CN201307152Y - 移动式真空断路器老练试验装置 - Google Patents

移动式真空断路器老练试验装置 Download PDF

Info

Publication number
CN201307152Y
CN201307152Y CNU200820106360XU CN200820106360U CN201307152Y CN 201307152 Y CN201307152 Y CN 201307152Y CN U200820106360X U CNU200820106360X U CN U200820106360XU CN 200820106360 U CN200820106360 U CN 200820106360U CN 201307152 Y CN201307152 Y CN 201307152Y
Authority
CN
China
Prior art keywords
aging test
vacuum breaker
test device
test
circuit breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820106360XU
Other languages
English (en)
Inventor
霍凤鸣
潘瑾
李晓峰
刘晓东
耿江海
高树国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Original Assignee
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority to CNU200820106360XU priority Critical patent/CN201307152Y/zh
Application granted granted Critical
Publication of CN201307152Y publication Critical patent/CN201307152Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

本实用新型涉及一种移动式真空断路器老练试验装置,适用于高压运行现场和试验室内切电容真空断路器的老练试验。本实用新型包括有一次部分YCB和测控装置CKZ;所述一次部分YCB由高压回路和大电流回路组成;其特征在于它还包括有装载所述一次部分YCB和测控装置CKZ的机动车。本实用新型的有益效果是本装置可以运输到高压运行现场对切电容真空断路器进行老练试验,真空断路器在现场安装完毕后,设备处于真实运行状态,这样更能检验安装方面对真空断路器重燃的影响,对真空断路器开合电容器组在现场的真实运行方面更加有实际意义。

