CN201305825Y - 新老桥梁板拼接夹具 - Google Patents
新老桥梁板拼接夹具 Download PDFInfo
- Publication number
- CN201305825Y CN201305825Y CNU200820302904XU CN200820302904U CN201305825Y CN 201305825 Y CN201305825 Y CN 201305825Y CN U200820302904X U CNU200820302904X U CN U200820302904XU CN 200820302904 U CN200820302904 U CN 200820302904U CN 201305825 Y CN201305825 Y CN 201305825Y
- Authority
- CN
- China
- Prior art keywords
- new
- bridge
- old
- bridge board
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
一种新老桥梁板拼接夹具,有至少两副夹具沿新老桥梁板拼接缝垂直分布,每副夹具的上夹板横梁和下夹板横梁横跨新桥梁板与旧桥梁板的拼接缝,其中上夹板横梁置于新桥梁板和旧桥梁板上的桥面铺装层上面,下夹板横梁置于新桥梁板和旧桥梁板的下面,上夹板横梁与桥面铺装层之间垫有上钢垫块,下夹板横梁与新桥梁板和旧桥梁板之间垫有下钢垫块,上夹板横梁与下夹板横梁在拼接缝处由至少两根螺杆及螺母紧固连接。本实用新型可使新、旧桥梁板在结构上连成整体,减少变形和相对位移,增强了结构的刚度,提高了桥梁的承载能力,并且能够效地将荷载从老桥梁板传递至新桥梁板。
Description
技术领域
本实用新型涉及一种桥梁拓宽工程中使用的缝拼接夹具。
背景技术
随着我国经济建设的快速发展,原有高速公路和桥梁的车流量迅速增长,年均增长率达到约15%以上,许多高速公路和桥梁迫切需要拓宽改造。由于高速公路和桥梁上的交通流量大,重交通比例高,对拓宽工程的施工带来非常大的困难。施工必须保证高速公路的畅通,高速公路上的交通一旦中断,将会引起地方交通的混乱,严重地影响地方的经济发展。因此拓宽工程不可能在全线封闭交通的情况下进行施工,必须在保证高速公路畅通的前提下边通车边施工。现有的拓宽拼接施工车辆需绕道行驶,在接缝混凝土现浇施工后至接缝混凝土达到需要的强度期间,车辆荷载不能作用在拓宽拼接处的桥梁板上,否则会引起新旧桥梁板的位移。另一种解决办法是封闭一幅道路交通,双向车辆通行都在同一幅进行,这样车速会降低,使得车辆通过能力大大降低,引起堵车和引发交通事故。由于车辆密度太大,封闭一幅交通至混凝土达到所需强度的时间不能太长,同时要求浇筑纵缝的混凝土必须是高强、早强,又有利于施工。
由于新老路基常常不同,因此沉降也不同,新旧路桥板的衔接处不易稳定,新老结构的接缝处会发生变形和相对的位移,因此,如何在拓宽工程中保证施工质量,保证软基沉降的稳定,保证拼接工程的可靠是桥梁拼宽纵向接缝施工的一个技术难题。
实用新型内容
本实用新型提供一种新老桥梁板拼接夹具,要解决保证新旧桥梁板拼接拓宽工程施工质量,防止接缝处发生变形和相对位移、保证新老桥梁板衔接稳定可靠的技术问题。
本实用新型解决其技术问题所采用的技术方案是:
这种新老桥梁板拼接夹具,其特征在于:有至少两副夹具沿新老桥梁板拼接缝垂直分布,每副夹具的上夹板横梁和下夹板横梁横跨新桥梁板与旧桥梁板的拼接缝,其中上夹板横梁置于新桥梁板和旧桥梁板上的桥面铺装层上面,下夹板横梁置于新桥梁板和旧桥梁板的下面,上夹板横梁与桥面铺装层之间垫有上钢垫块,下夹板横梁与新桥梁板和旧桥梁板之间垫有下钢垫块,上夹板横梁与下夹板横梁在拼接缝处由至少两根螺杆及螺母紧固连接。
上述上夹板横梁和下夹板横梁可以为工字钢、槽钢或方钢。
上述新桥梁板和旧桥梁板的拼接是空心板和空心板,或者是空心板与T梁的拼接。
上述上夹板横梁和下夹板横梁的长度可以是1.5米至3米。
上述两根螺杆的间距可以是0.1至0.3米。
上述两副夹具的间距可以是1米至3米。
