CN201265955Y - 废热回收制取高温热水系统 - Google Patents

废热回收制取高温热水系统 Download PDF

Info

Publication number
CN201265955Y
CN201265955Y CN 200820099562 CN200820099562U CN201265955Y CN 201265955 Y CN201265955 Y CN 201265955Y CN 200820099562 CN200820099562 CN 200820099562 CN 200820099562 U CN200820099562 U CN 200820099562U CN 201265955 Y CN201265955 Y CN 201265955Y
Authority
CN
China
Prior art keywords
water
temperature
pipe
high temperature
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200820099562
Other languages
English (en)
Inventor
刘琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jing Tian energy investment (Group) Limited by Share Ltd
Original Assignee
CHONGQING JINGTIAN ELECTRICAL EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JINGTIAN ELECTRICAL EQUIPMENT Co Ltd filed Critical CHONGQING JINGTIAN ELECTRICAL EQUIPMENT Co Ltd
Priority to CN 200820099562 priority Critical patent/CN201265955Y/zh
Application granted granted Critical
Publication of CN201265955Y publication Critical patent/CN201265955Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/12Hot water central heating systems using heat pumps

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

本实用新型公开了一种废热回收制取高温热水系统,冷凝水回水管(4)上分别连接有高温进水管(5)和高温出水管(6),高温进水管(5)和高温出水管(6)之间连接有板式换热器(7);板式换热器(7)低温进水口经进水管道(8)连接有补水箱(9),板式换热器(7)低温出水口通过出水管道(10)依次连接有高温热泵机组(11)和蓄水箱(12),蓄水箱(12)底部连接有热水输出管(13)。本实用新型将中央空调的冷凝热回收制取高温生活热水,其成本是传统锅炉制取生活热水的40%,而且也减少了二氧化碳的排放,也降低了冷水机组的运行成本,非常适用于洗浴业、酒店、餐厅、工厂等场所。

