CN201277706Y - Temperature keeping apparatus for heat accumulation type hot air stove - Google Patents

Temperature keeping apparatus for heat accumulation type hot air stove Download PDF

Info

Publication number
CN201277706Y
CN201277706Y CNU2008201871118U CN200820187111U CN201277706Y CN 201277706 Y CN201277706 Y CN 201277706Y CN U2008201871118 U CNU2008201871118 U CN U2008201871118U CN 200820187111 U CN200820187111 U CN 200820187111U CN 201277706 Y CN201277706 Y CN 201277706Y
Authority
CN
China
Prior art keywords
air
main pipe
combustion
pipe
reverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201871118U
Other languages
Chinese (zh)
Inventor
黄足兵
范文祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Iron and Steel Co Ltd
Original Assignee
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron and Steel Co Ltd filed Critical Maanshan Iron and Steel Co Ltd
Priority to CNU2008201871118U priority Critical patent/CN201277706Y/en
Application granted granted Critical
Publication of CN201277706Y publication Critical patent/CN201277706Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Supply (AREA)

Abstract

本实用新型属蓄热式热交换器领域,尤其涉及高炉热风炉的保温装置,技术方案包括助燃空气总管、混风总管,在所述的助燃空气总管和混风总管之间安装逆送风管,逆送风管上设置阀门。与现有技术相比,本实用新型只要在助燃空气总管和混风总管之间安装逆送风管和阀门,当高炉检修或停炉需要保温时,打开阀门,将180℃以上的助燃空气通过混风管逆送入蓄热室,利用助燃空气的热量进行保温,既能节能环保,又能多次重复使用,且操作简单。

The utility model belongs to the field of regenerative heat exchangers, in particular to a heat preservation device for a blast furnace hot blast stove. The technical proposal includes a combustion air main pipe and a mixed air main pipe, and a reverse air supply pipe is installed between the combustion air main pipe and the mixed air main pipe. , Set a valve on the reverse air duct. Compared with the prior art, the utility model only needs to install a reverse air pipe and a valve between the combustion air main pipe and the mixed air main pipe. When the blast furnace needs to be kept warm for maintenance or shutdown, the valve is opened to let the combustion air above 180°C pass through. The air mixing pipe is fed into the regenerator in reverse, and the heat of the combustion air is used for heat preservation, which can not only save energy and protect the environment, but also can be reused many times, and the operation is simple.

Description

蓄热式热风炉保温装置 Regenerative hot blast furnace insulation device

技术领域 technical field

本实用新型属蓄热式热交换器领域,尤其涉及高炉热风炉的保温装置The utility model belongs to the field of regenerative heat exchangers, in particular to a thermal insulation device for blast furnace hot blast stoves

背景技术 Background technique

热风炉是炼铁生产过程中的重要设备,它供给高炉热风以提高高炉产量、降低能耗、提高生铁质量和降低炼铁成本。目前,热风炉大致分为内燃式热风炉、外然式热风炉和顶燃式热风炉。为提高风温,其共同之处是在高温区采用硅砖砌筑,但硅砖有一个很大的缺点,就是低温体积稳定性差。硅砖砌筑的热风炉不允许温降过快,必须保持在600℃以上。因此在高炉停炉期间,采用合理的保温措施十分重要。目前热风炉的保温办法有“内燃加热,送风冷却”方法。鞍钢10号高炉就曾在1994年停炉一个月,保温办法是在蓄热室内加装燃烧器,当拱顶温度低于750℃时就燃烧加热,废气温度温度高于350℃时采用小风量冷却,使用该方法成功保温138天。该方法虽然能给硅砖热风炉保温,但其热能浪费大且使用后必须拆走,操作繁琐。为提高热风炉风温和燃烧效率,都采用提高助燃空气温度的办法,目前助燃空气温度保持在180℃以上。为此,有厂家采取从助燃风机出口处架设一组800mm主管导向每座热风炉蓄热室下部人孔处接接直径600mm的支管并安装切断阀,高炉停炉时关闭热风炉所有阀门,从助燃风机引入180℃以上的助燃空气入蓄热室,使蓄热室硅砖温度保持在700℃以上。该方法虽可减少热能消耗,但操作依然繁琐,且使用后必须拆除管道,否则影响正常生产。The hot blast stove is an important equipment in the process of ironmaking production. It supplies hot air to the blast furnace to increase the output of the blast furnace, reduce energy consumption, improve the quality of pig iron and reduce the cost of ironmaking. At present, hot blast stoves are roughly divided into internal combustion hot blast stoves, external combustion hot blast stoves and top combustion hot blast stoves. In order to increase the wind temperature, the common thing is to use silica bricks in the high temperature area, but silica bricks have a big disadvantage, that is, poor volume stability at low temperatures. The hot blast stove built with silica bricks does not allow the temperature to drop too fast, and must be kept above 600 °C. Therefore, it is very important to adopt reasonable heat preservation measures during the shutdown of the blast furnace. At present, the heat preservation method of the hot blast stove has the method of "internal combustion heating, air supply cooling". Anshan Iron and Steel No. 10 blast furnace was shut down for one month in 1994. The heat preservation method was to install a burner in the regenerator. When the temperature of the vault was lower than 750°C, it would be heated by combustion. When the temperature of the exhaust gas was higher than 350°C, a small air volume was used. Cooled, this method was used to successfully insulate for 138 days. Although this method can keep the silica brick hot-blast stove warm, its waste of heat energy is large and must be removed after use, and the operation is loaded down with trivial details. In order to improve the air temperature and combustion efficiency of the hot blast stove, the method of increasing the temperature of the combustion-supporting air is adopted. At present, the temperature of the combustion-supporting air is kept above 180°C. For this reason, some manufacturers set up a group of 800mm main pipes from the outlet of the combustion-supporting fan to guide the branch pipes with a diameter of 600mm to the manholes in the lower part of the regenerator of each hot blast stove and install shut-off valves. The combustion-supporting fan introduces combustion-supporting air above 180°C into the regenerator to keep the temperature of the silica brick in the regenerator above 700°C. Although this method can reduce heat energy consumption, the operation is still loaded down with trivial details, and the pipeline must be removed after use, otherwise normal production will be affected.

