可行走组装式龙门架式起重设备 Download PDFInfo
- Publication number
- CN201309802Y CN201309802Y CNU200820122489XU CN200820122489U CN201309802Y CN 201309802 Y CN201309802 Y CN 201309802Y CN U200820122489X U CNU200820122489X U CN U200820122489XU CN 200820122489 U CN200820122489 U CN 200820122489U CN 201309802 Y CN201309802 Y CN 201309802Y
- Authority
- CN
- China
- Prior art keywords
- walking
- lifting
- pulley
- adopts
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- 238000003466 welding Methods 0.000 claims abstract description 9
- 239000003351 stiffener Substances 0.000 claims description 15
- 241001669679 Eleotris Species 0.000 claims description 7
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
一种可行走组装式龙门架式起重设备,属于吊装设备技术领域。它是由钢架、行走和起重三大部分组成。由全钢焊接的钢架部分、行走部分和起重部分组成;其特征在于:A80塔式起重机轮组(6)通过插接轴连接到起重钢架的行走梁上;桥架支撑柱(4)之间的连接采用焊接;支撑柱(4)与行走梁的连接采用插口连接;桥架与支撑柱(4)之间的连接采用法兰连接,两组桥架的连接采用法兰连接;定滑轮组挂耳(10)与滑轮组挂轴(11)连接;通过滑轮组挂轴(11)将(10)片滑轮片连接在一起。优点在于,可以在场地较小、基础不被破坏的情况下,安装大型设备。
Description
技术领域
本实用新型属于吊装设备技术领域,特别是提供了一种可行走龙门架式起重设备,解决了不能使用大吊车安装大型设备和构件的工程。
背景技术
目前,在场地大、道路平整的施工现场吊装体积大、吨位大、安装精度高的设备通常采用两台大吨位履带吊同时起吊。但是,多数施工现场都比较狭小;如果先吊装后进行基础施工又影响工期,况且大型机械设备的台班费和转场费数额较大。
发明内容
本实用新型的目的在于提供一种可行走龙门架式起重设备,解决了现有的施工场地狭窄和凸凹不平,大型机械设备安装费用大的问题。该起重设备既能解决施工现场狭窄不能安装大型设备的问题,还能方便施工,降低设备安装的成本。
本实用新型解决其技术问题所采用的技术方案是:将轨道铺设完毕并达到技术要求后,用50吨汽车吊组装自制可行走组装式起重设备,组装顺序是:行走梁与A80行走轮组连接→两组桥架支撑柱之间连接→支撑柱与行走梁连接→桥架与支撑柱之间连接→钢枕头、滑轮组安装→其他提升设备、制动设备安装。
本实用新型由全钢焊接的钢架部分、行走部分、起重部分组成。A80塔式起重机轮组6通过插接轴连接到起重钢架的行走梁上;桥架支撑柱4之间的连接采用焊接;支撑柱4与行走梁的连接采用插口连接;桥架与支撑柱4之间的连接采用法兰连接,两组桥架的连接采用法兰连接;定滑轮组挂耳10与滑轮组挂轴11连接;通过滑轮组挂轴11将(10)片滑轮片连接在一起。
钢架部分包括主梁1、端梁2、钢枕头3、支撑柱4、连梁5;主梁1与端梁2的连接采用焊接;主梁1为箱型梁,由上、下盖板及腹板焊接而成,中间有加强板及隔板;主梁1和端梁2构成一个桥架。
起重部分:采用2台10吨慢速卷杨机及2套动定滑轮组。定滑轮组采用挂轴型滑轮组,每组滑轮需滑轮片10片。用卡扣将动滑轮组挂轴与吊耳连接在一起,卡扣采用120吨卡扣,共4套。
行走部份:行走部分为轨道式行走,沿轨道方向自由滑动行走,现浇两道600mm宽的钢筋混凝土轨道梁,轨道梁上铺设40mm钢板及43kg轨道;采用8组A80塔式起重机的行走轮组,每组设置4轮片,共计16轮片;该轮组直接通过插接轴,连接到起重钢架的行走梁上。采用2台10吨倒链人工拉动行走。同时需要两台10吨倒链作为反向应急制动储备。沿垂直轨道方向行走,当位移较小时,采用20吨倒链拉动钢枕头;当位移较大时,采用吊车先将钢枕头移动至合适位置后,通过钢销子锁定后再起吊。
轨基部份:在高低不平的基础处现浇2道600mm宽的混凝土轨道梁,长度依现场实际而定。轨道梁上铺设40mm厚钢板及43kg轨道,轨道末端安装终止车挡。
