CN201343381Y - Overline plank hanger for high-speed railway - Google Patents
Overline plank hanger for high-speed railway Download PDFInfo
- Publication number
- CN201343381Y CN201343381Y CNU2009201016355U CN200920101635U CN201343381Y CN 201343381 Y CN201343381 Y CN 201343381Y CN U2009201016355 U CNU2009201016355 U CN U2009201016355U CN 200920101635 U CN200920101635 U CN 200920101635U CN 201343381 Y CN201343381 Y CN 201343381Y
- Authority
- CN
- China
- Prior art keywords
- tire
- box
- cantilever
- speed railway
- gliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003638 chemical reducing agent Substances 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 5
- 230000000694 effects Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 10
- 230000005283 ground state Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses an overline plank hanger for a high-speed railway, which comprise a walking mechanism mounted at the bottom part of supporting legs, a supporting beam and a cantilever mounted at the top part; a trolly is arranged on the cantilever, wherein the cantilever adopts a gliding beam with a double-box-girder structure; an upper end and a lower end of the gliding beam and a gliding block arranged between the upper and the lower end of the supporting beam are internally movably mounted; the supporting beam is provided with a motor redactor and meshed with tooth racks on the gliding beam through a gear; the walking mechanism is provided with two wheel-box brackets, which are connected with a balance beam through vertical shafts symmetrically arranged at the upper part; the balance beam and an adjusting module are hinged with wheelset supporting legs through pin shafts; a driving tire and a driven tire are mounted on two wheel-box brackets; the driving tire is connected with the motor redactor fixed on the wheel-box brackets through a chain; and an electrohydraulic push rod is arranged between the vertical shafts of the driven tire and the balance beam. By adopting the two-way extension gliding beam, the time from extending state to retracting state is shortened; the pillar with a contact net can be retracted and evaded from a underbridge hoisting track plate; the operation and the control are simple and reliable.
Description
Technical field
The utility model is a kind of gantry crane that is used for the high speed railway construction, particularly a kind of used for high-speed railway cross-line bed board gantry crane, can run on preferably on the intervallum between double track railway concrete bed both sides and the crashproof wall, by telescopic arm and the traveling dolly on it taken, can be from goods and materials such as the lifting of the both sides under bridge track plate, reinforcing bars.
Background technology
Along with the development of railway cause, the Infrastructure of railway and construction method have all had corresponding raising.At present, the construction of high speed railway, the construction method that adopts two-wire to advance side by side usually.Therefore, on roadbed, build two parallel concrete beds during construction, constitute an intervallum between the base, not the waiting of intervallum apart from 1.8m, 2.0m, 2.2m, 2.4m; On concrete bed, lay the track plate then, will carry out CA mortar jar between track plate and the base and annotate, at last steel rail laying on the track plate.Implement in the above-mentioned steps, laying the track plate on concrete bed is a very important operation.During the laid rail guidance tape, a very important job is how work-site to be arrived in the handling of track plate.The handling of current track plate is to adopt the cross-line gauntry crane, and this gantry crane is across the both sides of two concrete beds, uses the air-inflation tyre traveling, and the crossbeam at gantry crane top is provided with the traveling dolly, is provided with suspender below the traveling dolly.During if on bridge floor, construct, for can be from hoisting heavy under the bridge, the two ends of door frame crossbeam just must extend outward 5~6 meters cantilever, though can finish hoisting heavy under the bridge like this, but because of cantilever can not auto-folder and Telescopic, so on by the bridge floor that installs the electrified contacting nets pillar time, cantilever partly need be pulled down withdrawal, also need said method when entering the tunnel, thereby increased the difficulty of construction period and crossing ability.
Summary of the invention
In view of the above-mentioned state of the art, the purpose of this utility model provides a kind of used for high-speed railway cross-line bed board gantry crane, makes its cantilever partly have Telescopic, can escape the contact system bar easily, and pass through tunnel smoothly.
For realizing above-mentioned technical purpose, the used for high-speed railway cross-line bed board gantry crane that the utility model provides comprises supporting leg bottom installation running mechanism; The cantilever of support beam and installation is equipped with at its top, on this cantilever dolly is set; Wherein cantilever is the slippage beam of two box-beam structures, and this slippage beam upper and lower side and the interior activity of slide block that is arranged between the support beam upper and lower side are installed; The tooth bar engagement of motor reducer by gear of output end and slippage beam side direction is installed on the support beam; Described running mechanism has two and independently takes turns box bracket and be connected with equalizer by symmetrically arranged vertical shaft on it; This equalizer and change are cross-module hinged by bearing pin and wheels supporting leg; Having active tire and driven tire is installed on two wheel box brackets; Then initiatively tire by chain be fixed on the motor reducer of taking turns on the box bracket and be connected; Between the vertical shaft of driven tire and equalizer, Electrohydraulic push rod is set.Like this, the slippage beam can realize the displacement of both direction and hang bridge floor, the weight of can slinging outside door frame of the electric block on the dolly; In addition, running mechanism is two independently tires, connects by connecting rod, can carry out that arbitrarily angled in 10 ° of scopes turns to and set equalizer realizes the equilibrium of tire having better ground state.
