CN201242570Y - 非接触式高压核相器 - Google Patents

非接触式高压核相器 Download PDF

Info

Publication number
CN201242570Y
CN201242570Y CNU2008200299475U CN200820029947U CN201242570Y CN 201242570 Y CN201242570 Y CN 201242570Y CN U2008200299475 U CNU2008200299475 U CN U2008200299475U CN 200820029947 U CN200820029947 U CN 200820029947U CN 201242570 Y CN201242570 Y CN 201242570Y
Authority
CN
China
Prior art keywords
phase
voltage
slave
contact type
tested
Prior art date
Application number
CNU2008200299475U
Other languages
English (en)
Inventor
穆明建
阴博超
刘子瑞
Original Assignee
西安爱邦电气有限公司
西北电网有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 西安爱邦电气有限公司, 西北电网有限公司 filed Critical 西安爱邦电气有限公司
Priority to CNU2008200299475U priority Critical patent/CN201242570Y/zh
Application granted granted Critical
Publication of CN201242570Y publication Critical patent/CN201242570Y/zh

Links

Abstract

本实用新型涉及一种高压线路相序校准核定技术。由主机和从机两个组件构成,主、从机均有非接触式电压传感器、无线通信模块、GPS模块和相位测量电路。本实用新型克服了传统相位核定装置存在的缺点,具有安全、可靠、效率高、操作简便等优点。

Description

非接触式高压核相器 技术领域本实用新型涉及一种高压线路相序校准核定技术。 背景技术每当新发电厂并网前、新变电站投产前、输变电工程扩建改造 后或主设备大修后,常常需要在竣工投运现场进行核相试验,即需要校核待并 网的两线路中的对应相是否同相一一相序校准核定。传统相位核定的方法有直 接核定法和间接核定法:
直接核定法:在运行电压下,使用二根电阻值相同的高绝缘、高阻值的核
相棒直接接触待核定的二相高压线,将被测高压降压后引入核相装置,读取连 接两个核相棒的微安表电流数值,根据广义交流电桥的原理,从而判断出待测
的二根高压线是否同相。这种方法主要存在两个弊端:1)核相时,人与电网通 过核相器形成电气连接,安全隐患极大;2)核相时,两相线路通过核相器连接, 有相间短路的危险。
间接核定法:在现场不具备直接核相条件时,利用连接在两个高压导线上 的同型号的电压互感器,通过电压互感器二次侧进行间接核定。这种方法,需 要多次调整系统一次接线,多次操作输变电设备,不仅麻烦,而且易出差错; 另外,电压互感器与系统电容可能发生铁磁谐振,引起过电压而损坏设备,造 成人身与系统事故;另外,采用该方法,需要多个部门配合,工作流程长,效率低。
实用新型内容本实用新型的目的在于,解决传统核相方法和装置存在的 不足,设计一种安全、可靠、效率高、操作简便的新型核相器一一非接触式高 压核相器。
本实用新型是这样实现的:主要由主机和从机两个组件构成,主、从机均有非接触式电压传感器、无线通信模块、GPS模块和相位测量电路。非接触式 电压传感器在高压线路的电磁场下感应产生电压差,结合GPS模块的时间基准, 提供被测高压线路的初相位信号;无线通信模块,用于主、从机之间的射频无 线通信;相位测量电路,进行两被测高压线路的相位差测量,得出是否同相的 判断。
使用本实用新型核相时,操作人员不必接触被测高压线路,只需在两条 被测高压线路的正下方,分别手持主机、从机。当主机和从机的无线通信建立 之后,首先将采集的高压线路电压信号进行处理,经过调制后再发送给对方。 主、从机各自将接收到的对方发来的电网电压信号解调后,与本机采集到的电 网电压信号进行实时比较,即可测出其相位差值。按照核相判定准则,相位差 值小于IO。为同相,相位差值大于30。为不同相。
'本实用新型克服了传统相位核定装置存在的缺点,更加安全、可靠、效率 高、操作简便。
附图说明
附图1.本实用新型的工作状态示意图; 附图2.单机的电路原理方框图; 附图3.相位测量的计算原理图。
具体实施方式 下面结合附图叙述一个本实用新型的实施例 图l显示了本实施例的工作状态。图中,A、 B、 C和A,、 B,、 C,分别表 示两条被测高压线路一一线路I和线路II各自的三相;两个操作人员位于两条 被测之高压线路I和线路II的正下方,分别手持主机、从机,以获得被测线路 的同频电压信号。
图2显示电路结构原理。主机、从机均含由非接触电压传感器l、无线通信模块2、 GPS模块3和相位测量电路4构成。
其中,非接触式电压传感器1是一个特制的铜质平板金属体,用来感应高 压导线上的电压。在感应电极上产生微弱的和被测高压线路同频同相的电压信 号,主机得到线路I的电压信号,从机得到线路II的电压信号,并送入各自的 相位测量电路进行处理。
从机的无线通信模块2将经过处理的线路II的电压信号发送给主机,主机的 无线通信模块2接收该信号。
GPS模块3提供相位测量的时间基准。
从机的相位测量电路4获得的线路II的工频正弦波电压信号,按信号的过零 点转换成同样频率的方波,处理后通过无线通信模块2发送给主机。主机的相
位测量电路4处理主机获得的线路i的电压信号,并将接收到的、经过处:a的从
机的同时刻电压信号进行比较,得到二者的相位差。按照核相判定准则,相位 差值小于IO。为同相,相位差值大于30'。为不同相。 图3系以图形方式表示的相位差计算原理。
由于相位实际是一个时域量,因此同频率的2个方波信号l、 Tl,其相
位差(p等于ll的上升沿(或下降沿)时间减去I的上升沿(或下降沿)的时 间差At,除以该频率信号的周期T,再乘以360度,相位差的计算公式为:
r
在相位差的计算中,I、 II两路信号必须有同一个参考时基。在高压核 相时,从机获得的信号需要调制后通过无线方式传送给主机,必然存在时
间的延迟,因此可以在主机和从机上各配置一各GPS,利用GPS的标准 秒脉冲来为主、从机提供统一的参考时基。

