CN201430375Y - Transmission line live replacement insulator suspension tool assembly - Google Patents
Transmission line live replacement insulator suspension tool assembly Download PDFInfo
- Publication number
- CN201430375Y CN201430375Y CN2009203036813U CN200920303681U CN201430375Y CN 201430375 Y CN201430375 Y CN 201430375Y CN 2009203036813 U CN2009203036813 U CN 2009203036813U CN 200920303681 U CN200920303681 U CN 200920303681U CN 201430375 Y CN201430375 Y CN 201430375Y
- Authority
- CN
- China
- Prior art keywords
- lead screw
- screw rod
- pull rod
- transmission line
- tool assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型涉及一种电力抢修工具,即输电线路带电更换绝缘子吊线工具组件。尤其适用于第四代500千伏同塔双回线路SZ1、SZ2、SZ3、SZ4直线塔。调整尺寸后也可用于220千伏、330千伏绝缘子挂点横担主塔材为接近水平设置的铁塔更换直线绝缘子。它包括丝杠拉杆、丝杠拉杆下部连接有四钩卡。采用两个丝杠拉杆座,两个丝杠拉杆座之间通过可调式拉杆连接;每个丝杠拉杆竖立插座在丝杠拉杆座上。丝杠拉杆座上有插卡在铁塔横担上两侧角钢立边上的插槽,使用时插接在铁塔横担上两侧角钢立边上。满足新型铁塔上安装使用,具有结构简单、合理,使用安全可靠的特点。
The utility model relates to an electric power emergency repair tool, which is a live replacement insulator hanging wire tool assembly for a power transmission line. It is especially suitable for the fourth-generation 500 kV double-circuit line on the same tower SZ 1 , SZ 2 , SZ 3 , SZ 4 linear towers. It can also be used for 220 kV and 330 kV insulator hanging points after the size is adjusted. The cross-arm main tower material is used to replace the linear insulators for iron towers that are close to the level. It comprises a lead screw rod, and the lower part of the lead screw rod is connected with four hooks. Two lead screw pull rod seats are adopted, and the two lead screw pull rod seats are connected by adjustable pull rods; each lead screw pull rod is vertically socketed on the lead screw pull rod seat. There are slots inserted into the vertical edges of the angle steel on both sides of the cross arm of the iron tower on the lead screw rod seat, and inserted into the vertical edges of the angle steel on both sides of the cross arm of the iron tower when in use. It is suitable for installation and use on a new iron tower, and has the characteristics of simple and reasonable structure, safe and reliable use.
Description
技术领域 technical field
本实用新型涉及一种电力抢修工具,即输电线路带电更换绝缘子吊线工具组件。适用于500千伏直线铁塔单回、同塔双回或同塔多回线路直线铁塔更换直线绝缘子时起吊导线。尤其适用于第四代500千伏同塔双回线路SZ1、SZ2、SZ3、SZ4直线塔。调整尺寸后也可用于220千伏、330千伏绝缘子挂点横担主塔材为接近水平设置的铁塔更换直线绝缘子。The utility model relates to an electric power emergency repair tool, which is a live replacement insulator hanging wire tool assembly for a power transmission line. It is suitable for lifting conductors when replacing linear insulators on 500 kV straight line iron tower single circuit, double circuit on the same tower or multiple circuits on the same tower. It is especially suitable for the fourth-generation 500 kV double-circuit line on the same tower SZ 1 , SZ 2 , SZ 3 , SZ 4 straight towers. It can also be used for 220 kV and 330 kV insulator hanging points after the size is adjusted. The cross-arm main tower material is used to replace the linear insulators for iron towers that are close to the level.
背景技术 Background technique
在现有技术中,输电线路带电更换绝缘子吊线工具包括丝杠拉杆,每个丝杠拉杆下部连接有四钩卡,丝杠拉杆座插在铁塔上两个间隔的横角铁之间。第四代500千伏同塔双回线路SZ1、SZ2、SZ3、SZ4直线塔采用了新型结构,前述间隔的横角铁之间取消了缝隙,使原有的丝杠拉杆无处可插。In the prior art, the insulator suspension tool for live replacement of power transmission lines includes screw rods, each screw rod bottom is connected with four hooks, and the screw rod seat is inserted between two spaced horizontal angle irons on the iron tower. The fourth-generation 500 kV double-circuit line on the same tower SZ 1 , SZ 2 , SZ 3 , and SZ 4 linear towers adopt a new structure, and the gaps between the aforementioned horizontal angle irons are eliminated, so that the original screw rods have nowhere to go can be plugged.