Description

废热回收制取高温热水系统
技术领域
本实用新型属于一种空调废热回收再加热利用系统,具体地说,是一种空调冷凝热回收再加热制取高温热水的系统。
背景技术
中央空调的制冷机组在制冷工况运行时,要通过冷却塔向大气环境排放大量的冷凝热,通常冷凝热约为制冷量的1.3倍左右。大量冷凝热向大气排放,浪费大量能源,这些热量又使周围环境温度升高,造成严重的环境热污染。同时在安装有中央空调一些公共场所如宾馆、饭店,,又需要24小时提供50~60度的热水洗澡等,都是通过气、电等进行加热或者锅炉制取。如果能将中央空调的冷水机组排放的冷凝热予以回收利用,不仅可以减少环境的热污染,而且也是一种有效的节能措施。又特别是我国南方地区夏季冷负荷大,供冷时间长,生活热水负荷相对较小,为冷凝热的回收利用创造了良好的条件。
实用新型内容
本实用新型所要解决的技术问题在于提供一种有效回收利用冷凝热再加热制取生活热水的空调冷凝热回收系统。
本实用新型的技术方案如下:一种废热回收制取高温热水系统,包括冷却水塔、制冷机组,所述冷却水塔底部和顶部分别通过冷凝水供水管和冷凝水回水管与制冷机组相连,其关键在于:所述冷凝水回水管上分别连接有高温进水管和高温出水管,所述高温进水管和高温出水管之间连接有板式换热器,所述高温进水管与板式换热器高温进水口相连,所述高温出水管与板式换热器高温出水口相连;所述板式换热器低温进水口通过进水管道连接有补水箱,该板式换热器低温出水口通过出水管道依次连接有高温热泵机组和蓄水箱,该蓄水箱底部连接有热水输出管。补水箱内的自来水通过进水管道进入板式换热器热交换,热交换后的水达到32度左右,然后再从出水管道经过高温热泵机组加热到55度左右进入蓄水箱贮存,再根据需要从热水输出管输出使用。
上述进水管道和热水输出管上分别设有第一闸阀和第二闸阀。用于控制真个系统的进水和出水。
上述冷凝水回水管上设置有电动调节阀,该电动调节阀位于高温进水管和高温出水管之间的冷凝水回水管上。所述高温进水管和高温出水管上分别设置有第三闸阀和第四闸阀。在冬天可以通过电动调节阀、第三闸阀和第四闸阀之间的切换,冷凝水回水管不与旁路的热回收装置相连,直接将冷却水塔、制冷机组连通。
上述高温热泵机组与蓄水箱之间设置有再加热回流管。可以进行再循环换热。
上述高温热泵机组设有与进水管道连接的回水管,可以进行再循环换热。
上述板式换热器与高温热泵机组之间的出水管道设置有向高温热泵机组输水的第一水泵。上述高温热泵机组与蓄水箱之间的出水管道上设置有向蓄水箱送水的第二水泵。
有益效果:本实用新型将中央空调的冷凝热回收制取高温生活热水,其成本是传统锅炉制取生活热水的40%,而且也减少了二氧化碳的排放,也降低了冷水机组的运行成本,非常适用于洗浴业、酒店、餐厅、工厂等场所。
附图说明
图1是本实用新型的连接示意图。
具体实施方式
下面结合附图和实施例对本实用新型作进一步说明:
如图1所示,本实用新型废热回收制取高温热水系统,由冷却水塔1、制冷机组2、板式换热器7、补水箱9、高温热泵机组11、蓄水箱12,所述冷却水塔1底部和顶部分别通过冷凝水供水管3和冷凝水回水管4与制冷机组2相连,所述冷凝水回水管4上分别连接有高温进水管5和高温出水管6,所述高温进水管5和高温出水管6之间连接有板式换热器7,所述高温进水管5与板式换热器7高温进水口相连,所述高温出水管6与板式换热器7高温出水口相连;所述板式换热器7低温进水口通过进水管道8连接有补水箱9,高温热泵机组11设有与进水管道8连接的回水管22。该进水管道8的两头都设置有闸阀。该板式换热器7低温出水口通过出水管道10依次连接有高温热泵机组11和蓄水箱12,该蓄水箱12底部连接有热水输出管13。蓄水箱12上部还连接有带闸阀的二次补水管22板式换热器7与高温热泵机组11的出水管道10上都设有闸阀。所述进水管道8和热水输出管13上分别设有第一闸阀14和第二闸阀15。所述冷凝水回水管4上设置有电动调节阀16,该电动调节阀16位于高温进水管5和高温出水管6之间的冷凝水回水管4上;所述高温进水管5和高温出水管6上分别设置有第三闸阀20和第四闸阀21。并且高温进水管5和高温出水管6均设置有时时检测的压力表和流量计。所述高温热泵机组11与蓄水箱12之间设置有再加热回流管17。该再加热回流管17的两头都设有闸阀。所述板式换热器7与高温热泵机组11之间的出水管道10设置有向高温热泵机组11输水的第一水泵18。所述高温热泵机组11与蓄水箱12之间的出水管道10上设置有向蓄水箱12送水的第二水泵19。
工作原理:补水箱9内的自来水通过进水管道8进入板式换热器7热交换,热交换后的水达到32度左右,然后再从出水管道10经过高温热泵机组11加热到55度左右进入蓄水箱12贮存,再根据需要从热水输出管13输出使用。二次补水管23可以对蓄水箱12再补水,蓄水箱12的水可以经再加热回流管17进入高温热泵机组11再加热;电动调节阀16、第三闸阀20和第四闸阀21之间的切换,冷凝水回水管4不与旁路的热回收装置相连,直接将冷却水塔1、制冷机组2连通。

Claims (7)

1、一种废热回收制取高温热水系统,包括冷却水塔(1)、制冷机组(2),所述冷却水塔(1)底部和顶部分别通过冷凝水供水管(3)和冷凝水回水管(4)与制冷机组(2)相连,其特征在于:所述冷凝水回水管(4)上分别连接有高温进水管(5)和高温出水管(6),所述高温进水管(5)和高温出水管(6)之间连接有板式换热器(7),所述高温进水管(5)与板式换热器(7)高温进水口相连,所述高温出水管(6)与板式换热器(7)高温出水口相连;所述板式换热器(7)低温进水口通过进水管道(8)连接有补水箱(9),该板式换热器(7)低温出水口通过出水管道(10)依次连接有高温热泵机组(11)和蓄水箱(12),该蓄水箱(12)底部连接有热水输出管(13)。
2、根据权利要求1所述的废热回收制取高温热水系统,其特征在于:所述进水管道(8)和热水输出管(13)上分别设有第一闸阀(14)和第二闸阀(15)。
3、根据权利要求1所述的废热回收制取高温热水系统,其特征在于:所述高温进水管(5)和高温出水管(6)之间的冷凝水回水管(4)上设置有电动调节阀(16);所述高温进水管(5)和高温出水管(6)上分别设置有第三闸阀(20)和第四闸阀(21)。
4、根据权利要求1所述的废热回收制取高温热水系统,其特征在于:所述高温热泵机组(11)与蓄水箱(12)之间设置有带闸阀的再加热回流管(17)。
5、根据权利要求1所述的废热回收制取高温热水系统,其特征在于:所述高温热泵机组(11)设有与进水管道(8)连接的回水管(22)。
6、根据权利要求1所述的废热回收制取高温热水系统,其特征在于:所述板式换热器(7)与高温热泵机组(11)之间的出水管道(10)设置有向高温热泵机组(11)输水的第一水泵(18)。
7、根据权利要求1所述的废热回收制取高温热水系统,其特征在于:所述高温热泵机组(11)与蓄水箱(12)之间的出水管道(10)上设置有向蓄水箱(12)送水的第二水泵(19)。
CN 200820099562 2008-07-28 2008-07-28 废热回收制取高温热水系统 Expired - Lifetime CN201265955Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200820099562 CN201265955Y (zh) 2008-07-28 2008-07-28 废热回收制取高温热水系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200820099562 CN201265955Y (zh) 2008-07-28 2008-07-28 废热回收制取高温热水系统

