CN201429653Y - Complete set of tower grounding resistance test tools - Google Patents

Complete set of tower grounding resistance test tools Download PDF

Info

Publication number
CN201429653Y
CN201429653Y CN2009200821493U CN200920082149U CN201429653Y CN 201429653 Y CN201429653 Y CN 201429653Y CN 2009200821493 U CN2009200821493 U CN 2009200821493U CN 200920082149 U CN200920082149 U CN 200920082149U CN 201429653 Y CN201429653 Y CN 201429653Y
Authority
CN
China
Prior art keywords
test
ground resistance
bearing
wire wheel
pole tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200821493U
Other languages
Chinese (zh)
Inventor
杜小波
廖学静
黄中华
薛维斌
张成兴
魏大祥
张玻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deyang Power Supply Co of State Grid Sichuan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
DEYANG ELECTRIC POWER BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DEYANG ELECTRIC POWER BUREAU filed Critical DEYANG ELECTRIC POWER BUREAU
Priority to CN2009200821493U priority Critical patent/CN201429653Y/en
Application granted granted Critical
Publication of CN201429653Y publication Critical patent/CN201429653Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

本实用新型提供一种成套杆塔接地电阻测试工具,包括地阻表、测试线和测试棒,测试棒包括接地极和手柄,还包括架体、线轮和箱体,所述架体上设有地阻表和线轮的预留位,在线轮的预留位上设置有轴承,线轮经轴承安装在架体上,所述线轮上缠有测试线;所述测试棒上端设有接线头,顶部设有大于测试棒径向横截面面积的护头。本实用新型既杜绝了收/放测试线时易发生乱缠绕的现象,省时、省力,有效提高了工作效率,又防止摇表时发生晃动而影响测试的准确度,并且满足了收/放测试线时不一定同步的需求,操作方便、快捷;既解决了测试棒与测试线接触不良的问题,又防止了测试棒的损坏;还配有箱体,解决了工具凌乱、易丢失的问题,且搬运、移动方便。

The utility model provides a complete set of pole tower grounding resistance testing tools, which include a ground resistance meter, a test line and a test rod. The test rod includes a ground electrode and a handle, and also includes a frame body, a wire wheel and a box body. The ground resistance meter and the reserved position of the wire wheel are provided with a bearing on the reserved position of the wire wheel, and the wire wheel is installed on the frame through the bearing, and a test line is wound on the wire wheel; the upper end of the test rod is provided with a wiring The top is provided with a head guard larger than the radial cross-sectional area of the test rod. The utility model not only eliminates the phenomenon of chaotic winding when receiving/releasing the test line, saves time and effort, effectively improves the work efficiency, but also prevents shaking when shaking the meter and affects the accuracy of the test, and meets the requirements of the retracting/releasing test line. It is not necessarily synchronized when testing the line, and the operation is convenient and fast; it not only solves the problem of poor contact between the test rod and the test line, but also prevents the damage of the test rod; it is also equipped with a box to solve the problem of messy tools and easy loss , and easy to carry and move.

Description

成套杆塔接地电阻测试工具 Complete set of tower grounding resistance test tools

技术领域 technical field

本实用新型涉及对电力网中输电线路的杆塔接地网进行测试的工具,具体是一种成套杆塔接地电阻测试工具。The utility model relates to a tool for testing a pole tower grounding network of a power transmission line in a power network, in particular to a complete set of pole tower grounding resistance testing tools.

背景技术 Background technique

杆塔接地装置是输电线路的重要组成部分,主要作用是防雷保护,接地装置是否符合要求,就要对接地网进行测试,以使判断是否应该对接地网进行补修。The tower grounding device is an important part of the transmission line, and its main function is lightning protection. Whether the grounding device meets the requirements, it is necessary to test the grounding grid to judge whether the grounding grid should be repaired.