发明内容 Contents of the invention

为了克服现有技术存在的缺陷与不足,本实用新型的目的在于提供一种蓄热式热风炉保温装置,该装置既能在高炉长时间检修或停炉时保证硅砖热风炉安全保温,又能节能环保,能多次重复使用,且操作简单。In order to overcome the defects and deficiencies in the prior art, the purpose of this utility model is to provide a thermal storage device for hot blast stoves. It can save energy and protect the environment, can be used repeatedly, and is easy to operate.

为实现上述目的,本实用新型的技术方案包括助燃空气总管、混风总管,在所述的助燃空气总管和混风总管之间安装逆送风管,逆送风管上设置阀门。In order to achieve the above purpose, the technical solution of the utility model includes a combustion air main pipe and a mixed air main pipe, and a reverse air supply pipe is installed between the combustion air main pipe and the mixed air main pipe, and a valve is arranged on the reverse air supply pipe.

与现有技术相比,本实用新型只要在助燃空气总管和混风总管之间安装逆送风管和阀门,当高炉检修或停炉需要保温时,打开阀门,将180℃以上的助燃空气通过混风管逆送入蓄热室,利用助燃空气的热量进行保温,既能节能环保,又能多次重复使用,且操作简单。Compared with the prior art, the utility model only needs to install a reverse air pipe and a valve between the combustion air main pipe and the mixed air main pipe. When the blast furnace needs to be kept warm for maintenance or shutdown, the valve is opened to let the combustion air above 180°C pass through. The air mixing pipe is fed into the regenerator in reverse, and the heat of the combustion air is used for heat preservation, which can not only save energy and protect the environment, but also can be reused many times, and the operation is simple.

附图说明 Description of drawings

下面结合附图对本实用新型实施例作进一步说明。The embodiment of the utility model will be further described below in conjunction with the accompanying drawings.

图1:外燃式蓄热式热风炉平面布置示意图Figure 1: Schematic diagram of the layout of the external-combustion regenerative hot blast stove

具体实施方式 Detailed ways

下面以外燃式热风炉为例来详细说明本实用新型;The utility model will be described in detail below with the external combustion type hot blast stove as an example;

如图1所示,外燃式热风炉包括燃烧室5、蓄热室4、混风总管1、助燃空气总管2、煤气管道、冷风管道、热风管道、烟道以及其他管道和阀门。热风炉工作过程大致如下:关闭热风、冷风管道,通过煤气管道和助燃空气管道往燃烧室5通入煤气和助燃空气,燃烧器燃烧加热,热量被蓄热室4中的格子砖收集,燃烧时产生的烟气顺热风炉底部的烟道管排出烟囱。热量储存完毕后,煤气、助燃空气、烟气管道阀门关闭。冷风通过蓄热室时被蓄热室储存的热量升温并达到高炉需要的温度变成热风,由热风管道提高给高炉。如图1所示,当高炉检修或停炉需保温时,先关闭所有的阀门,然后打开设置于连接混风总管1和助燃空气总管2的逆送风管3上的阀门,热助燃空气通过混风总管1逆送风入蓄热室4进行保温。不需要保温时关闭阀门即可。As shown in Figure 1, the external combustion hot blast stove includes a combustion chamber 5, a regenerator 4, a mixed air main pipe 1, a combustion air main pipe 2, gas pipes, cold air pipes, hot air pipes, flue and other pipes and valves. The working process of the hot blast stove is roughly as follows: close the hot air and cold air pipes, feed gas and combustion air into the combustion chamber 5 through the gas pipe and the combustion air pipe, the burner burns and heats, and the heat is collected by the checker bricks in the regenerator 4. When burning The flue gas produced is discharged out of the chimney along the flue pipe at the bottom of the hot blast stove. After the heat is stored, the gas, combustion air, and flue gas pipeline valves are closed. When the cold air passes through the regenerator, the heat stored in the regenerator heats up and reaches the temperature required by the blast furnace to become hot air, which is raised to the blast furnace by the hot air pipe. As shown in Figure 1, when the blast furnace needs to be kept warm for maintenance or shutdown, first close all valves, then open the valve on the reverse air supply pipe 3 connecting the air mixing main pipe 1 and the combustion air main pipe 2, and the hot combustion air passes through Air mixing main pipe 1 reversely sends air into regenerator 4 for heat preservation. Just close the valve when the heat preservation is not needed.