Publications (1)

Publication Number Publication Date
CN201265955Y true CN201265955Y (zh) 2009-07-01

Family

ID=40832324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200820099562 Expired - Lifetime CN201265955Y (zh) 2008-07-28 2008-07-28 废热回收制取高温热水系统

Country Status (1)

Country Link
CN (1) CN201265955Y (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102207306A (zh) * 2011-03-07 2011-10-05 李瑞杰 中央空调热回收生产及供应生活热水的节能运行模式
CN103196191A (zh) * 2013-03-26 2013-07-10 周晨星 可给室内空气进行调节和提供洗浴用水的系统及处理方法
CN103322654A (zh) * 2013-06-06 2013-09-25 江苏丰彩新型建材有限公司 一种制冷供热联供系统
CN106288094A (zh) * 2016-09-30 2017-01-04 长安大学 一种热交换冷却水系统及控制方法
CN107702252A (zh) * 2017-10-31 2018-02-16 江苏高菱蓄能科技有限公司 一种超层流布水系统
CN109708297A (zh) * 2018-12-18 2019-05-03 江西蒙山乳业有限公司 一种高效热量回收热水系统
CN110542331A (zh) * 2019-09-10 2019-12-06 广东石湾酒厂集团有限公司 一种多级废热回收节水系统
CN110762842A (zh) * 2019-10-18 2020-02-07 宁波奥克斯电气股份有限公司 一种热泵冷凝水回收利用系统及其控制方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102207306A (zh) * 2011-03-07 2011-10-05 李瑞杰 中央空调热回收生产及供应生活热水的节能运行模式
CN103196191A (zh) * 2013-03-26 2013-07-10 周晨星 可给室内空气进行调节和提供洗浴用水的系统及处理方法
CN103196191B (zh) * 2013-03-26 2015-12-09 周晨星 可给室内空气进行调节和提供洗浴用水的系统及处理方法
CN103322654A (zh) * 2013-06-06 2013-09-25 江苏丰彩新型建材有限公司 一种制冷供热联供系统
CN106288094A (zh) * 2016-09-30 2017-01-04 长安大学 一种热交换冷却水系统及控制方法
CN107702252A (zh) * 2017-10-31 2018-02-16 江苏高菱蓄能科技有限公司 一种超层流布水系统
CN109708297A (zh) * 2018-12-18 2019-05-03 江西蒙山乳业有限公司 一种高效热量回收热水系统
CN109708297B (zh) * 2018-12-18 2021-03-02 江西蒙山乳业有限公司 一种高效热量回收热水系统
CN110542331A (zh) * 2019-09-10 2019-12-06 广东石湾酒厂集团有限公司 一种多级废热回收节水系统
CN110762842A (zh) * 2019-10-18 2020-02-07 宁波奥克斯电气股份有限公司 一种热泵冷凝水回收利用系统及其控制方法
CN110762842B (zh) * 2019-10-18 2022-02-01 宁波奥克斯电气股份有限公司 一种热泵冷凝水回收利用系统及其控制方法

