的泄洪装置。所述的装置包括:一个竖井,竖井底部与水平的消能洞相贯连接,消能洞与导流洞贯通连接,竖井的进口处设置环形堰,环形堰的内环与竖井形成光滑的收缩型曲面连接;所述环形堰外设置几个导流墩,所述导流墩的中心线与环形堰的切线成0°≤θ<45°的夹角;竖井与消能洞连接的部位与消能洞相对的位置有一空间;消能洞设置有集水墩和收缩墩,集水墩和收缩墩之间是水垫塘。本实用新型利用几个导流墩与环形堰周边相切或成一小角度连接,使水流旋转,在竖井内形成螺旋流运动。其结构简单,施工方便,投资少,不用维修,防蚀和消能效果好,泄洪洞出口不产生雾化现象,保护生态环境。
The utility model relates to a flood discharge device for anti-corrosion and energy dissipation of a swirl annular weir. The device includes: a shaft, the bottom of the shaft is connected to the horizontal energy dissipation tunnel, the energy dissipation tunnel is connected to the diversion tunnel, an annular weir is arranged at the entrance of the shaft, and the inner ring of the annular weir forms a smooth contraction with the shaft shaped curved surface connection; several diversion piers are arranged outside the annular weir, and the center line of the diversion piers and the tangent line of the annular weir form an angle of 0°≤θ<45°; the connection between the vertical shaft and the energy dissipation tunnel and There is a space opposite to the energy dissipation tunnel; the energy dissipation tunnel is provided with a water collection pier and a contraction pier, and there is a water cushion pond between the water collection pier and the contraction pier. The utility model uses several diversion piers to be connected tangently or at a small angle to the periphery of the annular weir to make the water flow rotate and form a spiral flow movement in the shaft. The utility model has the advantages of simple structure, convenient construction, low investment, no need for maintenance, good corrosion prevention and energy dissipation effects, no atomization at the outlet of the flood discharge tunnel, and protection of the ecological environment.
Description
技术领域technical field
本实用新型涉及一种旋流环形堰防蚀、消能的泄洪装置,是一种水利防洪泄水的装置,是一种用于水库泄洪洞防蚀和消能的装置。The utility model relates to an anti-corrosion and energy-dissipating flood discharge device for a swirl annular weir, which is a water conservancy flood control and discharge device, and a device for anti-corrosion and energy dissipation in a flood discharge tunnel of a reservoir.
背景技术Background technique
修建大坝主要是为了防洪、发电、城市供水和农业灌溉等目的,而泄洪结构设施是汛期保证大坝安全的重要枢纽组成部分。对于一个好的泄水结构设施它必需满足运行安全可靠、工程投资少和不破坏下游生态环境的要求。我国的大、中型水库有数万座,其中大部分是土石坝,达不到防洪标准的工程为数不少,特大洪水到来时,往往因泄洪能力不足,或因闸门打不开,发生洪水漫溢溃坝现象,给人民生命财产造成灭顶之灾,如1975年8月河南的板桥和石漫滩水库垮坝事件对我国政治、经济和社会带来极大的负面影响,广西石大开水库在洪水来临时,闸门打不开,洪水位猛涨,正在水流要漫坝的瞬间,闸门被洪水冲垮,避免了一场大灾难。国内外垮坝事件很多,特别是中小型水库不计其数。为防止垮坝事件的发生,除在水坝附近建造溢流设施外。有时需增建一条非常溢洪道,这种溢流设施通常利用建造水坝时的导流洞(水坝完成后即废弃)增加一条竖井,在竖井上设环形堰的进水口形成泄洪洞。堰顶高程即水库正常水位,当水位高于正常水位时泄洪洞开始泄洪。种种传统的环形溢流堰竖井式泄洪洞(美国称Morning-glory spillway),在20世纪40~50年代美国修建很多,其主要缺点是:The main purpose of building a dam is for flood control, power generation, urban water supply and agricultural irrigation, and the flood discharge structure is an important pivotal part to ensure the safety of the dam during the flood season. For a good drainage structure facility, it must meet the requirements of safe and reliable operation, low engineering investment and no damage to the downstream ecological environment. There are tens of thousands of large and medium-sized reservoirs in my country, most of which are earth-rock dams, and there are quite a few projects that fail to meet the flood control standards. When a catastrophic flood comes, flood overflow often occurs due to insufficient flood discharge capacity or because the gate cannot be opened. The phenomenon of dam breaks has caused catastrophe to people's lives and properties. For example, the dam breaks of the Banqiao and Shimantan reservoirs in Henan in August 1975 had a great negative impact on my country's politics, economy and society. The Shidakai Reservoir in Guangxi When the flood came, the gate could not be opened, and the flood level rose sharply. At the moment when the water flow was about to overflow the dam, the gate was washed away by the flood, avoiding a catastrophe. There are many dam failure incidents at home and abroad, especially the countless small and medium-sized reservoirs. In order to prevent the occurrence of dam collapse events, in addition to building overflow facilities near the dam. Sometimes it is necessary to add a special spillway. This overflow facility usually uses the diversion tunnel when the dam is built (it is abandoned after the dam is completed) to add a shaft, and the water inlet of the annular weir is set on the shaft to form a spillway. The weir crest elevation is the normal water level of the reservoir. When the water level is higher than the normal water level, the flood discharge tunnel starts to discharge flood. All kinds of traditional circular overflow weir shaft type spillway (Morning-glory spillway in the United States) were built in the United States in the 1940s and 1950s. The main disadvantages are:
(1)为了适应设计流量,在环形堰顶设分流墩,而为了防止由于开挖地形引起的漩涡对泄流能力的影响,还需要专门设置防漩墩。(1) In order to adapt to the design flow, a diversion pier is provided on the top of the annular weir, and in order to prevent the impact of the vortex caused by the excavation terrain on the discharge capacity, a special anti-swirl pier is also required.