目前,对接地网进行接地电阻测试普遍是采用国产ZC-8地阻表套装,它包括一台ZC-8地阻表、2根测试棒和3根测试线(5m、38m、60m)。由于工具凌乱及结构限制,主要存在以下缺陷:1、测试线较长且直接圈在一起,收/放测试线时通常采用手工方法收/放,一次只能收/放一根测试线,收/放测试线速度慢,且易发生缠绕,清理测试线是一项非常繁琐的事,需要花费很多时间;2、测试线通过夹子夹在测试棒上,很容易脱落,测试棒与测试线存在接触不良问题;3、测试棒顶部无任何防护措施,易损坏;4、工具不能有效的统一集中,易丢失。这样既影响了收/放测试线的速度,又严重影响工作效率,造成不必要的成本增加。At present, the grounding resistance test of the grounding network generally adopts the domestic ZC-8 ground resistance meter set, which includes a ZC-8 ground resistance meter, 2 test rods and 3 test lines (5m, 38m, 60m). Due to the messy tools and structural limitations, there are mainly the following defects: 1. The test line is long and directly looped together. When collecting/releasing the test line, it is usually collected/released manually. Only one test line can be received/released at a time. / Putting the test line is slow and prone to entanglement. Cleaning the test line is a very cumbersome task and takes a lot of time; 2. The test line is clamped on the test rod by a clip, and it is easy to fall off. The test rod and the test line exist Poor contact problem; 3. There is no protective measure on the top of the test rod, which is easy to be damaged; 4. The tools cannot be effectively unified and concentrated, and are easy to lose. This not only affects the speed of receiving/releasing the test line, but also seriously affects the work efficiency, resulting in unnecessary cost increase.

发明内容 Contents of the invention

本实用新型的目的是提供一种成套杆塔接地电阻测试工具,它杜绝了收/放测试线时易发生乱缠绕的现象,有效提高了工作效率。The purpose of the utility model is to provide a complete set of tower grounding resistance test tool, which prevents the phenomenon of chaotic winding when receiving/releasing the test line, and effectively improves the work efficiency.

本实用新型是这样实现的:The utility model is achieved in that:

一种成套杆塔接地电阻测试工具,包括地阻表、测试线和测试棒,所述测试棒包括接地极和手柄,还包括架体和线轮,所述架体上设有地阻表和线轮的预留位,在线轮的预留位上设置有轴承,线轮经轴承安装在架体上,所述线轮上缠有测试线。A complete set of tower grounding resistance testing tools, including a ground resistance meter, a test line and a test rod, the test rod includes a ground electrode and a handle, and also includes a frame and a wire wheel, and the ground resistance meter and wires are arranged on the frame The reserved position of the wheel is provided with a bearing on the reserved position of the wire wheel, and the wire wheel is installed on the frame body through the bearing, and the test line is wound on the wire wheel.

所述轴承由连接在架体上的轴承支架横向支撑在线轮的预留位中心。The bearing is laterally supported in the center of the reserved position of the wire wheel by a bearing bracket connected to the frame body.

所述轴承支架固定支撑在轴承中部,两边部轴承上各安装有线轮。The bearing support is fixedly supported in the middle part of the bearing, and wire wheels are respectively installed on the bearings at both sides.

所述线轮的安轴孔两端设置有滑轮。Pulleys are arranged at both ends of the anchor hole of the wire wheel.

所述线轮的外部侧板上设有把手。A handle is provided on the outer side plate of the wire wheel.

所述测试线端连接有开口接线环;所述测试棒上设有螺栓结构的接线头。The end of the test line is connected with an open terminal ring; the test rod is provided with a terminal head with a bolt structure.

所述测试棒的上端设有大于测试棒径向横截面面积的护头。The upper end of the test rod is provided with a head guard which is larger than the radial cross-sectional area of the test rod.

本成套杆塔接地电阻测试工具还包括箱体。The complete set of tower grounding resistance testing tools also includes a box body.

本实用新型的有益效果是:The beneficial effects of the utility model are:

1.杜绝了收/放测试线时易发生乱缠绕的现象,省时、省力,有效提高了工作效率。1. It eliminates the phenomenon of chaotic winding when receiving/releasing the test line, saves time and effort, and effectively improves work efficiency.

2.线轮之间独立旋转,满足了收/放测试线时不一定同步的需求,操作方便、快捷。2. The wire wheels rotate independently, which meets the requirement of not necessarily synchronizing when receiving/releasing the test wire, and is easy and fast to operate.

3.防止遥表时发生晃动而影响测试的准确度。3. Prevent shaking when the remote meter is used to affect the accuracy of the test.

4.既解决了测试棒与测试线接触不良的问题,又防止了测试棒的损坏。4. It not only solves the problem of poor contact between the test rod and the test line, but also prevents the damage of the test rod.