本实用新型的有益效果如下:
本实用新型沿新、旧桥梁板纵向拼接缝均匀分布,可使新、旧桥梁板在结构上连成整体,增强了结构的刚度,提高了桥梁的承载能力,并且能够效地将荷载从老桥梁板传递至新桥梁板。新老桥梁板之间通过夹具联成一体,夹具可以承受相应的剪力,当汽车荷载通过时,可以通过夹具使力从老梁板传递到新梁板,新老结构的结构连续,接缝处不会变形,从而使夹具之间的混凝土不产生相对的位移,这样,在浇筑夹具之间的混凝土时混凝土就不会产生扰动,能够正常的固化,达到正常的强度。等砼达到强度后,拆掉夹具,原夹具承受的力由砼来承担。
在大交通量的拓宽工程通车状态下采用本实用新型,能够极大地提高拓宽工程的施工质量,又能够保证交通的畅通,保证新老桥梁板衔接稳定、可靠。施工不必封闭全路幅面交通,不必使用高强、早强的砼,只需按一般的钢纤维砼即可,同时也可减少裂缝的产生。本实用新型可在保持交通畅通的前提下进行公路的拓宽工程,因此在施工过程中做到了四个确保,即确保公路畅通,确保安全,确保质量及确保合理工期。适用于公路桥梁拓宽工程中桥梁拼宽的施工。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是一副夹具的结构示意图。
图2是本实用新型新老桥梁板拼接夹具沿拼接缝分布的示意图。
附图标记:1—上夹板横梁、2—下夹板横梁、3—螺杆、4—螺母、5—新桥梁板、6—旧桥梁板、7-桥面铺装层、8-上钢垫块、9-下钢垫块、10-拼接缝。
具体实施方式
实施例参见图1、图2所示,这种新老桥梁板拼接夹具,有若干副夹具沿新老桥梁板拼接缝10均匀分布,每副夹具的上夹板横梁1和下夹板横梁2横跨新桥梁板5与旧桥梁板6的拼接缝,其中上夹板横梁1置于新桥梁板和旧桥梁板上的桥面铺装层7上面,下夹板横梁2置于新桥梁板和旧桥梁板的下面,上夹板横梁1与桥面铺装层7之间垫有上钢垫块8,下夹板横梁2与新桥梁板和旧桥梁板之间垫有下钢垫块9,上夹板横梁1与下夹板横梁2在拼接缝10处由螺杆3及螺母4紧固连接。
上述上夹板横梁1和下夹板横梁2为工字钢、槽钢或方钢。横跨新老梁板,通过螺栓上下夹紧,使得荷载得以传递。
上述新桥梁板5和旧桥梁板6的拼接是空心板和空心板,或者是空心板与T梁板的拼接。桥面铺装层7是混凝土铺装层或沥青混凝土铺装层。
上述上夹板横梁1和下夹板横梁2的长度可以是2.4米。两根螺杆3的间距是0.2米,长度可以是1.45米。两副夹具的间距可以是2.2米。
Claims (6)
- 【权利要求1】一种新老桥梁板拼接夹具,其特征在于:有至少两副夹具沿新老桥梁板拼接缝(10)垂直分布,每副夹具的上夹板横梁(1)和下夹板横梁(2)横跨新桥梁板(5)与旧桥梁板(6)的拼接缝,其中上夹板横梁(1)置于新桥梁板和旧桥梁板上的桥面铺装层(7)上面,下夹板横梁(2)置于新桥梁板和旧桥梁板的下面,上夹板横梁(1)与桥面铺装层(7)之间垫有上钢垫块(8),下夹板横梁(2)与新桥梁板和旧桥梁板之间垫有下钢垫块(9),上夹板横梁(1)与下夹板横梁(2)在拼接缝(10)处由至少两根螺杆(3)及螺母(4)紧固连接。
- 【权利要求2】根据权利要求1所述的新老桥梁板拼接夹具,其特征在于:上述上夹板横梁(1)和下夹板横梁(2)为工字钢、槽钢或方钢。
- 【权利要求3】根据权利要求1所述的新老桥梁板拼接夹具,其特征在于:上述新桥梁板(5)和旧桥梁板(6)的拼接是空心板和空心板,或者是空心板与T梁板的拼接。
- 【权利要求4】根据权利要求1所述的新老桥梁板拼接夹具,其特征在于:上述上夹板横梁(1)和下夹板横梁(2)的长度是1.5米至3米。
- 【权利要求5】根据权利要求1所述的新老桥梁板拼接夹具,其特征在于:上述两根螺杆(3)的间距是0.1至0.3米。