Description

移动式真空断路器老练试验装置
技术领域
本实用新型涉及一种移动式真空断路器老练试验装置,适用于高压运行现场和试验室内切电容真空断路器的老练试验。
背景技术
国内对真空断路器的老练试验主要有两种方法:在试验站内利用合成回路法对真空断路器进行老练试验和现场投运前多次开合电容器组进行老练。前者是在试验站内进行,需要将真空断路器送到指定地点进行试验。后者存在较高的风险。
利用合成回路法进行老练试验时,试验装置由一次部分YCB和测控装置CKZ组成,所述一次部分由高压回路和大电流回路组成(见图2)。
在现场对真空断路器进行老练由于已安装完毕,设备状态处于真实运行状态,更能检验安装方面对真空断路器重燃的影响,对真空断路器开合电容器组在现场的真实运行方面更加有实际意义,现场进行老练试验的意义如下:
切电容组的真空断路器在投运前必须经过“老练”试验方能投入运行,也就是说制造厂提供的产品必须是已经进行过“老练”试验的产品。然而,从电网中电容器组真空断路器实际投运时发生的多次故障表明,并非如此,这些发生故障的真空断路器并未进行过“老练”试验。此时断路器已经安装完毕,如果进行“老练”试验,必须将真空断路器从安装地点拆下后运到指定地点进行试验,一般来说此时由于工期问题已经来不及了,只能撇开“老练”试验冒险投运,对电力安全生产造成重大威胁;另外开关柜的安装必须在开关厂车间内规定的环境中安装,但现场拆卸后由于开关柜已固定在现场,真空断路器再安装时只能在现场安装,这将造成许多未知的隐患。
发明内容
本实用新型所要解决的技术问题是提供一种无须拆卸真空断路器即可进行老练试验用的移动式真空断路器老练试验装置。
本实用新型解决其技术问题所采用的技术方案:
本实用新型是在现有技术的基础上改进而成的,其主要改进点是将试验装置的一次部分YCB和测控装置CKZ装在机动车上。
本实用新型的具体技术方案如下:
本实用新型包括有一次部分YCB和测控装置CKZ;所述一次部分YCB由高压回路和大电流回路组成;其特征在于它还包括有装载所述一次部分YCB和测控装置CKZ的机动车。
本实用新型的有益效果是本装置可以运输到高压运行现场对切电容真空断路器进行老练试验,真空断路器在现场安装完毕后,设备处于真实运行状态,这样更能检验安装方面对真空断路器重燃的影响,对真空断路器开合电容器组在现场的真实运行方面更加有实际意义。
附图说明
图1为本实用新型结构示意图。
图2为本试验装置的一次部分的电路原理图。
图3为本实用新型的现场试验的连线图。
在图1中,1、一次部分即YCB,2、测控装置即CKZ,3、机动车。
具体实施方式
由图1所示的实施例可知,本实用新型包括有一次部分1和测控装置2;所述一次部分1由高压回路和大电流回路组成;其特征在于它还包括有装载所述一次部分1和测控装置2的机动车3。
在本实施例中,一次部分YCB的电路原理图如图2所示,在图2中,大电流回路由调压器T1、电容C1、C2、电感L1、电源开关K1、电流互感器CT1、避雷器MOA1、电阻分压器FYf组成;图2中的大电流回路模拟切电容过程中电弧灭前流过真空断路器的容性大电流,调压变压器T1提供大电流回路的电压和T2的原边电压,通过L1和C1并联补偿提供流过真空断路器的被试相SP1的大电流,改变C1的值可以得到不同大小的试验电流。避雷器MOA1的作用是抑制可能出现的过电压,保护试验设备。
在图2中的高电压回路由升压器T2、电容C3、C4、电感L2、电压互感器PT、避雷器MOA2组成;图2中的高电压回路模拟电弧熄灭后真空断路器的断口上的高恢复电压,升压变压器T2提供所需要的高电压,T2的原边电压由T1的副边提供。电压互感器PT的作用是直接测量升压变压器T2的输出电压。
利用本实施例进行现场试验时现场连线如下:
上述庞大的试验装置不可能进入室内对开关柜内的真空断路器进行试验,因此整个试验装置将放在机动车上,把车开到现场室外进行试验。整个试验装置对外共引出三根线路,分别对应图2中的a、b和地。试验时,把变电站的变压器低压出口侧的导线拆开,如对A相进行试验,则按图3接线,其中A、B、C三条线代表变电站内的母排,把a点引出线也即电流回路线接到变压器低压出口C相母排上,b点引出线也即电压输入线接到B相母排上。在真空断路器侧把三相如图3所示首尾相连,同时把控制线接到真空断路器的分合闸线圈上,通过测控装置CKZ控制真空断路器的分合闸进行试验。对B、C两相进行试验时,只要把真空断路器处的接线调换一下,母排处的电流、电压输入接线调换一下就行。
试验过程如下:
在试品真空断路器的三相处于合闸状态时,真空断路器的被试相SP1中流过低压大电流,此时电压回路C3中流过的电流很小,对被试相SP1影响基本可以忽略,高电压主要加在C3上;真空断路器熄弧后,T2提供的高电压加在被试相SP1上,从而对开关触头实现“老练”,这时C3保持电压为T2电压峰值,半周波后SP1两端的电压即断路器容性负荷开断时的恢复电压增加一倍,如断口击穿,C3的储能通过L2向SP1放电,清洗烧灼触头表面,提高老练效果,放电产生的高频分量通过C2滤除。
试验过程中,电容电流的数值可通过改变C1的值来调整,电容电流的波形可以通过与SP1串联的CT和测控装置CKZ中的高速数据采集系统来测量、记录。加到被试相SP1的两端的电压可以通过与之并联的电阻分压器FYf进行测量,由数据采集系统进行采集、记录。如果被试相SP1断口发生复燃或重燃,与SP1串联的CT二次会流过电流,被试相SP1断口的恢复电压也会发生变化,可以准确的判断出是否发生复燃或重燃;此外发生复燃或重燃后,由T2向SP1断口提供放电电流,这个电流远远小于实际发生复燃或重燃时的放电电流,可以有效地起到SP1断口的老练作用,将触头表面的毛刺烧掉,提高断口的绝缘水平,减小断口发生复燃或重燃的概率。
测控装置CKZ可以实现数据存储及打印。

Claims (1)

1、移动式真空断路器老练试验装置,包括有一次部分(1)和测控装置(2);所述一次部分(1)由高压回路和大电流回路组成;其特征在于它还包括有装载所述一次部分(1)和测控装置(2)的机动车(3)。
CNU200820106360XU 2008-10-29 2008-10-29 移动式真空断路器老练试验装置 Expired - Fee Related CN201307152Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820106360XU CN201307152Y (zh) 2008-10-29 2008-10-29 移动式真空断路器老练试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820106360XU CN201307152Y (zh) 2008-10-29 2008-10-29 移动式真空断路器老练试验装置

Publications (1)

Publication Number Publication Date
CN201307152Y true CN201307152Y (zh) 2009-09-09