实用新型内容 Utility model content
本实用新型的目的是针对上述情况而提供一种适应新型铁塔使用的输电线路带电更换绝缘子吊线工具组件。The purpose of the utility model is to provide a live replacement insulator suspension tool assembly for a new type of iron tower in view of the above situation.
本实用新型的技术解决方案是:输电线路带电更换绝缘子吊线工具组件包括丝杠拉杆、丝杠拉杆下部连接有四钩卡。采用两个丝杠拉杆座,两个丝杠拉杆座之间通过可调式拉杆连接;每个丝杠拉杆竖立插座在丝杠拉杆座上。丝杠拉杆座上有插卡在铁塔横担上两侧角钢立边上的插槽,使用时插接在铁塔横担上两侧角钢立边上。The technical solution of the utility model is: the live replacement insulator suspension wire tool assembly of the transmission line includes a lead screw pull rod, and four hooks are connected to the lower part of the lead screw pull rod. Two lead screw pull rod seats are adopted, and the two lead screw pull rod seats are connected by adjustable pull rods; each lead screw pull rod is vertically socketed on the lead screw pull rod seat. There are slots inserted into the vertical edges of the angle steel on both sides of the cross arm of the iron tower on the lead screw rod seat, and inserted into the vertical edges of the angle steel on both sides of the cross arm of the iron tower when in use.
本实用新型的优点是:1、满足新型铁塔上安装使用。2、结构简单、合理,使用安全可靠。3、摆脱了铁塔横担头处绝缘子挂点形式的限制。The utility model has the advantages of: 1. It can be installed and used on the new iron tower. 2. The structure is simple and reasonable, and the use is safe and reliable. 3. Get rid of the limitation of the hanging point form of the insulator at the cross-arm head of the iron tower.
下面将结合附图对本实用新型的实施方式作进一步详细描述。Embodiments of the utility model will be further described in detail below in conjunction with the accompanying drawings.
附图说明 Description of drawings
图1是本实用新型使用状态结构简图。Fig. 1 is a schematic diagram of the structure of the utility model in use.
图2是丝杠拉杆座单件俯视放大结构简图。Fig. 2 is a schematic enlarged structural diagram of a single-piece top view of the lead screw rod seat.
图3是本实用新型在铁塔上安装示意图。Fig. 3 is a schematic diagram of installing the utility model on an iron tower.
具体实施方式 Detailed ways
参见图1,输电线路带电更换绝缘子吊线工具组件包括两个丝杠拉杆1和每个丝杠拉杆1下部连接有四钩卡2(都是电力部门常用工具)。在此基础上增加了两个丝杠拉杆座3,以适应新型铁塔结构要求。两个丝杠拉杆座3之间通过可调式拉杆4连接,用于增加连接强度和稳定性。每个丝杠拉杆1竖立插座在丝杠拉杆座3上。丝杠拉杆座3上有插卡在铁塔横担角钢6的立边7上的插槽5。安装使用时(图1状态),进行组装,丝杠拉杆座3插接在铁塔横担边缘上的角钢6的立边7上(见图3),将拉杆4与丝杠拉杆座3连接并调整,插上丝杠拉杆1,四钩卡2钩上四股导线。搬动手柄13,丝杠拉杆1上移,带动四钩卡2上提及与其连接的四股导线上提,释放绝缘瓷瓶承重,可以方便取下与导线连接的整串绝缘瓷瓶。Referring to Fig. 1, the power transmission line replacement insulator suspension tool assembly includes two
参见图2,丝杠拉杆1穿过孔8,搭在槽9、10上。Referring to Fig. 2, the lead
参见图3,现在新型铁塔11上的两个角钢12是靠在一起的。在已有技术中,两个角钢12是间隔的,丝杠拉杆1插立在两个角钢12之间,所以原有结构不适用了。现在的丝杠拉杆1通过两个丝杠拉杆座3插立于铁塔11上。Referring to Fig. 3, the two angle steels 12 on the new iron tower 11 are leaning together now. In the prior art, the two angle steels 12 are spaced apart, and the
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009203036813U CN201430375Y (en) | 2009-05-27 | 2009-05-27 | Transmission line live replacement insulator suspension tool assembly |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009203036813U CN201430375Y (en) | 2009-05-27 | 2009-05-27 | Transmission line live replacement insulator suspension tool assembly |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201430375Y true CN201430375Y (en) | 2010-03-24 |
Family
ID=42034114
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009203036813U Expired - Fee Related CN201430375Y (en) | 2009-05-27 | 2009-05-27 | Transmission line live replacement insulator suspension tool assembly |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201430375Y (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101820144A (en) * | 2010-03-26 | 2010-09-01 | 福建省电力有限公司莆田电业局 | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire |
| CN102074909A (en) * | 2010-10-28 | 2011-05-25 | 福建省电力有限公司漳州电业局 | Adjustable cross arm straight fixture |
