CN201282302Y - Composite insulator force-bearing type scramble raiser - Google Patents
Composite insulator force-bearing type scramble raiser Download PDFInfo
- Publication number
- CN201282302Y CN201282302Y CNU2008201497149U CN200820149714U CN201282302Y CN 201282302 Y CN201282302 Y CN 201282302Y CN U2008201497149 U CNU2008201497149 U CN U2008201497149U CN 200820149714 U CN200820149714 U CN 200820149714U CN 201282302 Y CN201282302 Y CN 201282302Y
- Authority
- CN
- China
- Prior art keywords
- lifter
- composite insulator
- climbing
- suspender
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ladders (AREA)
Abstract
本实用新型公开一种复合绝缘子承力式攀爬提升器,主要由吊环、吊杆和导线提升器构成,吊杆的上端设有吊环,吊杆的下端设有导线提升器,吊杆上还设有脚钉。本实用新型集提升导线、起重和攀爬功能于一体,具有使用方便、工作效率高、工作安全可靠等特点,使用过程中不踩踏、攀登复合绝缘子,从根本上保证了复合绝缘子的安装质量和电气性能,并提高工作效率,降低杆塔上工作人员的劳动强度。
The utility model discloses a composite insulator force-bearing climbing lifter, which is mainly composed of a suspension ring, a suspension rod and a wire lifter. Features spikes. The utility model integrates the functions of lifting wire, lifting and climbing, and has the characteristics of convenient use, high working efficiency, safe and reliable work, etc., and does not step on or climb the composite insulator during use, which fundamentally ensures the installation quality of the composite insulator And electrical performance, and improve work efficiency, reduce the labor intensity of staff on the tower.
Description
技术领域: Technical field:
本实用新型涉及安装和检测电力设施的辅助工具,具体地说是复合绝缘子辅助工具。The utility model relates to an auxiliary tool for installing and detecting electric facilities, in particular to an auxiliary tool for composite insulators.
背景技术: Background technique:
目前在安装、更换以及检查复合绝缘子时没有合适攀爬工具,大多利用废旧软梯简易制造攀爬工具或直接攀登复合绝缘子,工序比较复杂,使用软梯,工作人员上下攀爬时重心不稳,安全性能低;而如果不使用攀爬工具,工作人员在更换完成后直接攀扒绝缘子上横担,很容易造成绝缘子伞裙撕裂、护套受损或端部密封损坏,给输电线路运行带来极大的安全危害,且存在较大的安全隐患。At present, there are no suitable climbing tools when installing, replacing and inspecting composite insulators. Most of them use waste ladders to simply manufacture climbing tools or directly climb composite insulators. However, if climbing tools are not used, the staff will directly climb the upper cross arm of the insulator after the replacement is completed, which will easily cause the shed of the insulator to be torn, the sheath to be damaged, or the end seal to be damaged, which will bring extreme damage to the operation of the transmission line. There is a big safety hazard, and there is a big safety hazard.
实用新型内容: Utility model content:
本实用新型所要解决的技术问题就是针对以上不足而提供一种复合绝缘子承力式攀爬提升器,该攀爬提升器集提升导线、起重和攀爬功能于一体,具有使用方便、工作效率高、工作安全可靠等特点。The technical problem to be solved by the utility model is to provide a composite insulator load-bearing climbing lifter for the above deficiencies. High, safe and reliable work and so on.
本实用新型所采取的技术方案是:The technical scheme that the utility model takes is:
一种复合绝缘子承力式攀爬提升器,主要由吊环、吊杆和导线提升器构成,吊杆的上端设有吊环,吊杆的下端设有导线提升器,吊杆上还设有脚钉。A composite insulator force-bearing climbing hoist, mainly composed of a suspension ring, a boom and a wire lifter, the upper end of the suspension rod is provided with a suspension ring, the lower end of the suspension rod is provided with a wire lifter, and the suspension rod is also provided with foot nails .
导线提升器为单头导线提升器或双头导线提升器。The wire lifter is a single-head wire lifter or a double-head wire lifter.
导线提升器与吊杆为卡接、旋接、套接等方式的活连接。The wire lifter and the suspender are connected in the form of clamping, screwing, socketing, etc.
导线提升器与吊杆通过连接丝扣活连接。The wire lifter and the suspender are connected flexibly through connecting threaded buckles.
吊杆上具有脚钉孔,吊杆与脚钉之间的连接为插接。There are foot nail holes on the suspender, and the connection between the suspender and the foot nail is plug-in.
本实用新型能够达到的有益效果是:The beneficial effect that the utility model can reach is:
1、减少了安装导线提升器、起重工具和复合绝缘子爬梯等复杂施工工序,提高了工作效率。1. Reduce the complicated construction procedures such as the installation of wire lifters, lifting tools and composite insulator ladders, and improve work efficiency.
2、提高了作业安全性:工作时可以随着导线升降,始终是垂直受力状态,工作人员上下工作十分方便,克服了软梯攀爬工具不稳的缺点,提高了作业安全系数。2. Improve the safety of operation: It can be lifted and lowered with the wire during work, and it is always in a vertical force state. It is very convenient for the staff to work up and down. It overcomes the shortcomings of the unstable climbing tools of the soft ladder and improves the safety factor of the operation.
