CN201347191Y - Suction pile type ocean floor drilling novel basal disc - Google Patents
Suction pile type ocean floor drilling novel basal disc Download PDFInfo
- Publication number
- CN201347191Y CN201347191Y CNU2008201418363U CN200820141836U CN201347191Y CN 201347191 Y CN201347191 Y CN 201347191Y CN U2008201418363 U CNU2008201418363 U CN U2008201418363U CN 200820141836 U CN200820141836 U CN 200820141836U CN 201347191 Y CN201347191 Y CN 201347191Y
- Authority
- CN
- China
- Prior art keywords
- basal disc
- suction pile
- suction
- pile
- ocean floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to a suction pile type ocean floor drilling novel basal disc, which comprises a file base, a guide cylinder and a case basal disc, and is characterized in that the pile base adopts a suction pile base, a suction pile and the case basal disc are connected by the guide cylinder to form an integrated structure which is leveled simultaneously in suction sinking process, and the guide cylinder and the center of the top of the suction pile are welded to form a whole body; the guide cylinder passes through the case basal disc and is welded into a whole body; and a pumping hole is arranged at the top of the suction pile and used for installing a pump for pumping water in the suction pile. The suction pile type ocean floor drilling novel basal disc has the advantages that the self-floating towage can be realized by relying on the buoyancy provided by air enclosed in the case basal disc and the suction pile, the water sinking can be realized by a small-size loop wheel machine, the leveling operation of the basal disc can be carried out at the same time of sinking the suction pile, and large-size devices or special devices, such as barges, floating cranes, pile hammers, levelers, grouters, and the like are unnecessary to be used during the marine installation process, thereby simplifying the marine installation procedures and achieving the aims of shortening the marine installation completion period and reducing the cost.
Description
Technical field
The utility model belongs to the innovation of ocean engineering field ocean floor drilling basal disc structural shape.
Background technology
In the marine petroleum development,, recoup capital outlay as early as possible, adopt usually in the pre-scheme of carrying out the preboring well on the basal disc of seabed of installing in order to shorten the cycle of offshore oil field development engineering.After pre-drilling well was finished, interim abandoned well carried out the installation of jacket and upper module then, carries out tieback and completion operation with the service machine on the jacket platform at last.Because the engineering design of drilling operation and platform facility is carried out simultaneously with construction, this scheme has shortened the time-to-market before going into operation greatly.The ocean floor drilling basal disc is the structure facility of pre-drilling operation, and traditional ocean floor drilling basal disc adopts driven pile to be fixed in the seabed.Common way is earlier the ocean floor drilling basal disc to be lifted the seabed, drives piles along the basal disc sleeve then; After finishing, piling adjusts the levelness of ocean floor drilling basal disc, then grouted solid between stake and basal disc sleeve by special-purpose leveller.The part of driven pile more than the basal disc sleeve be as the direction peg that jacket docks with template, and the level from jacket of bearing is to impact.Tradition ocean floor drilling basal disc installation process, piling work, leveling operation and grouting operation are arranged, need construction equipment to be useful on and load barge, the crane barge that is used to lift ocean floor drilling basal disc and stake that transports ocean floor drilling basal disc and stake, the special-purpose leveller that is used for the leveling of ocean floor drilling basal disc, and drive hammer, grouting equipment etc., not only the construction period longer, and executive cost is high.
Summary of the invention
In order to shorten the marine installation period of ocean floor drilling basal disc, and the reduction expense, the utility model provides a kind of suction pile formula ocean floor drilling basal disc.This basal disc can be realized self-floating towing by the body structure of self; Just can realize transferring in the water by small-sized loop wheel machine, and can in suction pile negative pressure sinking process, finish the basal disc leveling, need not piling, leveling, grouting operation, thereby simplified marine erection procedure, reach the purpose that shortens marine installation period, reduces erected cost.