- 【权利要求6】根据权利要求1所述的新老桥梁板拼接夹具,其特征在于:上述两副夹具的间距是1米至3米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820302904XU CN201305825Y (zh) | 2008-11-25 | 2008-11-25 | 新老桥梁板拼接夹具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820302904XU CN201305825Y (zh) | 2008-11-25 | 2008-11-25 | 新老桥梁板拼接夹具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201305825Y true CN201305825Y (zh) | 2009-09-09 |
Family
ID=41098292
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200820302904XU Expired - Lifetime CN201305825Y (zh) | 2008-11-25 | 2008-11-25 | 新老桥梁板拼接夹具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201305825Y (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102926331A (zh) * | 2012-10-30 | 2013-02-13 | 商丘市豫东公路勘察设计有限公司 | 横向整体夹联加固的混凝土空心板桥 |
CN103243661A (zh) * | 2013-05-14 | 2013-08-14 | 华北水利水电学院 | 空心板桥扩宽改造的新旧桥横向增强钢框体及施工工艺 |
CN104389274A (zh) * | 2014-11-15 | 2015-03-04 | 北京市政路桥股份有限公司 | 一种桥梁拓宽新旧桥连接用工字钢横隔梁 |
CN110331675A (zh) * | 2019-07-02 | 2019-10-15 | 中交二公局东萌工程有限公司 | 一种改扩建桥梁的施工方法 |
CN110331667A (zh) * | 2019-07-02 | 2019-10-15 | 中交二公局东萌工程有限公司 | 边通车边施工条件下桥梁的拼接方法 |
CN111877194A (zh) * | 2020-09-08 | 2020-11-03 | 浙江世润建创科技发展有限公司 | 新旧桥梁的拼接夹具的制作使用方法 |
CN112095479A (zh) * | 2020-09-22 | 2020-12-18 | 马亮 | 一种桥梁平移对接定位装置 |
CN112160256A (zh) * | 2020-08-03 | 2021-01-01 | 中交路桥建设有限公司 | 一种桥梁横向整体加固施工方法 |
CN112281663A (zh) * | 2020-10-21 | 2021-01-29 | 广东精特建设工程有限公司 | 一种新、旧桥上部结构连接拓宽的施工方法 |
-
2008
- 2008-11-25 CN CNU200820302904XU patent/CN201305825Y/zh not_active Expired - Lifetime
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102926331A (zh) * | 2012-10-30 | 2013-02-13 | 商丘市豫东公路勘察设计有限公司 | 横向整体夹联加固的混凝土空心板桥 |
CN102926331B (zh) * | 2012-10-30 | 2015-06-24 | 商丘市豫东公路勘察设计有限公司 | 横向整体夹联加固的混凝土空心板桥 |
CN103243661A (zh) * | 2013-05-14 | 2013-08-14 | 华北水利水电学院 | 空心板桥扩宽改造的新旧桥横向增强钢框体及施工工艺 |
CN103243661B (zh) * | 2013-05-14 | 2016-04-06 | 华北水利水电大学 | 空心板桥扩宽改造的新旧桥横向增强钢框体及施工工艺 |