(2)环形堰下的竖井普遍存在较大的负压,除此之外,竖井与出水洞连接的顶部负压更大易发生空蚀破坏,还有洞内流速高(总水头100~200m,流速38~50m/s),也易发生空蚀破坏,而在洞的出口采用挑流坎射流产生雾化现象,破坏生态环境。(2) There is generally a large negative pressure in the vertical shaft under the annular weir. In addition, the negative pressure at the top of the connection between the vertical shaft and the outlet tunnel is greater and prone to cavitation damage, and the flow velocity in the tunnel is high (total water head 100-200m, The flow velocity is 38~50m/s), and it is also prone to cavitation damage, and the jet flow at the exit of the cave is used to generate atomization and destroy the ecological environment.
(3)已往为了解决竖井的空蚀问题,将整体竖井从上到下改成逐渐收缩断面,以增加压力(美国),或在竖井上部设置环形通气坎,在出水洞的进口顶部和底板设置掺气坎和通气槽(前苏联)。(3) In the past, in order to solve the cavitation problem of the shaft, the overall shaft was changed from top to bottom into a gradually shrinking section to increase the pressure (USA), or an annular ventilation sill was set on the upper part of the shaft, and the inlet top and bottom plate of the outlet tunnel were set. Aerated rim and vent tank (former Soviet Union).
(4)虽然多处设置了掺气设施,在与出水洞连接段的底板上也有发生空蚀破坏的可能性(如我国二滩1#泄洪洞)。(4) Although aeration facilities are installed in many places, there is also the possibility of cavitation damage on the bottom plate of the connection section with the outlet tunnel (such as Ertan 1 # flood discharge tunnel in China).
(5)通气管道系统复杂,增加施工困难,不经济。(5) The ventilation pipeline system is complex, which increases construction difficulties and is uneconomical.
在导流洞中也要设置消能设施,传统的消能设施是在竖井的洞底部位开挖消力井,在竖井与导流洞连接的部位的导流洞顶设置反向收缩坎(或称压板),同时设通气井,目的是增加消能效果和保持下游形成稳定的明流流态。通过许多试验证明这种设施对消能率的增加甚小(不到2%),洞内水面波动也较大。Energy dissipation facilities should also be installed in the diversion tunnel. The traditional energy dissipation facility is to excavate a stilling well at the bottom of the shaft, and set a reverse shrinkage sill on the top of the diversion tunnel where the shaft and the diversion tunnel are connected ( or pressure plate), and at the same time set up a ventilation well, the purpose is to increase the energy dissipation effect and maintain a stable open flow state downstream. It has been proved by many tests that the increase of this facility to the energy dissipation rate is very small (less than 2%), and the water surface fluctuation in the cave is also relatively large.
发明内容Contents of the invention
为解决现有技术的问题,本实用新型提出一种旋流环形堰防蚀、消能的泄洪装置,或者称为旋流环形堰防蚀、消能的泄洪设施。所述的设施的目的是为水电站水库提供一种可靠的高效率防蚀、消能的新型泄洪建筑物。本实用新型所述装置是利用环形堰易发生漩涡的机理,巧妙地利用几个导流墩使环形堰进水口和竖井形成稳定的螺旋流流态,增加壁面压力并掺入大量空气,在竖井下部产生环状水跃,与洞内水垫联合消能,达到防蚀和提高消能率的目的。In order to solve the problems of the prior art, the utility model proposes a swirl annular weir anti-corrosion and energy dissipation flood discharge device, or called a swirl annular weir anti-corrosion and energy dissipation flood discharge facility. The purpose of the facility is to provide a reliable high-efficiency anti-corrosion and energy-dissipating new flood discharge structure for the reservoir of the hydropower station. The device described in the utility model utilizes the mechanism that the vortex is easy to occur in the ring weir, cleverly uses several diversion piers to make the water inlet of the ring weir and the shaft form a stable spiral flow state, increase the wall pressure and add a large amount of air, and the water flow in the shaft is improved. The lower part produces a ring-shaped hydraulic jump, which is combined with the water cushion in the cave to dissipate energy, so as to achieve the purpose of anti-corrosion and improving energy dissipation rate.