According to above-mentioned application characteristic, the guiding roller is installed at slippage beam and the corresponding end face of support beam.
In concrete application, the support beam upper end is provided with a plurality of saddle crossbeams that distribute by spacing.
Two above-mentioned roller box support sides are provided with track adjusting wheel.
In above-mentioned, have equally conventional operator's compartment, helper, generator set and the electric control system that is had is installed on support beam.
In sum, the used for high-speed railway cross-line bed board gantry crane that the utility model provides, designed slippage beam can realize in support beam that the slippage of both direction is flexible, therefore, in construction, can make the slippage beam hang the bridge floor certain distance according to the particular case of construction, lifting track plate under the bridge; Because the slippage beam slides in supporting traverse, very short from the outstanding needed time of retracted mode that does well, and can regain and escape catenary mast soon.Had conveniently the net bar and crossed the tunnel, operation control is simple.
Description of drawings
Fig. 1 is a gantry crane front view of the present utility model;
Fig. 2 is Fig. 1 left view.
The specific embodiment
Used for high-speed railway cross-line bed board gantry crane as shown in Figure 1 and Figure 2 comprises the supporting leg 1 of symmetry and on supporting leg 1 bottom bonded assembly cross sill 7 running mechanism 6 is housed.Install to support girder 2 at described supporting leg 1 top, and support girder 2 and be provided with saddle crossbeam 12 and fuse; Along support beam 2 upper and lower end faces slide block 14 is set; And movable sliding beam 3 and sliding beam 3 sidewalls that two box-beam structures are installed are installed guiding roller 13 between this slide block 14; In the present embodiment, slippage beam 3 tops are provided with that installation can be along the dolly 5 of walking on it on walking track 10 and this walking track 10.For guaranteeing that slippage beam 3 supports girder 2 telescopic slide relatively, and in slippage beam 3 one sides tooth bar 9 being set drives with the gear that is installed in motor reducer 8 mouths in the support beam 2 (not marking among the figure) engagement, can realize that slippage beam 3 slides in support beam 2 grooves and hangs, the electric block 11 on the dolly 5 is by suspender 4 weight of slinging outside door frame.In the present embodiment, related traveling gear 6 comprises that a wheels supporting leg 15 is cross-module hinged with the change on the equalizer 17 by bearing pin 16, makes things convenient for equalizer 17 to realize the equilibrium of tire, makes ground state better.Described equalizer 16 has the vertical shaft that initiatively tire 20 and driven tire 22 take turns on the box bracket (among the figure mark) and is connected with one; This is the chain 19 and motor reducer 18 connecting band driving wheel tires rotation of tire 20 by installing initiatively; The connecting rod 21 of two interlocks of control tire independent steering is installed between the vertical shaft of active tire 20 and driven tire 22; Electrohydraulic push rod 24 control direction of travels wherein are set on the vertical shaft of driven tire 22 and equalizer 17.Driving wheel 20 and flower wheel 22 are taken turns the box bracket two ends and are provided with track adjusting wheel 23, are used under the bridge floor condition of construction of traveling inclement condition, and by track adjusting wheel 23 auxiliary travel direction controls, track adjusting wheel 23 relies on base to lead.
In above-mentioned, each is traveling wheels to driving wheel 20 and flower wheel 22, has 4 groups; Each traveling wheels is provided with a motor reducer 18 and drives.
The used for high-speed railway cross-line bed board gantry crane of present embodiment be with the intervallum of the two concrete beds outsides and bridge-collision-avoidance wall for walking row of channels, can realize roadbed, bridge and tunnel different spans requirement by the angle of adjusting wheels supporting leg 15 and cross sill 7; Slippage beam 3 horizontally slips in support beam 2, and can hang bridge floor, is provided with the dolly 5 of electric block 11, utilizes the motor reducer that self has to drive, can be on sliding beam 3 walking freely, in order to satisfy the weight of outside door frame, slinging.
In above-mentioned, mentioned supporting leg 1 and cross sill 7 are to adopt box type construction.
Claims (4)
1, a kind of used for high-speed railway cross-line bed board gantry crane comprises supporting leg bottom installation running mechanism; The cantilever of support beam and installation is equipped with at its top, on this cantilever dolly is set; It is characterized in that cantilever is the slippage beam (3) of two box-beam structures, this slippage beam (3) upper and lower side and the interior activity of slide block (14) that is arranged between support beam (2) upper and lower side are installed; Motor reducer (8) is installed, by tooth bar (9) engagement of gear of output end and slippage beam (3) side direction on the support beam (2); Described running mechanism (6) has two and independently takes turns box bracket and be connected with equalizer (17) by symmetrically arranged vertical shaft on it; This equalizer (17) and change are cross-module hinged by bearing pin (16) and wheels supporting leg (15); Having active tire (20) and driven tire (22) is installed on two wheel box brackets; Then initiatively tire (20) by chain (19) be fixed on the motor reducer (18) of taking turns on the box bracket and be connected; Between the vertical shaft of wherein driven tire (20) and the equalizer (17) Electrohydraulic push rod (24) is set.