5.配有箱体,除测试棒外的所有工具集中存放于箱体内,解决了工具凌乱、易丢失的问题,且搬运、移动方便。5. Equipped with a box, all tools except the test rod are stored in the box, which solves the problem of tools being messy and easy to lose, and is easy to carry and move.

附图说明 Description of drawings

图1是本实用新型的一种结构示意图。Fig. 1 is a kind of structural representation of the utility model.

图2是图1的俯视图。FIG. 2 is a top view of FIG. 1 .

图3是本实用新型的另一种结构示意图。Fig. 3 is another structural diagram of the utility model.

图中代号含义:1-架体;2-地阻表;3-线轮;4-轴承;5-把手;6-测试线;7-轴承支架;8-测试棒;9-护头;10-箱体;11-滑轮;12-接线头;13-接线环。The meaning of the code in the picture: 1-frame; 2-ground resistance meter; 3-wire wheel; 4-bearing; 5-handle; 6-test line; 7-bearing bracket; 8-test rod; 9-head guard; 10 -box body; 11-pulley; 12-wiring head; 13-wiring ring.

具体实施方式 Detailed ways

参见图1和图2:本实用新型在现有的地阻表2、测试线6和测试棒8的基础上还设置有架体1和线轮3,该现有测试棒8包括接地极和手柄。在架体1上设有地阻表2和线轮3的预留位,这样将地阻表2放置在架体1上设置的预留位内,防止地阻表2在遥表时发生晃动而影响测试的准确度。在线轮3的预留位上设置有轴承4,轴承4由连接在架体1上的轴承支架7横向支撑在线轮3的预留位中心,轴承支架7固定支撑在轴承4中部,两边部轴承4上各安装有线轮3,满足了收/放测试线时不一定同步进行的需求,操作方便、快捷。在线轮3的安轴孔两端设置有滑轮11,在线轮3的外部侧板上设有把手5,这样大大提高了线轮3在轴承4上的转动性及操作性。线轮3上缠有测试线6,杜绝了手工收/放测试线6时易发生乱缠绕的现象,工作人员可以同时收/放两根测试线,而不需要紧盯测试线6,省时、省力,使收/放测试线的工作变得更加方便快捷,有效提高了工作效率。Referring to Fig. 1 and Fig. 2: the utility model is also provided with frame body 1 and wire wheel 3 on the basis of existing ground resistance meter 2, test line 6 and test rod 8, and this existing test rod 8 comprises ground electrode and handle. On the frame body 1, there are reserved positions for the ground resistance meter 2 and the wire wheel 3, so that the ground resistance meter 2 is placed in the reserved position set on the frame body 1 to prevent the ground resistance meter 2 from shaking when the meter is remote affect the accuracy of the test. A bearing 4 is arranged on the reserved position of the wire wheel 3, and the bearing 4 is laterally supported in the center of the reserved position of the wire wheel 3 by a bearing bracket 7 connected to the frame body 1. The bearing bracket 7 is fixedly supported in the middle of the bearing 4, and the bearings on both sides Each of the 4 is equipped with a cable wheel 3, which satisfies the requirement that the collection/release of the test line is not necessarily performed synchronously, and the operation is convenient and fast. Pulleys 11 are arranged at both ends of the safety shaft hole of the wire pulley 3, and a handle 5 is provided on the outer side plate of the wire pulley 3, which greatly improves the rotatability and operability of the wire pulley 3 on the bearing 4. The test line 6 is wound on the reel 3, which eliminates the phenomenon of random winding when the test line 6 is manually collected/released. The staff can receive/release two test lines at the same time without keeping an eye on the test line 6, saving time , labor-saving, making the work of receiving/releasing the test line more convenient and efficient, and effectively improving work efficiency.

在现有测试棒8上设有螺栓结构的接线头12,测试线6端连接有开口接线环13,在工作时,将测试线6端的接线环13卡到测试棒8的接线头12上,旋紧螺丝,就能牢固的将测试线6固定在测试棒8上,解决了测试棒8与测试线6接触不良的问题。为了防止操作时榔头对测试棒8锤击造成的损坏,在测试棒8的上端设有大于测试棒8径向横截面面积的护头9,该护头9为圆球状(还可以为椭圆状、方形状或多边形状中的任一种,并不限制为某一种)。The existing test rod 8 is provided with a terminal head 12 of a bolt structure, and the test line 6 ends are connected with an open connection ring 13. When working, the connection ring 13 at the test line 6 ends is stuck on the connection head 12 of the test rod 8, By tightening the screws, the test line 6 can be firmly fixed on the test rod 8, which solves the problem of poor contact between the test rod 8 and the test line 6. In order to prevent the damage caused by the hammer hammering the test rod 8 during operation, the upper end of the test rod 8 is provided with a head guard 9 that is larger than the radial cross-sectional area of the test rod 8. The head guard 9 is spherical (can also be elliptical) , square shape or polygonal shape, not limited to any one).