本实用新型的目的是这样实现的:一种旋流环形堰防蚀、消能的泄洪装置,所述的装置包括:一个竖井,所述竖井底部与水平的消能洞相贯连接,所述消能洞与导流洞贯通连接,所述的竖井的进口处设置环形堰,所述环形堰的内环与竖井形成光滑的收缩型曲面连接;所述环形堰外设置几个导流墩,所述导流墩的中心线与环形堰的切线成大于或等于0°小于45°的夹角;所述的竖井与消能洞连接的部位与消能洞相对的位置有一空间;所述的消能洞设置有集水墩和收缩墩,集水墩和收缩墩之间是水垫塘。The purpose of this utility model is achieved as follows: a swirl annular weir anti-corrosion, energy dissipation flood discharge device, the device includes: a shaft, the bottom of the shaft is connected with a horizontal energy dissipation hole, the The energy dissipation tunnel is connected with the diversion tunnel, and an annular weir is arranged at the entrance of the vertical shaft, and the inner ring of the annular weir forms a smooth shrinking curved surface connection with the vertical shaft; several diversion piers are arranged outside the annular weir, The center line of the diversion pier and the tangent of the annular weir form an included angle greater than or equal to 0° and less than 45°; there is a space at the position where the vertical shaft is connected to the energy dissipation tunnel and the energy dissipation tunnel is opposite to the energy dissipation tunnel; The energy dissipation tunnel is provided with a water collection pier and a contraction pier, and there is a water cushion pond between the water collection pier and the contraction pier.
本实用新型产生的有益效果是:使环形堰产生稳定的带有空腔的螺旋流运动是本实用新型的基础,它不同于现有的涡室或起旋室需要修建一专门的起旋结构物,而是利用几个导流墩与环形堰周边相切或成一小角度连接,使水流旋转,在竖井内形成螺旋流运动。其结构简单,施工方便,投资少,不用维修,防蚀和消能效果好,泄洪洞出口不产生雾化现象,保护生态环境。The beneficial effects produced by the utility model are: the foundation of the utility model is to make the circular weir produce a stable spiral flow movement with a cavity, which is different from the existing vortex chamber or swirl chamber, which needs to build a special swirl structure Instead, several diversion piers are used to connect with the periphery of the annular weir tangentially or at a small angle to make the water flow rotate and form a spiral flow movement in the shaft. The utility model has the advantages of simple structure, convenient construction, low investment, no need for maintenance, good corrosion prevention and energy dissipation effects, no atomization at the outlet of the flood discharge tunnel, and protection of the ecological environment.
本实用新型所述的旋流环形堰竖井式泄洪道是最灵活的防洪泄水设施,它很适用于紧急泄洪,防止洪水漫坝,其主要特点是:The swirl annular weir shaft type spillway described in the utility model is the most flexible flood control and discharge facility, which is very suitable for emergency flood discharge and prevents floods from overflowing the dam. Its main features are:
(1)环形堰顶高程为正常高水位(堰上水头一般小于5m),不设置闸门,洪水到达堰顶时自动下泄流量。(1) The elevation of the circular weir crest is the normal high water level (the water head above the weir is generally less than 5m), no gate is set, and the flow is automatically released when the flood reaches the weir crest.
(2)利用几道导流墩使环形堰产生旋转流进入竖井,形成带有空腔的螺旋流运动,吸入大量空气,消能效果好,并可防止结构物发生空蚀破坏。(2) Several diversion piers are used to make the circular weir generate a swirling flow into the shaft, forming a spiral flow movement with a cavity, sucking in a large amount of air, having a good energy dissipation effect, and preventing cavitation damage of the structure.
(3)竖井底部不用开挖消力井,可节省开支。(3) There is no need to excavate the stilling shaft at the bottom of the shaft, which can save expenses.
(4)在消能洞中有集水墩、水垫塘、收缩墩组成的消能设施十分有效。(4) Energy dissipation facilities consisting of water collection piers, water cushion ponds and shrinkage piers in the energy dissipation tunnel are very effective.
采用环形堰和竖井的旋流加消能洞内水垫旋滚流联合消能的结果,消能率高,总消能率可达90%,泄洪洞出口无雾化现象,可防止河床冲刷和生态植被破坏,出口不用浇筑挑流坎,整个设施更加简化。As a result of combined energy dissipation of the swirling flow of the ring weir and shaft plus the swirl and tumble flow of the water cushion in the energy dissipation tunnel, the energy dissipation rate is high, and the total energy dissipation rate can reach 90%. There is no atomization at the outlet of the flood discharge tunnel, which can prevent river bed erosion and ecological The vegetation is destroyed, and the exit does not need to pour the sill, and the whole facility is simplified.
