CN201402221Y - 一种可移动式多点同步结构模型静载试验加载装置 - Google Patents

一种可移动式多点同步结构模型静载试验加载装置 Download PDF

Info

Publication number
CN201402221Y
CN201402221Y CN2009200837218U CN200920083721U CN201402221Y CN 201402221 Y CN201402221 Y CN 201402221Y CN 2009200837218 U CN2009200837218 U CN 2009200837218U CN 200920083721 U CN200920083721 U CN 200920083721U CN 201402221 Y CN201402221 Y CN 201402221Y
Authority
CN
China
Prior art keywords
counter
force
post
girder steel
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200837218U
Other languages
English (en)
Inventor
王戒躁
安群慧
周明星
王天亮
黄志坚
尹双庆
李荣庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Bridge Science Research Institute Ltd
Original Assignee
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd, China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2009200837218U priority Critical patent/CN201402221Y/zh
Application granted granted Critical
Publication of CN201402221Y publication Critical patent/CN201402221Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

一种可移动式多点同步结构模型静载试验加载装置,通过设置反力部分,将反力钢梁两端用精轧螺纹钢筋固定在反力柱顶或反力地梁上,保证由反力钢梁承载千斤顶的压力,实现对桥梁结构模型反力加载;通过在千斤顶下面设置加载柱,保证反力钢梁有一定高度,以适应在纵桥向不同部位两端固定,保证了加载装置可以在纵桥向移动;通过选用大吨位液压千斤顶施加荷载力,保证大吨位加载;通过加载柱与反力钢梁之间设置压力传感器,监测施加到分配梁的荷载值,保证加载值的准确性,通过在分配梁与桥梁结构模型桥面板之间设置厚橡胶垫块,保证施加荷载传递至桥面为面荷载,其结构设计简单,便于制作、安装。

Description

一种可移动式多点同步结构模型静载试验加载装置
技术领域
本实用新型涉及一种用于桥梁等结构大尺度模型静载试验的加载装置,特别是涉及一种利用反力及杠杆分配原理的大吨位、可移动式多点同步液压精确加载装置。
技术背景
现有技术中与本实用新型最为相近的有:专利号为CN200720116990.0、公开号为CN201110822、公开日为2008.09.03的“自平衡多功能结构静载试验加载装置”,该现有技术仅仅适用于钢筋混凝土梁和钢筋混凝土柱等的试验,单个千斤顶作用在反力梁上,对结构只有两个加载点,不能实现多点同步加载目的,而大尺度桥梁模型模拟车辆车轮轮压需要多点同步加载,如果要全面模拟桥面轮压荷载,单点加载需要多个传感器和反力横梁,结构复杂,成本高,且难以实现。同时单点加载不能保证加载同步,与实际轮压效应差别大,导致模型结构受力与实际桥面受力不一致,并且技术反力梁为固定构造,不能拆卸,不能模拟桥面空间网格布置的多工况变轮位加载。此外,该现有技术采用螺旋千斤顶,加载量小且难以操作。
发明内容
本实用新型的目的是针对现有技术的不足之处,提供一种用于桥梁大尺度、大吨位、可移动式多点同步加载的结构模型静载试验的加载装置。通过设置反力部分,将反力钢梁两端用精轧螺纹钢筋固定在反力柱顶或反力地梁上,保证由反力钢梁承载千斤顶的压力,实现对桥梁结构模型反力加载;通过在千斤顶下面设置加载柱,保证反力钢梁有一定高度,以适应在纵桥向不同部位两端固定,保证了加载装置可以在纵桥向移动;通过选用大吨位液压千斤顶施加荷载力,保证大吨位加载;通过加载柱与反力钢梁之间设置压力传感器,监测施加到分配梁的荷载值,保证加载值的准确性;通过在分配梁与桥梁结构模型桥面板之间设置厚橡胶垫块,保证施加荷载传递至桥面为面荷载。
本实用新型的技术方案是这样实现的:
一种可移动式多点同步结构模型静载试验加载装置包括反力钢梁1、压力传感器2、液压千斤顶3、加载柱4、分配梁5、橡胶垫块6、精轧螺纹钢筋7、反力地梁8、反力柱9。将桥梁结构模型箱梁纵桥向两排车辆车轮轮位上方设置一根横桥向的反力钢梁1,同一根反力钢梁1下方对应每个车道的每辆车四个相邻轮压设为一组,所设置的组数与具体桥梁的车道数对应,每组轮压上设置一根分配梁5,平面呈工字型,分配梁5的四个角点下对应桥面四个轮压位置,放置四个厚橡胶垫块6;分配梁5上方固定加载柱4,加载柱4上方固定液压千斤顶3,液压千斤顶3顶端安装压力传感器2,压力传感器2上方顶在反力钢梁1底板上,保证液压千斤顶3的压力由加载柱4、分配梁5及橡胶垫块6传递到桥面;若反力钢梁1对应没有反力柱9位置,则取消加载柱4,千斤顶3直接放置在分配梁5上方;为避免反力钢梁1受力失稳,同一反力钢梁1下的多个压力传感器2上方顶在反力钢梁1底板中线上;为保证顺畅传力,同一组中压力传感器2、液压千斤顶3、加载柱4应安装在同一竖向轴线上,而加载柱4(在没有反力柱9的部位为千斤顶3)中心设置在分配梁5上的位置则根据杠杆分配原理计算每个加载点加载力来确定;反力钢梁1两端与反力地梁8通过精轧螺纹钢筋7相连,若反力钢梁1的一端设置位置处于反力柱9位置,则该端通过精轧螺纹钢筋7与反力柱9相连,以保证反力传递到反力地梁8上,反力地梁8为圈梁;千斤顶3的吨位根据试验要求设置,以保证桥面大吨位加载要求。
本实用新型的优点:
1、通过多个液压千斤顶共用反力钢梁及加载柱下分配梁的设置,保证了用少量液压式千斤顶在静载大尺度模型桥面上逐点对轮压加载。
2、通过设置反力系统,将反力钢梁两端用精轧螺纹钢筋固定在反力柱顶或反力地梁上,保证由反力钢梁承载千斤顶的压力,实现反力加载的可能。
3、通过在千斤顶下面设置加载柱,保证反力钢梁有一定高度,适应在纵桥向不同部位两端固定,保证了加载装置可以在纵桥向移动。
4、通过选用大吨位液压千斤顶施加荷载力,保证大吨位加载,并通过加载柱与反力钢梁之间设置压力传感器,监测施加到分配梁的荷载值,保证加载值的准确性。
5、通过在分配梁与桥面板之间设置厚橡胶垫块,保证施加荷载传递至桥面为面荷载。
6、结构简单,成本低,便于制作、安装。
附图说明
图1是本实用新型反力钢梁对应反力柱位置横桥向布置示意图;
图2是本实用新型反力钢梁未对应反力柱位置横桥向布置示意图;
图3是本实用新型纵桥向布置示意图。
具体实施方式
下面结合实施例和附图对本实用新型进一步说明。该实施例是某大桥分体式钢箱梁1∶2大尺度节段桥梁结构模型两层杠杆分配梁体系。其加载装置主要构成及尺寸为:反力钢梁1由板厚为10mm钢板焊接成截面为600mm×600mm的箱梁,压力传感器2设计成外径50mm、内径15mm、高30mm的圆柱,液压千斤顶3选用80t液压千斤顶,加载柱4由板厚为10mm钢板焊接成截面为600mm×600mm、高1300mm的箱梁,分配梁5由板厚10mm、截面为150mm×150mm的小箱梁焊接成外形1200mm×1000mm的工字型,橡胶垫块6尺寸根据具体轮压面确定,选用直径φ32的精轧螺纹钢筋7锚固反力钢梁1,反力柱9为顶面1000mm×3000mm,柱身截面1000mm×1500mm的钢筋混凝土结构,反力地梁8为截面为1000mm×1000mm钢筋混凝土结构的圈梁。
图1是本实用新型反力钢梁对应反力柱位置横桥向布置示意图,图2是本实用新型反力钢梁未对应反力柱位置横桥向布置示意图,图3是本实用新型纵桥向布置示意图。将桥梁结构模型箱梁纵桥向两排车辆车轮轮位上方设置一根反力钢梁1,将同一根反力钢梁1下方每四个相邻轮压设为一组,每组轮压上设置一个分配梁5,分配梁5平面呈工字型,分配梁5的四个角点下对应桥面轮压位置,放置四个厚橡胶垫块6;分配梁5上方固定加载柱4,加载柱4上方固定液压千斤顶3,千斤顶3顶端安装压力传感器2,传感器2上方顶在反力钢梁1底板上,保证千斤顶3的压力由加载柱4、分配梁5及橡胶垫块6传递到桥面;若反力钢梁1对应没有反力柱9的位置,则取消加载柱4,千斤顶3直接放置在分配梁5上方;每个千斤顶3吨位设计为80t,保证桥梁结构模型桥面大吨位加载;反力钢梁1两端与反力地梁8通过精轧螺纹钢筋7相连,若反力钢梁1的一端设置位置处于反力柱9位置,则该端通过精轧螺纹钢筋7与反力柱9相连,以保证反力传递到反力地梁8上,保证千斤顶3的力准确施加到桥梁结构模型桥面每一个轮位处。
上述措施有效保证了多点同步大吨位加载,并可拆装,实现了加载装置在桥梁结构模型纵桥向移动。

Claims (3)

1、一种可移动式多点同步结构模型静载试验加载装置,主要由反力钢梁(1)、压力传感器(2)、液压千斤顶(3)、加载柱(4)、分配梁(5)、橡胶垫块(6)、精轧螺纹钢筋(7)、反力地梁(8)、反力柱(9)组成,其特征是:将桥梁结构模型纵桥向两排车辆车轮轮位上方设置一根横桥向的反力钢梁(1),同一根反力钢梁(1)下方每个车道中每四个相邻轮压设为一组,每组轮压上设置一根分配梁(5),平面呈工字型,分配梁(5)的四个角点下对应桥面四个轮压位置,放置四个厚橡胶垫块(6);分配梁(5)上方固定加载柱(4),加载柱(4)上方固定液压千斤顶(3),千斤顶(3)顶端安装压力传感器(2),压力传感器(2)上方顶在反力钢梁(1)底板上,保证液压千斤顶(3)的压力由加载柱(4)、分配梁(5)及橡胶垫块(6)传递到桥面;若反力钢梁(1)对应没有反力柱(9)位置,则取消加载柱(4),千斤顶(3)直接放置在分配梁(5)上方;反力钢梁(1)两端与反力地梁(8)通过精轧螺纹钢筋(7)相连,若反力钢梁(1)的一端设置位置处于反力柱(9)位置,则该端通过精轧螺纹钢筋(7)与反力柱(9)相连,以保证反力传递到反力地梁(8)上,反力地梁(8)为圈梁。
2、根据权利要求1所述的一种可移动式多点同步结构模型静载试验加载装置,其特征是:同一反力钢梁(1)下各组多个压力传感器(2)上方顶在反力钢梁(1)底板中线上。
3、根据权利要求1所述的一种可移动式多点同步结构模型静载试验加载装置,其特征是:同一组中压力传感器(2)、液压千斤顶(3)、加载柱(4)应安装在同一竖向轴线上,而加载柱(4)的中心及没有反力柱(9)部位的液压千斤顶(3)的中心,设置在分配梁(5)上的位置则根据杠杆分配原理计算每个加载点加载力来确定。
CN2009200837218U 2009-02-17 2009-02-17 一种可移动式多点同步结构模型静载试验加载装置 Expired - Lifetime CN201402221Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200837218U CN201402221Y (zh) 2009-02-17 2009-02-17 一种可移动式多点同步结构模型静载试验加载装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200837218U CN201402221Y (zh) 2009-02-17 2009-02-17 一种可移动式多点同步结构模型静载试验加载装置

Publications (1)

Publication Number Publication Date
CN201402221Y true CN201402221Y (zh) 2010-02-10

Family

ID=41662017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200837218U Expired - Lifetime CN201402221Y (zh) 2009-02-17 2009-02-17 一种可移动式多点同步结构模型静载试验加载装置

Country Status (1)

Country Link
CN (1) CN201402221Y (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104280297A (zh) * 2014-09-23 2015-01-14 同济大学 一种桥梁梁体静载试验用反力梁加载装置及加载方法
CN104713781A (zh) * 2015-03-25 2015-06-17 苏交科集团股份有限公司 大跨索承桥梁拉吊索试验加载装置
CN106705926A (zh) * 2016-12-14 2017-05-24 中国燃气涡轮研究院 基于简支纯弯梁的静态标准应变加载装置及方法
CN107167289A (zh) * 2017-05-17 2017-09-15 上海应用技术大学 一种大悬臂预制拼装盖梁加载试验方法
CN108051231A (zh) * 2017-11-27 2018-05-18 同济大学 一种能提供复杂分布荷载简支梁结构试验装置
CN109060509A (zh) * 2018-08-23 2018-12-21 招商局重庆交通科研设计院有限公司 柔性多功能大吨位索缆试验系统
CN109781549A (zh) * 2019-01-31 2019-05-21 中铁六局集团有限公司 U型梁静载试验方法
CN110108427A (zh) * 2019-05-06 2019-08-09 黄河科技学院 一种桥梁加载模拟试验装置
CN111238844A (zh) * 2020-01-20 2020-06-05 哈尔滨工业大学 一种装配式简支梁桥静载试验加载车快速确定方法
CN116026541A (zh) * 2023-03-29 2023-04-28 山东省滨州公路工程有限公司 一种桥梁静载实验模拟加压设备
CN116148049A (zh) * 2023-04-14 2023-05-23 华北科技学院(中国煤矿安全技术培训中心) 一种多点电动伺服组合整体同步加载系统、方法

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104280297A (zh) * 2014-09-23 2015-01-14 同济大学 一种桥梁梁体静载试验用反力梁加载装置及加载方法
CN104713781A (zh) * 2015-03-25 2015-06-17 苏交科集团股份有限公司 大跨索承桥梁拉吊索试验加载装置
CN106705926B (zh) * 2016-12-14 2019-03-19 中国燃气涡轮研究院 基于简支纯弯梁的静态标准应变加载装置及方法
CN106705926A (zh) * 2016-12-14 2017-05-24 中国燃气涡轮研究院 基于简支纯弯梁的静态标准应变加载装置及方法
CN107167289A (zh) * 2017-05-17 2017-09-15 上海应用技术大学 一种大悬臂预制拼装盖梁加载试验方法
CN108051231B (zh) * 2017-11-27 2019-08-06 同济大学 一种能提供复杂分布荷载简支梁结构试验装置
CN108051231A (zh) * 2017-11-27 2018-05-18 同济大学 一种能提供复杂分布荷载简支梁结构试验装置
CN109060509A (zh) * 2018-08-23 2018-12-21 招商局重庆交通科研设计院有限公司 柔性多功能大吨位索缆试验系统
CN109060509B (zh) * 2018-08-23 2023-09-22 招商局重庆交通科研设计院有限公司 柔性多功能大吨位索缆试验系统
CN109781549A (zh) * 2019-01-31 2019-05-21 中铁六局集团有限公司 U型梁静载试验方法
CN110108427A (zh) * 2019-05-06 2019-08-09 黄河科技学院 一种桥梁加载模拟试验装置
CN111238844A (zh) * 2020-01-20 2020-06-05 哈尔滨工业大学 一种装配式简支梁桥静载试验加载车快速确定方法
CN111238844B (zh) * 2020-01-20 2020-10-02 哈尔滨工业大学 一种装配式简支梁桥静载试验加载车快速确定方法
CN116026541A (zh) * 2023-03-29 2023-04-28 山东省滨州公路工程有限公司 一种桥梁静载实验模拟加压设备
CN116148049A (zh) * 2023-04-14 2023-05-23 华北科技学院(中国煤矿安全技术培训中心) 一种多点电动伺服组合整体同步加载系统、方法
CN116148049B (zh) * 2023-04-14 2024-01-09 华北科技学院(中国煤矿安全技术培训中心) 一种多点电动伺服组合整体同步加载系统、方法

Similar Documents

Publication Publication Date Title
CN201402221Y (zh) 一种可移动式多点同步结构模型静载试验加载装置
CN104165807B (zh) 一种预应力混凝土板梁大挠度破坏试验装置及测试方法
CN102052935B (zh) 基于损伤识别的独塔斜拉桥模型试验系统
CN103257080B (zh) 二次衬砌浇筑装置
CN201373811Y (zh) 一种构件压扭实验装置
CN203037475U (zh) 一种自平衡便携式自动控制剪力墙水平竖向荷载共同作用性能试验装置
Kim et al. Steel–concrete composite bridge deck slab with profiled sheeting
CN103485287A (zh) 混凝土框架箱涵施工中的预应力应用方法
CN101776554A (zh) 电液伺服控制电瓷弯扭试验机
CN111794127A (zh) 一种超高悬浇梁0#块支架的反力预压系统及预压方法
CN104949888A (zh) 一种再生混凝土长期裂缝试验多比例加载装置
CN204718888U (zh) 一种再生混凝土长期变形试验加载及测量装置
CN2844867Y (zh) 一种超大型轨道衡的校验装置
CN204718896U (zh) 一种再生混凝土长期裂缝试验多比例加载装置
CN201311377Y (zh) 加载孔定位装置
CN104594397B (zh) 可拆卸式管桩抗弯试验装置
CN203275106U (zh) 盾构隧道单层/双层衬砌结构原型试验装置
CN102587283B (zh) 一种现浇混凝土桥梁的现浇施工方法
CN214309937U (zh) 盖梁承载力检测结构
Jiang et al. Key technologies of whole incremental launching construction control for inclined continuous box girder with steep longitudinal gradient
CN112881186A (zh) 盖梁承载力检测结构及用该结构进行承载力检测的方法
CN203101030U (zh) 多液压缸组合式大型液压试验机
CN203034378U (zh) 横向调节限位装置
CN212358039U (zh) 一种超高悬浇梁0#块支架的反力预压系统
CN104949885A (zh) 一种再生混凝土长期变形试验加载及测量装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150226

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150226

Address after: 103 No. 430034 Hubei Province in Qiaokou District of Wuhan city road construction

Patentee after: China Zhongtie Major Bridge Engineering Group Co., Ltd.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 103 No. 430034 Hubei Province in Qiaokou District of Wuhan city road construction

Patentee before: China Zhongtie Major Bridge Engineering Group Co., Ltd.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 103 No. 430000 Hubei Province in Qiaokou District of Wuhan city road construction

Patentee after: BRIDGE SCIENCE AND TECHNOLOGY INSTITUTE CO., LTD., CHINA RAILWAY ENGINEERING GROUP

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 103 No. 430034 Hubei Province in Qiaokou District of Wuhan city road construction

Patentee before: China Zhongtie Major Bridge Engineering Group Co., Ltd.

Patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100210