起重钢架现场组装调试完毕后,要进行三次静载试验和三次动载试验。
本实用新型的有益效果是,
可以在场地较小、基础不被破坏的情况下,安装大型设备;用于吊装设备不能满足需求、施工场地狭窄、天车吨位不足、站车位置的地面凸凹不平、起升高度受限制的环境下安装和拆卸大型设备及构件。
用拖车将构件运输至施工地点后,该设备将构件卸车落地,然后将构件的一端提升至垂直离地,龙门架式起重设备沿轨道滑移至安装位置,最终平稳安装就位。
附图说明
下面结合附图和实施实例对本实用新型做进一步说明。
图1是本实用新型的主要组成部分。其中,钢枕头3、卷扬设备。
图2是本实用新型两组桥架的连接。其中,主梁1、端梁2、支撑柱4、连梁5、A80塔式起重机轮组6
图3是本实用新型定滑轮组的构造图。其中,钢枕头3、定滑轮组挂耳10、滑轮组挂轴11、200吨定滑轮组12。
具体实施方式
图1~图3为本发明的一种具体实施方式。
在图1中,A80塔式起重机轮组6通过插接轴连接到起重钢架的行走梁上;桥架支撑柱4之间的连接采用焊接;支撑柱4与行走梁的连接采用插口连接;桥架与支撑柱4之间的连接采用法兰连接。
在图2中,两组桥架的连接采用法兰连接;主梁1与端梁2的连接采用焊接。
在图3中,定滑轮组挂耳10与滑轮组挂轴11连接;通过滑轮组挂轴11将10片滑轮片连接在一起。
Claims (5)
1.一种可行走组装式龙门架式起重设备,由全钢焊接的钢架部分、行走部分和起重部分组成;其特征在于:A80塔式起重机轮组(6)通过插接轴连接到起重钢架的行走梁上;桥架支撑柱(4)之间的连接采用焊接;支撑柱(4)与行走梁的连接采用插口连接;桥架与支撑柱(4)之间的连接采用法兰连接,两组桥架的连接采用法兰连接;定滑轮组挂耳(10)与滑轮组挂轴(11)连接;通过滑轮组挂轴(11)将(10)片滑轮片连接在一起。
2.根据权利要求1所述的可行走组装式龙门架式起重设备,其特征在于:钢架部分包括主梁(1)、端梁(2)、钢枕头(3)、支撑柱(4)、连梁(5);主梁(1)与端梁(2)的连接采用焊接;主梁(1)为箱型梁,由上、下盖板及腹板焊接而成,中间有加强板及隔板;主梁(1)和端梁(2)构成一个桥架。
3.根据权利要求1所述的可行走组装式龙门架式起重设备,其特征在于:行走部分为轨道式行走,现浇两道600mm宽的钢筋混凝土轨道梁,轨道梁上铺设40mm钢板及43kg轨道;采用8组A80塔式起重机的行走轮组,该轮组直接通过插接轴,连接到起重钢架的行走梁上;采用2台10吨倒链人工拉动行走。
4.根据权利要求1所述的可行走组装式龙门架式起重设备,其特征在于:起重部分采用2台10吨慢速卷扬及2套动定滑轮组;用卡扣将动滑轮组挂轴与吊耳连接在一起,卡扣采用120吨卡扣,共4套。
5.根据权利要求4所述的可行走组装式龙门架式起重设备,其特征在于:定滑轮组采用挂轴型滑轮组,每组滑轮需滑轮片10片。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200820122489XU CN201309802Y (zh) | 2008-09-12 | 2008-09-12 | 可行走组装式龙门架式起重设备 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200820122489XU CN201309802Y (zh) | 2008-09-12 | 2008-09-12 | 可行走组装式龙门架式起重设备 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201309802Y true CN201309802Y (zh) | 2009-09-16 |
Family
ID=41107053
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU200820122489XU Expired - Lifetime CN201309802Y (zh) | 2008-09-12 | 2008-09-12 | 可行走组装式龙门架式起重设备 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201309802Y (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101941645A (zh) * | 2010-09-09 | 2011-01-12 | 太原重工股份有限公司 | 一种小型门式起重机的门架 |
| CN106012854A (zh) * | 2016-06-22 | 2016-10-12 | 武汉市创先专利技术服务有限公司 | 预制装配式高架桥桥板的运输设备 |