The technical scheme that its technical matters that solves the utility model adopts is: the ocean floor drilling basal disc is made up of pile foundation, guide cylinder and casing basal disc, tool is characterised in that pile foundation adopts suction pile, and suction pile and casing basal disc are connected to the integral structure of being convenient to leveling simultaneously in the suction sinking by guide cylinder.The center of top of guide cylinder and suction pile is welded as a whole; Guide cylinder passes the casing basal disc and is welded as a whole; The suction pile top is provided with pumping hole, is used for the pump that extracts water in the suction pile is installed, as diving pump or air-powered pump etc.After suction pile formula ocean floor drilling basal disc lifting entry, the confining gas in the suction pile provides the floating certainly buoyancy of a part, and not enough part is provided by casing, so on the ocean floor drilling basal disc can bubble through the water column certainly, is dragged to the installation site by tugboat; Can realize setting upright down in the ocean floor drilling basal disc water by small-sized loop wheel machine (hanging) then and put into mud as the side of a ship on the tugboat; The ocean floor drilling basal disc by extracting the water in the suction pile, makes in the suction pile injection ocean bottom soil after relying on deadweight to make the suction pile initial penetration into mud reach the native air-proof condition of stake; And, adjust pairing suction pile and go into the mud degree of depth, thereby the levelness of adjustment basal disc by controlling four suction pile top diving capacity of pump respectively.
The beneficial effects of the utility model are, marine installation process does not need to use Large-Scale Equipments such as barge, crane barge, drive hammer, do not need to use special-purpose leveller, grouting equipment yet, only need a tugboat to get final product, therefore can significantly shorten marine installation period, reduction expense.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the utility model front elevation;
Fig. 2 is the utility model birds-eye view;
Fig. 3 a is the utility model self-floating towing view front view;
Fig. 3 b is the utility model self-floating towing view birds-eye view;
Fig. 4 is the utility model suction sinking leveling scheme drawing.
Wherein: the 1-suction pile; The 2-guide cylinder; 3-casing basal disc; The 4-pumping hole; The 5-diving pump; The 6-tugboat; The 7-water surface; 8-soil.
The specific embodiment
The structure of suction pile formula ocean floor drilling basal disc is seen Fig. 1 and Fig. 2, is made up of four suction piles 1, four guide cylinders 2 and casing basal disc 3, and guide cylinder 2 is positioned at the center of top of suction pile 1, and casing basal disc 3 passes guide cylinder 2 and is attached thereto; The suction pile top is provided with pumping hole 4, and diving pump 5 or air-powered pump are installed in its top.
Suction pile formula ocean floor drilling basal disc self-floating towing state is seen Fig. 3 a and Fig. 3 b, this moment, suction pile 1 interior confining gas provided the floating certainly buoyancy of a part, not enough buoyancy is provided by casing basal disc 3, so suction pile formula ocean floor drilling basal disc can bubble through the water column on 7 certainly, is dragged to the installation site by tugboat 6.
By the side of a ship on the tugboat hang with set upright down in the suction pile formula ocean floor drilling basal disc water put into mud after.After suction pile formula ocean floor drilling basal disc relies on deadweight to make the suction pile initial penetration into mud reach the native air-proof condition of stake, by extracting the water in the suction pile, make in the suction pile injection ocean bottom soil 8, in injection soil 8 processes, by controlling the discharge capacity of four suction pile 1 top diving pumps 5 respectively, adjust pairing suction pile 1 and go into the mud degree of depth, thereby the levelness of adjustment basal disc is seen Fig. 4.
Claims (4)
1. the new basal disc of suction pile formula ocean floor drilling is made up of pile foundation, guide cylinder and casing basal disc, it is characterized in that pile foundation adopts suction pile, and suction pile and casing basal disc are connected to the integral structure of being convenient to leveling simultaneously in the suction sinking by guide cylinder.
2. according to the new basal disc of suction pile formula ocean floor drilling of claim 1, it is characterized in that the center of top of said guide cylinder and suction pile is welded as a whole.
3. according to the new basal disc of suction pile formula ocean floor drilling of claim 1, it is characterized in that said guide cylinder passes the casing basal disc and is welded as a whole.