附图说明Description of drawings
下面结合附图和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
图1是本实用新型实施例一所述的旋流环形堰防蚀、消能的泄洪装置示意图;Fig. 1 is a schematic diagram of the anti-corrosion and energy-dissipating flood discharge device of the swirling annular weir described in
图2是本实用新型实施例五所述的集水墩示意图,是图1的C-C剖面图;Fig. 2 is a schematic diagram of the water collection pier described in
图3是本实用新型实施例七所述的收缩墩示意图,是图1的D-D剖面图;Fig. 3 is a schematic diagram of the shrinkage pier described in
图4是图1的A-A剖面示意图;Fig. 4 is the A-A sectional schematic diagram of Fig. 1;
图5是本实用新型实施例二所述的五个导流墩的示意图;Fig. 5 is a schematic diagram of five diversion piers described in the second embodiment of the utility model;
图6是本实用新型实施例二所述的八个导流墩的示意图;Fig. 6 is a schematic diagram of the eight diversion piers described in the second embodiment of the utility model;
图7是本实用新型实施例九所述的旋流环形堰防蚀、消能的泄洪方法的水流示意图;Fig. 7 is a schematic diagram of the water flow of the swirl ring weir anti-corrosion and energy dissipation flood discharge method described in
图8是图7的E-E剖面图。FIG. 8 is a cross-sectional view along line E-E of FIG. 7 .
具体实施方式Detailed ways
实施例一:Embodiment one:
本实施例是一种旋流环形堰防蚀、消能的泄洪装置,如图1、4所示。本实施例所述的装置包括:一个竖井10,竖井底部与水平的消能洞相贯连接,消能洞与导流洞9贯通连接,竖井的进口处设置环形堰1,环形堰的内环与竖井形成光滑的收缩型曲面连接,形成缩口2。环形堰外设置若干导流墩3,导流墩的中心线与环形堰的切线成大于或等于0°,小于45°的夹角。竖井与消能洞连接的部位与消能洞相对的位置有一空间5,见图1、4所示。消能洞设置有集水墩6和收缩墩8,集水墩和收缩墩之间是水垫塘7。This embodiment is a flood discharge device for corrosion prevention and energy dissipation of a swirling annular weir, as shown in Figures 1 and 4 . The device described in this embodiment includes: a
本实施例由旋流环形堰、竖井、消能洞和导流洞组成。其中的导流洞是原水坝施工时建造的,用于将上游的水流引到下游,以便水坝施工,水坝建造完工即废弃。这种导流洞的截面通常是城门洞型,即顶部为半圆形,下部为矩形。导流洞改造为水平旋流泄洪洞时通常要对城门洞型的截面进行改造,例如改造为圆形截面,但本实施例无需对导流洞的截面进行任何改造。本实施例在大坝上游开挖竖井,与原导流洞相贯连接,在连接部位将上游的一段导流洞用混凝土塞4堵死,并在下游的导流洞中简单的改造,形成消能洞和出水引导水道,为方便起见将出水引导水道还称为导流洞。混凝土塞并不是紧挨在竖井的井壁设置,而是留有一定的空间,以便下落的水流在这个空间中产生旋滚流,有一定的消能作用。This embodiment consists of a swirling annular weir, a shaft, an energy dissipation tunnel and a diversion tunnel. Among them, the diversion tunnel was built during the construction of the original dam to guide the upstream water flow to the downstream for the construction of the dam, and the dam will be abandoned after construction. The cross-section of this kind of diversion hole is usually a city gate shape, that is, the top is semicircular and the lower part is rectangular. When the diversion tunnel is transformed into a horizontal swirling flood discharge tunnel, it is usually necessary to modify the cross section of the city gate tunnel, for example, to transform it into a circular cross section, but this embodiment does not require any modification to the cross section of the diversion tunnel. In this embodiment, a vertical shaft is excavated upstream of the dam to connect with the original diversion tunnel. At the connection part, a section of diversion tunnel upstream is blocked with
本实施例的进水口采用环形堰,而不需要采用专门的涡室或起旋室。传统的环形堰总是担心产生影响泄洪的漩涡水流,因此,往往设置防旋墩阻止水流在进入竖井时产生漩涡。而本实施例反其道而行之,利用导流墩产生漩涡水流,利用漩涡水流进行掺气和形成环形水跃,产生消能作用。只要竖井的直径设计合理,不会影响泄洪能力。本实施例采用数道导流墩与环形堰周边相切或成一角度布置,导流墩结构和平面布置遵守流体力学的原理和规律。环形堰导流墩的数量越多旋流效果越好,但流量系数相应会减小,即流量会减少,一般墩的数量取4~8个,导流墩与环形堰周边切线的夹角对流量系数影响也较大,角度越大流量系数越大,反之就越小,通常夹角取0~30°,(图4中采用10°角)如墩子数量多时,为了增加流量系数可将角度放大一些。环形堰上水头H与堰半径Rh之比对流量系数也影响较大,当H/Rh>0.5时开始变成淹没流,而当H/Rh<0.4时开始形成自由流,前者的流量系数小于0.3,后者要大于0.35,视导流墩的数量和夹角而变化。The water inlet of this embodiment adopts an annular weir instead of a special vortex chamber or swirling chamber. The traditional annular weir is always worried about the vortex flow that will affect the flood discharge. Therefore, anti-rotation piers are often set to prevent the vortex when the water flow enters the shaft. However, this embodiment does the opposite, using the diversion pier to generate vortex water flow, using the vortex water flow to aerate and form an annular hydraulic jump to generate energy dissipation. As long as the diameter of the shaft is designed properly, it will not affect the flood discharge capacity. In this embodiment, several diversion piers are arranged tangentially or at an angle to the periphery of the annular weir, and the structure and plane layout of the diversion piers comply with the principles and laws of fluid mechanics. The more the number of diversion piers in the annular weir, the better the swirling effect, but the flow coefficient will decrease accordingly, that is, the flow rate will decrease. Generally, the number of piers is 4 to 8, and the angle between the diversion piers and the tangent line around the annular weir is opposite to The discharge coefficient is also greatly affected. The larger the angle is, the larger the discharge coefficient is, and vice versa. Usually, the included angle is 0-30°, (the angle of 10° is used in Figure 4). If there are many piers, in order to increase the flow coefficient, the angle Zoom in some more. The ratio of the water head H on the annular weir to the radius R h of the weir also has a great influence on the discharge coefficient. When H/R h > 0.5, it begins to become submerged flow, and when H/R h < 0.4, it begins to form free flow. The flow coefficient is less than 0.3, and the latter is greater than 0.35, depending on the number and angle of the diversion piers.