参见图3:为了避免测试接地电阻的工具凌乱、易丢失等问题,本实用新型配备了箱体10,致使搬运、移动等方便。当使用时将架体1从箱体10内抬出(因地阻表2和线轮3等安置在架体1上,所以在抬出架体1时,地阻表2和线轮3等测试工具同时抬出),开始正常的打开接地线、放线、固定测试棒、摇表测试等工作。当存放时,转动线轮3收回测试线6,将架体1放入箱体10内,其他辅助工具(如扳手、钳子等辅助工具)也放入,封箱,搬运即可。See Fig. 3: In order to avoid problems such as clutter and easy loss of tools for testing grounding resistance, the utility model is equipped with a box body 10, which is convenient for handling and moving. When in use, the frame body 1 is lifted out from the box body 10 (because the ground resistance meter 2 and the wire wheel 3 etc. are placed on the frame body 1, so when the frame body 1 is lifted out, the ground resistance meter 2 and the wire wheel 3 etc. The test tools are lifted out at the same time), and start the normal work of opening the ground wire, setting out the wire, fixing the test rod, and shaking the meter. When depositing, turn the line wheel 3 to take back the test line 6, put the frame body 1 in the casing 10, and other auxiliary tools (as auxiliary tools such as wrench and pliers) also put into, seal the case and carry.

Claims (8)

1. complete pole tower ground resistance testing tool, comprise ground resistance table (2), p-wire (6) and prod (8), described prod (8) comprises earthing pole and handle, it is characterized in that: also comprise support body (1) and line wheel (3), described support body (1) is provided with the reserved place of ground resistance table (2) and line wheel (3), the reserved place of online wheel the (3) is provided with bearing (4), and line wheel (3) is installed on the support body (1) through bearing (4), is tied with p-wire (6) on the described line wheel (3).
2. complete pole tower ground resistance testing tool according to claim 1 is characterized in that: described bearing (4) is by the reserved place center that is connected online wheel of bearing bridge (7) cross-brace (3) on the support body (1).
3. complete pole tower ground resistance testing tool according to claim 2 is characterized in that: described bearing bridge (7) is fixedly supported on bearing (4) middle part, and wired wheel the (3) respectively is installed on the both sides portion bearing (4).
4. according to claim 1 or 3 described complete pole tower ground resistance testing tools, it is characterized in that: the peace axis hole two ends of described line wheel (3) are provided with pulley (11).
5. according to claim 1 or 3 described complete pole tower ground resistance testing tools, it is characterized in that: the outside side plate of described line wheel (3) is provided with handle (5).
6. complete pole tower ground resistance testing tool according to claim 1 is characterized in that: described p-wire (6) end is connected with opening wiring ring (13); Described prod (8) is provided with the connector lug (12) of bolt arrangement.
7. according to claim 1 or 6 described complete pole tower ground resistance testing tools, it is characterized in that: the upper end of described prod (8) is provided with protect (9) greater than prod (8) radial cross-sectional area.
8. complete pole tower ground resistance testing tool according to claim 1 is characterized in that: this testing tool also comprises casing (10).
CN2009200821493U 2009-06-25 2009-06-25 Complete set of tower grounding resistance test tools Expired - Lifetime CN201429653Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200821493U CN201429653Y (en) 2009-06-25 2009-06-25 Complete set of tower grounding resistance test tools

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200821493U CN201429653Y (en) 2009-06-25 2009-06-25 Complete set of tower grounding resistance test tools

Publications (1)

Publication Number Publication Date
CN201429653Y true CN201429653Y (en) 2010-03-24

Family

ID=42033392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200821493U Expired - Lifetime CN201429653Y (en) 2009-06-25 2009-06-25 Complete set of tower grounding resistance test tools

Country Status (1)