Claims (2)

1. 非接触式高压核相器,其特征在于:由主机和从机两个组件构成,主、从机均有非接触式电压传感器(1)、无线通信模块(2)、GPS模块(3)和相位测量电路(4),非接触式电压传感器(1)在高压线路的电磁场下感应产生电压差,结合GPS模块(3)的时间基准,提供被测高压线路的初相位信号;无线通信模块(2)用于主、从机之间的射频无线通信;相位测量电路(4)进行两被测高压线路的相位差测量,得出是否同相的判断。
2. 根据权利要求l所述非接触式高压核相器,其特征在于:所说的非接触式 电压传感器(l)是一个铜质平板金属体。
CNU2008200299475U 2008-08-14 2008-08-14 非接触式高压核相器 CN201242570Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200299475U CN201242570Y (zh) 2008-08-14 2008-08-14 非接触式高压核相器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200299475U CN201242570Y (zh) 2008-08-14 2008-08-14 非接触式高压核相器

Publications (1)

Publication Number Publication Date
CN201242570Y true CN201242570Y (zh) 2009-05-20

Family

ID=40715861

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200299475U CN201242570Y (zh) 2008-08-14 2008-08-14 非接触式高压核相器

Country Status (1)

Country Link
CN (1) CN201242570Y (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893662A (zh) * 2010-07-23 2010-11-24 江苏省电力公司常州供电公司 数字变电站的核相方法
CN102577058A (zh) * 2009-08-10 2012-07-11 艾默生环境优化技术有限公司 用于功率因数校正频率跟踪和参考产生的系统和方法
CN103063934A (zh) * 2012-12-31 2013-04-24 国家电网公司 一种三相电压鉴相方法
CN103604992A (zh) * 2013-11-28 2014-02-26 国家电网公司 变电站二次回路无线核相带负荷校保护的方法及系统
US9088232B2 (en) 2009-08-10 2015-07-21 Emerson Climate Technologies, Inc. Power factor correction with variable bus voltage
CN104880615A (zh) * 2015-05-19 2015-09-02 苏州市华安普电力工程有限公司 一种高压核相器
US9154061B2 (en) 2009-08-10 2015-10-06 Emerson Climate Technologies, Inc. Controller and method for transitioning between control angles
US9240749B2 (en) 2012-08-10 2016-01-19 Emerson Climate Technologies, Inc. Motor drive control using pulse-width modulation pulse skipping
CN105785143A (zh) * 2016-04-22 2016-07-20 国家电网公司 一种低压线路在线核相装置及其核相方法
US9634593B2 (en) 2012-04-26 2017-04-25 Emerson Climate Technologies, Inc. System and method for permanent magnet motor control
CN110333399A (zh) * 2019-08-21 2019-10-15 广东电网有限责任公司 一种配网低压用户负荷查相方法