传统的设计在环形堰和竖井的联系部位使用复杂的曲面形状,建造比较复杂,而本实施例采用环形堰断面为1/4椭圆曲线同竖井连接。由于旋流离心力的作用使壁面压力升高,可防止发生空蚀,同时在竖井下部产生环状水跃加大了消能力度。The traditional design uses a complex curved surface shape at the link between the ring weir and the shaft, and the construction is more complicated. However, in this embodiment, the section of the ring weir is 1/4 elliptic curve to connect with the shaft. Due to the effect of the centrifugal force of the swirling flow, the pressure on the wall surface is increased, which can prevent cavitation, and at the same time, the ring-shaped hydraulic jump in the lower part of the shaft increases the degree of energy dissipation.
竖井下部直接与原导流洞相贯连接,在原导流洞与竖井相贯处附近浇注集水墩形成水垫,而在集水墩下游浇注收缩墩形成水垫塘,总称为消能洞,消能洞下游直接连接原导流洞。集水墩是设在消能洞进口的底板上,自然形成一水垫,高速水流从集水墩顶部射流到由收缩墩构成的水垫塘内,而收缩墩的两侧墩产生立轴漩涡,中墩产生横向漩滚流,致使压力消能洞的消能率达40%左右,再加上竖井旋流和环状水跃的消能作用,泄洪洞总消能率可达90%。The lower part of the vertical shaft is directly connected with the original diversion tunnel, and the water collecting pier is poured near the intersection of the original diversion tunnel and the vertical shaft to form a water cushion, and the shrinkage pier is poured downstream of the water collecting pier to form a water cushion pond, which is collectively called the energy dissipation tunnel. The downstream of the energy dissipation tunnel is directly connected to the original diversion tunnel. The water collecting pier is set on the bottom plate of the entrance of the energy dissipation tunnel, which naturally forms a water cushion. The high-speed water jet flows from the top of the water collecting pier into the water cushion pond formed by the shrinking pier, and the two side piers of the shrinking pier generate a vertical axis vortex. The piers generate transverse swirling flow, which makes the energy dissipation rate of the pressure energy dissipation tunnel reach about 40%. In addition to the energy dissipation effect of the vertical shaft swirl and annular hydraulic jump, the total energy dissipation rate of the flood discharge tunnel can reach 90%.
为说明下面举一个实现的设计例:假设某水利枢纽的挡水坝为堆石面板坝,除修建泄洪和放空洞外,按MPF(最大可能洪水量)洪水标准需要利用导流洞改建一条环形堰竖井式非常泄洪洞。该工程基本资料:最大泄量Q=1300m3/s,堰上水头H=4.8m,总水头Z=120m,导流洞尺是宽13m、高15m城门洞形断面。To illustrate the following, a design example of realization is given: Assuming that the retaining dam of a water conservancy project is a rockfill face dam, in addition to building flood discharge and emptying tunnels, according to the flood standard of MPF (maximum possible flood volume), it is necessary to use diversion tunnels to rebuild an annular weir Shaft type very spillway. Basic data of the project: maximum discharge Q=1300m 3 /s, water head above the weir H=4.8m, total water head Z=120m, diversion tunnel scale is 13m wide, 15m high city gate-shaped section.
根据旋流环形堰防蚀、消能泄洪结构的设计原理,首先按四个导流墩设计旋流环形堰,墩子与环形堰圆周切线夹角取10°,当H/Rh=0.22时,流量系数m≈0.4,计算环形堰半径Rh:According to the design principle of the swirling annular weir for corrosion prevention and energy dissipation and flood discharge, the swirling annular weir is first designed according to four diversion piers. The angle between the piers and the tangent line of the circular weir is 10 ° . The discharge coefficient m≈0.4, calculate the annular weir radius R h :
环形堰直径Dh=33m,Annular weir diameter D h = 33m,
竖井直径:Shaft diameter:
环形堰断面尺寸采用1/4椭圆曲线(x2/a2+y2/b2=1),首先确定椭圆曲线短半轴:b≤D(D-竖井直径),长半轴:a≈2b。The cross-section size of the ring weir adopts 1/4 elliptic curve (x 2 /a 2 +y 2 /b 2 =1), first determine the semi-minor axis of the elliptic curve: b≤D (D-shaft diameter), and the semi-major axis: a≈ 2b.
