CN201352252Y - Gw27/zcw1隔离开关模拟试验机架 - Google Patents
Gw27/zcw1隔离开关模拟试验机架 Download PDFInfo
- Publication number
- CN201352252Y CN201352252Y CNU2008201499708U CN200820149970U CN201352252Y CN 201352252 Y CN201352252 Y CN 201352252Y CN U2008201499708 U CNU2008201499708 U CN U2008201499708U CN 200820149970 U CN200820149970 U CN 200820149970U CN 201352252 Y CN201352252 Y CN 201352252Y
- Authority
- CN
- China
- Prior art keywords
- disconnector
- machine frame
- base support
- experiment machine
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
本实用新型公开了一种隔离开关模拟试验机架,包括底座和安装在底座上的基础支撑件,所述底座由用型材铺设成的至少两根相互平行的水平轨道构成,所述的基础支撑件为竖立的钢桶结构,该基础支撑件可滑动安装在所述水平轨道上,所述基础支撑件上还通过易拆件安装有操动机构安装板;采用上述结构,可以快速安装及拆卸此试验机架,组装改进后的隔离开关三相联动试验机架,2人只需2小时即可完成,拆卸2人只需1小时,大大提高生产效率。再者此试验机架安装后牢固可靠,可充分保证产品试验的稳定性。
Description
技术领域
本实用新型涉及一种高压隔离开关的检验检测,尤其涉及一种对高压隔离开关三相同步和绝缘距离的检验检测机架。
背景技术
目前,公知的试验检验方法是模拟现场,在装配车间用槽钢等钢结构搭建一个试验机架,将隔离开关模拟现场进行试验。但不同的电压等级和不同的变电站都存在有不同的布置方式和安装基础,所以每次每种隔离开关都需搭建合适的试验机架来满足试验要求,往往还要投制不同的过渡钢板进行过渡。每次试验一组产品搭建试验机架2人需要将近2天时间,拆卸2人需要1天时间,工作效率低。且搭建的试验机架由于没有进行地脚固定,往往造成产品试验时的不稳定,影响试验结果及产品性能。
实用新型内容
本实用新型的目的是:提供一种隔离开关模拟试验机架,以解决拆装效率低及机架不稳定的问题。
本实用新型的技术方案是:一种隔离开关模拟试验机架,包括底座和安装在底座上的基础支撑件,所述底座由用型材铺设成的至少两根相互平行的水平轨道构成,所述的基础支撑件为竖立的钢桶结构,该基础支撑件可滑动安装在所述水平轨道上,所述基础支撑件上还通过易拆件安装有操动机构安装板。
所述易拆件为U形螺栓。
所述基础支撑件顶部设置有可安装隔离开关的连接法兰,所述的连接法兰上还可拆卸安装有多用过渡连接板。
所述的水平轨道埋设在地面上,其上端面与地面齐平,其下端面固定有地脚,该地脚伸入地下并固定。
所述的基础支撑件的外表面设置有加强筋。
采用上述结构,可以进行快速安装及拆卸此试验机架,组装改进后的隔离开关三相联动试验机架,2人只需2小时即可完成,拆卸2人只需1小时,大大提高生产效率。再者此试验机架安装后牢固可靠,可充分保证产品试验的稳定性。通过移动钢桶结构的基础支撑件和增加或调换过渡支架,可以满足多种隔离开关的出厂试验要求。
附图说明
图1为本实用新型的结构示意图;
图2为菱形过渡连接板俯视图;
图3为菱形过渡连接板侧视图;
图4为方形过渡连接板结构示意图;
图5为方形过渡连接板侧视图。
具体实施方式
如图1所示,将两条槽钢平行埋设在车间地面上,形成一条轨道1,槽钢轨道1的上端面与地面9齐平并找准水平,其下部设置有地脚6并伸入地下固定,基础支撑件2为钢桶结构,其上、下端的外表面设置有加强筋,在基础支撑件2的上端面设置有连接法兰7,该连接法兰7上可安装和更换如图2、图3所示的菱形过渡连接板3或如图4、图5所示的方形过渡连接板3,该过渡连接板3设有两个连接平面,两个连接平面中间设有固定支撑结构,过渡连接板3的一个安装平面上开设有与基础支撑件2上的连接法兰7相对应的螺栓孔,另一平面上开设有与不同隔离开关对应的连接螺栓孔。在基础支撑件2的中部通过U形螺栓8固定有机构安装板4。
使用时,在地面上对应隔离开关相隔一定的距离平行设置三条槽钢轨道1,用活动地脚螺栓5将基础支撑件2根据测试需要分别竖直的固定在各组轨道上,并调整至测试要求的尺寸,然后,根据不同的产品需要,将需要试验的产品直接安装在基础支撑件2上,或者通过过渡连接板3安装在基础支撑件2上。根据不同产品的的需要,选择不同的机构安装板4,然后用U型螺栓将机构安装板4固定在基础支撑件2的合适位置,最后将操作机构固定在机构安装板4上,然后进行调试,满足技术要求后进行隔离开关三相同步和绝缘距离的检验测量。
Claims (5)
1、一种隔离开关模拟试验机架,包括底座和安装在底座上的基础支撑件,其特征在于,所述底座由用型材铺设成的至少两根相互平行的水平轨道构成,所述的基础支撑件为竖立的钢桶结构,该基础支撑件可滑动安装在所述水平轨道上,所述基础支撑件上还通过易拆件安装有操动机构安装板。
2、根据权利要求1所述的隔离开关模拟试验机架,其特征在于,所述易拆件为U形螺栓。
3、根据权利要求1所述的隔离开关模拟试验机架,其特征在于,所述基础支撑件顶部设置有可安装隔离开关的连接法兰,所述的连接法兰上还可拆卸的安装有多用过渡连接板。
