CN201273057Y - Connection master-slave mouths between large templates based on small steel template combination - Google Patents

Connection master-slave mouths between large templates based on small steel template combination Download PDF

Info

Publication number
CN201273057Y
CN201273057Y CNU2008200908789U CN200820090878U CN201273057Y CN 201273057 Y CN201273057 Y CN 201273057Y CN U2008200908789 U CNU2008200908789 U CN U2008200908789U CN 200820090878 U CN200820090878 U CN 200820090878U CN 201273057 Y CN201273057 Y CN 201273057Y
Authority
CN
China
Prior art keywords
combination
master
mouth
formworks
small steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200908789U
Other languages
Chinese (zh)
Inventor
王玉辉
庞希儒
梁艳萍
孙婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEILONGJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
HEILONGJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEILONGJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical HEILONGJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CNU2008200908789U priority Critical patent/CN201273057Y/en
Application granted granted Critical
Publication of CN201273057Y publication Critical patent/CN201273057Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a connecting master-secondary port between the large formworks assembled from small steel formworks, which comprises two combination large formworks, a master port and a secondary port. The connecting master-secondary port is characterized in that the secondary port is mounted at one side of one combination large formwork; the master port is mounted at one side of the other combination large formwork; the secondary port of one combination large formwork is mounted in the master port of the other combination large formwork to connect the two formworks. The utility model adopts master and secondary ports to connect combination large formworks, having simple connection, fast process, low engineering cost, simple installment and detachment, and improved rigidity of combination large formworks.

Description

Based on the connection mother-son mouth between the large form of small steel templates combination
Technical field:
The utility model belong to that use in the construction work a kind of connect that knockdown large form uses the connection mother-son mouth.
Background technology:
During in-situ reinforced concrete wall construction at present, typical floor adopts large overall template to do template, and its early investment is big, and the number of turnover is few, and engineering cost is higher.Connection between the integral mold plate is more complicated also.
Summary of the invention:
The purpose of this utility model provides and a kind ofly is applicable to that early investment is little, the number of turnover is many, cost is low, connects simply based on the connection mother-son mouth between the large form of small steel templates combination.The connector of combined type large form, installing/dismounting is easy, speed of application is fast, connection is simple, use flexibly based on the connection mother-son mouth between the large form of small steel templates combination.The utility model comprises two combination large forms, the rim of the mouth, female mouthful, be characterized in: the rim of the mouth is installed in a side of a combination large form, female mouth is installed in a side of another piece combination large form, and the rim of the mouth of a combination large form is installed in another piece combination large form female mouthful two templates are linked together.The utility model adopts the feasible combination of mother-son mouth form large form to link together, and connects simply, has quick construction, and the characteristics that installing/dismounting is easy increase the rigidity that makes up large form simultaneously.
Description of drawings:
Fig. 1 is the utility model structure perspective diagram
Fig. 2 is the new section cross-sectional schematic of this practicality
The specific embodiment:
The utility model comprises the combination large form 1,2 based on the small steel templates combination, rim of the mouth 3, female mouthful 4, the rim of the mouth is installed in a side of combination large form 1, female mouth is installed in a side of combination large form 2, and during two combination large form 1,2 assembling combination, rim of the mouth 3 is installed together with female mouthful 4.

Claims (1)

1, a kind of based on the connection mother-son mouth between the large form of small steel templates combination, comprise two combination large forms, the rim of the mouth, female mouthful, it is characterized in that: the rim of the mouth is installed in a side of a combination large form, female mouth is installed in a side of another piece combination large form, and the rim of the mouth of a combination large form is installed in another piece combination large form female mouthful two templates are linked together.
CNU2008200908789U 2008-09-12 2008-09-12 Connection master-slave mouths between large templates based on small steel template combination Expired - Lifetime CN201273057Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200908789U CN201273057Y (en) 2008-09-12 2008-09-12 Connection master-slave mouths between large templates based on small steel template combination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200908789U CN201273057Y (en) 2008-09-12 2008-09-12 Connection master-slave mouths between large templates based on small steel template combination

Publications (1)

Publication Number Publication Date
CN201273057Y true CN201273057Y (en) 2009-07-15

Family

ID=40883405

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200908789U Expired - Lifetime CN201273057Y (en) 2008-09-12 2008-09-12 Connection master-slave mouths between large templates based on small steel template combination

Country Status (1)

Country Link
CN (1) CN201273057Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561683A (en) * 2012-02-14 2012-07-11 江苏江中集团有限公司 Joint device for large steel forms
CN109826103A (en) * 2019-03-19 2019-05-31 中国十七冶集团有限公司 A kind of cast-in-situ box girder bamboo slab rubber and splicing reinforcement means

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561683A (en) * 2012-02-14 2012-07-11 江苏江中集团有限公司 Joint device for large steel forms
CN109826103A (en) * 2019-03-19 2019-05-31 中国十七冶集团有限公司 A kind of cast-in-situ box girder bamboo slab rubber and splicing reinforcement means

Similar Documents

Publication Publication Date Title
CN203878615U (en) Light combined type set-shaped steel formwork for inspection well
CN203110126U (en) Elastic mold for manufacturing concrete cylinder
CN201273057Y (en) Connection master-slave mouths between large templates based on small steel template combination
CN201943341U (en) Combined building template convenient for disassembly and assembly
CN204402030U (en) A kind of oval door opening concrete wall template
CN202500323U (en) Novel splicing structure
CN202299396U (en) Composite building template
CN103835498A (en) Steel wedge hang mould convenient to demount
CN201339318Y (en) Large steel framework capable of being disassembled and assembled
CN202866279U (en) Connecting structure for plastic formwork fixing part
CN204344707U (en) Flange folder coupling
CN210797964U (en) Shear force wall assembly template
CN203701586U (en) Ring beam shaping device
CN201874232U (en) Building template suitable for being mounted and dismounted rapidly
CN201225006Y (en) Clamp special for beam formwork
CN202029221U (en) Mold device of prefabricated concrete member
CN202922802U (en) Making mould of glass reinforced plastic three-way pipe fitting
CN202556570U (en) Device capable of propping pipe mould open
CN202479355U (en) Combined corrugated pipe forming mould plate with bolt connection structure
CN201144519Y (en) Rectangular assembly type wall big formwork
CN103615059B (en) Ultra-high space whole light partition wall system
CN202401751U (en) Quick-mounting plug mould for constructional engineering rounding
CN209837361U (en) Detachable PC wall body
CN202131768U (en) Novel construction steel formwork
CN101691810A (en) Seam adjusting plate molding board

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20090715

CX01 Expiry of patent term