Similar Documents

Publication Publication Date Title
CN201265955Y (zh) 废热回收制取高温热水系统
CN201177332Y (zh) 带热回收冰蓄冷的双冷源热泵集中式空调装置
CN101165430B (zh) 余热回收式冷热水节能机组
CN101403521B (zh) 太阳能吸收式制冷与地源热泵耦合联供系统
CN101165435B (zh) 双效压缩式冷热水节能机组
CN107155280B (zh) 一种一体化通风冷却热回收装置
CN1811303A (zh) 单效热泵/双效(或多效)制冷吸收式机组和热电冷联供系统
CN101504190A (zh) 废热水余热回收型热泵热水系统
CN102032612A (zh) 利用直接空冷机组余热供热的热电联产节能装置及方法
CN101280941A (zh) 双冷源热泵集中式空调装置
CN107014110B (zh) 分布式水汽冷热电联供装置及方法
CN101876496B (zh) 一种双蒸发器直燃型吸收式冷热水机组
CN102022770A (zh) 利用直接空冷机组余热供热的热电联产节能装置及方法
CN101832595A (zh) 火电厂空冷机组回收排汽汽化潜热供热装置
CN101165418A (zh) 动态蓄冰式冷热水节能机组
CN201555394U (zh) 一种居住建筑用太阳能-地源热泵集成系统
CN201021855Y (zh) 复叠耦合式高温热回收空调机组
CN101329106A (zh) 利用空调机冷凝热与辅助热源制备卫生热水的技术与工艺
CN202101331U (zh) 一种利用中央空调冷却水和低温烟气余热的热泵热水系统
CN207716527U (zh) 一种热水优化节能系统
CN201314661Y (zh) 太阳能吸收式制冷与地源热泵耦合联供系统
CN201401197Y (zh) 新型利用汽轮机乏汽热量来加热供热热水的凝汽系统
CN201836967U (zh) 利用直接空冷机组余热供热的热电联产节能装置
CN108036397A (zh) 一种热水优化节能系统及太阳能耦合热源制热水节能方法
CN201973804U (zh) 中央空调热回收生产及供应生活热水的节能运行模式

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20100824

Address after: 401147 Chongqing city Yubei District Red Chamber Jin Road No. 2 Building No. 8-8

Patentee after: Chongqing Jingtian Shallow Layer Geothermal Development Co., Ltd.

Address before: 401147 Chongqing city Yubei District Red Chamber Jin Road No. 2 Building No. 8-8

Patentee before: Chongqing Jingtian Electrical Equipment Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: CHONGQING JINGTIAN ENERGY INVESTMENT CO., LTD.

Free format text: FORMER NAME: CHONGQING JINGTIAN SHALLOW GEOTHERMAL DEVELOPMENT CO., LTD.

CP03 Change of name, title or address

Address after: 400023, No. 6, North City Road, Jiangbei District, Chongqing

Patentee after: Chongqing Jontia Energy Investment Co., Ltd.

Address before: 401147 Chongqing city Yubei District Red Chamber Jin Road No. 2 Building No. 8-8

Patentee before: Chongqing Jingtian Shallow Layer Geothermal Development Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: CHONGQING JONTIA ENERGY INVESTMENT (GROUP) CO., LT

Free format text: FORMER NAME: CHONGQING JINGTIAN ENERGY INVESTMENT CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 400023, No. 6, North City Road, Jiangbei District, Chongqing

Patentee after: Chongqing Jing Tian energy investment (Group) Limited by Share Ltd

Address before: 400023, No. 6, North City Road, Jiangbei District, Chongqing

Patentee before: Chongqing Jontia Energy Investment Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: High temperature water heating system by waste heat recovery

Effective date of registration: 20141211

Granted publication date: 20090701

Pledgee: Chongqing Sanxia bank Limited by Share Ltd New District Branch

Pledgor: Chongqing Jing Tian energy investment (Group) Limited by Share Ltd|Chongqing branch air conditioning equipment manufacturing Co., Ltd.

Registration number: 2014990001062

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: High temperature water heating system by waste heat recovery

Effective date of registration: 20160120

Granted publication date: 20090701

Pledgee: Chongqing Sanxia bank Limited by Share Ltd New District Branch

Pledgor: Chongqing Beijing day energy investment (Group) Limited by Share Ltd|Chongqing branch pole Valley Information Technology Co. Ltd.

Registration number: 2016990000062

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20160113

Registration number: 2014990001062

Pledgor after: Chongqing Beijing day energy investment (Group) Limited by Share Ltd

Pledgor after: Chongqing branch pole Valley Information Technology Co. Ltd.

Pledgor before: Chongqing Jing Tian energy investment (Group) Limited by Share Ltd

Pledgor before: Chongqing branch air conditioning equipment manufacturing Co., Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170224

Granted publication date: 20090701

Pledgee: Chongqing Sanxia bank Limited by Share Ltd New District Branch

Pledgor: Chongqing Jingtian Energy Investment (Group) Co., Ltd|Chongqing Branch of the cloud - Information Technology Co., Ltd

Registration number: 2016990000062

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CX01 Expiry of patent term

Granted publication date: 20090701

CX01 Expiry of patent term