4、根据权利要求1、2或3任一项所述的隔离开关模拟试验机架,其特征在于,所述的水平轨道埋设在地面上,其上端面与地面齐平,其下端面固定有地脚,该地脚伸入地下并固定。
5、根据权利要求4所述的隔离开关模拟试验机架,其特征在于,所述的基础支撑件的外表面设置有加强筋。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201499708U CN201352252Y (zh) | 2008-10-24 | 2008-10-24 | Gw27/zcw1隔离开关模拟试验机架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201499708U CN201352252Y (zh) | 2008-10-24 | 2008-10-24 | Gw27/zcw1隔离开关模拟试验机架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201352252Y true CN201352252Y (zh) | 2009-11-25 |
Family
ID=41375640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201499708U Expired - Lifetime CN201352252Y (zh) | 2008-10-24 | 2008-10-24 | Gw27/zcw1隔离开关模拟试验机架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201352252Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101710010B (zh) * | 2009-11-30 | 2011-06-01 | 河南平高电气股份有限公司 | 隔离开关动静触头夹紧力测试装置 |
CN102903284A (zh) * | 2012-08-14 | 2013-01-30 | 国家电网公司 | 可拆解式gw6型隔离开关检修调试培训装置 |
-
2008
- 2008-10-24 CN CNU2008201499708U patent/CN201352252Y/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101710010B (zh) * | 2009-11-30 | 2011-06-01 | 河南平高电气股份有限公司 | 隔离开关动静触头夹紧力测试装置 |
CN102903284A (zh) * | 2012-08-14 | 2013-01-30 | 国家电网公司 | 可拆解式gw6型隔离开关检修调试培训装置 |
CN102903284B (zh) * | 2012-08-14 | 2015-02-11 | 国家电网公司 | 可拆解式gw6型隔离开关检修调试培训装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929148B (zh) | 风力发电塔基础环基础的倒装加固系统及其加固方法 | |
CN105043884A (zh) | 综合管廊管节承载能力试验装置及使用方法 | |
CN201352252Y (zh) | Gw27/zcw1隔离开关模拟试验机架 | |
CN103669225A (zh) | 一种连续梁0#块支架及安装方法 | |
CN202694637U (zh) | 自平衡式综合加载反力架 | |
CN102175475B (zh) | 千吨模块化组合式可调自反力台架装置 | |
CN203585544U (zh) | 一种电缆桥架托架 | |
CN203729208U (zh) | 一种连续梁0#块支架 | |
CN110391600A (zh) | 一种水平式户外高压交流隔离开关的移动检修调试系统 | |
CN203347205U (zh) | 悬挑式脚手架 | |
CN205015228U (zh) | 综合管廊管节承载能力试验装置 | |
CN203701282U (zh) | 一种预埋槽道及与其相匹配的支架结构 | |
CN205296528U (zh) | 一种稳固型张弦梁钢结构屋盖 | |
CN104514919A (zh) | 一种电缆桥架托架 | |
CN203889956U (zh) | 一种用于塔吊安装的附墙杆连接件装置 | |
CN208649893U (zh) | 一种桥梁设备支腿结构 | |
CN110894708A (zh) | 用于桥梁顶推的模块步履式多点顶推设备及施工方法 | |
CN218493326U (zh) | 一种易拆卸防护支架 | |
CN213741458U (zh) | 一种市政工程排水管道施工用固定装置 | |
CN204238951U (zh) | 三维空间曲面组合式顶模架装置 | |
CN203668773U (zh) | 顶升坑顶升轨道固定装置 | |
CN204370729U (zh) | 格栅踏步板安装结构 | |
CN201820441U (zh) | 移动式隔声屏障 | |
CN206636491U (zh) | 一种建筑装饰用梯 | |
CN201952739U (zh) | 桥梁现浇箱梁托架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20091125 |
|
CX01 | Expiry of patent term |