Claims (1)

1、一种蓄热式热风炉保温装置,包括助燃空气总管、混风总管,其特征在于:在所述的助燃空气总管和混风总管之间安装逆送风管,逆送风管上设置阀门。1. A thermal storage device for a regenerative hot blast stove, comprising a combustion-supporting air main pipe and a mixed-air main pipe, characterized in that: a reverse air supply pipe is installed between the combustion-supporting air main pipe and the mixed air main pipe, and the reverse air supply pipe is set valve.
CNU2008201871118U 2008-09-24 2008-09-24 Temperature keeping apparatus for heat accumulation type hot air stove Expired - Fee Related CN201277706Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201871118U CN201277706Y (en) 2008-09-24 2008-09-24 Temperature keeping apparatus for heat accumulation type hot air stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201871118U CN201277706Y (en) 2008-09-24 2008-09-24 Temperature keeping apparatus for heat accumulation type hot air stove

Publications (1)

Publication Number Publication Date
CN201277706Y true CN201277706Y (en) 2009-07-22

Family

ID=40895290

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201871118U Expired - Fee Related CN201277706Y (en) 2008-09-24 2008-09-24 Temperature keeping apparatus for heat accumulation type hot air stove

Country Status (1)

Country Link
CN (1) CN201277706Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110848724A (en) * 2019-11-20 2020-02-28 景德镇陶瓷大学 Three-channel heat accumulating type heat exchange device
CN112342332A (en) * 2020-10-22 2021-02-09 马鞍山钢铁股份有限公司 An integrated system and operation method for ignition, heat preservation and reverse air supply of a hot blast stove

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110848724A (en) * 2019-11-20 2020-02-28 景德镇陶瓷大学 Three-channel heat accumulating type heat exchange device
CN112342332A (en) * 2020-10-22 2021-02-09 马鞍山钢铁股份有限公司 An integrated system and operation method for ignition, heat preservation and reverse air supply of a hot blast stove

Similar Documents

Publication Publication Date Title
CN102952913B (en) Dual-preheating method and device for preheating blast furnace gas by using heat-storage-type preheating furnace
CN203336981U (en) Novel sintered ring refrigerator flue gas waste heat recycling system
CN206014992U (en) A kind of cool stove of air stove, furnace drying device
CN201277706Y (en) Temperature keeping apparatus for heat accumulation type hot air stove
CN101846447A (en) Down draft kiln
CN205482401U (en) Exhaust -heat boiler's afterbody evacuation flue gas waste heat utilization equipment
CN204529765U (en) A kind of biomass gasification fired heating system for Industrial Stoves
CN104359314B (en) The energy-saving heating furnace system of a kind of Mist heat recovering and flue gas waste heat recovery method
CN102381830A (en) A method and system for using oxygen-enriched air to support combustion in the production of float glass
CN109520318B (en) Heat accumulating type high-temperature flue gas waste heat utilization system
CN101993967B (en) Heat preservation method of self-preheating type hot blast stove
CN201429336Y (en) Heat Recovery System for Waste Heat Boiler in Glass Production Line with Combustion Air Heating Section
CN201285212Y (en) Low temperature flue gas waste heat reuse device
CN205223311U (en) Collection device to cast iron pipe annealing kiln gas
CN110873531A (en) Gas type energy-saving crucible furnace
CN101418358B (en) Furnace cooling method of silica brick hot blast stove
CN202808850U (en) Hot-blast stove capable of controlling temperatures
CN104110970A (en) Large kiln based waste heat recovery system and large kiln based waste heat recovery method
CN203964689U (en) Residual neat recovering system based on maximization stove
CN203177670U (en) Waste heat utilization device of tail low-temperature smoke of sinter cooler
CN201817372U (en) Energy-saving heat accumulating type glass kiln
CN223458343U (en) Hot blast furnace insulation system
CN206736291U (en) Time-sharing preheating system for combustion air of hot blast stove
CN106091672B (en) Rotary reaction furnace hot air heating system
CN206222953U (en) Metal smelting-furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090722

Termination date: 20150924

EXPY Termination of patent right or utility model