3、降低了作业强度:集提升导线、起重和攀爬功能于一体,既减轻了高空作业人员的劳动强度,又方便地面人员控制。3. Reduced operating intensity: It integrates the functions of lifting wires, lifting and climbing, which not only reduces the labor intensity of workers working at heights, but also facilitates the control of ground personnel.
4、减少了杆上作业人员:以往同类型作业杆塔上都是两名作业人员,利用此装置作业,不但减少了工具安装程序,而且杆塔上一人就能独立方便地完成所有操作,减少了安全隐患。4. Reduce the number of operators on the pole: In the past, there were two operators on the same type of pole and tower. Using this device to work not only reduces the tool installation procedure, but also one person on the pole and tower can complete all operations independently and conveniently, reducing safety. Hidden danger.
附图说明: Description of drawings:
图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.
具体实施方式: Detailed ways:
下面结合附图对本实用新型作进一步的描述:Below in conjunction with accompanying drawing, the utility model is further described:
如图1所示,该一种复合绝缘子承力式攀爬提升器,吊杆2的上端具有吊环1,吊杆2的下端通过连接丝扣4连接导线提升器5,吊杆2上还设有脚钉3。更换、安装和维修复合绝缘子时,杆上工作人员登杆,停在横担上合适位置,系好安全带,把循环绳栓在工作适当位置。地面工作人员把滑车组与上端吊环1组装好后转递给杆上工作人员,杆上工作人员把滑车组上端固定在横担上,吊杆2下端导线提线器5吊住导线,地面电工配合收紧滑车组尾绳,并将尾绳固定牢靠。杆上工作人员踩着脚钉3沿吊杆2下至导线位置,系好安全带,与地面作业人员配合收紧滑车组,更换安装复合绝缘子。安装完毕后,沿吊杆2上至横担处,拆除工具工作结束。在此过程中不踩踏、攀登复合绝缘子,从根本上保证了复合绝缘子的安装质量和电气性能,并提高工作效率,降低杆塔上工作人员的劳动强度。As shown in Figure 1, in this kind of composite insulator force-bearing climbing lifter, the upper end of the suspender 2 has a suspension ring 1, and the lower end of the suspender 2 is connected to the wire lifter 5 through the connecting
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201497149U CN201282302Y (en) | 2008-10-14 | 2008-10-14 | Composite insulator force-bearing type scramble raiser |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201497149U CN201282302Y (en) | 2008-10-14 | 2008-10-14 | Composite insulator force-bearing type scramble raiser |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201282302Y true CN201282302Y (en) | 2009-07-29 |
Family
ID=40929168
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008201497149U Expired - Fee Related CN201282302Y (en) | 2008-10-14 | 2008-10-14 | Composite insulator force-bearing type scramble raiser |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201282302Y (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102280835A (en) * | 2011-08-23 | 2011-12-14 | 四川省电力公司攀枝花电业局 | 35-220kV line maintenance operating frame |
| CN102623930A (en) * | 2012-04-17 | 2012-08-01 | 邯郸供电公司 | Combination tool for changing suspension insulator |
-
2008
- 2008-10-14 CN CNU2008201497149U patent/CN201282302Y/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102280835A (en) * | 2011-08-23 | 2011-12-14 | 四川省电力公司攀枝花电业局 | 35-220kV line maintenance operating frame |
| CN102623930A (en) * | 2012-04-17 | 2012-08-01 | 邯郸供电公司 | Combination tool for changing suspension insulator |
| CN102623930B (en) * | 2012-04-17 | 2017-08-25 | 国家电网公司 | String combination tool is hung in replacing |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
| CN209200516U (en) | Unmanned plane hang take flexible ladder arrangement | |
| CN203998746U (en) | Portable suspension installation | |
| CN206753012U (en) | A kind of attachment type raise scaffold just hangs hanging apparatus | |
| CN201785175U (en) | Hoisting basket for high-voltage steel tower | |
| CN115681719A (en) | Manual elevating system of transformer camera | |
| CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
| CN202745462U (en) | Clamping two-semicircle combined hoops for preventing rod from falling | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN104410009A (en) | Climbing type steel wire rope ladder | |
| CN201549856U (en) | Casual heavy hammer | |
| CN201498948U (en) | new towing tool | |
| CN206442059U (en) | A kind of insulated gin | |
| CN206773024U (en) | Breaker p-wire hitch bar | |
| CN201252363Y (en) | Combined tool for replacing a linear insulator of an electric transmission line | |
| CN203564663U (en) | Simple falling prevention device of electric transmission line | |
| CN102475945B (en) | Intelligent falling protector | |
| CN203911342U (en) | Adjustable temporary stay wire system for line repair | |
| CN205755762U (en) | The pulling device fallen trees for power circuit | |
| CN107255241A (en) | A kind of field lighting lamp lifting device | |
| CN218862516U (en) | Lifting ladder for insulators under 500kV transmission line | |
| CN208516850U (en) | A kind of auxiliary device for overhead ground wire of cement pole type transmission line | |
| CN101969182A (en) | Compound insulation armour clamp climbing assisting device for power system | |
| CN205666545U (en) | Line ware is carried to two split conductors of detachable anti -induction electricity vertical arrangement | |
| CN207863502U (en) | A kind of Construction of Steel Structure life line bracket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090729 Termination date: 20111014 |