CN104389274A (zh) * | 2014-11-15 | 2015-03-04 | 北京市政路桥股份有限公司 | 一种桥梁拓宽新旧桥连接用工字钢横隔梁 |
CN110331675A (zh) * | 2019-07-02 | 2019-10-15 | 中交二公局东萌工程有限公司 | 一种改扩建桥梁的施工方法 |
CN110331667A (zh) * | 2019-07-02 | 2019-10-15 | 中交二公局东萌工程有限公司 | 边通车边施工条件下桥梁的拼接方法 |
CN112160256A (zh) * | 2020-08-03 | 2021-01-01 | 中交路桥建设有限公司 | 一种桥梁横向整体加固施工方法 |
CN111877194A (zh) * | 2020-09-08 | 2020-11-03 | 浙江世润建创科技发展有限公司 | 新旧桥梁的拼接夹具的制作使用方法 |
CN111877194B (zh) * | 2020-09-08 | 2022-05-27 | 浙江世润建创科技发展有限公司 | 新旧桥梁的拼接夹具的制作使用方法 |
CN112095479A (zh) * | 2020-09-22 | 2020-12-18 | 马亮 | 一种桥梁平移对接定位装置 |
CN112281663A (zh) * | 2020-10-21 | 2021-01-29 | 广东精特建设工程有限公司 | 一种新、旧桥上部结构连接拓宽的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201305825Y (zh) | 新老桥梁板拼接夹具 | |
CN206538637U (zh) | 一种用于既有铁路的线路加固装置 | |
CN102926299A (zh) | 一种铁路架空固定装置及采用此装置增建铁路桥涵的方法 | |
CN203096598U (zh) | 一种外包式钢与混凝土组合结构梁桥抗倾覆装置 | |
CN204940141U (zh) | 框架桥顶进过程中既有线路的加固体系 | |
CN202401398U (zh) | 软基中施工钢管贝雷梁支架 | |
CN203807931U (zh) | 一种预制桥墩与基础的连接结构 | |
CN102912701B (zh) | 多功能左转式定向互通立交桥 | |
CN210712589U (zh) | 一种道路桥梁裂缝加固结构 | |
CN106320184B (zh) | 一种装配式桥梁施工方法 | |
CN202730656U (zh) | 公路桥梁独柱墩盖梁施工用双抱箍三角形托架 | |
CN210134353U (zh) | 一种用于盖梁施工的牛腿式抱箍托架 | |
CN202369921U (zh) | 倒梯形桁架 | |
CN208328660U (zh) | 公铁两用桥的双拼u型梁结构 | |
CN207672389U (zh) | 路基混凝土路肩现浇模具 | |
CN206956534U (zh) | 一种铁路及轨道交通用挂梁式框架墩 | |
CN202622992U (zh) | 通用型模块拆卸式可调钢构件后张法t梁预制台座 | |
CN209816686U (zh) | 一种新旧桥梁拼宽铰接连接构造 | |
CN205688355U (zh) | 高立式阻沙障 | |
CN204343153U (zh) | 多用连续施工便梁结构 | |
CN203200623U (zh) | 一种地铁整体道床伸缩缝浇筑辅助装置 | |
CN202730672U (zh) | 市政桥梁大型交通显示屏及附属设备的支承装置 | |
CN206971141U (zh) | 一种便于更换维护的高速公路隔离护栏 | |
CN207314166U (zh) | 一种跨电气化铁路营业线转体槽形连续梁中跨合拢装置 | |
CN202865708U (zh) | 一种铁路架空固定装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20090909 |
|
CX01 | Expiry of patent term |