消能洞的集水墩和收缩墩的特点是:The characteristics of the water collection pier and shrinkage pier of the energy dissipation tunnel are:
1)墩的体型为三角形,其背水坡为垂直面,使负压涡脱离结构物,再加上自然掺气,确保结构物不发生空蚀;1) The shape of the pier is triangular, and its backwater slope is a vertical surface, so that the negative pressure vortex is separated from the structure, and natural aeration is added to ensure that the structure does not suffer from cavitation;
2)保持各墩的过流面积约等于竖井截面积的一半,若过流面积太小,由于雍水在竖井和消能洞进口段将会产生不稳定涡线流态,可能引起结构物振动,同时降低泄流能力,若收缩面积太大,则进口洞段不能形成压力消能工,使消能率大为降低。2) Keep the flow area of each pier approximately equal to half of the cross-sectional area of the shaft. If the flow area is too small, the unstable vortex flow state will be generated in the entrance section of the shaft and energy dissipation tunnel due to Yongshui, which may cause vibration of the structure , and reduce the discharge capacity at the same time, if the shrinkage area is too large, the inlet hole section cannot form a pressure energy dissipator, which greatly reduces the energy dissipation rate.
实施例二:Embodiment two:
本实施例是实施例一的改进,是实施例一关于导流墩的改进。本实施例所述的导流墩数为4~8个。This embodiment is an improvement of the first embodiment, and it is an improvement of the first embodiment about the diversion pier. The number of diversion piers described in this embodiment is 4-8.
图4所示的是4个导流墩的情况。图5是五个导流墩的情况。图6是八个导流墩的情况。Figure 4 shows the situation of 4 diversion piers. Figure 5 is the case of five diversion piers. Figure 6 is the case of eight diversion piers.
实施例三:Embodiment three:
本实施例是实施例二的改进,是实施例二关于导流墩的改进。本实施例所述的截面形状是矩形303连接楔形302,导流墩离环形堰近端的楔形头部301呈钝圆型,导流墩的矩形尾部304呈圆形,如图4所示。This embodiment is an improvement of the second embodiment, and is an improvement of the second embodiment on the diversion pier. The cross-sectional shape described in this embodiment is a
导流墩更准确的说应该是导流墙,类似一堵短墙。短墙的截面形状是矩形的。为使导流效果更好,本实施例采用的一种头部为楔形,楔形的角度比较尖锐,楔形的尖端以一段圆弧过渡。为使水流顺畅,导流墩的所有棱角均使用圆弧过渡。More precisely, the diversion pier should be a diversion wall, similar to a short wall. The cross-sectional shape of the short wall is rectangular. In order to improve the diversion effect, the head used in this embodiment is wedge-shaped, the angle of the wedge is relatively sharp, and the tip of the wedge transitions with a circular arc. In order to make the water flow smoothly, all the corners of the diversion piers use arc transitions.
实施例四:Embodiment four:
本实施例是实施例三的改进,是实施例三关于环形堰的改进。本实施例所述的环形堰外缘102的断面呈圆形曲线形,环形堰内缘101与竖井连接的断面曲线呈椭圆曲线形,见图1所示。This embodiment is an improvement of the third embodiment, and is an improvement of the third embodiment about the annular weir. The section of the
环形堰的外缘使用简单的圆弧曲线,建造方便。环形堰的内缘与竖井的连接面使用四分之一椭圆曲线回转获得的曲面,形成收缩口。环形堰内缘的断面的椭圆曲线(x2/a2+y2/b2=1)十分简单,施工方便。The outer edge of the annular weir uses a simple arc curve, which is convenient for construction. The connection surface between the inner edge of the annular weir and the shaft uses a curved surface obtained by turning a quarter elliptic curve to form a constriction. The elliptic curve (x 2 /a 2 +y 2 /b 2 =1) of the cross section of the inner edge of the annular weir is very simple and convenient for construction.
实施例五:Embodiment five:
本实施例是实施例四的改进,是实施例四关于集水墩的改进,如图2所示。本实施例所述的集水墩设置在消能洞的底板上。集水墩截面呈三角形,顶部截去,形成小斜坡601。集水墩的迎水面与水平线呈30~45°角,背水面与水平线垂直。This embodiment is an improvement of the fourth embodiment, and is an improvement of the fourth embodiment on the water collection pier, as shown in FIG. 2 . The water collection pier described in this embodiment is arranged on the bottom plate of the energy dissipation tunnel. The cross section of the water collection pier is triangular, and the top is truncated to form a small slope 601 . The water-facing surface of the water-collecting pier forms an angle of 30-45° with the horizontal line, and the back-water surface is perpendicular to the horizontal line.