| CN103276941A (en) * | 2013-04-27 | 2013-09-04 | 国家电网公司 | Principal material replacing support assembly of electric transmission line tower |
-
2009
- 2009-05-27 CN CN2009203036813U patent/CN201430375Y/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101820144A (en) * | 2010-03-26 | 2010-09-01 | 福建省电力有限公司莆田电业局 | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire |
| CN101820144B (en) * | 2010-03-26 | 2012-06-27 | 福建省电力有限公司莆田电业局 | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire |
| CN102074909A (en) * | 2010-10-28 | 2011-05-25 | 福建省电力有限公司漳州电业局 | Adjustable cross arm straight fixture |
| CN103276941A (en) * | 2013-04-27 | 2013-09-04 | 国家电网公司 | Principal material replacing support assembly of electric transmission line tower |
| CN103276941B (en) * | 2013-04-27 | 2015-12-23 | 国家电网公司 | Electric power line pole tower main material replacing bracket component |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101174761B (en) | Up-spinning Live Replacement Method for Tension Insulator Strings of High-Voltage Transmission Lines | |
| CN204645808U (en) | Bar stepped on by cement pole cable | |
| CN202586171U (en) | Supporting plate device of special hook card for live line replacement linear horizontal double-division insulator | |
| CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
| CN203787855U (en) | Power transmission line linear charged wire lifting device | |
| CN201332249Y (en) | Tangent tower in shape of goblet of same-tower and three-circuit transmission line | |
| CN203014270U (en) | A triangular connecting plate connector used for a double bundled conductor in a power transmission line | |
| CN203288943U (en) | Intelligent switch installing accessory | |
| CN205355675U (en) | Suspension insulator changes device | |
| CN105178677A (en) | Linear tower for ultrahigh-voltage direct-current lines and with two poles arranged vertically | |
| CN201556716U (en) | Grounding clamp for high-voltage electrical inspection in the distribution transformer station area | |
| CN203891557U (en) | Compact insulation support | |
| CN202882514U (en) | 220-kilovolt all-angle single-circuit drilling cross tower | |
| CN202405714U (en) | Anti-swirl lifting support | |
| CN204657344U (en) | Be applied to the bending machine of step down side insulated conductor | |
| CN203631193U (en) | Pin-type insulator | |
| CN202850574U (en) | Wire rod | |
| CN116260095A (en) | Jumper wire up-winding type composite cross arm drilling structure suitable for 750kV line | |
| CN202797820U (en) | Electric lead wall support | |
| CN201674161U (en) | SZ type double-circuit straight line tower live replacement suspension insulator suspension wire fixture assembly | |
| CN203071493U (en) | Adjustable line tackle | |
| CN201549854U (en) | Insulation support device between conductors | |
| CN204876745U (en) | A tangent tower that is used for two poles of earth vertical arrangement of special high voltage direct current circuit | |
| CN204311819U (en) | A kind of 500kV double back broken line type cross-arm tangent tower | |
| CN204703578U (en) | Bar stepped on by gate framework type cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20121011 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20121011 Address after: Tonghua City, Jilin Province, Xinhua Street 134001 Dongchang District No. 770 Patentee after: Jilin Electric Power Company Limited, Tonghua Power Supply Company Patentee after: State Grid Corporation of China Address before: Tonghua City, Jilin Province, Xinhua Street 134001 Dongchang District No. 770 Patentee before: Jilin Electric Power Company Limited, Tonghua Power Supply Company |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100324 Termination date: 20180527 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |