CN201360116Y - Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line - Google Patents

Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line Download PDF

Info

Publication number
CN201360116Y
CN201360116Y CNU2008202278967U CN200820227896U CN201360116Y CN 201360116 Y CN201360116 Y CN 201360116Y CN U2008202278967 U CNU2008202278967 U CN U2008202278967U CN 200820227896 U CN200820227896 U CN 200820227896U CN 201360116 Y CN201360116 Y CN 201360116Y
Authority
CN
China
Prior art keywords
jig
tower
power transmission
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202278967U
Other languages
Chinese (zh)
Inventor
焦巨轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Original Assignee
Hebei Power Co Ultra-Hv Transmission & Distribution Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Power Co Ultra-Hv Transmission & Distribution Co filed Critical Hebei Power Co Ultra-Hv Transmission & Distribution Co
Priority to CNU2008202278967U priority Critical patent/CN201360116Y/en
Application granted granted Critical
Publication of CN201360116Y publication Critical patent/CN201360116Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a tower end bearing force fixture for tangent tower live-line work of a high voltage power transmission line of an electric power system, comprising a fixture, a fixture screw rod, a screw rod lifting device and an insulation hanging pole, wherein the screw rod lifting device is capable of driving the fixture screw rod to move up and down, and the insulation hanging pole is arranged on the lower end of the fixture screw rod. The utility model has the advantages of simple operation method and obvious practical effect and can be applied to the tangent tower live-line work of power transmission line of 110kV to 500kV. The utility model is especially suitable for live-line work skill competition. The simplification of operating steps of using the tower end bearing force fixture can reduce the probability of dangerous events, such as falling objects of tools in the transmission process and the like to ensure safety.

Description

A kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for
Technical field
The utility model relates to a kind of tower end load jig that is used for the live line working of power system high tension power line tangent tower.
Background technology
Traditional ultra-high-tension power transmission line tangent tower live line working tower end load jig adopts that the version structure of insulated hanger bar and cross-arm support is complicated, overall dimension is bigger.When being used for charged work high above the ground, for jig cross-arm support and insulated hanger bar are realized being connected, the operating personnel must penetrate the cross-arm support earlier from top to bottom on the tower in the two main material two angle-iron frame slits of lead hanging point, the cross-arm support is connected with insulated hanger bar bolt, personnel must be stretched in body part (hand) cross-arm master material below on the tower, finish a complete set of lead load device assembles, traditional power tool and operating type make the air gap between human body short circuit earth electrode and the electrified body, shortened the live line working safe distance, bring certain hazards for the safe operation of live line working operating personnel personal safety and transmission line charging equipment, and increased (high-altitude) work operations amount on the tower, the input manpower is more, operating time is longer, and efficiency descends thereupon.
Summary of the invention
Technical problem to be solved in the utility model provide a kind of quick and easy for installation, safe and reliable can effectively increase work efficiency entirely be used for ultra-high-tension power transmission line tangent tower live line working tower end load jig.
The utility model adopts following technical scheme:
The utility model comprises jig, jig leading screw, can drive leading screw lowering or hoisting gear that the jig leading screw moves up and down and the insulated hanger bar that is arranged on jig leading screw lower end.
Jig described in the utility model both sides are provided with the jig wing plate, and the jig wing plate is provided with the reinforcement gusset.
The width of jig wing plate described in the utility model is 40-60mm, and the optimum width of jig wing plate is 45-59mm.
The beneficial effects of the utility model are: use the transmission of a complete set of load instrument of the utility model once to finish, avoid repeating work, reduce workload, reduce manpower, time input, increase work efficiency, the utility model method of operation is easy, and practical function is obvious, can be applied to 110kV~500kV transmission line tangent tower live line working work.
The utility model is particularly useful for the contest of live line working technical ability.
Use the simplification of the utility model operating procedure, can reduce the probability that the hazard events such as falling object from high altitude of instrument in transmittance process takes place, guarantee safety.Personnel need not be stretched in body part (hand) cross-arm master material below on the tower.The person and shielding clothing can the short circuit electrified body and earth electrode between the air gap.Guarantee charging equipment and personal safety, improve the job safety level.
Description of drawings
Accompanying drawing is the utility model structural representation.
In the accompanying drawings: 1 jig, 2 jig leading screws, 3 jig wing plates, 4 are strengthened gusset, 5 leading screw lowering or hoisting gears, 6 iron tower main materials, 7 insulated hanger bars, 8 insulator strings, 9 leads, 10 hooks, 11 operating grips.
Concrete real examination mode
As shown in drawings, the utility model comprises jig 1, jig leading screw 2, can drive leading screw lowering or hoisting gear 5 that jig leading screw 2 moves up and down and the insulated hanger bar 7 that is arranged on jig leading screw 2 lower ends.Jig described in the utility model 1 both sides are provided with jig wing plate 3, and jig wing plate 3 is provided with strengthens gusset 4.The width of jig wing plate 3 described in the utility model is 40-60mm, and the optimum width of jig wing plate 3 is 45-59mm.
The utility model jig 1, jig leading screw 2 and insulated hanger bar 7 connect as one, be passed on the tower jig leading screw 2 bottom-up penetrating in hanging point iron tower main material 6 slits, treat that jig rises to hanging point iron tower main material 6 tops, personnel's rotary fixture 1 on the tower, make it evenly stressed on iron tower main material 6 leading role's steel, can tighten up leading screw lifting lead 9 and carry out operation.The width of the utility model jig wing plate 3 is 40-60mm, and the optimum width of jig wing plate 3 is 45-59mm, and the spacing between the iron tower main material 6 is 60mm, can penetrate in the slit between the two main materials of 500kV ultra-high-tension power transmission line tangent tower lead hanging point like this.As shown in drawings, the utility model jig 1 is of a size of 58 * 58 * 45mm.
Adopt the operating procedure of the utility model jig as follows:
1, the utility model jig 1, jig leading screw 2 and insulated hanger bar 7 are connected on ground.
2, use jig 1, jig leading screw 2 and insulated hanger bar 7 integral body transmitted after rope will connect to be delivered on the tower.After adopting the utility model jig, a complete set of stressed equipment can the disposable installation on ground, and stressed equipment can once be passed on the tower.
3, the width of the utility model jig wing plate 3 is 40-60mm, the optimum width of jig wing plate 3 is 45-59mm, can make on the tower personnel auxiliary like this is bottom-up penetrating iron tower main material 6 slits (two main materials are that the spacing between the iron tower main material 6 is 60mm) with jig 1 and jig leading screw 2 from lead 9 hanging wire points pair main materials, when treating that jig 1 rises to iron tower main material 6 tops, jig wing plate 3 revolved turn 90 degrees, make it evenly stressed on iron tower main material 6.After adopting the utility model jig, on the tower personnel hand need not to be extended cross-arm master material be iron tower main material 6 belows.Avoid the air gap between the person and shielding clothing short circuit electrified body and the earth electrode.Guarantee charging equipment and personal safety.Avoid required workload of repetitive operation and time.The utility model jig 1 both sides are provided with jig wing plate 3, and jig wing plate 3 is provided with strengthens gusset 4, can improve the bearing capacity of jig 1 greatly, makes jig 1 more sturdy and durable.
4, personnel utilize leading screw lowering or hoisting gear 5 that jig leading screw 2 is moved up by turn operating grip 11 on the tower, promote lead 9, and lead 9 loadings are transferred on the stressed equipment that jig 1, jig leading screw 2 and insulated hanger bar 7 be formed by connecting from the substring 8 that insulate.
5, personnel carry out the lead gold utensil on the tower, the defective operation is changed or eliminated to insulator string 8.