实施例六:Embodiment six:
本实施例是实施例五的改进,是实施例五关于集水墩的改进。本实施例所述的集水墩的截流面积等于竖井截面积的一半。This embodiment is an improvement of the fifth embodiment, and is an improvement of the fifth embodiment about the water collection pier. The intercepting area of the water collecting pier described in this embodiment is equal to half of the cross-sectional area of the shaft.
实施例七:Embodiment seven:
本实施例是实施例六的改进,是实施例六关于收缩墩的改进,如图3所示。本实施例所述的收缩墩设置在消能洞的底板上803和两侧洞壁上801。收缩墩截面呈三角形,顶部截去,形成小斜坡802。收缩墩迎水面与水平线呈30~45°角,背水面与水平线垂直。This embodiment is an improvement of the sixth embodiment, and is an improvement of the sixth embodiment on the shrinkage pier, as shown in FIG. 3 . The contraction pier described in this embodiment is arranged on the
实施例八:Embodiment eight:
本实施例是实施例七的改进,是实施例七关于导流墩的改进。本实施例所述的收缩墩的截流面积等于竖井截面积的一半。This embodiment is an improvement of the seventh embodiment, and is an improvement of the seventh embodiment on the diversion pier. The cut-off area of the shrinkage pier described in this embodiment is equal to half of the cross-sectional area of the shaft.
实施例九:Embodiment nine:
本实施例是一种使用上述实施例所述装置的旋流环形堰防蚀、消能的泄洪方法如图7、8所示。本实施例所述方法的步骤如下:This embodiment is a flood discharge method for corrosion prevention and energy dissipation of the swirling annular weir using the device described in the above embodiment, as shown in Figures 7 and 8 . The steps of the method described in this embodiment are as follows:
水流漫过环形堰1101;The water flows over the
水流在导流墩的作用下与环形堰切线成一定角度的方向进入环形堰1108;The water flow enters the
在多个导流墩的作用下,水流在环形堰内缘与竖井连接的光滑的收缩型曲面上形成绕垂直轴的旋流1102;Under the action of multiple diversion piers, the water flow forms a
旋流中部带有空腔,带有空腔的水流带入大量空气进入竖井;There is a cavity in the middle of the swirl, and the water flow with the cavity brings a lot of air into the shaft;
带有大量空气的旋流沿竖井下落,在竖井下部位形成环形水跃和气水混合垫层1103,消耗大量能量;The swirling flow with a large amount of air falls down the shaft, forming an annular hydraulic jump and an air-water
在竖井与消能洞结合的部位,水流在消能洞进口与消能洞相对的空间中形成旋滚流,与原绕垂直轴的旋流形成复杂的掺气流动1104,进行消能;At the joint between the vertical shaft and the energy dissipation tunnel, the water flow forms a tumbling flow in the space opposite the energy dissipation tunnel entrance and the energy dissipation tunnel, and forms a complex
水流进入消能洞,在集水墩的作用下,高速掺气水流从集水墩的顶部敞口射入水垫塘,在水垫塘内水流产生旋滚流进行强力的气水剪切作用继续消耗大量能量1105,再次消能;The water flow enters the energy dissipation hole, and under the action of the water collection pier, the high-speed aerated water flow is injected into the water cushion pond from the top opening of the water collection pier, and the water flow in the water cushion pond generates a tumbling flow to continue the strong air-water shearing effect. Consume a lot of
当水流流出收缩墩时,两侧墩诱发出立轴漩涡再次掺气1109,和底板上的中墩产生的横向漩滚水流1106互相碰撞剪切作用又消耗掉大量能量,再次消能;When the water flow flows out of the contracting piers, the piers on both sides induce the vertical axis vortex to aerate again 1109, and the horizontal
消能后水流经导流洞排出1107。After the energy is dissipated, the water flows out 1107 through the diversion hole.
本实施例所述泄洪洞运行过程:水流经导流墩起旋进入环形堰和竖井,形成带有空腔的螺旋流,在竖井下部产生环状水跃和气水混合垫层,消耗大量能量,接着高速掺气水流从集水墩顶部敞口射入水垫塘内,产生旋滚流进行强力的气水剪切作用继续消耗大量能量,当水流流出收缩墩时,两侧墩诱发出立轴漩涡再次掺气,和中墩产生的横向漩滚水流互相碰撞剪切作用又消耗掉大量能量,致使残留的动能所剩无几,洞内流速急剧降低(总水头100~200m的泄洪洞流速降至14~18m/s),导流洞内水面平稳,出口无冲刷,亦无雾化现象,完好地保护下游生态。The operation process of the flood discharge tunnel described in this embodiment: the water flows through the diversion pier and enters the ring-shaped weir and shaft, forming a spiral flow with a cavity, and a ring-shaped hydraulic jump and a gas-water mixed cushion are generated at the lower part of the shaft, consuming a lot of energy. Then the high-speed aerated water flow is injected into the water cushion pond from the top opening of the water collection pier, and the swirling flow is generated to carry out the strong air-water shearing effect and continue to consume a lot of energy. Aerated, colliding with the horizontal swirling water flow generated by the middle pier, the shearing effect consumes a lot of energy, resulting in little remaining kinetic energy, and the flow velocity in the cave drops sharply (the flow velocity of the spillway tunnel with a total water head of 100-200m drops to 14-200m). 18m/s), the water surface in the diversion tunnel is stable, there is no scouring and no atomization at the outlet, and the downstream ecology is well protected.