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9912263B2 (en) 2009-08-10 2018-03-06 Emerson Climate Technologies, Inc. Controller and method for transitioning between control angles
CN102577058A (zh) * 2009-08-10 2012-07-11 艾默生环境优化技术有限公司 用于功率因数校正频率跟踪和参考产生的系统和方法
US9705433B2 (en) 2009-08-10 2017-07-11 Emerson Climate Technologies, Inc. Controller and method for transitioning between control angles
US9154061B2 (en) 2009-08-10 2015-10-06 Emerson Climate Technologies, Inc. Controller and method for transitioning between control angles
CN102577058B (zh) * 2009-08-10 2015-09-02 艾默生环境优化技术有限公司 用于功率因数校正频率跟踪和参考产生的系统和方法
US9088232B2 (en) 2009-08-10 2015-07-21 Emerson Climate Technologies, Inc. Power factor correction with variable bus voltage
US9564846B2 (en) 2009-08-10 2017-02-07 Emerson Climate Technologies, Inc. Power factor correction with variable bus voltage
CN101893662B (zh) * 2010-07-23 2013-08-07 江苏省电力公司常州供电公司 数字变电站的核相方法
CN101893662A (zh) * 2010-07-23 2010-11-24 江苏省电力公司常州供电公司 数字变电站的核相方法
US9991834B2 (en) 2012-04-26 2018-06-05 Emerson Climate Technologies, Inc. System and method for permanent magnet motor control
US10075116B2 (en) 2012-04-26 2018-09-11 Emerson Climate Technologies, Inc. System and method for permanent magnet motor control
US9634593B2 (en) 2012-04-26 2017-04-25 Emerson Climate Technologies, Inc. System and method for permanent magnet motor control
US9853588B2 (en) 2012-08-10 2017-12-26 Emerson Climate Technologies, Inc. Motor drive control using pulse-width modulation pulse skipping
US9240749B2 (en) 2012-08-10 2016-01-19 Emerson Climate Technologies, Inc. Motor drive control using pulse-width modulation pulse skipping
CN103063934B (zh) * 2012-12-31 2017-02-08 国家电网公司 一种三相电压鉴相方法
CN103063934A (zh) * 2012-12-31 2013-04-24 国家电网公司 一种三相电压鉴相方法
CN103604992B (zh) * 2013-11-28 2015-11-04 国家电网公司 变电站二次回路无线核相带负荷校保护的方法及系统
CN103604992A (zh) * 2013-11-28 2014-02-26 国家电网公司 变电站二次回路无线核相带负荷校保护的方法及系统
CN104880615A (zh) * 2015-05-19 2015-09-02 苏州市华安普电力工程有限公司 一种高压核相器
CN105785143A (zh) * 2016-04-22 2016-07-20 国家电网公司 一种低压线路在线核相装置及其核相方法
CN110333399A (zh) * 2019-08-21 2019-10-15 广东电网有限责任公司 一种配网低压用户负荷查相方法

Similar Documents

Publication Publication Date Title
CN103293443B (zh) 一种配网架空线路接地故障定位方法
CN202057784U (zh) 一种电能表的在线检定与数字化在线监测系统
CN102944804B (zh) 一种架空线路故障检测系统
CN103454491B (zh) 智能电表及电能质量检测方法
CN101833051A (zh) 氧化锌避雷器带电测试仪
Muscas et al. Smart electric energy measurements in power distribution grids
CN202758062U (zh) 一种数字化变电站电能计量装置整体计量误差检测系统
CN100557731C (zh) 一种具有防窃电功能的电子式互感器
CN103472432B (zh) 智能变电站电能计量二次回路实负荷误差检测装置及方法
CN101266263B (zh) 电力计量监督系统及监督方法
CN103149546B (zh) 一种便携式电能计量终端现场综合校验仪
CN201438201U (zh) 电压互感器二次回路压降同步检测装置
CN103472433B (zh) 智能变电站电能计量二次系统虚负荷误差检测装置及方法
CN102680798B (zh) 杆塔接地电阻在线测量方法与装置
CN202486218U (zh) 一种高压线路的无线核相装置
CN102221660B (zh) 小电流接地故障在线定位装置
CN102279311A (zh) 配电变压器中线电流在线检测与总损耗确定方法
CN103777104B (zh) 数字化变电站二次信号传输系统延时特性测试装置及方法
KR20140046788A (ko) 스마트그리드 교육용 실습장치
CN102305922B (zh) 智能变电站光纤式电能表带负荷检测方法及装置
CN105974247B (zh) 导电滑环的测试系统及方法
Artale et al. Medium voltage smart grid: Experimental analysis of secondary substation narrow band power line communication
CN102073029A (zh) 电子式互感器测试系统及测试方法
CN104092738A (zh) 一种基于无线互联网的远程核相系统及方法
CN203534622U (zh) 配电变压器状态检修平台的参数采集系统

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090520

Termination date: 20130814