2, used for high-speed railway cross-line bed board gantry crane according to claim 1 is characterized in that at the corresponding end face of slippage beam (3) and support beam (2) guiding roller (13) being installed.
3, used for high-speed railway cross-line bed board gantry crane according to claim 1 is characterized in that support beam (2) upper end is provided with a plurality of saddle crossbeams (12) that distribute by spacing.
4, used for high-speed railway cross-line bed board gantry crane according to claim 1 is characterized in that two roller box support sides are provided with track adjusting wheel (23).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2009201016355U CN201343381Y (en) | 2009-02-21 | 2009-02-21 | Overline plank hanger for high-speed railway |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2009201016355U CN201343381Y (en) | 2009-02-21 | 2009-02-21 | Overline plank hanger for high-speed railway |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201343381Y true CN201343381Y (en) | 2009-11-11 |
Family
ID=41274965
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2009201016355U Expired - Fee Related CN201343381Y (en) | 2009-02-21 | 2009-02-21 | Overline plank hanger for high-speed railway |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201343381Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101913534A (en) * | 2010-08-19 | 2010-12-15 | 中国水电建设集团十五工程局有限公司 | Fixed double-suspending point cantilever track type purlin suspender |
| CN102659027A (en) * | 2012-05-23 | 2012-09-12 | 中铁上海工程局有限公司 | Variable-span transit method for girder-erecting gantry crane |
| CN102838044A (en) * | 2012-09-17 | 2012-12-26 | 中铁重工有限公司 | Tunnel rescue crane |
| CN110194417A (en) * | 2019-05-24 | 2019-09-03 | 中国一冶集团有限公司 | A kind of lifting pipeline device and its hanging method |
| CN111943041A (en) * | 2020-08-12 | 2020-11-17 | 中铁第五勘察设计院集团有限公司 | Equipment of mating formation |
-
2009
- 2009-02-21 CN CNU2009201016355U patent/CN201343381Y/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101913534A (en) * | 2010-08-19 | 2010-12-15 | 中国水电建设集团十五工程局有限公司 | Fixed double-suspending point cantilever track type purlin suspender |
| CN102659027A (en) * | 2012-05-23 | 2012-09-12 | 中铁上海工程局有限公司 | Variable-span transit method for girder-erecting gantry crane |
| CN102838044A (en) * | 2012-09-17 | 2012-12-26 | 中铁重工有限公司 | Tunnel rescue crane |
| CN102838044B (en) * | 2012-09-17 | 2014-05-21 | 中铁重工有限公司 | Tunnel rescue crane |
| CN110194417A (en) * | 2019-05-24 | 2019-09-03 | 中国一冶集团有限公司 | A kind of lifting pipeline device and its hanging method |
| CN111943041A (en) * | 2020-08-12 | 2020-11-17 | 中铁第五勘察设计院集团有限公司 | Equipment of mating formation |
| CN111943041B (en) * | 2020-08-12 | 2024-12-24 | 中铁第五勘察设计院集团有限公司 | Paving equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209988965U (en) | Automatic hoisting equipment for sleeper mold in and out of kiln | |
| CN201190254Y (en) | Double variable span multipurpose track laying machine and | |
| CN201343381Y (en) | Overline plank hanger for high-speed railway | |
| CN103726421B (en) | Height and span adjustable track paver for metro construction | |
| JP2016166453A (en) | Floor slab erection device | |
| CN201058969Y (en) | Novel bridging machine | |
| CN201284453Y (en) | Rotary overline-walking cantilever portal jib crane | |
| JP2009024464A (en) | Delivery cart | |
| CN203821184U (en) | Spreader used for separating and paving roadbed slabs | |
| CN201077720Y (en) | Tyre type doors hanging | |
| CN107938507A (en) | The mobile construction platform of steel truss arched bridge coating project | |
| CN104016241A (en) | Half-tyr- type gantry crane with electric hoist | |
| CN201459548U (en) | Track plate-felting machine of cantilever arm folding type | |
| CN202610665U (en) | Track layer | |
| CN101104499B (en) | Tyre gantry crane | |
| CN106553564B (en) | Contact net wire barrow | |
| CN210915033U (en) | Tire self-propelled cantilever crane | |
| CN100395411C (en) | Walking box girder bridge erecting machine | |
| CN205636494U (en) | HZQY900 type fortune frame all -in -one | |
| CN210195394U (en) | Servo type stereo garage with walking frame | |
| CN111648173A (en) | Track panel laying machine | |
| CN205574936U (en) | Prefab conveyer | |
| JP2009024465A (en) | Delivery method | |
| CN113697680B (en) | Crane and beam changing machine | |
| CN217352191U (en) | Novel bridge girder erection machine for wharf |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091111 Termination date: 20140221 |