最后应说明的是,以上仅用以说明本实用新型的技术方案而非限制,尽管参照较佳布置方案对本实用新型进行了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案(比如导流墩和环形堰的外形、大小,集水墩和收缩墩的外形、安排等)进行修改或者等同替换,而不脱离本实用新型技术方案的精神和范围。Finally, it should be noted that the above is only used to illustrate the technical solution of the utility model without limitation. Although the utility model has been described in detail with reference to the preferred layout scheme, those of ordinary skill in the art should understand that the technical solutions of the utility model can be Scheme (such as the shape and size of diversion pier and annular weir, the shape and arrangement of water collection pier and shrinkage pier, etc.) is modified or equivalently replaced without departing from the spirit and scope of the utility model technical solution.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201101911U CN201437586U (en) | 2009-07-24 | 2009-07-24 | A swirling annular weir anti-corrosion and energy dissipation flood discharge device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201101911U CN201437586U (en) | 2009-07-24 | 2009-07-24 | A swirling annular weir anti-corrosion and energy dissipation flood discharge device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201437586U true CN201437586U (en) | 2010-04-14 |
Family
ID=42399562
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009201101911U Expired - Lifetime CN201437586U (en) | 2009-07-24 | 2009-07-24 | A swirling annular weir anti-corrosion and energy dissipation flood discharge device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201437586U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101881019A (en) * | 2010-07-29 | 2010-11-10 | 中国水利水电科学研究院 | A kind of high tail water level swirling flood discharge tunnel and the exhaust method of flood discharge tunnel |
| CN103469772A (en) * | 2013-09-05 | 2013-12-25 | 国家电网公司 | Shaft type flood spillway for reservoirs |
| RU2817592C2 (en) * | 2022-08-29 | 2024-04-16 | Вадим Михайлович Голубенко | Water flow damper |
-
2009
- 2009-07-24 CN CN2009201101911U patent/CN201437586U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101881019A (en) * | 2010-07-29 | 2010-11-10 | 中国水利水电科学研究院 | A kind of high tail water level swirling flood discharge tunnel and the exhaust method of flood discharge tunnel |
| CN103469772A (en) * | 2013-09-05 | 2013-12-25 | 国家电网公司 | Shaft type flood spillway for reservoirs |
| CN103469772B (en) * | 2013-09-05 | 2015-04-29 | 国家电网公司 | Shaft type flood spillway for reservoirs |
| RU2817592C2 (en) * | 2022-08-29 | 2024-04-16 | Вадим Михайлович Голубенко | Water flow damper |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101638888B (en) | Flood discharging method for anticorrosion and energy dissipation of rotational flow ring dam and device thereof | |
| CN102704448B (en) | A deep-hole swirl shaft flood discharge tunnel and its design method | |
| CN202610774U (en) | Deep-hole cyclone shaft type flood drainage tunnel | |
| CN103215916B (en) | Disappear unrestrained cavity | |
| CN100554592C (en) | Diffused curved nose bridge | |
| CN111809579B (en) | Self-aeration ternary hydraulic jump stilling basin | |
| CN104264639B (en) | Underflow type step absorption basin energy-dissipating system | |
| CN108532565A (en) | A kind of differential mixing energy-dissipating structure of slope diffusion | |
| CN102277861B (en) | In-tunnel self-air-supply energy dissipation method and device | |
| CN113089600B (en) | A swirl flood discharge tunnel that reduces the velocity at the outlet of the swirl tunnel | |
| CN100392193C (en) | Method of rebuilding diversion tunnel into flood discharge tunnel with sudden expansion under pressure and aeration | |
| CN109098152B (en) | A kind of anti-aircraft facility for stepped overflow dam | |
| CN204919467U (en) | A separate and flow dyke that is used for approach channel on offshore lock | |
| CN118422654A (en) | A structure for improving water flow characteristics at the intersection of underground caverns and its use method | |
| CN210031716U (en) | A reservoir overflow device | |
| CN118653434A (en) | A stepped water discharge tunnel and energy dissipation method | |
| CN210262967U (en) | Energy-dissipating structure of tunnel plug for diversion tunnel | |
| CN206220066U (en) | Passed the flood period the choosing of the breach flow, down stream energy-dissipating structure for gravity dam bank | |
| CN116377974A (en) | An Energy Dissipation Structure for the Outlet Shaft of a Diversion Tunnel | |
| CN117536172A (en) | Vertical jet energy dissipation system for flood discharge of high dam | |
| CN211421064U (en) | River bank spillway | |
| CN104294802B (en) | Down stream formula step plunge pool system | |
| CN110080182B (en) | Diversion tunnel plug energy dissipation structure and its layout method | |
| CN121066123B (en) | Opposite-impact type underflow energy dissipation structure | |
| CN221798367U (en) | A diversion and discharge hole structure capable of mixing air into a water body |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20100414 Effective date of abandoning: 20090724 |