| CN106429869A (zh) * | 2016-10-26 | 2017-02-22 | 中国二十二冶集团有限公司 | 卧式重型设备高空安装装置及安装方法 |
-
2008
- 2008-09-12 CN CNU200820122489XU patent/CN201309802Y/zh not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101941645A (zh) * | 2010-09-09 | 2011-01-12 | 太原重工股份有限公司 | 一种小型门式起重机的门架 |
| CN106012854A (zh) * | 2016-06-22 | 2016-10-12 | 武汉市创先专利技术服务有限公司 | 预制装配式高架桥桥板的运输设备 |
| CN106429869A (zh) * | 2016-10-26 | 2017-02-22 | 中国二十二冶集团有限公司 | 卧式重型设备高空安装装置及安装方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203529768U (zh) | 一种在楼面行走作业的门式起重机 | |
| CN105060135B (zh) | 塔吊 | |
| CN201962607U (zh) | 高架桥挑臂吊装用可移动式提升装置 | |
| CN105152032A (zh) | 封闭环境厂房内桥式起重机的安装方法 | |
| CN201825671U (zh) | 轨道板吊装小车 | |
| CN111038940A (zh) | 一种轨道式用于吊装运输的牵引系统 | |
| CN209444345U (zh) | 一种隧道拱部预制管片施工装置 | |
| CN112575694A (zh) | 一种大跨径t梁安装施工工法 | |
| CN210366808U (zh) | 一种用于轨道行走的升降拆除装置 | |
| CN102815606B (zh) | 一种移动式塔吊在结构楼层上作业的装置及施工方法 | |
| CN203452009U (zh) | 一种钢梁安装用自行走装置 | |
| CN201309802Y (zh) | 可行走组装式龙门架式起重设备 | |
| CN108625270A (zh) | 导梁门吊安装桥梁预制箱梁施工方法 | |
| CN115182265B (zh) | 一种用于干拼节段盖梁工况下的一体化架桥机及施工方法 | |
| CN205591116U (zh) | 用于立交桥钢箱梁底部施工的双梁移动小车操作平台 | |
| CN104060838B (zh) | 一种通廊分组空中组对安装法 | |
| CN203382408U (zh) | 一种桥梁板面铺设用门式起重机 | |
| CN107140564A (zh) | 高铁crtsⅲ型无砟轨道板线上专用吊运设备 | |
| CN205576656U (zh) | 一种桥面铁路铺设的钢轨焊轨生产线 | |
| CN115897387A (zh) | 一种曲线桥梁架设方法 | |
| CN102587678A (zh) | 钢结构节点滑移装置 | |
| CN105643236A (zh) | 码头取料机预总装工艺 | |
| CN206245344U (zh) | 一种用于预制拼装综合管廊拼装的安装车 | |
| CN211711873U (zh) | 一种轨道式用于吊装运输的牵引系统 | |
| CN204938801U (zh) | 能与建筑物实现连接的塔吊 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: No. 15, Apple Garden Road, Shijingshan District, Beijing Co-patentee after: Shougang Group Co. Ltd. Patentee after: Beijing Shougang Construction Group Co., Ltd. Address before: No. 15, Apple Garden Road, Shijingshan District, Beijing Co-patentee before: Capital Iron & Steel General Company Patentee before: Beijing Shougang Construction Group Co., Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CX01 | Expiry of patent term |
Granted publication date: 20090916 |
|
| CX01 | Expiry of patent term |