Country Link
CN (1) CN201429653Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308732A (en) * 2013-07-10 2013-09-18 国家电网公司 Electrical testing device
CN103466394A (en) * 2013-09-05 2013-12-25 国家电网公司 Megger reeling and unreeling machine
CN104237646A (en) * 2014-09-30 2014-12-24 国家电网公司 Combination cart for ground resistance of electric transmission line
CN104977437A (en) * 2015-07-17 2015-10-14 国家电网公司 10kV cable branch box loop resistance testing tool
CN109444554A (en) * 2018-11-01 2019-03-08 国网新疆电力有限公司检修公司 Quickly withdraw the device of earth loop impedance test line
CN110275067A (en) * 2019-03-28 2019-09-24 国家电网有限公司 A kind of distribution transforming ground resistance Simplified Test Equipment
CN111811387A (en) * 2020-06-30 2020-10-23 中国电子科技集团公司第十六研究所 A device for measuring the resistance between the inner and outer rings of a bearing in a rotating state

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308732A (en) * 2013-07-10 2013-09-18 国家电网公司 Electrical testing device
CN103466394A (en) * 2013-09-05 2013-12-25 国家电网公司 Megger reeling and unreeling machine
CN103466394B (en) * 2013-09-05 2015-11-18 国家电网公司 A kind of megger reel
CN104237646A (en) * 2014-09-30 2014-12-24 国家电网公司 Combination cart for ground resistance of electric transmission line
CN104977437A (en) * 2015-07-17 2015-10-14 国家电网公司 10kV cable branch box loop resistance testing tool
CN104977437B (en) * 2015-07-17 2017-11-28 国家电网公司 10kV cable branch box loop resistance test instruments
CN109444554A (en) * 2018-11-01 2019-03-08 国网新疆电力有限公司检修公司 Quickly withdraw the device of earth loop impedance test line
CN110275067A (en) * 2019-03-28 2019-09-24 国家电网有限公司 A kind of distribution transforming ground resistance Simplified Test Equipment
CN110275067B (en) * 2019-03-28 2021-08-13 国家电网有限公司 A simple test device for distribution transformer grounding resistance
CN111811387A (en) * 2020-06-30 2020-10-23 中国电子科技集团公司第十六研究所 A device for measuring the resistance between the inner and outer rings of a bearing in a rotating state

Similar Documents

Publication Publication Date Title
CN201429653Y (en) Complete set of tower grounding resistance test tools
CN204230457U (en) Universal connector earth wire operation rod
CN102651530B (en) Compression spring type electric power grounding line operation rod
CN202454746U (en) High-altitude wiring pliers with built-in wire
WO2016000416A1 (en) Overhead ground wire lifter
CN203536853U (en) Bird scarer electric installation special tool
CN203536866U (en) Tripod line laying device
CN201312077Y (en) Earth wire raiser for electric pole tower
CN106915666B (en) A kind of earth cable is around putting device
CN203660422U (en) 500 kV overhead ground wire lifting tool
CN204516915U (en) Earth rod
CN201639196U (en) Insulating tool set
CN208265678U (en) Portable overhead ground wire lifting device
CN202725887U (en) Special device for pull wire manufacture
CN202550273U (en) Compression spring type power grounding wire operating arm
CN202285027U (en) Electroscope for power transmission line
CN204045895U (en) A connection structure of concrete pole ground wire
CN202373939U (en) Live-working double-conductor lifting device
CN202231360U (en) Post insulator bolt live fastening tool
CN104167650B (en) The attachment structure of a kind of concrete bar ground wire and using method thereof
CN201440587U (en) a pay-off tackle
CN204185029U (en) Transformer substation grounding wire line concentrator
CN203216951U (en) Terminal rods for lightning arresters
CN212258252U (en) Transmission line straight pole overhead earth wire overhauls support
CN201674158U (en) Transmission line overhead ground wire lifter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DEYANG POWER SUPPLY COMPANY, STATE GRID SICHUAN EL

Effective date: 20131213

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: DEYANG ELECTRIC POWER BUREAU

Effective date: 20131213

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 618000 DEYANG, SICHUAN PROVINCE TO: 100761 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131213

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Patentee after: State Grid Corporation of China

Patentee after: Deyang Power Supply Company, State Grid Sichuan Electric Power Corporation

Address before: 618000 Zijin Mountain street, Sichuan, Deyang, No. 4

Patentee before: Deyang Electric Power Bureau

CX01 Expiry of patent term

Granted publication date: 20100324

CX01 Expiry of patent term