Claims (3)

1, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for is characterized in that it comprises jig (1), jig leading screw (2), can drive leading screw lowering or hoisting gear (5) that jig leading screw (2) moves up and down and the insulated hanger bar (7) that is arranged on jig leading screw (2) lower end.
2, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for according to claim 1 is characterized in that described jig (1) both sides are provided with jig wing plate (3), and jig wing plate (3) is provided with strengthens gusset (4).
3, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for according to claim 2, the width that it is characterized in that described jig wing plate (3) is 40-60mm.
CNU2008202278967U 2008-12-11 2008-12-11 Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line Expired - Fee Related CN201360116Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202278967U CN201360116Y (en) 2008-12-11 2008-12-11 Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202278967U CN201360116Y (en) 2008-12-11 2008-12-11 Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line

Publications (1)

Publication Number Publication Date
CN201360116Y true CN201360116Y (en) 2009-12-09

Family

ID=41425881

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202278967U Expired - Fee Related CN201360116Y (en) 2008-12-11 2008-12-11 Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line

Country Status (1)

Country Link
CN (1) CN201360116Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102969672A (en) * 2012-11-30 2013-03-13 福建省电力有限公司 Crossing-type straight-route clamp

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102969672A (en) * 2012-11-30 2013-03-13 福建省电力有限公司 Crossing-type straight-route clamp
CN102969672B (en) * 2012-11-30 2016-01-13 福建省电力有限公司 Crossing-type straight-route clamp

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN203787855U (en) Power transmission line linear charged wire lifting device
CN201360116Y (en) Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line
CN105305317B (en) Live wire hangs the instrument of insulated flexible ladder
CN201868784U (en) Lifter for 220KV earth wire of power transmission line
CN101552433A (en) Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line
CN203536865U (en) Combined wire-tightening tool for tightening line wire
CN203251020U (en) A portable three-phase wire synchronously-lifting holding pole
CN103594976B (en) Combination stringing instrument for line conductor stringing
CN202260254U (en) Adjustable fixture for live line work of replacing linear whole-string insulator of four-split conductor
CN206099152U (en) Middle multi -disc insulator specialized tool of direct current strain insulator tower is changed in segmentation
CN101567529A (en) Lifting ladder hook for insulated pulling materials
CN206250670U (en) It is a kind of to be easy to operation and safe replacing device for insulator
CN104201611B (en) UHVDC Transmission Lines change tangent tower wire clamp tool
CN204258148U (en) A kind of built on stilts earth connection lifter
CN206148640U (en) Wire earth clamp with two hanging wire modes
CN206233852U (en) A kind of Portable lifting transmission platform
CN202930836U (en) Tension insulator replacement tool
CN2759024Y (en) 35KV-110KV high-voltage switch overhauling stand
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN206794455U (en) Copper bar bending device
CN206407839U (en) A kind of Fluorspar Powder processing device for lifting drug
CN203071500U (en) Dismounting tool for cross-arm of original pole tower in power supply line migration process
CN203722140U (en) Manual wire tightening device for electrical-power wiring
CN203705588U (en) Labor-saving spark fork tool for zero value live-line detection of porcelain insulator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HEBEI POWER COMPANY ULTRA-HV TRANSMISSION + DISTRIBUTION COMPANY

Effective date: 20121210

Owner name: THE MAINTENANCE BRANCH OF HEBEI ELECTRIC POWER COR

Effective date: 20121210

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 050070 SHIJIAZHUANG, HEBEI PROVINCE TO: 100761 DONGCHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20121210

Address after: 100761 West Chang'an Avenue, Beijing, No. 86

Patentee after: State Grid Corporation of China

Patentee after: Maintenance Branch, Hebei Electric Power Co.,Ltd.

Address before: 050070 Hebei city in Shijiazhuang Province, Xinhua District, Zhong Sheng Road No. 66

Patentee before: Hebei Power Company Ultra-HV Transmission & Distribution Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091209

Termination date: 20171211

CF01 Termination of patent right due to non-payment of annual fee