4. according to the new basal disc of suction pile formula ocean floor drilling of claim 1, it is characterized in that said suction pile top is provided with pumping hole, be used for installing the pump that extracts water in the suction pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201418363U CN201347191Y (en) | 2008-09-04 | 2008-09-04 | Suction pile type ocean floor drilling novel basal disc |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201418363U CN201347191Y (en) | 2008-09-04 | 2008-09-04 | Suction pile type ocean floor drilling novel basal disc |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201347191Y true CN201347191Y (en) | 2009-11-18 |
Family
ID=41366666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201418363U Expired - Fee Related CN201347191Y (en) | 2008-09-04 | 2008-09-04 | Suction pile type ocean floor drilling novel basal disc |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201347191Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7845882B2 (en) * | 2007-08-24 | 2010-12-07 | Oceaneering International Inc. | Subsea suction pile crane system |
CN103266625A (en) * | 2013-05-31 | 2013-08-28 | 中海石油(中国)有限公司番禺作业公司 | Gravity base structure seabed base disc |
CN103556972A (en) * | 2013-10-23 | 2014-02-05 | 中国海洋石油总公司 | Self-installed ocean floor drilling template and installation method thereof |
CN104443289A (en) * | 2014-11-13 | 2015-03-25 | 广州打捞局 | Piling ship |
-
2008
- 2008-09-04 CN CNU2008201418363U patent/CN201347191Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7845882B2 (en) * | 2007-08-24 | 2010-12-07 | Oceaneering International Inc. | Subsea suction pile crane system |
CN103266625A (en) * | 2013-05-31 | 2013-08-28 | 中海石油(中国)有限公司番禺作业公司 | Gravity base structure seabed base disc |
CN103266625B (en) * | 2013-05-31 | 2015-04-22 | 中海石油(中国)有限公司番禺作业公司 | Gravity base structure seabed base disc |
CN103556972A (en) * | 2013-10-23 | 2014-02-05 | 中国海洋石油总公司 | Self-installed ocean floor drilling template and installation method thereof |
CN104443289A (en) * | 2014-11-13 | 2015-03-25 | 广州打捞局 | Piling ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200971492Y (en) | Pile submarine drilling basal disc with suction | |
CN107542101B (en) | Construction method of offshore four-buoy-buoyancy tank combined foundation structure | |
US3896628A (en) | Marine structures | |
CN102839666B (en) | Bottom-supported floating pile-driving platform | |
CN201915824U (en) | Truck-mounted rotary drilling rig with construction function of diaphragm wall | |
CN107630461B (en) | Combined offshore four-buoy buoyancy tank foundation structure and construction method thereof | |
CN201056685Y (en) | Combined simple shaft mouth processing platform | |
CN103015455B (en) | Bridge pile-bucket combined foundation and construction method thereof | |
CN103046521A (en) | Novel, simple and easy wellhead rack structure and construction method | |
CN106320309A (en) | Suction anchor type overwater piling platform and overwater pile group foundation piling technology | |
CN202176267U (en) | Novel suction pile type seabed drilling base plate | |
CN201347191Y (en) | Suction pile type ocean floor drilling novel basal disc | |
CN110949615A (en) | Floating pile-stabilizing platform device based on anchoring positioning control and pile sinking method | |
CN102953709A (en) | Novel suction pile type subsea drilling template | |
CN103556972A (en) | Self-installed ocean floor drilling template and installation method thereof | |
CN101876174A (en) | Foundation structure of marine wind electric field fan | |
CN101298765B (en) | Novel single pillar structure and mounting method thereof | |
CN202131986U (en) | Pile driver | |
CN115897575B (en) | Underwater pile sinking process based on suction barrel type pile stabilizing platform | |
CN109208624B (en) | Offshore booster station jacket leveling construction process | |
CN202530448U (en) | Large-diameter cross section-variable special-shape resistance-increase steel pipe pile system | |
CN102628270B (en) | Great-diameter variable section irregularly-shaped resistance-increased steel pipe pile system and construction method thereof | |
CN115787645A (en) | Quick pile sinking construction process for four-pile jacket foundation by offshore wind power deepwater pile-first method | |
CN101761341A (en) | Simple wellhead frame structure and construction method | |
CN203096753U (en) | Undersea oil storage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091118 Termination date: 20130904 |