Family

ID=41099619

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820106360XU Expired - Fee Related CN201307152Y (zh) 2008-10-29 2008-10-29 移动式真空断路器老练试验装置

Country Status (1)

Country Link
CN (1) CN201307152Y (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102103940A (zh) * 2009-12-21 2011-06-22 中国振华电子集团宇光电工有限公司 一种真空灭弧室容性老练方法及装置
CN105772429A (zh) * 2014-12-19 2016-07-20 厦门华瑞电子有限公司 继电器自动清洗装置
CN109459688A (zh) * 2018-12-03 2019-03-12 中国电力科学研究院有限公司 提升并评价真空断路器性能的试验电路及装置
CN114295973A (zh) * 2021-12-30 2022-04-08 中国工程物理研究院流体物理研究所 一种高功率气体开关预处理及老炼方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102103940A (zh) * 2009-12-21 2011-06-22 中国振华电子集团宇光电工有限公司 一种真空灭弧室容性老练方法及装置
CN102103940B (zh) * 2009-12-21 2013-04-17 中国振华电子集团宇光电工有限公司 一种真空灭弧室容性老炼方法及装置
CN105772429A (zh) * 2014-12-19 2016-07-20 厦门华瑞电子有限公司 继电器自动清洗装置
CN109459688A (zh) * 2018-12-03 2019-03-12 中国电力科学研究院有限公司 提升并评价真空断路器性能的试验电路及装置
CN114295973A (zh) * 2021-12-30 2022-04-08 中国工程物理研究院流体物理研究所 一种高功率气体开关预处理及老炼方法
CN114295973B (zh) * 2021-12-30 2023-11-07 中国工程物理研究院流体物理研究所 一种高功率气体开关预处理及老炼方法

Similar Documents

Publication Publication Date Title
CN103018627B (zh) 非有效接地系统故障类型自适应接地选线方法
US20170146603A1 (en) Integrated High And Low Voltage Ride Through Test System
CN101216535A (zh) 发电机注入式定子接地保护组合式模拟试验屏及试验方法
CN107797034A (zh) 一种高压sf6断路器弧后介质恢复特性的检测装置及方法
CN103293446A (zh) 基于消弧线圈的小电流接地故障选线方法
CN201237626Y (zh) 消弧线圈调试装置
CN102680861A (zh) 变压器或电抗器的短路承受能力试验系统及其方法
CN108802531B (zh) 一种具备对地短路功能的高低电压穿越测试装置
CN201307152Y (zh) 移动式真空断路器老练试验装置
Corzine Circuit breaker for DC micro grids
CN106970322A (zh) 混合式高压直流断路器快速机械开关动态均压测试系统
CN102087323A (zh) 一种消弧线圈调试装置
CN103310078B (zh) 真空断路器投切电抗器过电压水平的自动建模分析方法
CN202772570U (zh) 一种电压消弧法智能型接地故障综合保护系统
CN204666789U (zh) 一种真空断路器的终检工作台
CN201886097U (zh) 一种消弧线圈调试装置
CN206725723U (zh) 混合式高压直流断路器快速机械开关动态均压测试系统
CN211505756U (zh) 单相接地故障下获取一次电流接线切换装置及系统
CN202956482U (zh) 小电流系统单相接地故障检测校验装置
Van der Sluis et al. The influence of the arc voltage in synthetic test circuits
Zhou Research on neutral voltage offset and its influencing factors of 20kV small resistance grounding system
CN2238479Y (zh) 真空断路器老炼试验装置
CN207730878U (zh) 一种高压sf6断路器弧后介质恢复特性的检测装置
CN210720621U (zh) 一种用于电力电缆的故障测试装置
CN109917231B (zh) 单相接地故障下获取电能计量装置计量性能的系统及方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP. HEBEI ELECTRIC POWER CONS

Effective date: 20130320

Owner name: HEBEI ELECTRIC POWER CORPORATION ELECTRIC POWER RE

Free format text: FORMER OWNER: HEBEI ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20130320

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130320

Address after: 050021 Shijiazhuang Province, Yuhua Province Sports street, South Street, No. 238, No.

Patentee after: Electric Power Research Institute of Hebei Electric Power Corporation

Patentee after: State Grid Corporation of China

Patentee after: Hebei Electric Power Construction & Adjustment Research Institute

Address before: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Patentee before: Hebei Electric Power Research Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090909

Termination date: 20151029

EXPY Termination of patent right or utility model